NEW CHILLER INSTALLATION
Risk Assessment No. :
Project no:
HYDROSTATIC TEST Method Statement Title : Hydro test
Signature of Assessor: 1
Method Statement No. :
NEW CHILLER INSTALLATION
Risk Assessment No. :
Project no:
HYDROSTATIC TEST Method Statement Title : Hydro test
Carry out Failure if the blind 6 1 6 Ensure that 2 gauges will be used for pressure testing. 1 1 1
Hydrostatic Mal function of the pressure gauges Ensure that both gauges are calibrated and certified by 3 rd party.
testing Failure of bolts Proper bolts shall be used of specified standard.
Improper torque Ensure proper torque for fastening the bolts.
Signature of Assessor: 2
Method Statement No. :
NEW CHILLER INSTALLATION
Risk Assessment No. :
Project no:
HYDROSTATIC TEST Method Statement Title : Hydro test
During holding Mal function of the pressure gauges 6 4 24 During holding pressure keep away from the danger zone. 2 1 2
time of Failure of bolts Area to be barricaded.
pressure Improper torque Display signs indicating hazards of hydro
Failure of blind Test.
Follow the test package procedure.
Failure of pipe/gasket /foundation Only experience person to carry out hydrostatic test.
Releasing Sudden release of pressure Provide addition support foundation.
pressure
Hammer effect Proper drain shall be provided .
Proper housekeeping.
Draining of
Electrocution
water
Slip/trip/fall
Water coming in contact with
welding generator / electric
equipment
Signature of Assessor: 3
Method Statement No. :
NEW CHILLER INSTALLATION
Risk Assessment No. :
Project no:
HYDROSTATIC TEST Method Statement Title : Hydro test
General Notes:
1. All staff and workers to wear the required Personal Protective Equipment while in the Working Site.
2. All major works must be covered by a Permit to Work System and all necessary attachment prior to commencement of works,
as per requirements in our HSE Plan for Construction.
3. All the Engineer’s and Supervisor’s in charge must be implemented all the safety requirements and safe working procedure on
this operation.
4. Safety officer to monitor the safe working procedures and the necessary compliance to all the safety requirements.
5. All hazards identified in this RISK ASSESMENT must be properly coordinated with all personnel involved in the activities
through Toolbox Talks, and Construction Managers, Supervisors and Foremen to ensure full implementation of all
recommended measures.
6. In case of any Emergency follow our emergency evacuation procedure.
Signature of Assessor: 4