BALOCHISTAN INTEGRATED WATER RESOURCES MANAGEMENT & DEVELOPMENT PROJECT - BIWRMDP

Project Supervision & Implementation Assistance Consultant (PSIAC)


JOINT VENTURE OF ACE-CAMEOS & KASIB (As Sub-Consultant)

TIME SHEET
NAME: Rasool Khan DESIGNATION: Site Supervisor EMPLOYER: KASIB ASSOCIATES

MONTH & YEAR: November- 22 Grade Employee Code

Sunday/ Holiday

Present

Absent
Leave

Total
Tour
DATE DAY WORK PERFORMED REMARKS

1 Tuesday Supervised Stone Masonry of 5 Cell Culvert RD 1+056 Package-1 1


2 Wednesday Supervised Stone Masonry of Spillway Dam#3 1
3 Thursday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
4 Friday Supervised Stone Masonry of Spillway Dam#2 1
5 Saturday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
6 Sunday Weekend 1
Monday Supervised Stone Masonry of 5 Cell Culvert RD 1+056 Package-1 1
8 Tuesday Supervised Stone Masonry of Spillway Dam#3 1
9 Wednesday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
10 Thursday Supervised Stone Masonry of Spillway Dam#2 1
11 Friday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
12 Saturday Supervised Land Leveling Work at Ameen Balwo Land 1
13 Sunday Weekend 1
14 Monday Supervised Stone Masonry of 5 Cell Culvert RD 1+056 Package-1 1
15 Tuesday Supervised Stone Masonry of Spillway Dam#3 1
16 Wednesday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
17 Thursday Supervised Stone Masonry of Spillway Dam#2 1
18 Friday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
19 Saturday Supervised Land Leveling Work at Muhammad Gul Land 1
20 Sunday Weekend 1
21 Monday Supervised Stone Masonry of 5 Cell Culvert RD 1+056 Package-1 1
22 Tuesday Supervised Pouring Concrete Coping on Wing Walls of Spillway Dam#3 1
23 Wednesday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
24 Thursday Supervised Stone Masonry of Spillway Dam#2 1
25 Friday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
26 Saturday Supervised Land Leveling Work at Abdul Wahab Land 1
27 Sunday Weekend 1
28 Monday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
29 Tuesday Supervised Stone Masonry of Spillway Dam#2 1
30 Wednesday Supervised RCC Concrete Pouring Stilling Basin Bed at Weir Structure Package-1 1
4 26 30
W = WEEKEND S = SICK LEAVE
H = HOLIDAY E = EARNED LEAVE
T = TOUR R = RECREATION LEAVE
C = CASUAL LEAVE L = LEAVE ON LOSS OF PAY
2) MANAGER ADMIN
1) SIGNATURE OF EMPLOYEE 3) SIGNATURE OF RE/CDS
PSIAC

4) EXECUTIVE DIRECTOR KASIB 5) SIGNATURE OF CHIEF RESIDENT 6) SIGNATURE OF DEPUTY PROJECT


7) TEAM LEADER
ASSOCIATES ENGINEER DIRECTOR (PIU)