CONSTRUCTION METHODOLOGY

PROJECT : FIVE STOREY SCHOOL BUILDING WITH BASEMENT


LOCATION : INDANGAN, DAVAO CITY
DATE : December 12, 2022

METHODOLOGY FOR EXECUTION OF WORKS

 Personnel working on site will be complete of Personal Protective Equipment prior to


start of construction

 All approach will be as per plan. Designs will duly follow by the construction team.
 Surface up for waterproofing will be properly prepare and cleared.
 Rough surfaces will be well grinded
 Reglet Terminations will be up for chipping
 Bitumen Membrane Will be well applied
 Surface applied will be flood tested to ensure no leak will arise

HEALTH AND SAFETY PROCEDURE

PURPOSE
This procedure is designed to provide instructions and to assign responsibilities for
safety control.

SAFETY POLICY
a.) Safety precedes all activities.
b.) It shall be a duty for each person to create the safety environment.

 All personnel are required to wear face mask at all times


 Site supervisor will be strict for health monitoring of all workers
 Foot bath and alcohol will be on site for disinfection
 Daily health monitoring sheet/log will be provided
 Personnel are limited only to stay on site to prevent interactions on other person
outside.

RESPONSIBILITIES AND AUTHORITY

Project Engineer shall take responsibilities for the safety of all activities and promote
the safety consciousness among all workers at every stage of the work. Specifically, he shall
adjust and coordinate construction work in the safest manner based on the detailed work
schedule.

SAFE WORKING PRACTICES


All workers shall wear the following equipment whenever they are on the site
a.) Hard hat

b.) Hand gloves for jobs which have potential for hand injuries, burns, chemical
infections,etc.

c.) Safety belts at heights of over 2.0m above the ground level were properly
constructed working platforms are neither available nor practical.

d.) Welding shield while doing welding works, anti-glare eye protection (safety
goggles while doing gas cutting or any similar activities.
e.) All workers are required to wear face mask and face shield

TOOLS AND EQUIPMENT

a.) The following three basic principles shall be applied to and govern the safe use of hand and
power tools, and which principles are :

1. To use the correct tool for the job in the correct way.
2. To use only tools in good conditions
3. To maintain and store tools properly after use.

LIST OF TOOLS AND EQUIPMENT:

 Personal Protective Equipment


 Survey Equipment
 Earth-moving Equipment
 Heavy machinery

WARRANTY
- 1 year after work completion

CONSTRUCTION LEAD TIME

- 30 Calendar days upon receipt of Purchase Order


Prepared By:

Engr. Kelvene Silva


CIVIL ENGINEER