You are on page 1of 2

Ballast Water Treatment System

HiBallast / Technical Information

Date 2021.03.18 Prepared by Checked by Approved by

Doc. No HWC-TSM-17
H.S.PARK J.W.YU S.H.LEE
Rev. 1.0

• FRD check method(Fast Recovery Diode)

1. Caution
(1) Turn off the Main Power prior to maintenance.
(2) Remember the correct position of the cables.
(3) Measure the diode value with a multimeter.

2. Maintenance method
Picture Description

1. Take the module you want to check forward


as follows
Remove the fixing screw on the back of the
module.
Remove the input/output cable and MS-
Connector(2) from the front of the module.

FRD location

2. Remove module protection cover


1) Left FRD
3.Remove the cable from the diode.
4. Place the tester mode on the diode
and measure both sides of the left diode.
(1) (2)
Left FRD Value(DC V) Remark
(1):Red (2):Black 0.36
(1):Black (2):Red OL

(1) (2)

2) Right FRD 4. measure both sides of the left diode.


* The right and left diodes are installed
differently.

(1) (2) Right FRD Value(DC V) Remark


(1):Black (2):Red 0.36
(1):Red (2):Black OL

(1) (2)

This publication or any part there of may not be reproduced or transmitted by any process or means without
prior written permission of Machinery Division, Hyundai Welding Company.

You might also like