STRUCTURAL CALCULATIONS

NCSD Technology & Information Services Metal Bldg Fdn


4444 SE Lake Road, Milwaukie, OR
BBL Architects

March 13, 2020


Project No. 190220

31 pages

ARL
Principal Checked: ______

2020

*** LIMITATIONS ***

Miller Consulting Engineers, Inc. was retained in a limited capacity for this
project. This design is based upon information provided by the client, who
is solely responsible for accuracy of same. No responsibility and or liability
is assumed by or is to be assigned to the engineer for items beyond that
shown on these sheets.

Engineering Practical, Diverse Structural Solutions Since 1978


9570 S W Barbur Blvd., Suite 100, Portland, Oregon 97219-5412
Phone: (503) 246-1250 Fax: (503) 246-1395 www.miller-se.com
Building Code: 2019 Oregon Structural Specialty Code
Soils Report: Yes Soils Report by: PBS Engineering and Environmental Dated: 2/14/2019
Soil Bearing: 2500 PSF Retaining Walls: No
Equivalent Fluid Pressure (active): N/A PCF Passive bearing: N/A PCF Friction: 0.35
Structural System: Building Structure
Vertical System: All steel framed building Lateral Sys:
Foundation Loads were provided by Nucor building systems

Basic Design
Loads:

Lateral Design Parameters:


ASCE7-10
Wind Design: ASCE 7-16 Wind Speed (3 sec Gust): 98
120 MPH
Exposure C

Importance Factors IW = 1.00 IE = 1.00 IS = 1.00 Ii = 1.00 Risk Cat: II


(ice w/ wind) (seismic) (snow) (ice)

Seismic Design

Seismic design parameters are based on the geotechnical


engineering report as provided by PBS

Design Summary:

Miller Consulting Engineers is responsible for the anchorage of the metal building to the foundation and the design of the foundation.
Loads from the metal building to the foundation have been provided to Miller Consulting Engineers by the metal building manufacturer Nucor.

Index of Calculations:

Design Summary Pg 1
Anchorage Design Pgs 2-19
Foundation Calculations Pgs 20-27
Appendix - foundation loads and plan Pgs 28-31

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 1 of 31
ENGINEERS
Design Concrete anchorage
Plan for reference

Only Design for the worse case connections:


Anchor A has same forces as C
Anchor D has same forces as F
Anchor E has higher forces when compared to B
Anchor G has same forces as H

Only need to check anchorage for A, G, and E

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 2 of 31
ENGINEERS
Design Concrete anchorage

Anchor A Conditions:
1. wind to Left - (LRFD load combo: 0.9D+1.0W)
2. wind to right - (LRFD load combo: 0.9D+1.0W)
3. wind to front / back - (LRFD load combo: 0.9D+1.0W)
4. seismic to left - (LRFD load combo: (0.9-0.2Sds)D+omega*E)
5. seismic to right - (LRFD load combo: (0.9-0.2Sds)D+omega*E)

Condition 1:
D = 2 kips Load
Wind to left: 3 kips (uplift on roof)
Wind to left: 3 kips (uplift brace)
direction
Wind to left: 4 kips (lateral)

Vertical load: 0.9D + 1.0W = 0.9(2k) + 1.0 (6k) = 4.2 kips (up)
Lateral load = 5 kips

Conditions 2:
D = 2 kips Load
Wind to right: 3 kips (uplift on roof) direction
Wind to right: 3 kips (downward brace)
Wind to right: 5 kips (lateral)

Vertical load: 0.9D + 1.0W = 0.9(2k) + 1.0 (0k) = 1.8 kips (down)
Lateral load = 5 kips

Condition 3:
D = 2 kips Load
Wind to front: 3 kips (uplift on roof) direction
Vertical load: 0.9D + 1.0W = 0.9(2k) + 1.0 (3k) = 1.2 kips (up)
Lateral load = 1 kips

Condition 4:
D = 2 kips Load
Seismic to left: 2 kips (uplift brace)
Seismic to left: 3 kips (lateral)
direction

Vertical load: 0.77D + 2.5E = 0.77(2k) + 2.5 (2k) = 3.5 kips (up)
Lateral load = 2.5 (3) = 7.5 kips

Condition 5:
D = 2 kips Load
Seismic to left: 2 kips (downward brace)
Seismic to left: 3 kips (lateral) direction

