Professional Documents
Culture Documents
7.1 Excavate manually soft materials for structure M3 90.00 1,000.00 90,000.00
7.2 provide and place rockfill to sides of structure M3 90.00 2,000.00 180,000.00
SUMMARY SHEET
Project:
Bill
Description Amount KSHS
No.
1 PRELIMINARY AND GENERAL ITEMS 245,000.00