00200-1 BID PROPOSAL

PAHOKEE HOUSING AUTHORITY BID PROPOSAL McCLURE VILLAGE

All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line item. If the line
item does not appear to be balanced, the bid can be determined not responsible and can be rejected.

McCLURE VILLAGE ASPHALT OVERLAY + PARKING SPACE EXTENSIONS PROJECT CFP FL14PO21501-19/21
The Owner has the right to reject or deduct any portion or line item of any bid.

Description Line Item Cost

1a Parking Space Extensions and Overlays


(Includes base, grading, asphalt, striping, wheel stops, painting, landscape $_______________________.00
repair and watering)

1b Excavation and Disposal of Arsenic Soil associated with Line item 1a $_______________________.00

1c Restriping all parking space lines at 30 day mark for Line Item 1a $_______________________.00

2a Barrett Court Overlay


(Includes full scope of work at Barrett Court including Landscape repair if $_______________________.00
needed)

2b Restriping all parking space lines at 30 day mark for Line Item 2a $_______________________.00

3 Asphalt Overlay and Edge Repair for Eisenhower Drive and Jefferson Ave $_______________________.00

4a New Concrete Sidewalks as shown on plan $_______________________.00

4b Excavation and Disposal of Arsenic Soil associated with Line item 4a $_______________________.00

5 Update existing survey to become an As-Built Survey of new site changes $_______________________.00

6 New Perimeter Flush Concrete Curbs at Eisenhower Asphalt / Sod Edges $_______________________.00
(Per Addendum #1)
7 New Perimeter Flush Concrete Curbs at Jefferson Ave Asphalt / Sod Edges $_______________________.00
(Per Addendum #1)
8a New Maintenance Building / Foundation / Driveway / Engineering $_______________________.00
(Per Addendum #1) (Per Addendum #2 for 1 Tree relocation)
8b New Fence at Maintenance Shed $_______________________.00
(Per Addendum #1)
8c New Landscape at Maintenance Shed $_______________________.00
(Per Addendum #1)

00200-2 BID PROPOSAL


100 McClure Village Asphalt Overlay + Parking Space Extensions Sub-Total:
w/ Addendum #1 line items $_______________________.00

PAHOKEE HOUSING AUTHORITY BID PROPOSAL PADGETT ISLAND HOMES

All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.

PADGETT ISLAND ASPHALT OVERLAY PROJECT CFP FL14PO21501-19/21


The Owner has the right to reject or deduct any portion or line item of any bid.

Description Line Item Cost

10a Parking Space Overlays at Site Area #1 $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

10b Restriping all parking space lines at 30 day mark for Line Item 10a $_______________________.00

11a Parking Space Overlays at Site Area #2 $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

11b Restriping all parking space lines at 30 day mark for Line Item 11a $_______________________.00

12a Parking Space Overlays at Residential Units at Site Area #3 $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

12b Restriping all parking space lines at 30 day mark for Line Item 12a $_______________________.00

13a Parking Space Overlays at Site Area #4 $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

13b Restriping all parking space lines at 30 day mark for Line Item 13a $_______________________.00

14a Parking Space Overlays at Site Area #5 $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering) [Includes Add#1 extension]

14b Restriping all parking space lines at 30 day mark for Line Item 14a $_______________________.00

00200-3 BID PROPOSAL


15a Parking Space Overlays at Site Area #6 $_______________________.00
(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

15b Restriping all parking space lines at 30 day mark for Line Item 15a $_______________________.00

16a Parking Space Overlays at Site Area #6 $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

16b Restriping all parking space lines at 30 day mark for Line Item 16a $_______________________.00

17a Parking Space Overlay at Aministration Building Parking Lot $_______________________.00


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

17b Restriping all parking space lines at 30 day mark for Line Item 17a $_______________________.00

18 New Yard Fence and Remote Slide Gate and Pedestrian Gate at Amin Lot $_______________________.00

(Includes full scope of work for all fencing and gates including, landscaping
scope, electrical scope, remote equipment operator scope) + (addendum #1
modifications)

19a Basketball Court Mill and Overlay and Striping $_______________________.00


(Per Addendum #1)

19b Restriping all basketball court lines at 30 day mark for Line Item 19a $_______________________.00

19c Awning Structure


(Per Addendum #1) $_______________________.00

(Includes full scope of work for all foundation and pole engineering and Signed
and Sealed Shop Drawings, and Materials and Installation)

200 Padgett Island Asphalt Overlays and Fencing Sub-Total:


w/ Addendum #1 line items $_______________________.00

00200-4 BID PROPOSAL


PAHOKEE HOUSING AUTHORITY BID PROPOSAL FREMD VILLAGE

All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.

