You are on page 1of 17

PROJECT NO.

& TITLE 2502323 – FEED for NAG LTFD Phase II

TP DOCUMENT NO. TP-CGDF-80132-CAL-A3

DOCUMENT TITLE DG SIZING CALCULATION

CONTRACT NUMBER SA-080-2015

CONTRACTOR DOC. NO. TP-CGDF-80132-CAL-A3

CONTRACTOR DOC. REV. A1

ISSUED FOR REVIEW IFR TATWEER PETROLEUM REVIEW STAMP

ISSUED FOR DESIGN IFD X 1. APPROVED TO PROCEED


(Submit Final Document)

ISSUED FOR CONSTRUCTION IFC 2. APPROVED TO PROCEED AS NOTED


(Revise and Submit Final Document)

ISSUED FOR INFORMATION IFI 3. NOT APPROVED


(Revise and Re-Submit for Approval)

AS-BUILT ASB 4. FOR INFORMATION ONLY

FINAL/HANDOVER DOSSIER HDD 5. AS-BUILT


(After FAT as Applicable)
CANCELLED CAN 6. CANCELLED
Acceptance in any of these categories in no way relieves the contractor / supplier of its responsibility to the due
and proper performance of the works in accordance with the contract / purchase order.
Reviewer
Signature Date
Name

A0 MAY 30,2018 ISSUED FOR REVIEW DC SMS SR


REV DATE DESCRIPTION PREPARED CHECKED APPROVED
FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 2 of 8

REVISION DESCRIPTION SHEET

Rev. Para. Revision Description

A0 - Issued for Review

Hold No. Para. Description of Hold


FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 3 of 8

TABLE OF CONTENTS

1.0 INTRODUCTION ............................................................................................................ 4

2.0 PURPOSE ...................................................................................................................... 4

3.0 DEFINITIONS ................................................................................................................. 4

4.0 ABBREVIATIONS .......................................................................................................... 4

5.0 PROJECT DOCUMENTS .............................................................................................. 5

6.0 BASIS OF SIZING .......................................................................................................... 5

7.0 DIESEL GENERATOR SIZING ..................................................................................... 5

8.0 CONCLUSION................................................................................................................ 6

APPENDIX-1: DIESEL GENERATOR SIZING ......................................................................... 7

APPENDIX-2: ELECTRICAL LOAD LIST ................................................................................ 8


FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 4 of 8

1.0 INTRODUCTION

TATWEER Petroleum (Owner) is undertaking a phased field development project (i.e.


Long-term Field Development (LTFD)) to install Centralised Gas Dehydration Facility
(CGDF) in order to maintain gas deliverability from the Awali field in Bahrain.
A Conceptual Study and follow-on Pre-FEED Studies concluded that the full Long-term
Field Development Plan (LTFD) should be implemented in 4 phases of execution up to
the Year 2030. Execution (EPC) of Phase -I was completed in 2017.
TATWEER Petroleum now intends to install Phase-II facilities of LTFD. In pursuit of
this objective, Tatweer Petroleum has appointed Wood to carry out the FEED
activities.

2.0 PURPOSE

This document provides the basis of Emergency Diesel Generator sizing calculation
for Train-2 and Train-3 in this PROJECT.

3.0 DEFINITIONS

Within this specification the following definitions apply:

COMPANY : Tatweer Petroleum

ENGINEER : WOOD (FEED Consultant)

PROJECT : FEED for NAG LTFD Phase II


PURCHASER : The party appointed by COMPANY with
responsibility to perform Detailed Design/
Procurement/installation/construction activity at
site during EPC stage of the project
(also referred to as CONTRACTOR)

SUPPLIER/MANUFACTURER: Company/organization supplying equipment,


material or services (also referred to as
VENDOR)

Within this document:


The word ‘shall’ indicates a requirement.
The word ‘should’ indicates a recommendation.

4.0 ABBREVIATIONS

AC Alternating Current
DG Diesel Generator
FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 5 of 8

5.0 PROJECT DOCUMENTS

TP-CGDF-81120-BOD-A4 Electrical Design Basis

TP-CGDF-80562-LST-A3 Electrical Load List

TP-CGDF-80131-SPC-A4 Specification for DG package

TP-CGDF-80133-DAS-A4 Datasheet for DG package

Single line Diagram – 415V Switchboard


TP-CGDF-80543-DSL-A1 Train-2

Single line Diagram – 415V Switchboard


TP-CGDF-90543-DSL-A1 Train-3

6.0 BASIS OF SIZING

The generator size shall be decided based on the following criteria:


• kVA rating based on capacity under normal running conditions including future
50% spare capacity (Pat). Highest load requirement out of Train-2 and Train-3
loads shall be considered to arrive at DG rating as common rating for each train.
• Capacity to limit voltage drop within a permissible value under transient
conditions (Pas).
• Capacity to withstand short time overload (Pst).
The minimum capacity of the generator set is selected from the maximum capacity
among the above three values.
• The highest rated motor to be started is Glycol circulation pump rated for 110kW.
• The starting current of the highest rated motor is considered as 600% of full load
current plus 10% tolerance.
• Short time overload coefficient is considered as 1.5 as per IEC 60034-3.
• The voltage drop at the emergency diesel generator bus during motor starting
shall be restricted to 20%.
• The voltage drop due to motor starting is considered as 20% at motor terminals.
7.0 DIESEL GENERATOR SIZING

Refer Appendix-1 for detailed Emergency Diesel Generator sizing calculation. Peak
load during emergency condition is considered as per the electrical load list.
FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 6 of 8

The summary of the result is as below:


• Minimum capacity required to meet the normal running loads including future
margin (Pat) is 886.05kVA.
• Minimum capacity required to restrict voltage drop within 20% during motor
starting (Pas) is 420.43kVA.
• Minimum capacity to withstand the short time over loading (Pst) is 999.76kVA.
8.0 CONCLUSION

The minimum capacity of the generator set is selected from the maximum capacity
among (Pat), (Pas) and (Pst) which is (Pat) = 999.76kVA.
Hence 1250kVA generator with sub-transient reactance (X’’d) value of 12.5% is
selected.
The voltage drop at emergency bus terminal and motor terminal along with final
rating of DG set based on load list shall be further verified during detailed
engineering stage.
FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 7 of 8

APPENDIX-1: DIESEL GENERATOR SIZING


FEED FOR NAG LTFD PHASE II

Document. No. Document Title Page 1 of 1


TP-CGDF-80132-CAL- Rev. A0
DIESEL GENERATOR SIZING CALCULATION
A3-A0 Date 30-05-2018
Emergency Generator Sizing Calculation
Sl.
Description Abbreviation Formula / Remarks Value Unit
No.
1 Emergency Generator System Voltage Vn - 415 V

2 Active Peak Load Po 498.09 KW

3 Reactive Peak Load Qo As per Electrical load list 317.58 kVAr

4 Total Peak Load P 590.70 kVA

5 Spare Margin sp 50 %

6 Biggest Motor Details

6.1 Rating Pm Glycol Circulation Pump 110 kW

6.2 Running Power factor Mpf - 0.84 -

6.3 Starting power factor pfst Assumed 0.30 -

6.4 Motor effeciency Meff Assumed 0.950 -

6.5 Reactive power Qm Pm*tan(Cos-1(Mpf)) 71.053 kVAr


6 times the of full load current +
6.6 Starting current Ist 610 %
10% tolerance
7 Active base load inclusive of spare margin Pba Po(1+sp/100)-Pm 637.14 kW

8 Reactive base load inclusive of spare margin Qba Qo(1+sp/100)-Qm 405.32 kVAr

Generator Size

9 Calculated kVA considering spare capacity Pat P(1+sp/100) 886.05 kVA


Total active power including spare margin at
10 Po(1+sp/100) 747.14 kW
steady state
11 Motor starting input power in kVA Ps (Pm*(Ist/100))/(Mpf*Meff) 840.85 kVA

12 Sub-transient Reactance X''d 0.125 pu


Capacity to limit voltage drop at 20% during
13 Pas Ps*((1/Vd)-1)* X''d 420.43 kVA
motor starting
14 Maximum motor starting load in kW Pms Ps*pfst 252.26 kW

15 Reactive Maximum starting load kVAR Qms SQRT(Ps2- Pms2) 802.12 kVAr

16 Total active power required during motor starting Pba+ Pms 889.39 kW
Total reactive power required during motor
17 Qba+ Qms 1207.44 kVAr
starting
18 Calculated kVA considering motor starting kVAms (Sqrt (Pba + Pms)2 + (Qba+Qms)2) 1499.64 kVA

19 Generator Short time overload capacity KG 1.5


Generator size based on the capacity to
20 Pst kVAms / KG 999.76 kVA
withstand permissible short time overload
21 Selected Generator Size 1250 kVA
FEED FOR NAG LTFD PHASE II

DG Sizing Calculation
Contract No: SA-080-2015 Date: MAY 30, 2018
TP-CGDF-80132-CAL-A3 Rev. A0
CTR#: CTR#13 Page 8 of 8

APPENDIX-2: ELECTRICAL LOAD LIST


FEED FOR NAG LTFD PHASE II
ELECTRICAL LOAD LIST
FOR CENTRAL GAS DEHYDRATION FACILITY (CGDF)

DOC.NO. TP-CGDF-80562-LST-A3

PROJECT NO: PROJECT TITLE :

2502323 FEED for NAG LTFD Phase II


CONTRACT NO. : SA-080-2015
A1 ISSUED FOR APPROVAL MA DC DC SR APR 19, '18 WG CTR NO. : CTR#13 CLIENT : TATWEER PETROLEUM
A0 ISSUED FOR REVIEW MA DC DC SR MAR 11, '18 ORIGINAL DOC. SIZE : A3 COMPANY DOC NO : TP-CGDF-80562-LST-A3 SHT. 001 OF 008 REV. A1
REV DESCRIPTION PREP CHK'D APP'D APP'D DATE SCALE : NA DOCUMENT NO : TP-CGDF-80562-LST-A3
FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13

INDEX SHEET

DESCRIPTION SHEET NO.

