Professional Documents
Culture Documents
upm in 2 lines
B POWER
1 Operating Load ( In KW ) 39 39
Power Reqd. per day (KWH)
2 ( Load X 22.5 hrs X 75% )
658.13 658.13
C WASTAGE
1 Rejection % 0.5 0.50
2 Quantity of rejection (in Lakhs) 5.5 5.5
Landed Cost of material (per Lakh pcs in
3 Lakhs)
1.8 1.8
4 Total cost towards rejection 9.8 9.8
Net Saving in minimizing Rejection (Rs. In
Lacs)
9.83 9.83
P
SAVING A
C
M
### A
### C
###
###
###
2.26 ###
###
###
###
###
2.13 ###
###
0.00 ###
###
4.39 ###
###