FREMD VILLAGE ASPHALT OVERLAY PROJECT CFP FL14PO21501-19/21


The Owner has the right to reject or deduct any portion or line item of any bid.

Description Line Item Cost

20a Parking Space Overlays at SHIRLEY DRIVE Residential Units (ZONES 6-24) $_______________________.00

20b Restriping all parking space lines at 30 day mark for Line Item 20a $_______________________.00

21a Parking Space Overlay at SALVATORE CT. $_______________________.00

21b Restriping all parking space lines at 30 day mark for Line Item 21a $_______________________.00

22a Parking Space Overlay at POPE CT. $_______________________.00

22b Restriping all parking space lines at 30 day mark for Line Item 22a $_______________________.00

23a Parking Space Overlay at HOLMAN CT. $_______________________.00

23b Restriping all parking space lines at 30 day mark for Line Item 23a $_______________________.00

24a Parking Space Overlay at DOBROW CT. $_______________________.00

24b Restriping all parking space lines at 30 day mark for Line Item 24a $_______________________.00

25a Parking Space Overlay at CHAMBERLAIN CT. $_______________________.00

25b Restriping all parking space lines at 30 day mark for Line Item 25a $_______________________.00

26a Parking Space Overlay at APELGREN CT. $_______________________.00

26b Restriping all parking space lines at 30 day mark for Line Item 26a $_______________________.00

27 Parking Space Overlay at MAINTENANCE ROAD $_______________________.00

00200-5 BID PROPOSAL


28a Parking Space Overlays at MAINTENANCE BUILDING $_______________________.00

28b Restriping all parking space lines at 30 day mark for Line Item 28a $_______________________.00

NOTE: ALL line items above Include base as necessary, grading, asphalt,
striping, wheel stops, painting, landscape repair and watering.

29a Remote Slide Gate at MAINTENANCE BUILDING ENTRANCE


(Includes full scope of work for all fencing work and gate including, landscaping $_______________________.00
scope, electrical scope, remote equipment operator)

29b Awning Structure #1 at MAINTENANCE BUILDING PARKING LOT $_______________________.00


(Per Addendum #1)
(Includes full scope of work for all foundation and pole engineering and Signed and
Sealed Shop Drawings, and Materials and Installation)

29c Awning Structure #2 at MAINTENANCE BUILDING PARKING LOT $_______________________.00


(Per Addendum #1)
(Includes full scope of work for all foundation and pole engineering and Signed and
Sealed Shop Drawings, and Materials and Installation)

300 Fremd Village Asphalt Overlays and Gate Sub-Total:


w/ Addendum #1 line items $_______________________.00

00200-6 BID PROPOSAL


PAHOKEE HOUSING AUTHORITY BID PROPOSAL MAIN OFFICE GATE

All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.

MAIN OFFICE GATE PROJECT CFP FL14PO21501-19/21


The Owner has the right to reject or deduct any portion or line item of any bid.

Description Line Item Cost

30 Remote Slide Gate at PHA MAIN OFFICE (465 Friend Terrace) $_______________________.00
(Includes full scope of work for all fencing work and gate including, landscaping
scope, electrical scope, remote equipment operator)

31 Repair of Left Side Chainlink Gate Swing Arm at PHA MAIN OFFICE $_______________________.00
(Per Addendum #2)

400 PHA MAIN OFFICE GATE Sub-Total: $_______________________.00

PAHOKEE HOUSING AUTHORITY BID PROPOSAL McCLURE VILLAGE TREE LANDSCAPING

All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.

addendum #2 McCLURE VILLAGE TREE LANDSCAPING SCOPE PROJECT CFP FL14PO21501-19/21


The Owner has the right to reject or deduct any portion or line item of any bid.

Description Line Item Cost

40a Tree supply and install per Addendum #2 scope of work $_______________________.00
(Per Addendum #2)
40b Excavation and Disposal of Arsenic Soil associated with Line item 40a $_______________________.00

00200-7 BID PROPOSAL


(Per Addendum #2)
41 Tree watering per Watering Instructions on sheet L7.0 $_______________________.00
(Per Addendum #2)

500 McCLURE VILLAGE LANDSCAPING SCOPE Sub-Total: $_______________________.00

PAHOKEE HOUSING AUTHORITY BID PROPOSAL TOTALS

All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.

MAIN OFFICE GATE PROJECT CFP FL14PO21501-19/21


The Owner has the right to reject or deduct any portion or line item of any bid.