Vertical load: 0.77D + 2.5E = 0.77(2k) + 2.5 (2k) = 6.5 kips (down)
Lateral load = 2.5 (3) = 7.5 kips

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 3 of 31
ENGINEERS
Design Concrete anchorage

Anchor A
Conditions:
6. wind to Left - (LRFD load combo: 1.2D+1.6S)

Condition 6:
D = 2 kips Load
Snow = 1 kips
direction
Vertical load: 1.2D + 1.6S = 1.2(2k) + 1.6(1k) = 4 kips (down)

Summary for Anchor A

Hilti Summary and Utilization for Conditions 1-6 (3/4" dia anchor bolts, 16" embed)
supplemental reinforcement is not required
1. 19% - highest uplift - calculation on pages 5-6
2. 42%
3. 0%
4. 28%
5. 62% - highest shear - calculation on pages 7-8
6. 0%

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 4 of 31
ENGINEERS
ANCHOR: A CONDITION 1
www.hilti.us Profis Anchor 2.7.5
Company: Page: 1
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/12/2019
E-Mail:

Specifier's comments:

1 Input data
Anchor type and diameter: Hex Head ASTM F 1554 GR. 36 3/4
Effective embedment depth: hef = 16.000 in.
Material: ASTM F 1554
Proof: Design method ACI 318-11 / CIP
Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in.
Anchor plate: lx x ly x t = 8.000 in. x 14.000 in. x 0.500 in.; (Recommended plate thickness: not calculated
Profile: no profile
Base material: cracked concrete, 3000, fc' = 3000 psi; h = 20.000 in.
Reinforcement: tension: condition B, shear: condition B;
edge reinforcement: none or < No. 4 bar

Geometry [in.] & Loading [lb, in.lb]

Input data and results must be checked for agreement with the existing conditions and for plausibility! 5 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: A CONDITION 1

www.hilti.us Profis Anchor 2.7.5


Company: Page: 2
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/12/2019
E-Mail:

2 Proof I Utilization (Governing Cases)


Design values [lb] Utilization

Loading Proof Load Capacity bN / bV [%] Status


Tension Concrete Breakout Strength 4200 36788 12 / - OK
Shear Concrete edge failure in direction x- 5000 27094 - / 19 OK

Loading bN bV z Utilization bN,V [%] Status


Combined tension and shear loads 0.114 0.185 5/3 9 OK

3 Warnings
• Please consider all details and hints/warnings given in the detailed report!

Fastening meets the design criteria!


4 Remarks; Your Cooperation Duties
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility! 6 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: A CONDITION 5
www.hilti.us Profis Anchor 2.7.5
Company: Page: 1
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/12/2019
E-Mail:

Specifier's comments:

1 Input data
Anchor type and diameter: Hex Head ASTM F 1554 GR. 36 3/4
Effective embedment depth: hef = 16.000 in.
Material: ASTM F 1554
Proof: Design method ACI 318-11 / CIP
Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in.
Anchor plate: lx x ly x t = 8.000 in. x 14.000 in. x 0.500 in.; (Recommended plate thickness: not calculated
Profile: no profile
Base material: cracked concrete, 3000, fc' = 3000 psi; h = 20.000 in.
Reinforcement: tension: condition B, shear: condition B;
edge reinforcement: none or < No. 4 bar

Geometry [in.] & Loading [lb, in.lb]

Input data and results must be checked for agreement with the existing conditions and for plausibility! 7 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: A CONDITION 5
www.hilti.us Profis Anchor 2.7.5
Company: Page: 2
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/12/2019
E-Mail:

2 Proof I Utilization (Governing Cases)


Design values [lb] Utilization

Loading Proof Load Capacity bN / bV [%] Status


Tension - - - -/- -
Shear Concrete edge failure in direction y- 7500 12192 - / 62 OK

Loading bN bV z Utilization bN,V [%] Status


Combined tension and shear loads - - - - -

3 Warnings
• Please consider all details and hints/warnings given in the detailed report!

Fastening meets the design criteria!