COVER SHEET 1
INDEX 2
SUMMARY SHEET 3
33KV RING MAIN UNIT (RMU): CGDF-RMU-03/04 4
415 V SWITCHGEAR : CGDF-LVSG-02 5-6
415 V SWITCHGEAR : CGDF-LVSG-03 7-8

SHEET : 002 OF 008


FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13

CONTINUOUS LOAD INTERMITTENT LOAD STAND-BY LOAD MAXIMUM RUNNING LOAD PEAK LOAD
S. NO. EQUIPMENT TAG / DESCRIPTION
KW KVAR KVA KW KVAR KVA KW KVAR KVA KW KVAR KVA KW KVAR KVA

1 CGDF-RMU-03 & 04 / 33KV RING MAIN UNIT 918 579 1085 333 203 390 234 170 289 926 582 1093 996 635 1181

2 CGDF-LVSG-02 / 415V SWITCHGEAR 459 290 543 166 101 195 117 85 145 463 291 547 498 318 591

3 CGDF-LVSG-03 / 415V SWITCHGEAR 459 290 543 166 101 195 117 85 145 463 291 547 498 318 591

TRANSFORMER/ SWITCHBOARD LOADING SUMMARY

MAX LOAD
% SPARE MAX LOAD WITH SPARE SELECTED RATING FULL LOAD CURRENT AT RMU / SELECTED SWITCHBOARD
S. NO. EQUIPMENT TAG / DESCRIPTION TRANSFORMER TAG REMARKS
MARGIN MARGIN (RMU/TRANSFORMER) TRANSFORMER RATING (A) RATING (A)
KVA

1 CGDF-RMU-03& 04 / 33KV RING MAIN UNIT - 1093 - - 1250 kVA 22 A 630 A

CGDF-HVTR-03 &
2 CGDF-LVSG-02/ 415V SWITCHGEAR CGDF-HVTR-04 547 50 820 kVA 1250 kVA 1739 A 2000 A
(33/0.433 KV)

CGDF-HVTR-05 &
3 CGDF-LVSG-03/ 415V SWITCHGEAR CGDF-HVTR-06 547 50 820 kVA 1250 kVA 1739 A 2000 A
(33/0.433 KV)

NOTES :
1 Electrical Load List has been prepared based on EPC Phase#1 Electrical Load List doc. no. TP-CGDF-00561-LST-A3, Rev D1. The values of efficiencies, power factors (i.e. p.f for motor loads, lighting loads, ups panels, auxiliary loads etc.) and load factors are based on vendor
data received during EPC phase#1. However, as per COMPANY recommendations, overall average power factor for 415V Switchgear and 33kV RMU has been considered as 0.95 for calculation purpose. Values of these factors shall be further verified by EPC contractor during
detailed engineering. Electrical load list is a live document and load ratings for different disciplines considered are preliminary loads which shall be further updated upon the receipt of actual vendor data during detailed engineering.
2 AC UPS power supply requirements for Telecom Cabinets, EIP Panels, Instrument Air Compressor Package, Incinerator Package, Ultrasonic Transmitters, HP/LP Flare Ignition Panels, CCTV Workstation, Auxiliary supply to 415V Switchgear & 33kV RMU etc. has been
considered to be fed from new 240V AC UPS (Tag no. CGDF-UPS-05A/B for Train-2 and CGDF-UPS-07A/B for Train 3) located in LCF. Refer relevant single line diagrams for more details on individual item load ratings.
3 Loads (UPS / Non-UPS) related to Hot Oil Package are not considered in this document as the requirements for Hot Oil System is not envisaged as part of Phase-II FEED scope.
4 Load for Direct Fired Heater (part of GDU package) as envisaged in FEED Phase-II depends on several factors i.e. Type of furnace (natural/forced) if forced then air blower required, Number of burners and burner management (Load due to ignition system and control
system), Dampener (Based on the type of control – Manual/Automatic) etc. Hence due to unavailability of these informations at FEED stage, load for Direct fired heater is not included in this load list. Same shall be included by EPC Contractor during detailed engineering.
Subsequently spare margin for electrical equipments has been considered as 50%.
5 DC UPS power supply requirements for DCS Cabinets, ESD Cabinets, FGS Cabinets,FGS Marshalling Cabinets, HSSD etc. has been considered to be fed from new 24V DC UPS (Tag no. CGDF-UPS-04A/B for Train-2 and CGDF-UPS-06A/B for Train 3) located in
LCF. Refer relevant single line diagrams for more details on individual item load ratings.
6 Common 2 nos. of RMU (Tag no. CGDF-RMU-03 & 04) has been considered for both Train-2 & Train-3.
7 Separate LCF for each Train-2 & Train-3 has been considered. Power supply to HVAC and Lighting & Small Power Loads for each LCF shall be fed from 415V Switchgear (CGDF-LVSG-02 for Train-2 and CGDF-LVSG-03 for Train-3).
8 Load rating for new 240V AC UPS system Bypass incomers are considered as 125% of the main incomer load rating.

SHEET : 003 OF 008


FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13
LOCATION : PACKAGE SUBSTATION 33kV RING MAIN UNIT : CGDF-RMU-03 & CGDF-RMU-04
Equipment Load calculation Consumed Load

Information
Efficiency Load

Rev.No
Factor
category
Absorbed Equipped Power factor

Load
Feeder
Load /
REMARKS

status
at load Duty Continuous Intermittent Stand-by
S. No

Type
Load
Bus
Tag Number Description Load Rating at load factor
factor C/I/S
kW kW pu in decimals cos j kW kVAr kW kVAr kW kVAr
1 CGDF-LVSG-02 415V SWITCHGEAR 458.76 289.62 166.29 101.45 117.19 84.96 A1
2 CGDF-LVSG-03 415V SWITCHGEAR 458.76 289.62 166.29 101.45 117.19 84.96 A1
Maximum of normal running plant load:
(Est.= x%E + y%F) 925.53 kW 582.18 kVAr (kW 2+ kVAr2) = 1093.4 kVA TOTAL 917.51 579.23 332.57 202.90 234.37 169.91 Power factor (cos j):
Peak load
996.17 kW 635.16 kVAr (kW 2+ kVAr2) = 1181.4 kVA kW
(Est.= x%E +y%F + z%G or Individual largest standby load) 0.95
kVA 1085.06 389.58 289.48 kVA
Diversity factors : x = 90, y = 30, z = 10.
NOTES:-
a) Load Duty: b) E - Sum of all continuous operating Load. d) Maximum & Peak Loads : e) Information status f) Load /Feeder Type g) Load category
C - "Continuous "; Loads that are normally running / energized F = Sum of all intermittent load Maximum Normal Running Plant Load : P - preliminary data. M - motor N - Normal loads
during normal operating times. G = Sum of all standby loads Est.= 90% * E + 30% *F V - vendor data F - switchboard/UPS/DB/ panel feeder E - Emergency loads
I - "Intermittent "; Loads in service on intermittent basis C) Diversity Factors: Peak Load : A - As built data L - lighting loads
e.g : Motorized valves, spares of continuously running consumers. x = 90%. Est.= 90% * E +30% * F + 10% * G or Individual largest standby load H - heater
S - "Stand by (S)" ; Loads connected but not normally energized. y = 30%.
z = 10 % or largest stand by load (whichever is larger)

SHEET : 004 OF 008


FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13
LOCATION : PACKAGE SUBSTATION 415 V SWITCHGEAR : CGDF-LVSG-02
Equipment Load calculation Consumed Load

Information
Efficiency Load

Rev.No
Factor
category
Absorbed Equipped Power factor

Load
Feeder
Load /
REMARKS

status
at load Duty Continuous Intermittent Stand-by
S. No

Type
Load
Bus
Tag Number Description Load Rating at load factor
factor C/I/S
kW kW pu in decimals cos j kW kVAr kW kVAr kW kVAr
1 CGDF-PM-2001A GLYCOL CIRCULATON PUMP MOTOR - A P A M N 75.30 110.00 0.68 0.95 0.84 C 79.10 51.09 A1

2 CGDF-PM-2001B GLYCOL CIRCULATON PUMP MOTOR - B P B M N 75.30 110.00 0.68 0.95 0.84 I 79.10 51.09 Refer Note - h A1

3 CGDF-PM-2005A pH BUFFER INJECTION PUMP MOTOR P A M N 0.09 0.25 0.36 0.60 0.40 I 0.15 0.34 A1

4 CGDF-PM-2004 ANTIFOAM INJECTION PUMP MOTOR P B M N 0.09 0.25 0.36 0.60 0.40 I 0.15 0.34 A1

5 CGDF-FM-2007A INLET AIR COOLER FAN MOTOR - A P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

6 CGDF-FM-2007B INLET AIR COOLER FAN MOTOR - B P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

7 CGDF-FM-2007C INLET AIR COOLER FAN MOTOR - C P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

8 CGDF-FM-2007D INLET AIR COOLER FAN MOTOR - D P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

9 CGDF-FM-2007E INLET AIR COOLER FAN MOTOR - E P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

10 CGDF-FM-2007F INLET AIR COOLER FAN MOTOR - F P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

11 CGDF-FM-2007G INLET AIR COOLER FAN MOTOR - G P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

12 CGDF-FM-2007H INLET AIR COOLER FAN MOTOR - H P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

13 CGDF-KM-1001A INSTRUMENT AIR COMPRESSOR MOTOR-A P A M N 45.00 50.00 0.90 0.94 0.88 C 47.77 25.78 A1

14 CGDF-FM-1005A INSTRUMENT AIR COMPRESSOR COOLING FAN MOTOR-A P A M N 1.60 2.20 0.73 0.83 0.68 C 1.94 2.09 A1

15 CGDF-FM-1006A COMPRESSOR ENCLOSURE COOLING FAN MOTOR-A P A M N 0.24 0.25 0.95 0.73 0.70 C 0.33 0.33 A1

16 CGDF-KM-1001B INSTRUMENT AIR COMPRESSOR MOTOR-B P B M N 45.00 50.00 0.90 0.94 0.88 I 47.77 25.78 Refer Note - h A1

17 CGDF-FM-1005B INSTRUMENT AIR COMPRESSOR COOLING FAN MOTOR-B P B M N 1.60 2.20 0.73 0.83 0.68 I 1.94 2.09 Refer Note - h A1

18 CGDF-FM-1006B COMPRESSOR ENCLOSURE COOLING FAN MOTOR-B P B M N 0.24 0.25 0.95 0.73 0.70 I 0.33 0.33 Refer Note - h A1

19 CGDF-KM-2008A INCINERATOR COMBUSTION AIR FAN MOTOR-A P A M N 17.58 18.50 0.95 0.92 0.86 C 19.06 11.31 A1

20 CGDF-KM-2008B INCINERATOR COMBUSTION AIR FAN MOTOR-B P B M N 17.58 18.50 0.95 0.92 0.86 I 19.06 11.31 Refer Note - h A1

21 CGDF-PM-2007A CORROSION INHIBITOR INJECTION PUMP MOTOR-A P A M N 0.71 0.75 0.95 0.80 0.55 I 0.89 1.36 A1

22 CGDF-PM-2007B CORROSION INHIBITOR INJECTION PUMP MOTOR-B P B M N 0.71 0.75 0.95 0.80 0.55 S 0.89 1.36 A1

23 CGDF-PM-2003A GLYCOL CLOSED DRAIN PUMP MOTOR-A P A M N 11.37 15.00 0.76 0.93 0.91 I 12.29 5.60 A1

24 CGDF-PM-2003B GLYCOL CLOSED DRAIN PUMP MOTOR-B P B M N 11.37 15.00 0.76 0.93 0.91 S 12.29 5.60 A1

25 CGDF-PM-2007 HYDRO CARBON DRAIN DRUM PUMP MOTOR P A M N 0.68 4.00 0.17 0.88 0.69 I 0.77 0.82 A1

26 CGDF-PM-2008 GLYCOL MAKEUP PUMP P B M N 3.51 5.50 0.64 0.92 0.85 I 3.84 2.38 A1

27 CGDF-LVDB-13-A HVAC SYSTEM FOR SS FEEDER-A P A F N 26.25 26.25 1.00 1.00 0.80 C 26.25 19.69 A1

28 CGDF-LVDB-13-B HVAC SYSTEM FOR SS FEEDER-B P B F N 26.25 26.25 1.00 1.00 0.80 S 26.25 19.69 A1

29 CGDF-LVDB-14-A HVAC SYSTEM FOR LCF FEEDER-A P A F N 35.32 35.32 1.00 1.00 0.80 C 35.32 26.49 Refer Note - 7 A1

30 CGDF-LVDB-14-B HVAC SYSTEM FOR LCF FEEDER-B P B F N 35.32 35.32 1.00 1.00 0.80 S 35.32 26.49 Refer Note - 7 A1

31 CGDF-UPS-04A 24V DC UPS-04A P A F N 4.42 8.84 0.50 1.00 0.80 C 4.42 3.32 A1

32 CGDF-UPS-04B 24V DC UPS-04B P B F N 4.42 8.84 0.50 1.00 0.80 C 4.42 3.32 A1

33 CGDF-LVDB-09 OUTDOOR NORMAL LIGHTING & SMALL POWER DB P B L N 40.00 40.00 1.00 1.00 0.85 C 40.00 24.79 A1

34 CGDF-LVDB-10 AUXILIARY POWER DB P B F N 9.31 9.31 1.00 1.00 0.90 C 9.31 4.51 A1

SHEET : 005 OF 008


FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13
LOCATION : PACKAGE SUBSTATION 415 V SWITCHGEAR : CGDF-LVSG-02
Equipment Load calculation Consumed Load