Description Line Item Cost

100 McClure Village Asphalt Overlay + Parking Space Extensions Sub-Total: $_______________________.00
w/ Addendum #1 line items
200 Padgett Island Asphalt Overlays and Fencing Sub-Total: $_______________________.00
w/ Addendum #1 line items
300 Fremd Village Asphalt Overlays and Gate Sub-Total: $_______________________.00
w/ Addendum #1 line items
400 PHA MAIN OFFICE GATE Sub-Total: $_______________________.00
w/ Addendum #2 GATE REPAIR
500 McClure Village Landscape Trees (per Add#2): $_______________________.00
w/ Addendum #2 ADDED TREES
600 Line Item place holder

700 Line Item place holder

800 Line Item place holder

900 PERMIT ALLOWANCE OF 2.5% OF THE SUBTOTAL OF LINE ITEMS 100 - 500:
$_______________________.00

PROJECT GROSS TOTAL:


1000
(100+200+300+400+500+900) $_______________________.00

00200-8 BID PROPOSAL


ITEM DESCRIPTION TAKEOFFS QTY

30 Remote Slide Gate at PHA MAIN OFFICE (465 Friend Terrace)


(Includes full scope of work for all fencing work and gate including, landscaping
scope, electrical scope, remote equipment operator)
LUMP SUM 1 1

31 Repair of Left Side Chainlink Gate Swing Arm at PHA MAIN OFFICE
(Per Addendum #2)
LUMP SUM 1 1

900 PERMIT ALLOWANCE OF 2.5% OF THE SUBTOTAL OF LINE ITEMS 100 - 500:
UNIT MATERIAL EQUIPMENT LABOR RATE COST

EA

EA
REMARK
ITEM DESCRIPTION TAKEOFFS

10a Parking Space Overlays at Site Area #1


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

EXISTING SURFACE 4,374.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

10b Restriping all parking space lines at 30 day mark for Line Item 10a

ALL COMBINED QUANTITIES 177

11a Parking Space Overlays at Site Area #2


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

EXISTING SURFACE 20,167.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

11b Restriping all parking space lines at 30 day mark for Line Item 11a

ALL COMBINED QUANTITIES 830.46

12a Parking Space Overlays at Residential Units at Site Area #3


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

EXISTING SURFACE 13,902.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

12b Restriping all parking space lines at 30 day mark for Line Item 12a

ALL COMBINED QUANTITIES 577.26


13a Parking
(IncludesSpace
base Overlays at Site
as necessary, Area #4
grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

EXISTING SURFACE 12,092.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

13b Restriping all parking space lines at 30 day mark for Line Item 13a

ALL COMBINED QUANTITIES 478.41

14a Parking Space Overlays at Site Area #5


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering) [Includes Add#1 extension]

EXISTING SURFACE 5,904.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

14b Restriping all parking space lines at 30 day mark for Line Item 14a

ALL COMBINED QUANTITIES 569.97

15a Parking Space Overlays at Site Area #6


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

15b Restriping all parking space lines at 30 day mark for Line Item 15a

16a Parking Space Overlays at Site Area #6


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

16b Restriping all parking space lines at 30 day mark for Line Item 16a

17a Parking Space Overlay at Aministration Building Parking Lot


(Includes base as necessary, grading, asphalt, striping, wheel stops, painting,
landscape repair and watering)

EXISTING SURFACE 7,819.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

17b Restriping all parking space lines at 30 day mark for Line Item 17a

ALL COMBINED QUANTITIES 569.97

18 New Yard Fence and Remote Slide Gate and Pedestrian Gate at Amin Lot

(Includes full scope of work for all fencing and gates including, landscaping scope,
electrical scope, remote equipment operator scope) + (addendum #1
modifications)

19a Basketball Court Mill and Overlay and Striping


(Per Addendum #1)

19b Restriping all basketball court lines at 30 day mark for Line Item 19a

19c Awning Structure


(Per Addendum #1)
(Includes full scope of work for all foundation and pole engineering and Signed
and Sealed Shop Drawings, and Materials and Installation)
QTY UNIT MATERIAL EQUIPMENT LABOR RATE