4 Remarks; Your Cooperation Duties
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility! 8 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
Design Concrete anchorage

Anchor E Conditions:
1. wind to Left - (LRFD load combo: 0.9D+1.0W)

Condition 1:
D = 4 kips Load
Wind to left: 10 kips (uplift on roof)
Wind to left: 3 kips (lateral)
direction

Vertical load: 0.9D + 1.0W = 0.9(4k) + 1.0 (10k) = 6.4 kips (up)
Lateral load = 3 kips

Summary for Anchor E

Hilti Summary and Utilization for Condition 1 (3/4" dia anchor bolts, 16" embed)
1. 11%

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 9 of 31
ENGINEERS
Design Concrete anchorage

Anchor G Conditions:
1. wind to left (1.2D + 1.6S + 0.5W)
2. wind to left (1.2D + 1.0W + 0.5S)
3. wind to left (0.9D + 1.0W)

Condition 1:
Load
Vertical loads
D = 7 kips
direction
Roof live = 14 kips
Snow = 18 kips
Wind to left: 16 kips (uplift on roof)
Wind to left: 3 kips (uplift force brace)
Lateral loads
D = 4 kips
Roof Live = 7 kips
Snow = 9 kips
Wind to left: 9 kips

Vertical load: 1.2D + 1.6S + 0.5W = 1.2 (7) + 1.6 (18) + 0.5 (19) = 27.7 kips down
Lateral load: 1.2D + 1.6S + 0.5W = 1.2 (4) + 1.6 (9) = 19.2 kips
Lateral load: 1.2D + 1.6S + 0.5W = 0.5 (9) = 4.5 kips
Condition 2:

Vertical loads
D = 7 kips Load
Roof live = 14 kips direction
Snow = 18 kips
Wind to left: 16 kips (uplift on roof)
Wind to left: 3 kips (uplift force brace)
Lateral loads
D = 4 kips
Roof Live = 7 kips
Snow = 9 kips
Wind to left: 9 kips

Vertical load: 1.2D + 0.5S + 1.0W = 1.2 (7) + 0.5 (18) + 1.0 (19) = 1.6 kips up
Lateral load: 1.2D + 0.5S + 1.0W = 1.2 (4) + 0.5 (9) = 9.3 kips
Lateral load: 1.2D + 0.5S + 1.0W = 1.0 (9) = 9 kips
Condition 3:

Vertical loads
D = 7 kips
Wind to left: 16 kips (uplift on roof)
Wind to left: 3 kips (uplift force brace) Load
Lateral loads direction
D = 4 kips
Wind to left: 9 kips

Vertical load: 0.9D + 1.0W = 0.9 (7) + 1.0 (19) = 12.7 kips up
Lateral load: 0.9D + 1.0W = 0.9 (4) = 3.6 kips
Lateral load: 0.9D + 1.0W = 1.0 (9) = 9 kips
NCSD Technology & Information Services Metal Bldg Fdn 190220
9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 10 of 31
ENGINEERS
Design Concrete anchorage

Anchor G Conditions:
4. seismic to left: 0.9-0.2Sds)D+omega*E)
5. seismic to left: 1.2+0.2Sds)D+omega*E+0.2S)

Condition 4:
Load
Vertical loads
D = 7 kips direction
Roof live = 14 kips
Snow = 18 kips
Seismic to left: 1 kips (uplift)
Seismic to left: 2 kips (uplift force brace)

Lateral loads
D = 4 kips
Roof Live = 7 kips
Snow = 9 kips
Seismic to left: 2 kips

Vertical load: 0.77D + 2.5E = 0.77(7) + 2.5 (3) = 2.2 kips up


Lateral load: 0.77D + 2.5E = 0.77 (4) = 3.1 kips
Lateral load: 0.77D + 2.5E = 2.5 (2) = 5 kips

Condition 5:
Load
Vertical loads
D = 7 kips direction
Roof live = 14 kips
Snow = 18 kips
Seismic to left: 1 kips (uplift)
Seismic to left: 2 kips (uplift force brace)

Lateral loads
D = 4 kips
Roof Live = 7 kips
Snow = 9 kips
Seismic to left: 2 kips

Vertical load: 1.33D + 2.5E + 0.2S = 1.33(7) + 2.5 (3) + 0.2(18) = 5.4 kips down
Lateral load: 1.33D + 2.5E + 0.2S = 1.33 (4) + 0.2 (9) = 7.2 kips
Lateral load: 1.33D + 2.5E = 2.5 (2) = 5 kips

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 11 of 31
ENGINEERS
Design Concrete anchorage

