SECTION (6)
INSPECTION AND TESTING DURING
MANUFACTURE
CONTENT
6.2. Sub-contractors
In order to facilitate the inspection of bought-out materials and plant, the contractor
shall be submit for approval three copies of all specifications placed by him.
One copy of any drawing referred to in the sub-order shall be submitted, unless
otherwise agreed by the Purchaser / Engineer.
The drawings and sub-orders submitted to the purchaser / engineer shall cover all
major components which are subject to electrical and mechanical pressure and stress
when the plant is in operation and also all auxiliaries, materials and stores which will
be dispatched to site direct from the sub-contractor's works. For the purpose of this
clause, inter-works orders shall be treated as sub-orders. Sub-orders shall include a
statement advising the sub-contractor that the item being order will be subject to
inspection and test by the purchaser / engineer.
It is important that all copies of sub-orders are clearly marked with the main
contractor's name the following reference:
if any test fail to comply with the appropriate specifications for the material in
question ,the purchaser /Engineer may reject the whole of the material represented by
that test ,the contractors designers and metallurgists will be consulted before any
material is so rejected .
in the event of the purchaser /engineer being furnished with certified particular of the
test which have been carried out for the contractor by the suppliers of material ,the
purchaser engineer may at his own discretion, dispense with previously mentioned
test entirely.
Under the above condition the engine shall be run steadily to the satisfaction of the
purchaser /engineer .all the necessary services ,instruments ,meter ,lubricating oil
,water ,fuel oil….. etc. which are required for the tests shall be provided by the
contractor as part of contract .satisfactory proof of the accuracy of all instruments and
of the calorific value of the fuel used in the tests shall be furnished –to-the .purchaser
/engineer
During these shop tests, the engine shall be run as far as practicable with the auxiliary
to be incorporated in the site installation ,the engine shall be free from all water fuel
or lubricating oil leak .
Speed control and govern ring tests to ISO 3046 shall be carried out .tests of all
engine protection devices shall be carried out on this occasion.