DESIGN OF DECK SLAB

1 1
DESIGN OF deck slab
1 DESIGN DATA
Overall width of deck slab = 16 m
No of lanes for design purpose = 3 #
No of girders = 5 #
C/C of Girder = 3 m
Girder width at top = 1 m
Width of carriageway = 15 m
Width of paved portion = 15 m
width of footpath = 0 m
Width of crash barrier at outer edge of footpath = 0.5 m
Width of crash barrier = 0.5 m
Thickness of deck slab Slab = 0.240 m
Thickness of wearing coat = 0.075 m
Unit weight of concrete = 25 kN/m3
Grade of concrete = M 30 Ec= 31 Gpa
Grade of Steel = Fe 500
Cover to slab = 40 mm
Thk. Of top flage of girder at face of web = 0.130m 0.3 = width of web
4 EFFECTIVE WIDTH OF SLAB
Effective Width beff = a x a x (1-a/lo) b1
lo Effective Span a = The distance of the CG of the conc. load
from the nearest support.
b = Width of slab i.e C/C of bearings
Overall depth of top slab considered = 240 mm
Adopt bar of dia = 12 mm
Clear cover = 40 mm
Effective depth = 194 mm
lo = 3 m a = 2.600
b1 = Breadth of loads over deck after 45 o
dispersion through wearing coat.
Class 70RTracked Width of Tyre =4.570m b1 =4.720m
400kn Bogie Load Width of Tyre =0.235m b2 =0.385m
Class 70R Wheeled Width of Tyre =0.235m b3 =0.385m
Class A Wheeled Width of Tyre =0.227m b4 =0.377m
Dispersion Width is considered as the Wheel length over the span after 45 o dispersion through
wearing coat and slab
Impact Factor (For Wheeled Vehicle) = 1.250
Impact Factor (For Tracked Vehicle) = 1.250
Impact Factor - Class A = 1.500
70R Tracked Load dispersion along span of deck slab
Dispersion along Span = 0.79 2(ts+twc)
ts Thickness of Slab twc Thickness of wearing coat
Dispersion along Span = 1.420 m
40 R Bogie Loading dispersion along span of deck slab
width of tyre = 0.81
Dispersion along Span = 1.440 m
Class A wheel dispersion along span of deck slab
width of tyre = 0.475
Dispersion along Span = 1.105 m
70 R Wheeled Vehicle dispersion along span of deck slab
width of tyre = 0.81
Dispersion along Span = 1.440 m

2 2
CALCULATION OF LODS
Self weight of wearing coat consiedrd as = 2.20 Kn/sq.m 2.2
Self weight of crash barrier/Haind rail per running
= meter 8.00 Kn/sq.m 16
16
16
Additional footpath DL per running meter/ running width 0.00 Kn/sq.m 0
Additional footpath LL per running meter/ running width 3.72 Kn/sq.m 3.72
CALCULATION OF EFFECTIVE WIDTH AND LOAD INTENSITY
Loads on a( m) b1( m) beff ( m) beff / 2 ( m) Net Load Load

Class A 1st case a = 2.60


114.00 0.900 0.377 1.457 0.729 2.657 42.906 58.243
114.00 0.700 0.377 1.772 0.886 2.972 38.354 52.064
114.00 0.600 0.377 1.625 0.813 2.825 40.354 54.779
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
57.00 0.100 0.377 0.628 0.314 0.628 90.716 123.144
114.00 1.300 0.377 2.292 1.146 3.492 32.643 44.312
Class A 2nd case
114.00 0.600 0.377 1.625 0.813 2.825 40.354 54.779
114.00 0.600 0.377 1.625 0.813 2.825 40.354 54.779
114.00 1.100 0.377 2.188 1.094 3.388 33.645 45.672
57.00 0.100 0.377 0.628 0.314 0.628 90.716 123.144
114.00 1.400 0.377 2.318 1.159 3.518 32.402 43.984
114.00 0.400 0.377 1.278 0.639 2.478 45.999 62.442
Class A 3rd case
114.00 0.650 0.377 1.701 0.850 2.901 39.299 53.347
114.00 1.150 0.377 2.221 1.110 3.421 33.325 45.238
57.00 0.150 0.377 0.747 0.374 0.747 76.254 103.512
114.00 1.350 0.377 2.308 1.154 3.508 32.502 44.120
Class A 4th case
57.00 0.350 0.377 1.181 0.590 1.181 48.271 65.526
114.00 0.850 0.377 1.961 0.980 3.161 36.066 48.959
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
Class A 5th case
57.00 0.350 0.377 1.181 0.590 1.181 48.271 65.526
114.00 0.850 0.377 1.961 0.980 3.161 36.066 48.959
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
Class A 6th case
114.00 0.650 0.377 1.701 0.850 2.901 39.299 53.347
114.00 1.150 0.377 2.221 1.110 3.421 33.325 45.238
114.00 1.000 0.377 2.110 1.055 3.310 34.438 46.748
114.00 0.800 0.377 1.902 0.951 3.102 36.747 49.882
Class A 7th case
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868

40 R + class A -CASE 1
100.00 0.120 0.385 0.685 0.342 2.055 48.673 42.251
200.00 0.820 0.385 1.934 0.967 3.304 60.528 52.542
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
40 R + class A -CASE 2
200.00 0.750 0.385 1.848 0.924 3.218 62.160 53.958
100.00 0.190 0.385 0.848 0.424 2.218 45.091 39.142
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
40 R + class A -CASE 3
200.00 0.915 0.385 2.038 1.019 3.408 58.678 50.936

