TIMELINE AND MANPOWER EXCEL TEMPLATE SAMPLE MONTH MAY JUNE

INSTRUCTION: COUNT OF DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

PLEASE FILL UP ALL PER LEVEL OR FLOOR BASIS DATE 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

USE ARROW TO INDICATE DATE START AND DATE END DAY M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T

Floor /
Level Scope of Work Prerequisites / Concerns / Notes Manpower Start End

1 Pipe lay-out for split type aircon No confirmation on the aircon location

Stair Pressurization None

Toilet Exhaust None

Fresh Air duct For mock up / Area not ready for installation yet

Exhaust Air duct For mock up / Area not ready for installation yet

Transfer jet fan None

2 Pipe lay-out for split type aircon No confirmation on the aircon location

Stair Pressurization Done / Already Installed

Toilet Exhaust For verification of toilet location

Fresh Air duct For mock up / Area not ready for installation yet.

Exhaust Air duct For mock up / Area not ready for installation yet.

Transfer jet fan Area not yet ready for installation of Jets Fans / Due to workers
temfacil
3 Pipe lay-out for split type aircon None

Stair Pressurization Done / Already Installed

Toilet Exhaust None

Fresh Air duct For mock up/ Area is not ready for installation of ducts

Exhaust Air duct Area is not ready for installation of ducts


Area not yet ready for installation of Jets Fans / Due to workers
Transfer jet fan temfacil
4 Pipe lay-out for split type aircon None

Stair Pressurization Done / Already Installed

Toilet Exhaust None

Fresh Air duct For Mock up / Area is not ready for installation of ducts

Exhaust Air duct Area is not ready for installation of ducts


Area not yet ready for installation of Jets Fans / Due to workers
Transfer jet fan temfacil
5 Pipe lay-out for split type aircon None

Stair Pressurization For Mock up / Area is not ready for installation of ducts/ Due
unfinished pouring of floor slab 3 5/18 5/18 3
Toilet Exhaust None
Fresh Air duct Area not yet ready for installation of ducts
Exhaust Air duct Area not yet ready for installation of ducts
Area not yet ready for installation of Jets Fans / Due to workers
Transfer jet fan temfacil

6 Pipe lay-out for split type aircon None

Stair Pressurization For Mock up / Area is not ready for installation of ducts/ Due
unfinished pouring of floor slab 3 5/18 5/18 3
Toilet Exhaust None

Fresh Air duct Area not yet ready for installation of ducts

Exhaust Air duct Area not yet ready for installation of ducts

Transfer jet fan Area not yet ready for installation of Jets Fans

7 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/20 5/20 3
For Mock up / Area is not ready for installation of ducts/ Due
Stair Pressurization unfinished pouring of floor slab 3 5/18 5/18 3
Toilet Exhaust Installed female toilet only 2 5/27 5/27 2
Fresh Air duct Area not yet ready for installation of ducts 2 5/24 5/24 2
Exhaust Air duct Done
Transfer jet fan None

8 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/20 5/21 3 3
Stair Pressurization For Mock up / Area is not ready for installation of ducts/ Due
unfinished pouring of floor slab 3 5/19 5/20 3 3
Toilet Exhaust Installed female toilet only 2 5/27 5/27 2
Fresh Air duct Partially installed 60% / for installation of remaining 40% 3 5/18 5/19 3 3
Exhaust Air duct Done

Transfer jet fan None

9 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/21 5/22
For Mock up / Area is not ready for installation of ducts/ Due
Stair Pressurization unfinished pouring of floor slab 3 5/19 5/20 3 3
Toilet Exhaust Installed female toilet only 2 5/28 5/28 2
Fresh Air duct Area not yet ready for installation of ducts 3 5/23 5/24 3 3
Exhaust Air duct Done / Already Installed

Transfer jet fan None

10 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/22 5/23 3 3
Stair Pressurization For Mock up / Area is not ready for installation of ducts/ Due
unfinished pouring of floor slab 3 5/21 5/22 3 3
Toilet Exhaust For installation both male and female 2 5/22 5/28 2 2
Fresh Air duct Area not yet ready for installation of ducts 3 6/6 6/7 3 3
Exhaust Air duct Done / Already Installed

Transfer jet fan None

11 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/25 5/26 3 3
For Mock up / Area is not ready for installation of ducts/ Due
Stair Pressurization unfinished pouring of floor slab 3 5/21 5/22 3 3
Toilet Exhaust For installation both male and female 2 5/22 5/29 2 2
Fresh Air duct Area not yet ready for installation of ducts 3 6/7 6/9 3 3
Exhaust Air duct Done / Already Installed 3 5/28 5/29 3 3
Transfer jet fan None

12 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/26 5/27 3 3
For Mock up / Area is not ready for installation of ducts/ Due
Stair Pressurization unfinished pouring of floor slab 3 5/21 5/22 3 3
Toilet Exhaust For installation both male and female 2 5/23 5/29
Fresh Air duct Area not yet ready for installation of ducts 2 6/10 6/11 2 2
Exhaust Air duct Area not yet ready for installation of ducts 3 6/1 6/2 3 3
Transfer jet fan None

13 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/27 5/28 3 3
For Mock up / Area is not ready for installation of ducts/ Due
Stair Pressurization unfinished pouring of floor slab 3 5/21 5/22 3 3
Toilet Exhaust For installation both male and female 2 5/23 5/30 2 2
Fresh Air duct Area not yet ready for installation of ducts 3 6/12 6/13 3 3
Exhaust Air duct Area not yet ready for installation of ducts

Transfer jet fan None

14 Pipe lay-out for VRF type aircon Pipe Riser only ( Zone 1) For verification due to conflict with plumbing contractor 3 5/28 5/29 3 3
For Mock up / Area is not ready for installation of ducts/ Due
Stair Pressurization unfinished pouring of floor slab 3 5/24 5/25 3 3
Toilet Exhaust For installation both male and female 2 5/25 5/30 2 2
Fresh Air duct Area not yet ready for installation of ducts 3 6/14 6/15 3 3
Exhaust Air duct Area not yet ready for installation of ducts 3 6/23 6/24 3 3
Transfer jet fan None

DAILY MANPOWER 4

(PLEASE SUM UP NUMBER OF MANPOWER PER DAY BASIS)


JULY
38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F S SU M T W TH F

You might also like