INSPECTION CLEARANCE REPORT

DATE: 16 ohAy
cONTRACTOR MANUFACTURER

U.P. STATE BRIDGE CORPORATION LTD (U.P.S.B.C. L) M/S HMM INFRA LTD. AMBALA

DRG. NOD PURCHASING AUTHORITY

SP-AP/STR/FLY/101 RO SERIES U.P. STATE BRIDGE CORPORATION LTD (U.P.S.B.C. L)

DESCRIPTION OF STORES MATERIAL SPECIFICATION

PROJECT: CONSTRUCTION OF FLYOVER FOR


"PROPOSED DIRECT CONNECTIVITY BETWEEN
SHAHEED PATH & AIRPORT IN DIST. LUCKNOW IN
UTTAR PRADESH) IS 2062-2011 E350 BR (for plates & rolled section)
96 M STEEL TRUSS FOR FLYOVER
PO2 (355.145m) to PO5 (451.145m)

YPE OF INSPECTION/TEST CONDUCTED: VISUAL/PHYSICAL/CHEMICAL/METROLOGICAL/ELECTRICAL


DIMENSIONAL/NDTs/PERFORMANCE TEST/ ANY OTHER

Contract/CHP
Details if inspection/Tests Qty for which
Sr. no. Rquirements Result Remarks
Conducted Stage in Cleared
for Tests

Incoming raw Visual, dimensional, chemical & M.T.C. & Inspection reports
Confirms 96M Span
material mechanical properties reviewed. attached
1No.(2nd Span)

Remarks: Above raw material is cleared for further Fabrication processes.

It is certified that based on the inspection/tests conducted at above mfg. Stage/CHP of QAP material is cleared for further
processing.

N E R

CanlcaionEngieersnlenationalLnd
k Revlewed
fT/Witnessed
ipin Vincent
(CEI-261W
Date: