PTW NO. :
PAGE: :
PREPARED BY : DATE: REVIEWED AND ENDORSED BY: DATE: APPROVED BY: DATE:
SYAWAL
6. DISMANTLE EXISTING MCC 4 PANEL 6.1-SHARP OBJECT C3 6.1.1-IDENTIFY PIINCH POINT WHILE DOING WORK C1 WORKLEADER
6.2-ELECTRICAL SHOCK C3 6.2.1-TO APPLY ELECTRICAL ISOLATION C1 WORKLEADER
6.2.2-WEAR PROPER PPE AND ELECTRICAL GLOVES C1 WORKERS
7. INSTALL NEW MCC PANEL 7.1-SHARP OBJECT C3 7.1.1-IDENTIFY PIINCH POINT WHILE DOING WORK C1 WORKLEADER
7.2-SLIP, TRIP AND FALL C3 7.2.1-BEWARE OF THE EQUIPMENTS OR ANY OBSTACLES C1 WORKERS
AROUND THE WORK AREA
7.2.2-WEAR PROPER PPE C1 WORKERS
8. LAYING NEW CABLE 8.1-SHARP EDGE C3 8.1.1-WEAR GLOVES C1 WORKLEADER
8.2-ERGONOMIC C3 8.2.1-LAY / PULL AT LEAST 2 PERSON C1 WORKERS
9. GLANDING AND TERMINATION FOR INCOMER AND 9.1-ELECTRICAL ENERGY SOUCE C3 9.1.1-SAFE WORK PRACTICE C1 WORKLEADER
OUTGOING CABLE 9.1.2-SECURE CABLE DURING INSTALLATION C1 WORKERS
10. TESTING AND COMMISSIONING 10.1-ELECTRICAL SHOCK C3 10.1.1-USE PROPER TOOLS AND FOLLOW THE JOB STEP C1 WORKLEADER
DURING TESTING
10.1.2-WEAR PROPER PPE C1 WORKERS
11. HOUSEKEEPING 11.1-SLIP AND FALL C3 11.1.1-REMOVE ALL LOOSE MATERIALS FROM WORK AREA C1 WORKLEADER
AND WALKAWAYS.
11.1.2-ENSURE NO EQUIPMENT ARE LEFT. C1 WORKLEADER