The location of the preliminary test pile is around Ring Road Phase Ⅲ
Tinishu Akaki Viaduct Pier six (drawing attached to A) Static load testing
28.6meters. The test pile may be considered to have failed when the total
=6783.583KN
JUNE 2007
3、Testing preparing
The hydraulic jack, pump, hoses, pipes, couplings and other apparatus to
pressure of 1½ times the maximum pressure used in the test without leaking
3.2.4 kentledge
than 859MT.
During the execution on the load test, the load shall be applied, decreased
maintained at the specified value for not less than the time specified in
Table a.Reduction of load at the end of the test, shall be gradual and the