INSPECTION AND TEST FLOW CHART

(Blasting and Painting) Figure 2

Fabrication Activity QC Activity QC Activity Description

Surface Preparation
Start
 Check ambient temperature
 Check steel surface temperature
 Check garnet for size and no contaminant
 Check surface cleanliness achieved
Surface Preparation by  Repair, re-blast and re-check
Reject
Blasting  Report and record.
 Check peak and valey roughness for anchor
QC
Check

Accepted
Report
Spray Painting – 1st Coat

Apply  Follow paint matrix


1st Coat Reject  Check surface for grit contaminant
 Check paint product use.
QC  Monitor mixing, thinning, pot life
 Check spray tip for size
Check
 Check WFT
 Repair, re-apply, and re-check.
Accepted  Record and report.
Report
Spray Painting – 2nd Coat
Apply
2 Coat
nd Reject  Observe curing time of previous coat and coating
internal
 Check previous DFT
QC  Check for surface contaminant
Check  Check paint batch number
 Monitor paint mixing, thinning, pot life
Accepted  Check tip size for correct tips
Report  Check WFT
 Record and report
Apply  Check colour of 2nd coat-correct
Final Coat Reject

Spray Painting – Final Coat


QC
Check  Check climate/ Dew Point
 Check previous total DFT
 Check curing time and coating internal of previous coat
Accepted
Report application
 Check for surface contaminant
Report  Check paint batch for expiring
 Monitor paint mixing, thinning, pot life
 Check for correct tip size use
 Check WFT
Deliver  Record and report
 Check appearance, sagging, chaulking, etc

Completion
Finish
 Prepare joint inspection with Client Representative
 Prepare Acceptance Note
 Prepare Handover Certificate