Information
Efficiency Load

Rev.No
Factor
category
Absorbed Equipped Power factor

Load
Feeder
Load /
REMARKS

status
at load Duty Continuous Intermittent Stand-by
S. No

Type
Load
Bus
Tag Number Description Load Rating at load factor
factor C/I/S
kW kW pu in decimals cos j kW kVAr kW kVAr kW kVAr
35 CGDF-LVDB-11 INDOOR LIGHTING & SMALL POWER DB-SS P A L N 5.32 5.32 1.00 1.00 0.85 C 5.32 3.29 A1

36 CGDF-LVDB-12 INDOOR LIGHTING & SMALL POWER DB- LCF P B L N 9.06 9.06 1.00 1.00 0.85 C 9.06 5.61 Refer Note - 7 A1

37 CGDF-UPS-05A 240V AC UPS-05-MAIN INCOMER P A F N 5.15 10.29 0.50 1.00 0.80 C 5.15 3.86 Refer Note - 2 A1

38 CGDF-UPS-05B 240V AC UPS-05-BYPASS INCOMER P B F N 6.43 12.86 0.50 1.00 0.80 S 6.43 4.82 Refer Note - 2 A1

39 CGDF-PM-82008A HYBRID INJECTION SKID MOTOR-A P A M N 0.71 0.75 0.95 0.80 0.55 C 0.89 1.36 A1

40 CGDF-PM-82008B HYBRID INJECTION SKID MOTOR-B P B M N 0.71 0.75 0.95 0.80 0.55 C 0.89 1.36 A1

41 CGDF-PM-82008C HYBRID INJECTION SKID MOTOR-C P A M N 0.71 0.75 0.95 0.80 0.55 C 0.89 1.36 A1

42 WR-5 & WR-6 WELDING RECEPTACLE CKT - 1 (2 No.s) P A F N 18.00 30.00 0.60 1.00 0.80 S 18.00 13.50 A1

43 WR-7 & WR-8 WELDING RECEPTACLE CKT - 2 (2 No.s) P B F N 18.00 30.00 0.60 1.00 0.80 S 18.00 13.50 A1
Maximum normal running plant load:
(Est.= x%E + y%F) 462.77 kW 291.09 kVAr (kW 2+ kVAr2) = 546.7 kVA TOTAL 458.76 289.62 166.29 101.45 117.19 84.96 Power factor (cos j):
Peak load
498.09 kW 317.58 kVAr (kW 2+ kVAr2) = 590.7 kVA kW
(Est.= x%E +y%F + z%G or Individual largest standby load) 0.95
kVA 542.53 194.79 144.74 kVA

NOTES
a) Load Duty: b) E - Sum of all continuous operating Load. d) Maximum & Peak Loads : e) Information status f) Load /Feeder Type g) Load category
C - "Continuous "; Loads that are normally running / energized F = Sum of all intermittent load Maximum Normal Running Plant Load : P - preliminary data. M - motor N - Normal loads
during normal operating times. G = Sum of all standby loads Est.= 90% * E + 30% *F V - vendor data F - switchboard/UPS/DB/ panel feeder E - Emergency loads
I - "Intermittent "; Loads in service on intermittent basis C) Diversity Factors: Peak Load : A - As built data L - lighting loads
e.g : Motorized valves, spares of continuously running consumers. x = 90%. Est.= 90% * E +30% * F + 10% * G or Individual largest standby load H - heater
S - "Stand by (S)" ; Loads connected but not normally energized. y = 30%.
e.g : Operational spares. z = 10 % or largest stand by load (whichever is larger)
h) These loads are standby duty loads which are considered as Intermittent based on Electrical Load List - CGDF for EPC Phase#1.

SHEET : 006 OF 008


FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13
LOCATION : PACKAGE SUBSTATION 415 V SWITCHGEAR : CGDF-LVSG-03
Equipment Load calculation Consumed Load

Feeder Type
Load

Information

Rev.No
Factor
Absorbed Equipped Efficiency at Power factor

category

Load
Load /
REMARKS

status
Duty Continuous Intermittent Stand-by
S. No

Load
Bus
Tag Number Description Load Rating load factor at load factor
C/I/S
kW kW pu in decimals cos j kW kVAr kW kVAr kW kVAr
1 CGDF-PM-3001A GLYCOL CIRCULATON PUMP MOTOR - A P A M N 75.30 110.00 0.68 0.95 0.84 C 79.10 51.09 A1