3 3
200.00 1.145 0.385 2.226 1.113 3.596 55.621 48.282
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
40 R + class A -CASE 4
200.00 1.310 0.385 2.304 1.152 3.674 54.441 47.258
200.00 0.750 0.385 1.848 0.924 3.218 62.160 53.958
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868

40 R + class A -CASE 5
200.00 0.915 0.385 2.038 1.019 3.408 58.678 50.936
200.00 1.145 0.385 2.226 1.113 3.596 55.621 48.282
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
40 R + class A -CASE 6
200.00 1.310 0.385 2.304 1.152 3.674 54.441 47.258
200.00 0.750 0.385 1.848 0.924 3.218 62.160 53.958
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
70 R Track + CLASS A CASE 1
350 0.120 4.720 5.020 2.510 5.020 69.728 61.380
350 0.820 4.720 6.269 3.135 6.269 55.828 49.144
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
70 R Track + CLASS A CASE 2
350 0.750 4.720 6.183 3.091 6.183 56.611 49.834
350 0.190 4.720 5.183 2.591 5.183 67.532 59.447
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
70 R Track + CLASS A CASE 3
350 0.930 4.720 6.388 3.194 6.388 54.787 48.228
350 1.130 4.720 6.551 3.276 6.551 53.424 47.028
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
70 R Track + CLASS A CASE 4
350 1.310 4.720 6.639 3.319 6.639 52.721 46.409
350 0.750 4.720 6.183 3.091 6.183 56.611 49.834
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
70 R Track + CLASS A CASE 5
350 0.930 4.720 6.388 3.194 6.388 54.787 48.228
350 1.130 4.720 6.551 3.276 6.551 53.424 47.028
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
70 R Track + CLASS A CASE 6
350 1.310 4.720 6.639 3.319 6.639 52.721 46.409
350 0.750 4.720 6.183 3.091 6.183 56.611 49.834
57.00 0.000 0.377 0.377 0.189 0.377 151.194 205.240
114.00 1.200 0.377 2.249 1.125 3.449 33.053 44.868
SV Vehical 1
45 0.725 0.274 1.703 0.852 1.703 26.417 64.4
45 1.475 0.274 2.223 1.112 2.223 20.239 49.4
45.00 0.475 0.274 1.313 0.657 1.313 34.261 83.6
45.00 0.275 0.274 0.923 0.462 0.923 48.730 118.9
SV Vehical 2
45 1.425 0.274 2.219 1.110 2.219 20.278 49.5
45 0.825 0.274 1.829 0.915 1.829 24.602 60.0
45.00 0.225 0.274 0.815 0.408 0.815 55.206 134.6
45.00 0.975 0.274 1.985 0.993 1.985 22.669 55.3

