The document provides calculations to determine the number of rebar pieces needed for the footings of a structure. It is constructing 20 footings that are 1.05 meters long on the long side and 0.575 meters long on the short side. The calculations show that 12 pieces of rebar are needed for the long side of each footing, with 12 pieces also needed for the short sides, resulting in a total of 24 pieces of 12mm rebar being required.
The document provides calculations to determine the number of rebar pieces needed for the footings of a structure. It is constructing 20 footings that are 1.05 meters long on the long side and 0.575 meters long on the short side. The calculations show that 12 pieces of rebar are needed for the long side of each footing, with 12 pieces also needed for the short sides, resulting in a total of 24 pieces of 12mm rebar being required.
The document provides calculations to determine the number of rebar pieces needed for the footings of a structure. It is constructing 20 footings that are 1.05 meters long on the long side and 0.575 meters long on the short side. The calculations show that 12 pieces of rebar are needed for the long side of each footing, with 12 pieces also needed for the short sides, resulting in a total of 24 pieces of 12mm rebar being required.
L = 1.20-0.075(2)+.125(2) = 1.05m = 1.175 20 sets of footing # of pcs = 3X20 = 60pcs of 1.175 = 70.5 =11.5 or 12 pcs rebar for long side L = 0.60-0.075(2)+125(2) = 0.575 20 sets of footing # of pcs = 6X20 = 120pcs of 0.575 = 69m = 11.5 or 12 rebar for short sides Total =24pcs of 12mm(6m)