2 CGDF-PM-3001B GLYCOL CIRCULATON PUMP MOTOR - B P B M N 75.30 110.00 0.68 0.95 0.84 I 79.10 51.09 Refer Note - h A1

3 CGDF-PM-3005A pH BUFFER INJECTION PUMP MOTOR P A M N 0.09 0.25 0.36 0.60 0.40 I 0.15 0.34 A1

4 CGDF-PM-3004 ANTIFOAM INJECTION PUMP MOTOR P B M N 0.09 0.25 0.36 0.60 0.40 I 0.15 0.34 A1

5 CGDF-FM-3007A INLET AIR COOLER FAN MOTOR - A P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

6 CGDF-FM-3007B INLET AIR COOLER FAN MOTOR - B P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

7 CGDF-FM-3007C INLET AIR COOLER FAN MOTOR - C P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

8 CGDF-FM-3007D INLET AIR COOLER FAN MOTOR - D P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

9 CGDF-FM-3007E INLET AIR COOLER FAN MOTOR - E P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

10 CGDF-FM-3007F INLET AIR COOLER FAN MOTOR - F P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

11 CGDF-FM-3007G INLET AIR COOLER FAN MOTOR - G P A M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

12 CGDF-FM-3007H INLET AIR COOLER FAN MOTOR - H P B M N 19.31 22.00 0.88 0.92 0.86 C 21.08 12.51 A1

13 CGDF-KM-2001A INSTRUMENT AIR COMPRESSOR MOTOR-A P A M N 45.00 50.00 0.90 0.94 0.88 C 47.77 25.78 A1

14 CGDF-FM-2005A INSTRUMENT AIR COMPRESSOR COOLING FAN MOTOR-A P A M N 1.60 2.20 0.73 0.83 0.68 C 1.94 2.09 A1

15 CGDF-FM-2006A COMPRESSOR ENCLOSURE COOLING FAN MOTOR-A P A M N 0.24 0.25 0.95 0.73 0.70 C 0.33 0.33 A1

16 CGDF-KM-2001B INSTRUMENT AIR COMPRESSOR MOTOR-B P B M N 45.00 50.00 0.90 0.94 0.88 I 47.77 25.78 Refer Note - h A1

17 CGDF-FM-2005B INSTRUMENT AIR COMPRESSOR COOLING FAN MOTOR-B P B M N 1.60 2.20 0.73 0.83 0.68 I 1.94 2.09 Refer Note - h A1

18 CGDF-FM-2006B COMPRESSOR ENCLOSURE COOLING FAN MOTOR-B P B M N 0.24 0.25 0.95 0.73 0.70 I 0.33 0.33 Refer Note - h A1

19 CGDF-KM-3008A INCINERATOR COMBUSTION AIR FAN MOTOR-A P A M N 17.58 18.50 0.95 0.92 0.86 C 19.06 11.31 A1

20 CGDF-KM-3008B INCINERATOR COMBUSTION AIR FAN MOTOR-B P B M N 17.58 18.50 0.95 0.92 0.86 I 19.06 11.31 Refer Note - h A1

