Contractor :Perfect Engineering

Client/Owner:ArcelorMittal Nippon Steel India Limited


Structural Erection
PO No.-5200014584

Monthly Report(Erection) - oct-2022


Progress
Till Last This month Till Last This month RFI ACC (THIS
Erection Month (MT) (MT) Cumulative (MT) Remarks Month (Nos) (Nos) MONTH)

Erection 513.73 304.92 818.65 RFI Raised 6 2 1


Alignment 0.00 0.00 0.00
Final Till Last This month Cumulative
handover 0.00 0.00 0.00 Month (Nos) (Nos) (Nos)

NCR summary 0 0 0

Stage Wise Inspection Status Welder Tests


Till Last week This Week Cumulative (MT) Till Last This month Cumulative WQT accepted
(MT) (MT) Remarks Month (Nos) (Nos) (Nos) (this month)

Alignment 0.00 0.00 0.00 SMAW 4 0 4 0

Final
handover 0.00 0.00 0.00 FCAW 0 0 0 0

GMAW 0 0 0 0

Total 4 0 4 0
RFI REJ OR Cumulative
CANCEL (THIS (Nos)
MONTH)

1 8

Closed (Nos)

Tests
This month
WQT rejected Welder
(this month) qualify(Nos)

0
0
0
0
0
0
0 0