You are on page 1of 7

PARQUE INDUSTRIAL LA PAZ

ESTACION DE TRANF. - ADMINISTRACION


Date: 25-11-2010

The nominal values shown in this report are the result of precision calculations, based upon precisely positioned luminaires in a fixed relationship
to each other and to the area under examination. In practice the values may vary due to tolerances on luminaires, luminaire positioning, reflection
properties and electrical supply.

CalcuLuX Indoor 4.5b


PARQUE INDUSTRIAL LA PAZ
ESTACION DE TRANF. - ADMINISTRACION Date: 25-11-2010

Table of Contents

1. Summary 3

1.1 Room Summary 3


1.2 Project Luminaires 3
1.3 Calculation Results 3

2. Calculation Results 4

2.1 Grid: Textual Table 4


2.2 Grid: Iso Contour 5

3. Luminaire Details 6

3.1 Project Luminaires 6

4. Installation Data 7

4.1 Legends 7
4.2 Luminaire Positioning and Orientation 7

CalcuLuX Indoor 4.5b Philips Lighting B.V. Page: 2/7


PARQUE INDUSTRIAL LA PAZ
ESTACION DE TRANF. - ADMINISTRACION Date: 25-11-2010

1. Summary

1.1 Room Summary

Room Dimensions Surface Reflectance


Width 2.22 m Ceiling 0.70
Length 2.57 m Left Wall 0.50
Height 2.93 m Right Wall 0.50
Working Plane Height 0.80 m Front Wall 0.50
Back Wall 0.50
Floor 0.10
Room Position (Front Bottom Left)
X 0.00 m
Y 0.00 m
Total Average Room Surface Luminance (cd/m2):
Ceiling Left Right Front Back Floor
17.1 29.5 29.5 27.0 26.8 7.7

Unified Glare Rating (CIE): 15


The overall maintenance factor used for this project is 1.00.

1.2 Project Luminaires

Code Qty Luminaire Type Lamp Type Power (W) Flux (lm)
A 1 TBS133/236 M2 2 * TL-D36W 72.0 2 * 3200

The total installed power: 0.07 (kWatt)

Number of Luminaires Per Arrangement:


Luminaire
Arrangement Code Power (kWatt)
A
Room Block 1 0.07

1.3 Calculation Results

(Il)luminance Calculations:
Calculation Type Unit Ave Min/Ave Min/Max Result
Grid Surface Illuminance lux 355 0.72 0.60 Total

CalcuLuX Indoor 4.5b Philips Lighting B.V. Page: 3/7


PARQUE INDUSTRIAL LA PAZ
ESTACION DE TRANF. - ADMINISTRACION Date: 25-11-2010

2. Calculation Results

2.1 Grid: Textual Table

Grid : Grid at Z = 0.80 m


Calculation : Surface Illuminance (lux)
Result Type : Total

X (m) 0.09 0.28 0.46 0.65 0.83 1.02 1.20 1.39 1.57 1.76 1.94 2.13
Y (m)
2.46 257< 281 305 328 344 351 351 344 328 305 281 257<
2.25 277 306 334 359 377 385 385 377 359 334 306 277
2.03 291 322 352 378 398 407 407 398 378 352 322 291
1.82 300 332 362 390 410 419 419 410 390 362 332 300
1.61 303 336 367 395 416 425 425 416 395 367 336 303
1.39 304 337 369 397 418 427 427 418 397 369 337 304
1.18 304 337 369 397 418 427> 427> 418 397 369 337 304
0.96 303 336 368 396 416 425 425 416 396 368 336 303
0.75 300 332 363 390 410 419 419 410 390 363 332 300
0.54 292 323 353 379 399 408 408 399 379 353 323 292
0.32 278 307 335 360 378 387 387 378 360 335 307 278
0.11 258 283 307 330 346 353 353 346 330 307 283 258

Average Min/Ave Min/Max Project maintenance factor


355 0.72 0.60 1.00

CalcuLuX Indoor 4.5b Philips Lighting B.V. Page: 4/7


PARQUE INDUSTRIAL LA PAZ
ESTACION DE TRANF. - ADMINISTRACION Date: 25-11-2010

2.2 Grid: Iso Contour

Grid : Grid at Z = 0.80 m


Calculation : Surface Illuminance (lux)
Result Type : Total
3.2
2.7

0
30 350

25
5

3
27

375

27
2.2

5
32
5

300
1.7

400
425
Y(m)

A
1.2

400
375
350

350
0.7

300

32

5
37
5
27
5

5
0.2

27

32

0
30
-0.3
-0.8

-1 -0.5 0 0.5 1 1.5 2 2.5 3


X(m)

A TBS133/236 M2

Average Min/Ave Min/Max Project maintenance factor Scale


355 0.72 0.60 1.00 1:25

CalcuLuX Indoor 4.5b Philips Lighting B.V. Page: 5/7


PARQUE INDUSTRIAL LA PAZ
ESTACION DE TRANF. - ADMINISTRACION Date: 25-11-2010

3. Luminaire Details

3.1 Project Luminaires

TBS133/236 M2 2 x TL-D36W / 830 Luminous Intensity Diagram (candela/1000 lumen)


120o 150o 180o 150o 120o
Light output ratios
DLOR : 0.60
ULOR : 0.00
TLOR : 0.60
Ballast : Electronic 90o 90o
Lamp flux : 3200 lm
Luminaire wattage : 72.0 W
Measurement code : LVN7043200
60o 60o

200

30o 0o 30o
C = 180o Imax C = 0o
C = 270o C = 90o

CalcuLuX Indoor 4.5b Philips Lighting B.V. Page: 6/7


PARQUE INDUSTRIAL LA PAZ
ESTACION DE TRANF. - ADMINISTRACION Date: 25-11-2010

4. Installation Data

4.1 Legends

Project Luminaires:
Code Qty Luminaire Type Lamp Type Flux (lm)
A 1 TBS133/236 M2 2 * TL-D36W 2 * 3200

4.2 Luminaire Positioning and Orientation

Qty and Position Aiming Angles


Code
X (m) Y (m) Z (m) Rot. Tilt90 Tilt0
1*A 1.11 1.28 2.93 0.00 0.00 0.00

CalcuLuX Indoor 4.5b Philips Lighting B.V. Page: 7/7

You might also like