Professional Documents
Culture Documents
All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line item. If the line
item does not appear to be balanced, the bid can be determined not responsible and can be rejected.
McCLURE VILLAGE ASPHALT OVERLAY + PARKING SPACE EXTENSIONS PROJECT CFP FL14PO21501-19/21
The Owner has the right to reject or deduct any portion or line item of any bid.
1b Excavation and Disposal of Arsenic Soil associated with Line item 1a $_______________________.00
1c Restriping all parking space lines at 30 day mark for Line Item 1a $_______________________.00
2b Restriping all parking space lines at 30 day mark for Line Item 2a $_______________________.00
3 Asphalt Overlay and Edge Repair for Eisenhower Drive and Jefferson Ave $_______________________.00
4b Excavation and Disposal of Arsenic Soil associated with Line item 4a $_______________________.00
5 Update existing survey to become an As-Built Survey of new site changes $_______________________.00
6 New Perimeter Flush Concrete Curbs at Eisenhower Asphalt / Sod Edges $_______________________.00
(Per Addendum #1)
7 New Perimeter Flush Concrete Curbs at Jefferson Ave Asphalt / Sod Edges $_______________________.00
(Per Addendum #1)
8a New Maintenance Building / Foundation / Driveway / Engineering $_______________________.00
(Per Addendum #1) (Per Addendum #2 for 1 Tree relocation)
8b New Fence at Maintenance Shed $_______________________.00
(Per Addendum #1)
8c New Landscape at Maintenance Shed $_______________________.00
(Per Addendum #1)
All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.
10b Restriping all parking space lines at 30 day mark for Line Item 10a $_______________________.00
11b Restriping all parking space lines at 30 day mark for Line Item 11a $_______________________.00
12b Restriping all parking space lines at 30 day mark for Line Item 12a $_______________________.00
13b Restriping all parking space lines at 30 day mark for Line Item 13a $_______________________.00
14b Restriping all parking space lines at 30 day mark for Line Item 14a $_______________________.00
15b Restriping all parking space lines at 30 day mark for Line Item 15a $_______________________.00
16b Restriping all parking space lines at 30 day mark for Line Item 16a $_______________________.00
17b Restriping all parking space lines at 30 day mark for Line Item 17a $_______________________.00
18 New Yard Fence and Remote Slide Gate and Pedestrian Gate at Amin Lot $_______________________.00
(Includes full scope of work for all fencing and gates including, landscaping
scope, electrical scope, remote equipment operator scope) + (addendum #1
modifications)
19b Restriping all basketball court lines at 30 day mark for Line Item 19a $_______________________.00
(Includes full scope of work for all foundation and pole engineering and Signed
and Sealed Shop Drawings, and Materials and Installation)
All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.
20a Parking Space Overlays at SHIRLEY DRIVE Residential Units (ZONES 6-24) $_______________________.00
20b Restriping all parking space lines at 30 day mark for Line Item 20a $_______________________.00
21b Restriping all parking space lines at 30 day mark for Line Item 21a $_______________________.00
22b Restriping all parking space lines at 30 day mark for Line Item 22a $_______________________.00
23b Restriping all parking space lines at 30 day mark for Line Item 23a $_______________________.00
24b Restriping all parking space lines at 30 day mark for Line Item 24a $_______________________.00
25b Restriping all parking space lines at 30 day mark for Line Item 25a $_______________________.00
26b Restriping all parking space lines at 30 day mark for Line Item 26a $_______________________.00
28b Restriping all parking space lines at 30 day mark for Line Item 28a $_______________________.00
NOTE: ALL line items above Include base as necessary, grading, asphalt,
striping, wheel stops, painting, landscape repair and watering.
All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.
30 Remote Slide Gate at PHA MAIN OFFICE (465 Friend Terrace) $_______________________.00
(Includes full scope of work for all fencing work and gate including, landscaping
scope, electrical scope, remote equipment operator)
31 Repair of Left Side Chainlink Gate Swing Arm at PHA MAIN OFFICE $_______________________.00
(Per Addendum #2)
All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.