Anchor G Conditions:
6. wind to left (1.2D + 1.6S + 0.5W)
7. wind to left (1.2D + 1.0W + 0.5S)
8. 1.2D+1.6S

Condition 6:
Load
Vertical loads
D = 7 kips direction
Roof live = 14 kips
Snow = 18 kips
Wind to front: 15 kips (uplift)

Lateral loads
D = 4 kips
Roof Live = 7 kips
Snow = 9 kips
Wind to front: 4 kips

Vertical load: 1.2D + 1.6S + 0.5W = 30 kips down


Lateral load: 1.2D + 1.6S + 0.5W = 0.2 (4) + 1.6(9) + 0.5(4) = 17.2 kips

Condition 7:
Load
Vertical loads
D = 7 kips direction
Roof live = 14 kips
Snow = 18 kips
Wind to front: 15 kips (uplift)

Lateral loads
D = 4 kips
Roof Live = 7 kips
Snow = 9 kips
Wind to front: 4 kips

Vertical load: 1.2D + 0.5S + 1.0W = 2.4 kips down


Lateral load: 1.2D + 0.5S + 1.0W = 0.2 (4) + 0.5(9) + 1.0(4) = 13.3 kips

Condition 8:

Vertical loads
D = 7 kips
Snow = 18 kips

Lateral loads
D = 4 kips
Snow = 9 kips

Vertical load: 1.2D + 1.6S = 37.2 kips down


Lateral load: 1.2D + 1.6S = 1.2 (4) + 1.6(9) = 19.2 kips

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 12 of 31
ENGINEERS
Design Concrete anchorage

Anchor G Conditions:
1. Check wind to Left - (LRFD load combo: 0.9D+1.0W)
2. Check wind to right - (LRFD load combo: 0.9D+1.0W)
3. Check wind to front / back - (LRFD load combo: 0.9D+1.0W)
4. Check seismic to left - (LRFD load combo: (0.9-0.2Sds)D+omega*E)
5. Check seismic to right - (LRFD load combo: (0.9-0.2Sds)D+omega*E)

Summary for Anchor G

Hilti Summary and Utilization for Conditions 1-8 (3/4" dia anchor bolts, 16" embed)
with supplemental anchor reinf.
1. 51% - calculation on concrete anchorage (pg 14-15)
2. 17%
3. 23% - calculation on concrete anchorage (pg 16-17)
4. 5%
5. 23%
6. 45%
7. 35%
8. 50% - calculation on concrete anchorage (pg 18-19)

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 13 of 31
ENGINEERS
ANCHOR: G CONDITION 1
www.hilti.us Profis Anchor 2.7.5
Company: Page: 1
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/6/2019
E-Mail:

Specifier's comments:

1 Input data
Anchor type and diameter: Hex Head ASTM F 1554 GR. 55 3/4
Effective embedment depth: hef = 16.000 in.
Material: ASTM F 1554
Proof: Design method ACI 318-11 / CIP
Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in.
Anchor plate: lx x ly x t = 14.000 in. x 8.000 in. x 0.500 in.; (Recommended plate thickness: not calculated
Profile: no profile
Base material: cracked concrete, 3000, fc' = 3000 psi; h = 20.000 in.
Reinforcement: tension: condition B, shear: condition A; anchor reinforcement: shear
edge reinforcement: none or < No. 4 bar

Geometry [in.] & Loading [lb, in.lb] Hairpin Calculation:


#5 bar tension capacity = 0.75 x 60ksi x 0.31in^2 = 14 kips
.] & Loading [lb, in.lb] Capacity of #5 bar at 45 degrees = 14 k x 0.707 = 9.9 k
Capacity of #5 bar at 60 degrees = 14 k x cos30 = 12.1 k
Capacity of #5 at 45 and #5 at 60 = 22 kips > 19.2 kips, ok

#5 bar development length = 22 in


#4 bar development length = 18 in

Develop the #5 hairpin into the #4 slab reinforcement.


Each end of the #5 hairpin crosses (3) #4 bars. Every other #4 is
discontinuous through control joints, therefore the hairpin only
crosses (1) #4 bar that is continuous through slab at each end of #5
hairpins

(2) #5 hairpins

hairpins cross (3) #4


(#4 are at 18" oc) N.T.S.
Input data and results must be checked for agreement with the existing conditions and for plausibility! 14 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: G CONDITION 1
www.hilti.us Profis Anchor 2.7.5
Company: Page: 2
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/6/2019
E-Mail:

2 Proof I Utilization (Governing Cases)


Design values [lb] Utilization

Loading Proof Load Capacity bN / bV [%] Status


Tension - - - -/- -
Shear Steel Strength 4930 9769 - / 51 OK

Loading bN bV z Utilization bN,V [%] Status


Combined tension and shear loads - - - - -

3 Warnings
• Please consider all details and hints/warnings given in the detailed report!

Fastening meets the design criteria!


4 Remarks; Your Cooperation Duties
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility! 15 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: G CONDITION 3
www.hilti.us Profis Anchor 2.7.5
Company: Page: 1
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/6/2019
E-Mail:

Specifier's comments:

1 Input data
Anchor type and diameter: Hex Head ASTM F 1554 GR. 55 3/4
Effective embedment depth: hef = 16.000 in.
Material: ASTM F 1554
Proof: Design method ACI 318-11 / CIP
Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in.
Anchor plate: lx x ly x t = 14.000 in. x 8.000 in. x 0.500 in.; (Recommended plate thickness: not calculated
Profile: no profile
Base material: cracked concrete, 3000, fc' = 3000 psi; h = 20.000 in.
Reinforcement: tension: condition B, shear: condition A; anchor reinforcement: shear
edge reinforcement: none or < No. 4 bar

Geometry [in.] & Loading [lb, in.lb]

Input data and results must be checked for agreement with the existing conditions and for plausibility! 16 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: G CONDITION 3

www.hilti.us Profis Anchor 2.7.5


Company: Page: 2
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/6/2019
E-Mail:

2 Proof I Utilization (Governing Cases)


Design values [lb] Utilization

Loading Proof Load Capacity bN / bV [%] Status


Tension Pullout Strength 3175 10987 29 / - OK
Shear Steel Strength 2423 9769 - / 25 OK

Loading bN bV z Utilization bN,V [%] Status


Combined tension and shear loads 0.289 0.248 5/3 23 OK

3 Warnings
• Please consider all details and hints/warnings given in the detailed report!

Fastening meets the design criteria!


4 Remarks; Your Cooperation Duties
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility! 17 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: G CONDITION 8

www.hilti.us Profis Anchor 2.7.5


Company: Page: 1
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/6/2019
E-Mail:

Specifier's comments:

1 Input data
Anchor type and diameter: Hex Head ASTM F 1554 GR. 55 3/4
Effective embedment depth: hef = 16.000 in.
Material: ASTM F 1554
Proof: Design method ACI 318-11 / CIP
Stand-off installation: eb = 0.000 in. (no stand-off); t = 0.500 in.
Anchor plate: lx x ly x t = 14.000 in. x 8.000 in. x 0.500 in.; (Recommended plate thickness: not calculated
Profile: no profile
Base material: cracked concrete, 3000, fc' = 3000 psi; h = 20.000 in.
Reinforcement: tension: condition B, shear: condition A; anchor reinforcement: shear
edge reinforcement: none or < No. 4 bar

Geometry [in.] & Loading [lb, in.lb]

Input data and results must be checked for agreement with the existing conditions and for plausibility! 18 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
ANCHOR: G CONDITION 8

www.hilti.us Profis Anchor 2.7.5


Company: Page: 2
Specifier: Project:
Address: Sub-Project I Pos. No.:
Phone I Fax: | Date: 3/6/2019
E-Mail:

2 Proof I Utilization (Governing Cases)


Design values [lb] Utilization

Loading Proof Load Capacity bN / bV [%] Status


Tension - - - -/- -
Shear Steel Strength 4800 9769 - / 50 OK

Loading bN bV z Utilization bN,V [%] Status


Combined tension and shear loads - - - - -

3 Warnings
• Please consider all details and hints/warnings given in the detailed report!

Fastening meets the design criteria!