21 CGDF-PM-3007A CORROSION INHIBITOR INJECTION PUMP MOTOR-A P A M N 0.71 0.75 0.95 0.80 0.55 I 0.89 1.36 A1

22 CGDF-PM-3007B CORROSION INHIBITOR INJECTION PUMP MOTOR-B P B M N 0.71 0.75 0.95 0.80 0.55 S 0.89 1.36 A1

23 CGDF-PM-3003A GLYCOL CLOSED DRAIN PUMP MOTOR-A P A M N 11.37 15.00 0.76 0.93 0.91 I 12.29 5.60 A1

24 CGDF-PM-3003B GLYCOL CLOSED DRAIN PUMP MOTOR-B P B M N 11.37 15.00 0.76 0.93 0.91 S 12.29 5.60 A1

25 CGDF-PM-3007 HYDRO CARBON DRAIN DRUM PUMP MOTOR P A M N 0.68 4.00 0.17 0.88 0.69 I 0.77 0.82 A1

26 CGDF-PM-3008 GLYCOL MAKEUP PUMP P B M N 3.51 5.50 0.64 0.92 0.85 I 3.84 2.38 A1

27 CGDF-LVDB-22-A HVAC SYSTEM FOR LCF FEEDER-A P A F N 35.32 35.32 1.00 1.00 0.80 C 35.32 26.49 Refer Note - 7 A1

28 CGDF-LVDB-22-B HVAC SYSTEM FOR LCF FEEDER-B P B F N 35.32 35.32 1.00 1.00 0.80 S 35.32 26.49 Refer Note - 7 A1

29 CGDF-LVDB-18-A HVAC SYSTEM FOR SS FEEDER-A P A F N 26.25 26.25 1.00 1.00 0.80 C 26.25 19.69 A1

30 CGDF-LVDB-18-B HVAC SYSTEM FOR SS FEEDER-B P B F N 26.25 26.25 1.00 1.00 0.80 S 26.25 19.69 A1

31 CGDF-UPS-06A 24V DC UPS-06A P A F N 4.42 8.84 0.50 1.00 0.80 C 4.42 3.32 A1

32 CGDF-UPS-06B 24V DC UPS-06B P B F N 4.42 8.84 0.50 1.00 0.80 C 4.42 3.32 A1

33 CGDF-LVDB-15 OUTDOOR NORMAL LIGHTING & SMALL POWER DB P B L N 40.00 40.00 1.00 1.00 0.85 C 40.00 24.79 A1

34 CGDF-LVDB-16 AUXILIARY POWER DB P B F N 9.31 9.31 1.00 1.00 0.90 C 9.31 4.51 A1

35 CGDF-LVDB-17 INDOOR LIGHTING & SMALL POWER DB-SS P A L N 5.32 5.32 1.00 1.00 0.85 C 5.32 3.29 A1

SHEET : 007 OF 008


FEED STUDY FOR NAG LTFD PHASE II

ELECTRICAL LOAD LIST - CGDF

Contract No: SA-080-2015


TP-CGDF-80562-LST-A3 Rev. A1 Date: APR 19, 2018
WG CTR#: CTR#13
LOCATION : PACKAGE SUBSTATION 415 V SWITCHGEAR : CGDF-LVSG-03
Equipment Load calculation Consumed Load

Feeder Type
Load

Information

Rev.No
Factor
Absorbed Equipped Efficiency at Power factor

category

Load
Load /
REMARKS

status
Duty Continuous Intermittent Stand-by
S. No

Load
Bus
Tag Number Description Load Rating load factor at load factor
C/I/S
kW kW pu in decimals cos j kW kVAr kW kVAr kW kVAr
36 CGDF-LVDB-21 INDOOR LIGHTING & SMALL POWER DB- LCF P B L N 9.06 9.06 1.00 1.00 0.85 C 9.06 5.61 Refer Note - 7 A1

37 CGDF-UPS-07A 240V AC UPS-07-MAIN INCOMER P A F N 5.15 10.29 0.50 1.00 0.80 C 5.15 3.86 Refer Note - 2 A1

38 CGDF-UPS-07B 240V AC UPS-07-BYPASS INCOMER P A F N 6.43 12.86 0.50 1.00 0.80 S 6.43 4.82 Refer Note - 2 A1

39 CGDF-PM-92008A HYBRID INJECTION SKID MOTOR-A P A M N 0.71 0.75 0.95 0.80 0.55 C 0.89 1.36 A1

40 CGDF-PM-92008B HYBRID INJECTION SKID MOTOR-B P B M N 0.71 0.75 0.95 0.80 0.55 C 0.89 1.36 A1

41 CGDF-PM-92008C HYBRID INJECTION SKID MOTOR-C P A M N 0.71 0.75 0.95 0.80 0.55 C 0.89 1.36 A1

42 WR-9 & WR-10 WELDING RECEPTACLE CKT - 1 (2 No.s) P A F N 18.00 30.00 0.60 1.00 0.80 S 18.00 13.50 A1

43 WR-11 & WR-12 WELDING RECEPTACLE CKT - 2 (2 No.s) P B F N 18.00 30.00 0.60 1.00 0.80 S 18.00 13.50 A1
Maximum normal running plant load:
(Est.= x%E + y%F) 462.77 kW 291.09 kVAr (kW 2+ kVAr2) = 546.7 kVA TOTAL 458.76 289.62 166.29 101.45 117.19 84.96 Power factor (cos j):
Peak load

(Est.= x%E +y%F + z%G or Individual largest standby load)


498.09 kW 317.58 kVAr (kW 2+ kVAr2) = 590.7 kVA kW
0.95
kVA 542.53 194.79 144.74 kVA

NOTES
a) Load Duty: b) E - Sum of all continuous operating Load. d) Maximum & Peak Loads : e) Information status f) Load /Feeder Type g) Load category
C - "Continuous "; Loads that are normally running / energized F = Sum of all intermittent load Maximum Normal Running Plant Load : P - preliminary data. M - motor N - Normal loads
during normal operating times. G = Sum of all standby loads Est.= 90% * E + 30% *F V - vendor data F - switchboard/UPS/DB/ panel feeder E - Emergency loads
I - "Intermittent "; Loads in service on intermittent basis C) Diversity Factors: Peak Load : A - As built data L - lighting loads
e.g : Motorized valves, spares of continuously running consumers. x = 90%. Est.= 90% * E +30% * F + 10% * G or Individual largest standby load H - heater
S - "Stand by (S)" ; Loads connected but not normally energized. y = 30%.
e.g : Operational spares. z = 10 % or largest stand by load (whichever is larger)
h) These loads are standby duty loads which are considered as Intermittent based on Electrical Load List - CGDF for EPC Phase#1.

SHEET : 008 OF 008