You are on page 1of 4

June

MONTUE Wed Thu Fri Sat Sun Mon Tue


8 9 10 11 12 13 14 15 16
Install load bank
need load bank
#1 First Ignision
#2
#1 Cool down
#2
#1 Boiler Wash
#2
#1 Piping flushing
#2
#1 Control valve install
#2
#1 GTG DLE adjustment(including commisioning)
#2
#1 Duct Burner adjustment
#2
#1 Safety Valve test
#2
#1 Boiler Performance test
#2
#1
#2
#1
#2
#1
#2
#1
#2
July
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5
Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
6 7 8 9 10 11 12 13 14 15
KOACGS HOT COMMISSIONING SCHEDULE 19th Jun 2020

June July
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Expected gas consumption (m3) 1,200 12,162 10,525 10,525 10,525 16,382 5,857 9,335 1,200 12,162 10,525 10,525 10,525 16,382 5,857 9,335

Delivery load bank


Install load bank
need load bank
Remove load bank

Milestone
First Ignition Performance Test First Ignition Performance Test
Gas compressor
#1 Pre inspection (Installation condition)
#2
#1 Pressure test, Oil filling, alighnment
#2
#1 Internal signals check and founction test
#2
#1 Nitrogen substitute
#2
#1 Fuel gas substitute
#2
#1 Compressor on bypass operation 1 1 1
#2 2 2 2
#1 GT start / stop tracking confirmation 1 1 1
#2 2 2 2
#1 Interlock check (real signal) 1 1
#2 2 2 2
#1 Load test 1 1 1 1 1 1 1
#2 2 2 2 2 2 2 2 2
GTG + HRSG
#1 First Ignition 1
#2 2
#1 Cool down 1 1
#2 2 2
#1 Boiler Wash 1
#2 2
#1 Piping flushing
#2 By steam of once through boiler
#1 Control valve install 1 1 1 1 1
#2 2 2 2 2 2
#1 AVR adjustment 1
#2 2
#1 Facing test 1
#2 2
#1 Synchronizing with grid 1
#2 2
#1 GTG DLE adjustment(including load reject test) 1 1 1 1
#2 2 2 2 2
#1 Duct Burner adjustment 1 1
#2 2 2
#1 Safety Valve test 1
#2 2
#1 GTG load running test 1
#2 2
#1 Boiler Performance test 1
#2 2
#1 Noize test 1
#2 2
#1 Vibration test 1
#2 2
#1 Emission control test 1
#2 2
#1 Island mode & back-synchronizing(52s1) 1
#2 2

You might also like