4 Remarks; Your Cooperation Duties
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility! 19 of 31
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
Design Thickened slab edge

Check along grid A (Grid A is the controlling case since reaction G has the highest loads and this
nce the bracing)
grid A also contains

Check load combination 1.2D + 1.6S

Column A:
D=2k
S=1k
1.2D+1.6S = 4 kips

Column G:
D=7k
S = 18 k
1.2D+1.6S = 37.2 kips

Column D:
D=2k
S=4k
1.2D+1.6S = 8.8 kips

Check footing on following pages

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 20 of 31
ENGINEERS
Design Thickened slab edge

Check along grid A I = bd^3/12 = (27)*(21)^3/12


Vspring = 100pci x 12" x 27" = 32.4 k/in
Inputs

Output

Max (ultimate) reaction = 2.139 kips


Convert this to a ultimate psf = 2.139 kips / 2.25ft / 1ft
= 951 psf ultimate soil bearing, this is ok and
conservative because the max allowable soil bearing
is 2500 psf

Check concrete design for the positive and negative moments


and shear forces on the following two pages
NCSD Technology & Information Services Metal Bldg Fdn 190220
9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 21 of 31
ENGINEERS
Design Thickened slab edge

Check along grid A

Check positive bending moments from page 19

Bending - ACI 318-11


φ= 0.9
Factored Moment (Mu) = 72.5 ft-k
fy = 60 ksi
f'c = 3000 psi

Bar Size = #5
Bar Quantity = 5 bars
Layers = 1
As = 1.55 in² total
b= 27 in
h= 24 in
Clear dist. = 3 in
d= 20.69 in = 24-3-0.625*0.5
λ= 1.00
β1 = 0.85
a= 1.351 in
Mallowable = φMn = 139.6 ft-k > 72.5 ft-k OK
As, min. = 1.86 in² > 1.55, provide 1/3 greater steel than what is required
c= 1.59 in 139.6 > 96.7 (1/3 greater = 96.7) OK
εt = 0.0361 > 0.005, tension controlled

Temperature steel ratio = 0.0018 times cross sectional area


Temperature steel = 0.0028 > 0.0018 OK

Use (5) #5 bars


Beam Shear - 11.2.1.1
φ= 0.75
Factored Shear (Vu) = 19200 lb
Vc = 61195 lb = 2*(3000)^0.5*20.69*27
φ Vc / 2= 22948 lb > 19200, no shear steel required

Shear Reinforcing Design: Not Required

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 22 of 31
ENGINEERS
Design Thickened slab edge

Check along grid A

Check negative bending moments from page 19

Bending - ACI 318-11


φ= 0.9
Factored Moment (Mu) = 25.9 ft-k
fy = 60 ksi
f'c = 3000 psi

Bar Size = #5
Bar Quantity = 3 bars
Layers = 1
As = 0.93 in² total
b= 27 in
h= 24 in
Clear dist. = 3 in
d= 20.69 in = 24-3-0.625*0.5
λ= 1.00
β1 = 0.85
a= 0.810 in
Mallowable = φMn = 84.9 ft-k > 25.9 ft-k OK
As, min. = 1.86 in² > 0.93, provide 1/3 greater steel than what is required
c= 0.95 in 84.9 > 34.5 (1/3 greater = 34.5) OK
εt = 0.0621 > 0.005, tension controlled

Temperature steel ratio = 0.0018 times cross sectional area


Temperature steel = 0.0020 > 0.0018 OK

Use (3) #5 bars


Beam Shear - 11.2.1.1
φ= 0.75
Factored Shear (Vu) = 6500 lb
Vc = 61195 lb = 2*(3000)^0.5*20.69*27
φ Vc / 2= 22948 lb > 6500, no shear steel required

Shear Reinforcing Design: Not Required

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 23 of 31
ENGINEERS
Design Thickened slab edge

Check along grid A


nce

Wind
direction
Check load combination 1.2D + 1.0W + 0.5S

Column A:
D=2k
S=1k
W = 6 kips (wind uplift) + 3 kips (brace down) = 3 kips uplift net
1.2D+1.0W+0.5S = 0.1 kips up

Column G:
D=7k
S = 18 k
W = 16 kips (wind uplift) + 3 kips (brace uplift) = 19 kips uplift net
1.2D+1.0W+0.5S = 1.6 kips up

Column D:
D=2k
S=4k
W = 6 kips (wind uplift)
1.2D+1.0W+0.5S = 1.6 kips up

These forces are low and will not control the foundation design

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 24 of 31
ENGINEERS
Design Thickened slab edge