40a Tree supply and install per Addendum #2 scope of work $_______________________.00
(Per Addendum #2)
40b Excavation and Disposal of Arsenic Soil associated with Line item 40a $_______________________.00
All line items must be balanced with proportional amount of GC, OH, PROFIT, and Bonding expenses for each line
item. If the line item does not appear to be balanced, the bid can be determined not responsible and can be
rejected.
100 McClure Village Asphalt Overlay + Parking Space Extensions Sub-Total: $_______________________.00
w/ Addendum #1 line items
200 Padgett Island Asphalt Overlays and Fencing Sub-Total: $_______________________.00
w/ Addendum #1 line items
300 Fremd Village Asphalt Overlays and Gate Sub-Total: $_______________________.00
w/ Addendum #1 line items
400 PHA MAIN OFFICE GATE Sub-Total: $_______________________.00
w/ Addendum #2 GATE REPAIR
500 McClure Village Landscape Trees (per Add#2): $_______________________.00
w/ Addendum #2 ADDED TREES
600 Line Item place holder
900 PERMIT ALLOWANCE OF 2.5% OF THE SUBTOTAL OF LINE ITEMS 100 - 500:
$_______________________.00
31 Repair of Left Side Chainlink Gate Swing Arm at PHA MAIN OFFICE
(Per Addendum #2)
LUMP SUM 1 1
900 PERMIT ALLOWANCE OF 2.5% OF THE SUBTOTAL OF LINE ITEMS 100 - 500:
UNIT MATERIAL EQUIPMENT LABOR RATE COST
EA
EA
REMARK
ITEM DESCRIPTION TAKEOFFS
10b Restriping all parking space lines at 30 day mark for Line Item 10a
11b Restriping all parking space lines at 30 day mark for Line Item 11a
12b Restriping all parking space lines at 30 day mark for Line Item 12a
13b Restriping all parking space lines at 30 day mark for Line Item 13a
14b Restriping all parking space lines at 30 day mark for Line Item 14a
15b Restriping all parking space lines at 30 day mark for Line Item 15a
16b Restriping all parking space lines at 30 day mark for Line Item 16a
17b Restriping all parking space lines at 30 day mark for Line Item 17a
18 New Yard Fence and Remote Slide Gate and Pedestrian Gate at Amin Lot
(Includes full scope of work for all fencing and gates including, landscaping scope,
electrical scope, remote equipment operator scope) + (addendum #1
modifications)
19b Restriping all basketball court lines at 30 day mark for Line Item 19a
4,374.00 SQFT
4,374.00 SQFT
4,374.00 SQFT
4,374.00 SQFT
177 LFT
20,167.00 SQFT
20,167.00 SQFT
20,167.00 SQFT
20,167.00 SQFT
830.46 LFT
13,902.00 SQFT
13,902.00 SQFT
13,902.00 SQFT
13,902.00 SQFT
577.26 LFT
12,092.00 SQFT
12,092.00 SQFT
12,092.00 SQFT
12,092.00 SQFT
478.41 LFT
5,904.00 SQFT
5,904.00 SQFT
5,904.00 SQFT
5,904.00 SQFT
569.97 LFT
7,819.00 SQFT
7,819.00 SQFT
7,819.00 SQFT
7,819.00 SQFT
569.97 LFT
COST REMARK
AREA NOT FOUND ON
PLANS
ITEM DESCRIPTION TAKEOFFS
1c Restriping all parking space lines at 30 day mark for Line Item 1a
(Includes full scope of work at Barrett Court including Landscape repair if needed)
Barrett Court Overlays 4,712.00
MILLING
BROOM CLEANING
NEW OVERLAY 1" ASPHALT LAYER (WITH OTHER LAYERS)
2b Restriping all parking space lines at 30 day mark for Line Item 2a
3 Asphalt Overlay and Edge Repair for Eisenhower Drive and Jefferson Ave
NA ???
7 New Perimeter Flush Concrete Curbs at Jefferson Ave Asphalt / Sod Edges
(Per Addendum #1)
New Perimeter Flush Concrete Curbs at Jefferson Ave Asphalt / Sod Edges 1233.2
8a New Maintenance Building / Foundation / Driveway / Engineering
(Per Addendum #1) (Per Addendum #2 for 1 Tree relocation)
Tree to be relocate
MAINTANANCE BUILDING 300
40b Excavation and Disposal of Arsenic Soil associated with Line item 40a
(Per Addendum #2)
1.17
34,089.40 SQFT $ - $ -
34,089.40 SQFT $ - $ -
34,089.40 SQFT $ - $ -
34,089.40 SQFT $ - $ -
$ - $ -
16082.67 SQFT $ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
16082.67 SQFT $ - $ -
8,617.40 LF $ - $ -
4,712.00 SQFT
4,712.00 SQFT
4,712.00 SQFT
4,712.00 SQFT
550 LF
54,391.00 SQFT
54,391.00 SQFT
54,391.00 SQFT
54,391.00 SQFT
3289.03 SQFT
3289.03 SQFT
2,551.69 LFT
300 SQFT
78 LFT
216 EA
9 EA
6 EA
231 EA
15 DAYS
COST REMARK
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
PARKING AREA EXCLUDED
20a Parking Space Overlays at SHIRLEY DRIVE Residential Units (ZONES 6-24)
Provide New Concrete Stop (For Broken Or Missing Concrete Stop) Include In
Base Bid Pricing And Not As A Unit Price 2.0
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 84.0
20b Restriping all parking space lines at 30 day mark for Line Item 20a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 1,746.49
21b Restriping all parking space lines at 30 day mark for Line Item 21a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 926.10
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 44.0
22b Restriping all parking space lines at 30 day mark for Line Item 22a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 958.44
23a Parking Space Overlay at HOLMAN CT.
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 36.0
23b Restriping all parking space lines at 30 day mark for Line Item 23a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 830.03
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 16.0
24b Restriping all parking space lines at 30 day mark for Line Item 24a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 372.92
Safely Remove And Store Existing Concrete Stops (Stops Contain vertical Steel
Rods) Prior To New Asphalt Overlay. Re - Install Existing Concrete Stops At Newly
Striped Locations._x000D_
If Contractor Damages Existing Concrete Stops Upon Removal, Contractor Shall
Replace Concrete Stops At his Expense. _x000D_
All Concrete Wheel Stops (New And Reused) Are To Be Painted White With
Professionally Stenciled, Black painted, Address Numbers And marked Guest
Spots._x000D_ 19.0
25b Restriping all parking space lines at 30 day mark for Line Item 25a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 513.37
26b Restriping all parking space lines at 30 day mark for Line Item 26a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 200.99
28b Restriping all parking space lines at 30 day mark for Line Item 28a
Newly Striped Spaces Will Fall Between The Dimensions Of 9'- 0" Wide To 11' - 0"
Wide Where Asphalt Edge To Edge Dimensions Permit Wider Spaces Than The
Code Required 9' - 0" Width. All Handicap Spaces And Adjacent handicap Aisles
Are To Be Held At 12' - 0" Wide And 5' - 0" Wide Respectively _x000D_ 213.99
NOTE: ALL line items above Include base as necessary, grading, asphalt, striping,
wheel stops, painting, landscape repair and watering.
26,003.71 SQFT
26,003.71 SQFT
26,003.71 SQFT
26,003.71 SQFT
2.00 EA
84.00 EA
1,746.49 LF
18,142.20 SQFT
18,142.20 SQFT
18,142.20 SQFT
18,142.20 SQFT
46.00
926.10 LF
15,215.50 SQFT
15,215.50 SQFT
15,215.50 SQFT
15,215.50 SQFT
44.00
958.44 LF
14,278.40 SQFT
14,278.40 SQFT
14,278.40 SQFT
14,278.40 SQFT
1.00
36.00
830.03 LF
5,988.74 SQFT
5,988.74 SQFT
5,988.74 SQFT
5,988.74 SQFT
1.00
16.00
372.92 LF
7,337.24 SQFT
7,337.24 SQFT
7,337.24 SQFT
7,337.24 SQFT
19.00 EA
513.37 LF
5,493.90 SQFT
5,493.90 SQFT
5,493.90 SQFT
5,493.90 SQFT
11.00 EA
200.99 LF
1,227.70 SQFT
1,227.70 SQFT
1,227.70 SQFT
1,227.70 SQFT
8,574.73 SQFT
8,574.73 SQFT
8,574.73 SQFT
8,574.73 SQFT
11.00
213.99 LF
1,017.46
730.87
REMARK