4 4
SUMMARY OF GOVERNING BENDING MOMENTS AND SHEAR FORCES All Bm are in Kn-m and SF are in Kn
Bending Moments
Memb Locat
No. ion Class Class Class Class Class Class Class 40 R+ 40 R+ 40 R+ 40 R+ 40 R+ 40 R+ 70 R+ 70 R+ 70 R+ 70 R+ 70 R+ 70 R+ LL LL LL LL
DL WC CB HR FPDL FPLL Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A SV SV HOG SAG
A-1 A-2 A-3 A-4 A-5 A-6 A-7 HOG SAG
1 2 3 4 5 6 1 2 3 4 5 6 SV SV
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load no in staad 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
3 End 6.75 1.10 10.00 0.00 0.00 0.00 38.58 0.00 0.00 0.00 0.00 0.00 0.00 0.21 0.00 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.58 0.00 0.00 0.00
4 End 10.27 2.00 12.80 0.00 0.00 0.00 61.09 0.00 0.00 0.09 0.00 0.00 0.00 4.26 0.00 0.00 0.00 0.00 0.00 5.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.09 0.00 0.00 0.00
7 Start -3.49 -1.25 -0.22 0.00 0.00 0.00 -21.01 -18.83 -5.62 -20.49 0.15 -5.57 0.02 -16.70 -21.17 -11.73 -16.73 -11.73 -16.73 -18.39 -20.45 -11.17 -16.23 -11.17 -16.23 0.30 0.19 0.15 -21.17 0.30 0.19
7 End 1.00 0.34 0.18 0.00 0.00 0.00 4.49 3.03 2.96 3.98 -0.09 2.93 -0.01 4.44 3.55 5.66 7.02 5.66 7.02 3.62 3.79 5.39 6.84 5.39 6.84 -0.17 -0.11 7.02 -0.09 -0.11 -0.17
10 End -2.06 -0.76 0.06 0.00 0.00 0.00 -9.14 -8.44 -4.66 -10.68 0.10 -4.62 0.01 -11.24 -10.40 -11.21 -14.10 -11.21 -14.10 -10.89 -10.21 -10.68 -13.75 -10.68 -13.75 0.20 0.12 0.10 -14.10 0.20 0.12
13 End 0.88 0.33 -0.05 0.00 0.00 0.00 3.58 3.37 0.87 0.15 0.29 0.97 0.03 3.86 4.30 3.80 6.63 3.80 6.63 3.97 3.48 3.65 6.47 3.65 6.47 0.56 0.35 6.63 0.03 0.56 0.35
14 End 3.32 1.23 -0.10 0.00 0.00 0.00 19.82 19.29 14.58 31.09 0.44 14.70 0.03 21.56 16.30 21.04 20.74 21.04 20.74 20.78 18.56 19.94 20.13 19.94 20.13 0.69 0.43 31.09 0.03 0.69 0.43
17 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -18.42 -18.70 -18.64 -23.52 -20.50 -25.68 -2.01 -2.39 -4.28 -23.43 -21.63 -23.43 -21.63 -2.37 -5.21 -22.64 -19.99 -22.64 -19.99 -40.01 -25.09 -2.01 -25.68 -25.09 -40.01
17 End 0.90 0.33 0.00 0.00 0.00 0.00 6.25 5.53 5.93 1.89 3.99 9.22 1.15 1.45 0.71 6.46 3.94 6.46 3.94 1.44 0.45 6.17 3.67 6.17 3.67 10.54 10.74 9.22 0.45 10.74 10.54
20 End -2.09 -0.77 0.00 0.00 0.00 0.00 -12.22 -11.41 -12.00 -12.16 -10.68 -19.35 -1.32 -1.22 -1.48 -14.62 -10.21 -14.62 -10.21 -1.22 -1.57 -14.04 -9.35 -14.04 -9.35 -24.21 -20.94 -1.22 -19.35 -20.94 -24.21
23 End 0.91 0.33 0.00 0.00 0.00 0.00 2.56 2.27 2.81 5.90 0.14 8.45 -3.52 -3.61 -3.38 3.12 1.31 3.12 1.31 -3.60 -3.30 2.82 0.87 2.82 0.87 9.83 8.48 8.45 -3.61 9.83 8.48
24 End 3.37 1.24 0.00 0.00 0.00 0.00 21.82 20.84 21.23 17.91 31.09 27.47 11.93 11.76 12.17 26.66 21.55 26.66 21.55 11.77 12.31 25.88 20.65 25.88 20.65 41.13 35.91 31.09 11.76 41.13 35.91
27 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -16.90 -17.69 -15.71 -0.31 -23.50 -16.17 -23.17 -23.17 -23.18 -23.43 -23.34 -23.43 -23.34 -23.17 -23.18 -23.41 -23.32 -23.41 -23.32 -16.52 -35.19 -0.31 -23.50 -16.52 -35.19
27 End 0.91 0.33 0.00 0.00 0.00 0.00 4.60 4.67 5.24 0.25 1.89 1.94 1.62 1.61 1.62 1.82 1.75 1.82 1.75 1.61 1.62 1.81 1.74 1.81 1.74 -2.05 0.69 5.24 0.25 0.69 -2.05
30 End -2.09 -0.77 0.00 0.00 0.00 0.00 -11.73 -12.00 -11.73 0.09 -12.14 -6.26 -12.24 -12.24 -12.23 -12.16 -12.19 -12.16 -12.19 -12.24 -12.23 -12.17 -12.19 -12.17 -12.19 -2.86 -12.56 0.09 -12.24 -2.86 -12.56
33 End 0.90 0.33 0.00 0.00 0.00 0.00 5.54 6.00 5.54 -0.08 5.89 3.64 5.97 5.97 5.97 5.91 5.93 5.91 5.93 5.97 5.97 5.91 5.93 5.91 5.93 2.20 7.30 6.00 -0.08 7.30 2.20
34 End 3.37 1.24 0.00 0.00 0.00 0.00 15.97 15.57 15.38 -0.13 17.90 7.10 18.04 18.04 18.04 17.93 17.97 17.93 17.97 18.04 18.04 17.94 17.98 17.94 17.98 3.97 14.25 18.04 -0.13 14.25 3.97
37 Start -3.32 -1.23 -0.12 0.10 0.00 0.03 -0.28 -11.49 -0.27 0.00 -0.31 -0.12 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.31 -0.07 -0.25 0.00 -11.49 -0.07 -0.25
37 End 0.88 0.33 0.07 -0.05 0.00 -0.01 0.22 -0.66 0.22 0.00 0.25 0.10 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.06 0.20 0.25 -0.66 0.20 0.06
40 End -2.06 -0.76 -0.08 0.06 0.00 0.02 0.08 -2.58 0.08 0.00 0.09 0.03 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.02 0.07 0.09 -2.58 0.07 0.02
43 End 1.00 0.35 -0.23 0.18 0.00 0.05 -0.07 1.87 -0.07 0.00 -0.08 -0.03 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.08 -0.02 -0.06 1.87 -0.08 -0.02 -0.06
44 End 3.49 1.12 0.70 0.22 0.00 0.06 -0.12 3.43 -0.11 0.00 -0.13 -0.05 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.13 -0.03 -0.11 3.43 -0.13 -0.03 -0.11
47 Start -10.27 0.00 0.00 -12.80 0.00 -3.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
47 End 6.75 0.00 0.00 10.00 0.00 1.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Shear Force
Memb Locat Class Class Class Class Class Class Class 40 R+ 40 R+ 40 R+ 40 R+ 40 R+ 40 R+ 70 R+ 70 R+ 70 R+ 70 R+ 70 R+ 70 R+ LL SF
DL WC CB HR FPDL FPLL Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A Cla A SV SV LL SF
No. ion A-1 A-2 A-3 A-4 A-5 A-6 A-7 SV
1 2 3 4 5 6 1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
2 End 7.84 1.56 8.00 0.00 0.00 0.00 50.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.15 0.00
8 End -4.90 -1.57 -0.12 0.00 0.00 0.00 -22.82 -19.64 -6.05 -15.88 0.12 -5.98 0.01 -15.84 -25.67 -15.85 -26.78 -15.85 -26.78 -15.37 -24.12 -15.14 -25.90 -15.14 -25.90 0.30 0.22 26.78 0.30
12 End 4.77 1.55 -0.12 0.00 0.00 0.00 20.96 19.91 15.87 21.31 0.12 15.94 0.01 26.60 15.59 27.14 31.77 27.14 31.77 25.13 15.64 25.81 31.09 25.81 31.09 0.30 0.22 31.77 0.30
18 End -4.84 -1.56 0.00 0.00 0.00 0.00 -27.76 -26.18 -27.04 -15.60 -15.88 -38.01 -1.19 -1.34 -1.08 -31.17 -25.71 -31.17 -25.71 -1.33 -0.99 -30.01 -23.58 -30.01 -23.58 -53.76 -39.20 38.01 53.76
22 End 4.84 1.56 0.00 0.00 0.00 0.00 15.36 13.14 14.58 27.52 21.30 38.78 -1.19 -1.34 -1.08 20.68 10.93 20.68 10.93 -1.33 -0.99 19.33 9.75 19.33 9.75 48.76 48.50 38.78 48.76
28 End -4.84 -1.56 0.00 0.00 0.00 0.00 -18.88 -21.39 -20.32 -0.14 -15.58 -19.53 -15.45 -15.45 -15.45 -15.57 -15.52 -15.57 -15.52 -15.45 -15.45 -15.57 -15.52 -15.57 -15.52 -4.71 -28.80 38.01 28.80
32 End 4.84 1.56 0.00 0.00 0.00 0.00 26.89 26.25 26.36 -0.14 27.50 8.46 27.63 27.63 27.63 27.50 27.55 27.50 27.55 27.63 27.63 27.51 27.56 27.51 27.56 2.42 15.89 38.01 15.89
38 End -4.77 -1.56 -0.07 0.12 0.00 0.03 -0.13 -7.46 -0.13 0.00 -0.14 -0.05 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.02 -0.10 38.01 0.10
42 End 4.90 1.56 -0.07 0.12 0.00 0.03 -0.13 2.60 -0.13 0.00 -0.14 -0.05 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.14 -0.02 -0.10 38.01 0.10
48 End -7.84 0.00 0.00 -8.00 0.00 -2.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.01 0.00

5 5
LL LL ULS-Factor for

LOCATION
HOG SAG LL HOG LL SAG
DL WC CB HR FPDL FPLL
MEM LL SV SV DL WC CB HR FPDL FPLL LL HOG LL SAG SV load SV load GOVERNONG GOVERNON
No. HOG LL SAG load load 1.35 1.75 1.35 1.35 1.35 1.5 1.5 1.5 1 1 HOGGING G SAGGING
3 End 6.75 1.10 10.00 0.00 0.00 0.00 38.58 0.00 0.00 0.00 9.11 1.93 13.50 0.00 0.00 0.00 57.87 0.00 0.00 0 82.41 0.00
4 End 10.27 2.00 12.80 0.00 0.00 0.00 61.09 0.00 0.00 0.00 13.86 3.50 17.28 0.00 0.00 0.00 91.64 0.00 0.00 0 126.28 0.00
7 Start -3.49 -1.25 -0.22 0.00 0.00 0.00 0.15 -21.17 0.30 0.19 -4.71 -2.19 -0.30 0.00 0.00 0.00 0.23 -31.76 0.30 0.19 0.00 -38.95
7 End 1.00 0.34 0.18 0.00 0.00 0.00 7.02 -0.09 -0.11 -0.17 1.35 0.60 0.24 0.00 0.00 0.00 10.53 -0.14 -0.11 -0.17 12.72 0.00
10 End -2.06 -0.76 0.06 0.00 0.00 0.00 0.10 -14.10 0.20 0.12 -2.78 -1.33 0.08 0.00 0.00 0.00 0.15 -21.15 0.20 0.12 0.00 -25.18
13 End 0.88 0.33 -0.05 0.00 0.00 0.00 6.63 0.03 0.56 0.35 1.19 0.58 -0.07 0.00 0.00 0.00 9.95 0.05 0.56 0.35 11.64 0.00
14 End 3.32 1.23 -0.10 0.00 0.00 0.00 31.09 0.03 0.69 0.43 4.48 2.15 -0.14 0.00 0.00 0.00 46.64 0.05 0.69 0.43 53.13 0.00
17 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -2.01 -25.68 -25.09 -40.01 -4.55 -2.17 0.00 0.00 0.00 0.00 -3.02 -38.52 -25.09 -40.01 0.00 -46.73
17 End 0.90 0.33 0.00 0.00 0.00 0.00 9.22 0.45 10.74 10.54 1.22 0.58 0.00 0.00 0.00 0.00 13.83 0.68 10.74 10.54 15.62 0.00
20 End -2.09 -0.77 0.00 0.00 0.00 0.00 -1.22 -19.35 -20.94 -24.21 -2.82 -1.35 0.00 0.00 0.00 0.00 -1.83 -29.03 -20.94 -24.21 0.00 -33.19
23 End 0.91 0.33 0.00 0.00 0.00 0.00 8.45 -3.61 9.83 8.48 1.23 0.58 0.00 0.00 0.00 0.00 12.68 -5.42 9.83 8.48 14.48 -3.61
24 End 3.37 1.24 0.00 0.00 0.00 0.00 31.09 11.76 41.13 35.91 4.55 2.17 0.00 0.00 0.00 0.00 46.64 17.64 41.13 35.91 53.35 0.00
27 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -0.31 -23.50 -16.52 -35.19 -4.55 -2.17 0.00 0.00 0.00 0.00 -0.47 -35.25 -16.52 -35.19 0.00 -41.97
27 End 0.91 0.33 0.00 0.00 0.00 0.00 5.24 0.25 0.69 -2.05 1.23 0.58 0.00 0.00 0.00 0.00 7.86 0.38 0.69 -2.05 9.67 -0.24
30 End -2.09 -0.77 0.00 0.00 0.00 0.00 0.09 -12.24 -2.86 -12.56 -2.82 -1.35 0.00 0.00 0.00 0.00 0.14 -18.36 -2.86 -12.56 0.00 -22.53
33 End 0.90 0.33 0.00 0.00 0.00 0.00 6.00 -0.08 7.30 2.20 1.22 0.58 0.00 0.00 0.00 0.00 9.00 -0.12 7.30 2.2 10.79 0.00
34 End 3.37 1.24 0.00 0.00 0.00 0.00 18.04 -0.13 14.25 3.97 4.55 2.17 0.00 0.00 0.00 0.00 27.06 -0.20 14.25 3.97 33.78 0.00
37 Start -3.32 -1.23 -0.12 0.10 0.00 0.03 0.00 -11.49 -0.07 -0.25 -4.48 -2.15 -0.16 0.14 0.00 0.05 0.00 -17.24 -0.07 -0.25 0.00 -23.90
37 End 0.88 0.33 0.07 -0.05 0.00 -0.01 0.25 -0.66 0.20 0.06 1.19 0.58 0.09 -0.07 0.00 -0.02 0.38 -0.99 0.20 0.06 2.17 0.00
40 End -2.06 -0.76 -0.08 0.06 0.00 0.02 0.09 -2.58 0.07 0.02 -2.78 -1.33 -0.11 0.08 0.00 0.03 0.14 -3.87 0.07 0.02 0.00 -8.01
43 End 1.00 0.35 -0.23 0.18 0.00 0.05 1.87 -0.08 -0.02 -0.06 1.35 0.61 -0.31 0.24 0.00 0.08 2.81 -0.12 -0.02 -0.06 4.78 0.00
44 End 3.49 1.12 0.70 0.22 0.00 0.06 3.43 -0.13 -0.03 -0.11 4.71 1.96 0.95 0.30 0.00 0.09 5.15 -0.20 -0.03 -0.11 13.15 0.00
47 Start #### 0.00 0.00 -12.80 0.00 -3.39 0.00 0.00 0.00 0.00 ##### 0.00 0.00 -17.28 0.00 -5.09 0.00 0.00 0.00 0 0.00 -36.23
47 End 6.75 0.00 0.00 10.00 0.00 1.86 0.00 0.00 0.00 0.00 9.11 0.00 0.00 13.50 0.00 2.79 0.00 0.00 0.00 0 25.40 0.00
LL SF ULS-Factor for
LOCATION

LL SF SV
SV
DL WC CB HR FPDL FPLL DL WC CB HR FPDL FPLL LL SF loading
MEM loadin
No. LL SF g 1.35 1.75 1.35 1.35 1.35 1.5 1.5 1 GOV. SF
2 End 7.84 1.56 8.00 0.00 0.00 0.00 50.15 0.00 10.58 2.73 10.80 0.00 0.00 0.00 75.23 0.00 99.34
8 End 4.90 1.57 0.12 0.00 0.00 0.00 26.78 0.30 6.62 2.75 0.16 0.00 0.00 0.00 40.17 0.30 49.69
12 End 4.77 1.55 0.12 0.00 0.00 0.00 31.77 0.30 6.44 2.71 0.16 0.00 0.00 0.00 47.66 0.30 56.97
18 End 4.84 1.56 0.00 0.00 0.00 0.00 38.01 53.76 6.53 2.73 0.00 0.00 0.00 0.00 57.02 53.76 66.28
22 End 4.84 1.56 0.00 0.00 0.00 0.00 38.78 48.76 6.53 2.73 0.00 0.00 0.00 0.00 58.17 48.76 67.43
28 End 4.84 1.56 0.00 0.00 0.00 0.00 38.01 28.80 6.53 2.73 0.00 0.00 0.00 0.00 57.02 28.80 66.28
32 End 4.84 1.56 0.00 0.00 0.00 0.00 38.01 15.89 6.53 2.73 0.00 0.00 0.00 0.00 57.02 15.89 66.28
38 End 4.77 1.56 0.07 0.12 0.00 0.03 38.01 0.10 6.44 2.73 0.09 0.16 0.00 0.05 57.02 0.10 66.49
42 End 4.90 1.56 0.07 0.12 0.00 0.03 38.01 0.10 6.62 2.73 0.09 0.16 0.00 0.05 57.02 0.10 66.66
48 End 7.84 0.00 0.00 8.00 0.00 2.64 38.01 0.00 10.58 0.00 0.00 10.80 0.00 3.96 57.02 0.00 82.36

6 6
LL LL SLS-RARE COMBINATION Factor

LOCATION
HOG SAG LL HOG LL SAG
DL WC CB HR FPDL FPLL
MEM LL SV SV DL WC CB HR FPDL FPLL LL HOG LL SAG SV load SV load GOVERNONG GOVERNON
No. HOG LL SAG load load 1 1.2 1 1 1 1 1 1 1 1 HOGGING G SAGGING
3 End 6.75 1.10 10.00 0.00 0.00 0.00 38.58 0.00 0.00 0.00 6.75 1.32 10.00 0.00 0.00 0.00 38.58 0.00 0.00 0 56.65 0.00
4 End 10.27 2.00 12.80 0.00 0.00 0.00 61.09 0.00 0.00 0.00 10.27 2.40 12.80 0.00 0.00 0.00 61.09 0.00 0.00 0 86.56 0.00
7 Start -3.49 -1.25 -0.22 0.00 0.00 0.00 0.15 -21.17 0.30 0.19 -3.49 -1.50 -0.22 0.00 0.00 0.00 0.15 -21.17 0.30 0.19 0.00 -26.38
7 End 1.00 0.34 0.18 0.00 0.00 0.00 7.02 -0.09 -0.11 -0.17 1.00 0.41 0.18 0.00 0.00 0.00 7.02 -0.09 -0.11 -0.17 8.61 0.00
10 End -2.06 -0.76 0.06 0.00 0.00 0.00 0.10 -14.10 0.20 0.12 -2.06 -0.91 0.06 0.00 0.00 0.00 0.10 -14.10 0.20 0.12 0.00 -17.01
13 End 0.88 0.33 -0.05 0.00 0.00 0.00 6.63 0.03 0.56 0.35 0.88 0.40 -0.05 0.00 0.00 0.00 6.63 0.03 0.56 0.35 7.86 0.00
14 End 3.32 1.23 -0.10 0.00 0.00 0.00 31.09 0.03 0.69 0.43 3.32 1.48 -0.10 0.00 0.00 0.00 31.09 0.03 0.69 0.43 35.79 0.00
17 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -2.01 -25.68 -25.09 -40.01 -3.37 -1.49 0.00 0.00 0.00 0.00 -2.01 -25.68 -25.09 -40.01 0.00 -44.87
17 End 0.90 0.33 0.00 0.00 0.00 0.00 9.22 0.45 10.74 10.54 0.90 0.40 0.00 0.00 0.00 0.00 9.22 0.45 10.74 10.54 12.04 0.00
20 End -2.09 -0.77 0.00 0.00 0.00 0.00 -1.22 -19.35 -20.94 -24.21 -2.09 -0.92 0.00 0.00 0.00 0.00 -1.22 -19.35 -20.94 -24.21 0.00 -27.22
23 End 0.91 0.33 0.00 0.00 0.00 0.00 8.45 -3.61 9.83 8.48 0.91 0.40 0.00 0.00 0.00 0.00 8.45 -3.61 9.83 8.48 11.14 -2.30
24 End 3.37 1.24 0.00 0.00 0.00 0.00 31.09 11.76 41.13 35.91 3.37 1.49 0.00 0.00 0.00 0.00 31.09 11.76 41.13 35.91 45.99 0.00
27 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -0.31 -23.50 -16.52 -35.19 -3.37 -1.49 0.00 0.00 0.00 0.00 -0.31 -23.50 -16.52 -35.19 0.00 -40.05
27 End 0.91 0.33 0.00 0.00 0.00 0.00 5.24 0.25 0.69 -2.05 0.91 0.40 0.00 0.00 0.00 0.00 5.24 0.25 0.69 -2.05 6.55 -0.74
30 End -2.09 -0.77 0.00 0.00 0.00 0.00 0.09 -12.24 -2.86 -12.56 -2.09 -0.92 0.00 0.00 0.00 0.00 0.09 -12.24 -2.86 -12.56 0.00 -15.57
33 End 0.90 0.33 0.00 0.00 0.00 0.00 6.00 -0.08 7.30 2.20 0.90 0.40 0.00 0.00 0.00 0.00 6.00 -0.08 7.30 2.2 8.60 0.00
34 End 3.37 1.24 0.00 0.00 0.00 0.00 18.04 -0.13 14.25 3.97 3.37 1.49 0.00 0.00 0.00 0.00 18.04 -0.13 14.25 3.97 22.90 0.00
37 Start -3.32 -1.23 -0.12 0.10 0.00 0.03 0.00 -11.49 -0.07 -0.25 -3.32 -1.48 -0.12 0.10 0.00 0.03 0.00 -11.49 -0.07 -0.25 0.00 -16.31
37 End 0.88 0.33 0.07 -0.05 0.00 -0.01 0.25 -0.66 0.20 0.06 0.88 0.40 0.07 -0.05 0.00 -0.01 0.25 -0.66 0.20 0.06 1.55 0.00
40 End -2.06 -0.76 -0.08 0.06 0.00 0.02 0.09 -2.58 0.07 0.02 -2.06 -0.91 -0.08 0.06 0.00 0.02 0.09 -2.58 0.07 0.02 0.00 -5.57
43 End 1.00 0.35 -0.23 0.18 0.00 0.05 1.87 -0.08 -0.02 -0.06 1.00 0.42 -0.23 0.18 0.00 0.05 1.87 -0.08 -0.02 -0.06 3.29 0.00
44 End 3.49 1.12 0.70 0.22 0.00 0.06 3.43 -0.13 -0.03 -0.11 3.49 1.34 0.70 0.22 0.00 0.06 3.43 -0.13 -0.03 -0.11 9.24 0.00
47 Start #### 0.00 0.00 -12.80 0.00 -3.39 0.00 0.00 0.00 0.00 ##### 0.00 0.00 -12.80 0.00 -3.39 0.00 0.00 0.00 0 0.00 -26.46
47 End 6.75 0.00 0.00 10.00 0.00 1.86 0.00 0.00 0.00 0.00 6.75 0.00 0.00 10.00 0.00 1.86 0.00 0.00 0.00 0 18.61 0.00