Check along grid A


nce

Wind
direction
Check load combination 0.9D + 1.0W

Column A:
D=2k
W = 6 kips (wind uplift) + 3 kips (brace down) = 3 kips uplift net
0.9D+1.0W = 1.2 kips uplift

Column G:
D=7k
W = 16 kips (wind uplift) + 3 kips (brace uplift) = 19 kips uplift net
0.9D+1.0W = 12.7 kips uplift

Column D:
D=2k
W = 6 kips (wind uplift)
0.9D+1.0W = 4.2 kips uplift

Check footing on following pages

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 25 of 31
ENGINEERS
Design Thickened slab edge

Check along grid A


Inputs Output

The negative moment is less than the thickened slab edge


calculation pg 19, negative concrete moment calculation is
shown on thickened slab edge calculation pg 21

9570 SW Barbur Blvd


NCSD Technology & Information Services Metal Bldg Fdn 190220
Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
ARL
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd Date Page 26 of 31
ENGINEERS
Design Thickened slab edge

Check Global footing

Resisting moments:
Thickened slab edge: 150 pcf x 2ft thick x 2.25ft wide x (45ft long edge x 4edges) x 45ft/2 arm = 2733 k-ft

Moment overturning:
Wind uplift = (16 kips at center x 2 columns x 45ft /2) + (6 kips at end wall x 2 columns x 45ft + 10 kips x 45ft) = 1710 k-ft
Wind lateral = (zone 1 + zone 4 = 20psf) x 45ft wide x 14.2ft tall x 7.1ft moment arm = 90 k-ft

1.5Mot = 2700 k-ft < Mres = 2733 k-ft, foundation weight is ok

NCSD Technology & Information Services Metal Bldg Fdn 190220


9570 SW Barbur Blvd Project Name Project #
Suite One Hundred
Portland, OR 97219 4444 SE Lake Road, Milwaukie, OR
Location
BBL Architects
Client
MILLE R Phone 503.246.1250
BAM 3/4/19
C O N S U LT I N G Fax 503.246.1395
www.miller-se.com By Ck'd ARL Date Page 27 of 31
ENGINEERS
Building: Main

Date/Time: 3/11/2019 4:21 PM MST Control #: P201903112221

Cust Quote Nbr: U0H-19023-R1 Project Name: U0H-19023-R1 Page: 1

*** PRELIMINARY REACTIONS ONLY - DO NOT USE FOR FINAL CONSTRUCTION!!! ***
This page covers the following frame lines:
1
GLOBAL X : POSITIVE INTO BUILDING (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
(LATERAL) C INT. INT. INT. A COLUMNS COLUMNS CORNER COLUMNS
Dead 0 B 0 0 B 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 1 2 0 2 1
Wind to Back -1 -2 0 -2 -1
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
(VERTICAL) C INT. INT. INT. A COLUMNS COLUMNS CORNER COLUMNS
Dead 1 B 1 0 B 1 1
Collateral Dead 1 2 0 2 1
Roof Live 1 5 0 5 1
Roof Snow* 1 7 0 7 1
Wind to Left -2 -5 0 -7 -3
Wind to Right -2 -8 0 -6 -1
Wind to Front -2 -9 0 -9 -2
Wind to Back -2 -9 0 -9 -2
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow*
Wind to Left
Wind to Right
Wind to Front
Wind to Back
0
0
0
0
0
REFERENCE ONLY
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 8.00 0.00 8.00 8.00
Base Plate Length 14.00 14.00 0.00 14.00 14.00
Anchor Bolt Quantity 4 4 0 4 4
Anchor Bolt Diameter 0.75 0.75 0.00 0.75 0.75
BRACING REACTIONS
BRACING
(KIPS) CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL
LOADS)X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 0 0 0 0
Wind to Back -4 (LATERAL) -4 0 0
Seismic to Front 0 0 0 0
Seismic to Back -3 -3 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 3 +/- 3 0 0
Wind to Back +/- 3 +/- 3 0 0
Seismic to Front +/- 2 (VERTICAL) +/- 2 0 0
Seismic to Back +/- 2 +/- 2 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
28 of 31
Building: Main

