A110 A359
Performance Bond Setting out of works
3,800
3,800.0
A120 - A150
Insurance of works, A 311.1
equipment,third party Setting up Contractors
and against accident office and compound
to workmen
GH¢ 6,000
GH¢ 8000
A250
A311.2
Provide for material site Maintaining Contractor
investigation office and compound
8
1 8.00
GH¢ 800 8 mth
A311.3
Removing contractor's
A290 office and compound
Provide Progress
Photographs
GH¢ 1000
12
12.00 12 Set
Page 1
JOLA VENTURES LIMITED
SPOT IMPROVEMENT OF ANUM APAPAM- KOFIPARA FEEDER ROAD ( 3.80 KM)
A420.1 A420.4
Provide safe drinking Provide First Aid Kit and
water for site employees train First Aider.
including storage facilities
( Polytank )
GH¢ 482
GH¢ 1,500
A420.5
Provide assistance to
and facilitate site
A 420.2 visit by MOH Personnel
Provide and maintain to educate workers and
protective clothing,safety communities in STDs,
equipement for use by site HIV/AIDS awareness and
employees consultation meeting
A420.3
Provide and maintain
temporary latrines, relocate
as necessary and remove
and remove and backfill on
completion.
GH¢ 800
Page 2
JOLA VENTURES LIMITED
SPOT IMPROVEMENT OF ANUM APAPAM- KOFIPARA FEEDER ROAD ( 3.80 KM)
Page 3
2 60.00
0.6
0.5 0.4 14.40
C/F 767.4
K 463.1
E592.3 Excavate drainage ditch
Blading road surface 500.00 500.00 as turnout.
to crossfalls
3,412 From 0+000-3+800
length = 3,800m 500m
6.00 20,472 Less total Culvert Filling
approach = 388
Length =3,800 - 388
Total = 3,412
K 463.1
Excavate of existing
20,472m² unlined vee-shaped
ditched to section area
( 0.5 - 1.0sq.m)
From 0+300-3+800
2 length = 3,500m
E900.1 3050 6,100.0 Less total Culvert Filling
Haulage of excess of 1 km approach = 450
for all items ( 1-20) Length =3,500 - 450
Distance = 5 km Total = 3,112
Less 1 km
4 Total Distance = 4 km
1,971.4 7,886 6,100 m
7,886m³.km
E 420.1
90.00 Excavate material
2.00 in cutting
1.31 235.80 From 0+100-0+190
Page 4
236m³
598.00
598m K 979.2
Wingwall and apron
outlet structure
2
6.00 12.00
H 510
Pruvide and place precast
concrete slab, size 1.5 x 12Nr
0.45 x 0.12 thick.
40
1.00 40.00
Page 5
40 Nr
1150
6
0.12 1.91 2512
2 0.69 1.15
598 0.05 1.32 AV. = 1300+2512
0.50 2 2
0.12 71.76 ( Vertical Walls) = 1.91
598 6
0.69 2.51
0.12 49.51 ( Bottom Slab) 0.2
2 0.05 0.30 ( Toe )
136.97
F 253& F632
6
Volume of concrete 7.40
for 700x900 'U 'culvert 1.30
Main Trench 0.20 11.544 ( top slab)
7.40
1300
2512
Page 6
6 0.20 11.544 ( Main Channel )
HAULAGE
Wing walls Grade 1:2:4
Total = 187.46
900
200
Chips = 190.45x0.88
167.6
1.21
Page 7
6 1.30 Sand
0.20 4.51 X 0.56= 2.53
0.40 1.25 ( Head walls)
6
2 7.40
0.90
0.20 15.984 ( Abutment walls)
C/F 51.20
TOTAL
R 114
SAND CHIPS Spread gravel wearing
83.78 167.6 course material from
2.53 4.15 barrow ,shape and
84.18 168.36 compact to 150mm thick
layer.
E 900.1 Sectional Gravelling
Haulage of aggregate From 1+800- 1+900=100
in excess of 1 km
( 0-20 km) From 2+200- 2+800=600
42
86.31 3,625.02 ( sand ) 700.00 Total length = 700
E 900.2 6.00 4,200
Ditto ,ditto, haulage
136.7 ( 100-250)
171.75 23,478 4200m²
SAND
R 900.1
3,625m³.km Haulage of gravel sub-
base material in
excess of 1 km ( 0-20km)
CHIPPINGS Distance 5 km
Less 1 km
Total 4 km
Page 8
23,478m³.km 4
700
6.00 2,520m³.km
0.15 2,520.0
Page 9
Page 10
0.15 0.45 0.15
0.45
0.15
0.75
Page 11
0.75
0.70
0.15
1.2
Page 12
1.2
Page 13
4.00
1300
2512
1300
1150
2512
Page 14
20
0
900
200
1.21
Page 15
12.00
1300
2512
1300
1150
2512
Page 16
20
0
900
200
1.21
Page 17
4.00
1300
2512
1600
1559
3158
Page 18
20
0
1100
300
200
1.56
Page 19
Page 20
1200
1300
2512
1600
1559
3158
Page 21
20
0
1100
300
200
1.56
Page 22
Page 23
Page 24
Page 25
Page 26