7 7
LL LL SLS-RARE COMBINATION Factor

LOCATION
HOG SAG LL HOG LL SAG
DL WC CB HR FPDL FPLL
MEM LL SV SV DL WC CB HR FPDL FPLL LL HOG LL SAG SV load SV load GOVERNONG GOVERNON
No. HOG LL SAG load load 1 1.2 1 1 1 0 0 0 0 0 HOGGING G SAGGING
3 End 6.75 1.10 10.00 0.00 0.00 0.00 38.58 0.00 0.00 0.00 6.75 1.32 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0 18.07 0.00
4 End 10.27 2.00 12.80 0.00 0.00 0.00 61.09 0.00 0.00 0.00 10.27 2.40 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0 25.47 0.00
7 Start -3.49 -1.25 -0.22 0.00 0.00 0.00 0.15 -21.17 0.30 0.19 -3.49 -1.50 -0.22 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 -5.21
7 End 1.00 0.34 0.18 0.00 0.00 0.00 7.02 -0.09 -0.11 -0.17 1.00 0.41 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0 1.59 0.00
10 End -2.06 -0.76 0.06 0.00 0.00 0.00 0.10 -14.10 0.20 0.12 -2.06 -0.91 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 -2.91
13 End 0.88 0.33 -0.05 0.00 0.00 0.00 6.63 0.03 0.56 0.35 0.88 0.40 -0.05 0.00 0.00 0.00 0.00 0.00 0.00 0 1.23 0.00
14 End 3.32 1.23 -0.10 0.00 0.00 0.00 31.09 0.03 0.69 0.43 3.32 1.48 -0.10 0.00 0.00 0.00 0.00 0.00 0.00 0 4.70 0.00
17 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -2.01 -25.68 -25.09 -40.01 -3.37 -1.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 -4.86
17 End 0.90 0.33 0.00 0.00 0.00 0.00 9.22 0.45 10.74 10.54 0.90 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 1.30 0.00
20 End -2.09 -0.77 0.00 0.00 0.00 0.00 -1.22 -19.35 -20.94 -24.21 -2.09 -0.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 -3.01
23 End 0.91 0.33 0.00 0.00 0.00 0.00 8.45 -3.61 9.83 8.48 0.91 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 1.31 0.00
24 End 3.37 1.24 0.00 0.00 0.00 0.00 31.09 11.76 41.13 35.91 3.37 1.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 4.86 0.00
27 Start -3.37 -1.24 0.00 0.00 0.00 0.00 -0.31 -23.50 -16.52 -35.19 -3.37 -1.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 -4.86
27 End 0.91 0.33 0.00 0.00 0.00 0.00 5.24 0.25 0.69 -2.05 0.91 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 1.31 0.00
30 End -2.09 -0.77 0.00 0.00 0.00 0.00 0.09 -12.24 -2.86 -12.56 -2.09 -0.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 -3.01
33 End 0.90 0.33 0.00 0.00 0.00 0.00 6.00 -0.08 7.30 2.20 0.90 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 1.30 0.00
34 End 3.37 1.24 0.00 0.00 0.00 0.00 18.04 -0.13 14.25 3.97 3.37 1.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 4.86 0.00
37 Start -3.32 -1.23 -0.12 0.10 0.00 0.03 0.00 -11.49 -0.07 -0.25 -3.32 -1.48 -0.12 0.10 0.00 0.00 0.00 0.00 0.00 0 0.00 -4.82
37 End 0.88 0.33 0.07 -0.05 0.00 -0.01 0.25 -0.66 0.20 0.06 0.88 0.40 0.07 -0.05 0.00 0.00 0.00 0.00 0.00 0 1.30 0.00
40 End -2.06 -0.76 -0.08 0.06 0.00 0.02 0.09 -2.58 0.07 0.02 -2.06 -0.91 -0.08 0.06 0.00 0.00 0.00 0.00 0.00 0 0.00 -2.99
43 End 1.00 0.35 -0.23 0.18 0.00 0.05 1.87 -0.08 -0.02 -0.06 1.00 0.42 -0.23 0.18 0.00 0.00 0.00 0.00 0.00 0 1.37 0.00
44 End 3.49 1.12 0.70 0.22 0.00 0.06 3.43 -0.13 -0.03 -0.11 3.49 1.34 0.70 0.22 0.00 0.00 0.00 0.00 0.00 0 5.75 0.00
47 Start #### 0.00 0.00 -12.80 0.00 -3.39 0.00 0.00 0.00 0.00 ##### 0.00 0.00 -12.80 0.00 0.00 0.00 0.00 0.00 0 0.00 -23.07
47 End 6.75 0.00 0.00 10.00 0.00 1.86 0.00 0.00 0.00 0.00 6.75 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0 16.75 0.00