Date/Time: 3/11/2019 4:21 PM MST Control #: P201903112221

Cust Quote Nbr: U0H-19023-R1 Project Name: U0H-19023-R1 Page: 2

*** PRELIMINARY REACTIONS ONLY - DO NOT USE FOR FINAL CONSTRUCTION!!! ***
This page covers the following frame lines:
2
GLOBAL X : POSITIVE TO RIGHT (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
H INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
(LATERAL)
Dead 2 0 0 0
G -2
Collateral Dead 2 0 0 0 -2
Roof Live 7 0 0 0 -7
Roof Snow* 9 0 0 0 -9
Wind to Left -4 0 0 0 9
Wind to Right -9 0 0 0 4
Wind to Front -6 0 0 0 4
Wind to Back -4 0 0 0 6
Seismic to Right -2 0 0 0 -2
Seismic to Left 2 0 0 0 2
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
H INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
(VERTICAL)
Dead 3 0 0 0
G 3
Collateral Dead 4 0 0 0 4
Roof Live 14 0 0 0 14
Roof Snow* 18 0 0 0 18
Wind to Left -12 0 0 0 -16
Wind to Right -16 0 0 0 -12
Wind to Front -13 0 0 0 -15
Wind to Back -15 0 0 0 -13
Seismic to Right -1 0 0 0 1
Seismic to Left 1 0 0 0 -1
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow*
Wind to Left
Wind to Right
Wind to Front
0
0
0
0
REFERENCE ONLY
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Wind to Back 0 0 0 0 0
Seismic to Right 0 0 0 0 0
Seismic to Left 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 0.00 0.00 0.00 8.00
Base Plate Length 14.00 0.00 0.00 0.00 14.00
Anchor Bolt Quantity 4 0 0 0 4
Anchor Bolt Diameter 0.75 0.00 0.00 0.00 0.75
BRACING REACTIONS
BRACING
(KIPS) CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL
LOADS)X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 4 4 0 0
Wind to Back 0 (LATERAL) 0 0 0
Seismic to Front 3 3 0 0
Seismic to Back 0 0 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 3 +/- 3 0 0
Wind to Back +/- 3 (VERTICAL) +/- 3 0 0
Seismic to Front +/- 2 +/- 2 0 0
Seismic to Back +/- 2 +/- 2 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
29 of 31
Building: Main

Date/Time: 3/11/2019 4:21 PM MST Control #: P201903112221

Cust Quote Nbr: U0H-19023-R1 Project Name: U0H-19023-R1 Page: 3

*** PRELIMINARY REACTIONS ONLY - DO NOT USE FOR FINAL CONSTRUCTION!!! ***
This page covers the following frame lines:
3
GLOBAL X : POSITIVE INTO BUILDING (KIPS) E
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
(LATERAL) INT. INT. INT. D COLUMNS COLUMNS CORNER COLUMNS
Dead F 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 1 0 3 0 1
Wind to Back -1 0 -3 0 -1
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Y : POSITIVE UPWARD (KIPS) E
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
(VERTICAL) INT. INT. INT. D COLUMNS COLUMNS CORNER COLUMNS
Dead F 1 0 2 0 1
Collateral Dead 1 0 2 0 1
Roof Live 3 0 6 0 3
Roof Snow* 4 0 7 0 4
Wind to Left -4 0 -7 0 -6
Wind to Right -5 0 -8 0 -4
Wind to Front -6 0 -10 0 -6
Wind to Back -6 0 -10 0 -6
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left
Wind to Right
Wind to Front
Wind to Back
0
0
0
0
0
0
0
0
REFERENCE ONLY
0
0
0
0
0
0
0
0
0
0
0
0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 0.00 10.00 0.00 8.00
Base Plate Length 14.00 0.00 15.00 0.00 14.00
Anchor Bolt Quantity 4 0 4 0 4
Anchor Bolt Diameter 0.75 0.00 0.75 0.00 0.75
BRACING REACTIONS
BRACING
(KIPS) CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL
LOADS)X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 0 0 0 0
Wind to Back 0 0 0 0
Seismic to Front 0 (LATERAL) 0 0 0
Seismic to Back 0 0 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 0 +/- 0 0 0
Wind to Back +/- 0 +/- 0 0 0
Seismic to Front +/- 0 (VERTICAL) +/- 0 0 0
Seismic to Back +/- 0 +/- 0 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
30 of 31
REFERENCE ONLY
Back
Side
Wall

Left
End
Wall Ridge
Right
End
Wall

Front
Side
Wall

31 of 31