Appendix Transmission Operation and Maitenance Guideline-V3 - 092020
Appendix Transmission Operation and Maitenance Guideline-V3 - 092020
11 163
Deploying new
equipment
The plan is approved by the board of
- Analyze implementation requirements directors
As
Making plan - Check the input information Note: The plan must include an LLD DS BO
requirement
- Planning project implementation if the deployment project changes the
LLD
- Equipment/system is installed in
accordance with the Design.
- Check the infrastructure
Installing - Completion of the Equipment As plan DS BO
- Installation
Installation Acceptance Record
(BM1)
- Network node declared on NIMS
- The device is powered on
- Completed signing the minutes of
network node integration to NIMS
(BM04.03)
- Declare the network node on NIMS - Complete signing of power-on
As plan DS BO
- Power on the device minutes (BM02)
- Must ensure the power standard
condition for the axis station (if the
new device operation involves
converting the access station to the
main station)
Intergrating
triển khai
ai
g
Periodically Execu Co-
No Regulation Content Implementation Result Reference
/ Duration te ordinate
- Declare equipment/systems to
BO receives
' - The BO received and exploited the
the
network node
- Prepare to hand over the account, the handover handover
- Perform loading test
documents, ensure that it has been integrated into the within 3
- The time to complete the hand-over
monitoring system working
is no more than 30 days after
- Perform the handover days from
completing the ATP test DS BO
Handover, loading test - Update resource information, device configuration to the date of
Note: In case the deployment group is
monitoring and management systems the
also the BO operating and exploiting,
- Sign test loading plan handover by
the acceptance and handover records
- Load test the
only need to sign the leader of the BO
deployment
unit.
unit
Power off
- The updated network node is no time is
longer on the network within 30
Step 4 Power off, remove and move device - The device is powered off, the days after DS,BO BO,VCC
hardware is disconnected and moved device has
out of the installation location finished
service
Report on the implementation result
Step 5 Completed and reported implementation results As plan DS,BO BO,VCC
is approved, closed
Monitoring alarm system
1728/QĐ-CNVTQĐ-VTNet: Quy
2
system
'Alảm levels must be optimized with a frequency of 01 The alarm level corresponds to the
Reviewing alarm levels Monthly FO BO
month/time, ensuring the alarm level is correct with the severity of the problem
priority to be handled.
- Creates a TT on incident management software for
network problems, including:
- Create the TT on time, correct type
Creating TT + Problems arising from alarm monitoring, ber error, 10 minutes FO
of problem, correct object handle
performance, server / DCN, Database
+ Incident from another unit
- When the incident occurs, individuals and units - Assignment and operation of
involved in troubleshooting incident with the existing incident handling to the right subjects
As
Handling TT MOP. /units FO
regulation
- In the event of an incident affecting the service, the - Incidents are restored and
Contingency plan must be prioritized. fulfillment on target
- Check routing, service parameters are running
thay đổi
Periodically Execu Co-
No Regulation Content Implementation Result Reference
/ Duration te ordinate
- CR and ECR need to be approved by the NOC / GNOC - CR approved in the right order, LĐP/B
Approving CR Daily FE
BoD before implementation decentralized GĐ
- CRs and ECRs must be verified by CAB (or ECAB)
before approval
- CR/ECR assessment results of CAB / ECAB must
Impacting indicate:
6
system + The feasibility of change;
CR is assessed properly / sufficient
Assessing CR + The extent and scope of affected; Daily BO FE
content as required
+ Possible risks;
+ Actions to promptly respond to problems, minimize
impacts on services;
+ Requirements to supplement, improve CR / ECR (if
any).
- CR is executed correctly/enough on
- CRs must be scheduled by date.
request BO/FO/
Executing CR - The implementation of CR must be strictly adhered to Daily FE
- The process of implementation must FT
the pre-scheduled calendar and the approved content
ensure network safety
- Checking the conditions for assurance of: tools; MOP,
Check the conditions DT; service tests; Network status ready for CR - Ensure conditions for CR As BO/FO/
FE
before the implementation implementation. implementation regulation FT
- If this condition is not met, CR is not allowed.
QT.VTNet
638/QyĐ-VTNet-
1728/QĐ-CNVT
Periodically Execu Co-
No Regulation Content Implementation Result Reference
/ Duration te ordinate
Checking the backup of - Switch each active/standby SCC, cross-connect card Every 6
- The backup card works fine FE BO
SCC, cross-connect - Ensure the cards are stable months
Checking the backup of - Switch each active/standby SCC, cross-connect card Every 6
- The backup card works fine FE BO
SCC, cross-connect - Ensure the cards are stable months
Checking cable
connection, tighten screws, - Clean and maintance hardware equipment - The cable lay as standard
Quarterly FT FO
screws, recover unused - Ensure equipment operates in the best conditions - The connections are firmly fixed
redundant cables
Cleaning the inside of the - Clean and maintance hardware equipment Every 6
- Card is clean FT FO
equipment - Ensure equipment operates in the best conditions months
Access equipment
4077/QyĐ-VTNet-CNTT: WLA/OLA Quy trình bảo dư
1728/QĐ-CNVTQĐ-VTNet: Quy định VHKT mạng viễn
3127/QĐ-VTNet-VHKTTC: Quy định bảo dưỡng
Reinforcement and
maintenance cable
Approve the risk plan Evaluate the risk plan Evaluate the risk plan After 3 days BO QLVĐ
iễn thông
lý rủi ro
Periodically Execu Co-
No Regulation Content Implementation Result Reference
/ Duration te ordinate
- Check the temperature, humidity of the machine Evaluate whether the machine
Check the operating
room and equipment room environment is standardized Yearly BO FT
environment
- Check room humidity or not
Clean the dust filter - Check and clean the dust filter of the appliance Check and clean the equipment Yearly BO FT
Check FAN - Check the status and operation of the FAN module Evaluate the status of the FAN Yearly BO FT
Fix rack, shelf - Check, re-rack, shelf of equipment to ensure safety Equipment is secure Yearly BO FT
- Clean patchcord, connectors are not guaranteed
Clean patchcord - Take all patchcord yarn at risk of unsafe as Room is clean Yearly BO FT
prescribed
- Measure the spectral power of the channel by
Measurement of channel OTDR. Check, compare the actual test
Yearly BO FT
power spectra - Test the accuracy of the spectrum measurement with the system
on the system.
Ensure 1 shelf is supplied from 2
Check the DC power Check the DC power connection at the site Yearly BO FT
different DC cabinets
Check the switch over
- Check for switch-over card activity when one card
the control card on the The control card works fine Yearly BO FT
is faulty
device
- Reviewing and checking cable entry routes,
Check the cable status critical points on cable lines and proposing The list unsafe optical cable Yearly BO FT
corrective measures
Network resource
- Update new cable: update the cable database to NIMS
as guidelines.
Fully updated information
- Update after emergency
Cable information (infrastructure and cable connection) Monthly FT FO
- Update after re-route, move, relocation, maintenance
to NIMS
and repair of optical cable
- Update change information after patrol
Node database:
optical/microwave/vsat/bac - Update node database: type/configuration - Update all of network database Quarterly BO
kbone/access
n thông
ế
management