4,374.00 SQFT
4,374.00 SQFT
4,374.00 SQFT
4,374.00 SQFT

177 LFT

20,167.00 SQFT
20,167.00 SQFT
20,167.00 SQFT
20,167.00 SQFT

830.46 LFT

13,902.00 SQFT
13,902.00 SQFT
13,902.00 SQFT
13,902.00 SQFT

577.26 LFT
12,092.00 SQFT
12,092.00 SQFT
12,092.00 SQFT
12,092.00 SQFT

478.41 LFT

5,904.00 SQFT
5,904.00 SQFT
5,904.00 SQFT
5,904.00 SQFT

569.97 LFT

7,819.00 SQFT
7,819.00 SQFT
7,819.00 SQFT
7,819.00 SQFT

569.97 LFT
COST REMARK
AREA NOT FOUND ON
PLANS
ITEM DESCRIPTION TAKEOFFS

1a Parking Space Extensions and Overlays


(Includes base, grading, asphalt, striping, wheel stops, painting, landscape repair
and watering)
Re-installation of all Existing wheel stops+paint
Relocate Plam tree
New Wheel stops+paint

Parking Space Overlays 34,089.40


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

Parking Space Extensions 16082.67

1b Excavation and Disposal of Arsenic Soil associated with Line item 1a

SAME QUANTITY FOR SOIL 16082.67

1c Restriping all parking space lines at 30 day mark for Line Item 1a

ALL COMBINED QUANTITIES 7,834.00

2a Barrett Court Overlay

(Includes full scope of work at Barrett Court including Landscape repair if needed)
Barrett Court Overlays 4,712.00
MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

2b Restriping all parking space lines at 30 day mark for Line Item 2a

ALL COMBINED QUANTITIES 550

3 Asphalt Overlay and Edge Repair for Eisenhower Drive and Jefferson Ave

EXISTING SURFACE 54,391.00


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

4a New Concrete Sidewalks as shown on plan

sidewalk on McClure 3289.03

4b Excavation and Disposal of Arsenic Soil associated with Line item 4a

SAME QUATITY FOR SOIL 3289.03

5 Update existing survey to become an As-Built Survey of new site changes

NA ???

6 New Perimeter Flush Concrete Curbs at Eisenhower Asphalt / Sod Edges


(Per Addendum #1)
New Perimeter Flush Concrete Curbs at Eisenhower Asphalt / Sod Edges 2,551.69

7 New Perimeter Flush Concrete Curbs at Jefferson Ave Asphalt / Sod Edges
(Per Addendum #1)
New Perimeter Flush Concrete Curbs at Jefferson Ave Asphalt / Sod Edges 1233.2
8a New Maintenance Building / Foundation / Driveway / Engineering
(Per Addendum #1) (Per Addendum #2 for 1 Tree relocation)

Tree to be relocate
MAINTANANCE BUILDING 300

8b New Fence at Maintenance Shed

(Per Addendum #1)


6' TALL COMMERCIAL GRADE BLACK CHAIN LINK FENCE 6" FROM INSIDE
EDGE OF CONCRETE SLAB 78

8c New Landscape at Maintenance Shed


(Per Addendum #1)

NEW #3-24" TALL AT PLANTING CALUSA HEDGES AREOUND MAINENANCE


FENCE.

ddendum #2 McCLURE VILLAGE TREE LANDSCAPING SCOPE

40a Tree supply and install per Addendum #2 scope of work


(Per Addendum #2)

SP SABAL PALMETTO SABAL PALM 216


CG CARYAGLABRA (PIGNUT HICKORY) 9
IC ILEXCASSINE (DAHOON HOLLY) 6

40b Excavation and Disposal of Arsenic Soil associated with Line item 40a
(Per Addendum #2)

LUMP SUMP 231

41 Tree watering per Watering Instructions on sheet L7.0


(Per Addendum #2)

15 DAYS WATERING ON PLANTED TREES 15


RATE
QTY UNIT MATERIAL EQUIPMENT LABOR RATE 17% profit and
overhead

1.17

30 EA $ 20.00 $ 20.00 $ 23.40


1 EA $ 150.00 $ 150.00 $ 175.50
3 EA 85 18 $ 12.00 $ 115.00 $ 134.55

34,089.40 SQFT $ - $ -
34,089.40 SQFT $ - $ -
34,089.40 SQFT $ - $ -
34,089.40 SQFT $ - $ -
$ - $ -
16082.67 SQFT $ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -

16082.67 SQFT $ - $ -

8,617.40 LF $ - $ -

4,712.00 SQFT
4,712.00 SQFT
4,712.00 SQFT
4,712.00 SQFT

550 LF

54,391.00 SQFT
54,391.00 SQFT
54,391.00 SQFT
54,391.00 SQFT

3289.03 SQFT

3289.03 SQFT

2,551.69 LFT
300 SQFT

78 LFT

216 EA
9 EA
6 EA

231 EA

15 DAYS
COST REMARK

$ 702.00 Addendum 5/b.


$ 175.50 Addendum 5/c.
$ 403.65 Addendum 5/d.

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -

$ -

$ -
PARKING AREA EXCLUDED

PARKING AREA EXCLUDED


as6.0
ITEM DESCRIPTION TAKEOFFS

20a Parking Space Overlays at SHIRLEY DRIVE Residential Units (ZONES 6-24)

Parking Space Overlays 26,003.71


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

Provide New Concrete Stop (For Broken Or Missing Concrete Stop) Include In
Base Bid Pricing And Not As A Unit Price 2.0

Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 84.0

20b Restriping all parking space lines at 30 day mark for Line Item 20a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 1,746.49

21a Parking Space Overlay at SALVATORE CT.

Parking Space Overlays 18,142.20


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 46.0

21b Restriping all parking space lines at 30 day mark for Line Item 21a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 926.10

22a Parking Space Overlay at POPE CT.

Parking Space Overlays 15,215.50


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 44.0

22b Restriping all parking space lines at 30 day mark for Line Item 22a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 958.44
23a Parking Space Overlay at HOLMAN CT.

Parking Space Overlays 14,278.40


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)
Provide New Concrete Stop (For Broken Or Missing Concrete Stop) Include In
Base Bid Pricing And Not As A Unit Price 1.0

Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 36.0

23b Restriping all parking space lines at 30 day mark for Line Item 23a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 830.03

24a Parking Space Overlay at DOBROW CT.

Parking Space Overlays 5,988.74


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)
Provide New Concrete Stop (For Broken Or Missing Concrete Stop) Include In
Base Bid Pricing And Not As A Unit Price 1.0

Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 16.0

24b Restriping all parking space lines at 30 day mark for Line Item 24a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 372.92

25a Parking Space Overlay at CHAMBERLAIN CT.

Parking Space Overlays 7,337.24


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 19.0

25b Restriping all parking space lines at 30 day mark for Line Item 25a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 513.37

26a Parking Space Overlay at APELGREN CT.

Parking Space Overlays 5,493.90


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 11.0

26b Restriping all parking space lines at 30 day mark for Line Item 26a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 200.99

27 Parking Space Overlay at MAINTENANCE ROAD

Parking Space Overlays 1,227.70


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)

28a Parking Space Overlays at MAINTENANCE BUILDING

Parking Space Overlays 8,574.73


MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)
Provide New Concrete Stop (For Broken Or Missing Concrete Stop) Include In
Base Bid Pricing And Not As A Unit Price 11.0

28b Restriping all parking space lines at 30 day mark for Line Item 28a

Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 213.99
NOTE: ALL line items above Include base as necessary, grading, asphalt, striping,
wheel stops, painting, landscape repair and watering.

29a Remote Slide Gate at MAINTENANCE BUILDING ENTRANCE


(Includes full scope of work for all fencing work and gate including, landscaping
scope, electrical scope, remote equipment operator)

29b Awning Structure #1 at MAINTENANCE BUILDING PARKING LOT


(Per Addendum #1)
(Includes full scope of work for all foundation and pole engineering and Signed and
Sealed Shop Drawings, and Materials and Installation) 1,017.46

29c Awning Structure #2 at MAINTENANCE BUILDING PARKING LOT


(Per Addendum #1)
(Includes full scope of work for all foundation and pole engineering and Signed and
Sealed Shop Drawings, and Materials and Installation ) 730.87
QTY UNIT MATERIAL EQUIPMENT LABOR RATE COST

26,003.71 SQFT
26,003.71 SQFT
26,003.71 SQFT
26,003.71 SQFT

2.00 EA

84.00 EA

1,746.49 LF

18,142.20 SQFT
18,142.20 SQFT
18,142.20 SQFT
18,142.20 SQFT
46.00

926.10 LF

15,215.50 SQFT
15,215.50 SQFT
15,215.50 SQFT
15,215.50 SQFT

44.00

958.44 LF
14,278.40 SQFT
14,278.40 SQFT
14,278.40 SQFT
14,278.40 SQFT

1.00

36.00

830.03 LF

5,988.74 SQFT
5,988.74 SQFT
5,988.74 SQFT
5,988.74 SQFT

1.00

16.00
372.92 LF

7,337.24 SQFT
7,337.24 SQFT
7,337.24 SQFT
7,337.24 SQFT

19.00 EA

513.37 LF

5,493.90 SQFT
5,493.90 SQFT
5,493.90 SQFT
5,493.90 SQFT
11.00 EA

200.99 LF

1,227.70 SQFT
1,227.70 SQFT
1,227.70 SQFT
1,227.70 SQFT

8,574.73 SQFT
8,574.73 SQFT
8,574.73 SQFT
8,574.73 SQFT

11.00

213.99 LF
1,017.46

730.87
REMARK