8 8
Detailed Design
2 2 2
Fck 30 N/mm Fst 500 N/mm fctm 2.5 N/mm clear cover 40 mm
SLS SLS SLS SLS
ULS ULS Rare Rare Quasi Quasi
Sec Men hog sag hog sag hog sag d in dc in
no No Location ( kn-m) ( kn-m) ( kn-m) ( kn-m) ( kn-m) ( kn-m) b (mm) D (mm) (mm) (mm)
1 3 End 82.41 0.00 56.65 0.00 18.07 0.00 1000 240 194 46
2 4 End 126.28 0.00 86.56 0.00 25.47 0.00 1000 370 324 46
3 7 Start 0.00 -38.95 0.00 -26.38 0.00 -5.21 1000 370 324 46
4 7 End 12.72 0.00 8.61 0.00 1.59 0.00 1000 240 194 46
5 10 End 0.00 -25.18 0.00 -17.01 0.00 -2.91 1000 240 194 46
6 13 End 11.64 0.00 7.86 0.00 1.23 0.00 1000 240 194 46
7 14 End 53.13 0.00 35.79 0.00 4.70 0.00 1000 370 324 46
8 17 Start 0.00 -46.73 0.00 -44.87 0.00 -4.86 1000 370 324 46
9 17 End 15.62 0.00 12.04 0.00 1.30 0.00 1000 240 194 46
10 20 End 0.00 -33.19 0.00 -27.22 0.00 -3.01 1000 240 194 46
11 23 End 14.48 -3.61 11.14 -2.30 1.31 0.00 1000 240 194 46
12 24 End 53.35 0.00 45.99 0.00 4.86 0.00 1000 370 324 46
13 27 Start 0.00 -41.97 0.00 -40.05 0.00 -4.86 1000 370 324 46
14 27 End 9.67 -0.24 6.55 -0.74 1.31 0.00 1000 240 194 46
15 30 End 0.00 -22.53 0.00 -15.57 0.00 -3.01 1000 240 194 46
16 33 End 10.79 0.00 8.60 0.00 1.30 0.00 1000 240 194 46
17 34 End 33.78 0.00 22.90 0.00 4.86 0.00 1000 370 324 46
18 37 Start 0.00 -23.90 0.00 -16.31 0.00 -4.82 1000 370 324 46
19 37 End 2.17 0.00 1.55 0.00 1.30 0.00 1000 240 194 46
20 40 End 0.00 -8.01 0.00 -5.57 0.00 -2.99 1000 240 194 46
21 43 End 4.78 0.00 3.29 0.00 1.37 0.00 1000 240 194 46
22 44 End 13.15 0.00 9.24 0.00 5.75 0.00 1000 370 324 46
23 47 Start 0.00 -36.23 0.00 -26.46 0.00 -23.07 1000 370 324 46
24 47 End 25.40 0.00 18.61 0.00 16.75 0.00 1000 240 194 46

9 9
Check Check
Ast Asc Check Check for Max for ULS Check for Check for
Men Bar dia spacing Bar dia spacing provide provided Check for for Max for Min total momen SLS Rare SLS Rare Check for
SectionNo (mm) (mm) (mm) (mm) d (mm2) (mm2) Min Ast Ast Asc steel t con. Stre steel Stre SLS crack
1 3 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
2 4 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
3 7 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
4 7 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
5 10 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
6 13 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
7 14 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
8 17 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
9 17 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
10 20 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
11 23 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
12 24 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
13 27 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
14 27 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
15 30 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
16 33 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
17 34 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
18 37 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
19 37 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
20 40 12 150 0 150 754 754 Safe safe Safe safe safe Safe Safe safe
21 43 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
22 44 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
23 47 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe
24 47 12 150 10 150 1278 754 Safe safe Safe safe safe Safe Safe safe

10 10
Ast min is max of 0.26 fctm/fyk b1 d and 0.0013 b1 d Max Ast 0.025 Ac
maximum total steel =0.04 Ac Asc minimum= 0.01 Act.ext= i.e 0.01 x area of concrete below clear cover
Ast Asc
provided provided Max total effective effective distribution distribution Check for
Section Men No (mm2) (mm2) Min Ast Max Ast Min Asc steel cover to Ast cover to Asc steel rq stel. pro dia Spaving Dis. Steel
1 3 1278 754 253 6000 400 9600 45.55 46.00 256 349 10 180 safe
2 4 1278 754 422 9250 400 14800 45.55 46.00 256 349 10 180 safe
3 7 1278 754 422 9250 400 14800 45.55 46.00 256 349 10 180 safe
4 7 1278 754 253 6000 400 9600 45.55 46.00 256 349 10 180 safe
5 10 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
6 13 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
7 14 754 754 421 9250 400 14800 46.00 46.00 151 349 10 180 safe
8 17 754 754 421 9250 400 14800 46.00 46.00 151 349 10 180 safe
9 17 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
10 20 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
11 23 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
12 24 754 754 421 9250 400 14800 46.00 46.00 151 349 10 180 safe
13 27 754 754 421 9250 400 14800 46.00 46.00 151 349 10 180 safe
14 27 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
15 30 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
16 33 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
17 34 754 754 421 9250 400 14800 46.00 46.00 151 349 10 180 safe
18 37 754 754 421 9250 400 14800 46.00 46.00 151 349 10 180 safe
19 37 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
20 40 754 754 252 6000 400 9600 46.00 46.00 151 349 10 180 safe
21 43 1278 754 253 6000 400 9600 45.55 46.00 256 349 10 180 safe
22 44 1278 754 422 9250 400 14800 45.55 46.00 256 349 10 180 safe
23 47 1278 754 422 9250 400 14800 45.55 46.00 256 349 10 180 safe
24 47 1278 754 253 6000 400 9600 45.55 46.00 256 349 10 180 safe

11 11
Calculation of ULS Capacity of section
Check for Ultimate moment
Idealized Stress- strain drawing for Idealized Stress- strain drawing for Concrete
untensioned steel Ecu3 =0.0035
Stress h fcd
Fcs
Asc x lx Fc
fyk/gs NA
= fyk/1.15
= 434.8 Mpa

Ast Fts
min modified yeilding strain = 0.00217
Strain l= 0.8 0.80 for fck <=60 Mpa
0.8-(fck-60)/500 for 60 <fck <110 Mpa
modifed yeild strain = (fyk/gs)/E of steel
0.0021739 h= 1 1 for fck <=60 Mpa
1- (fck-60)/250 for 60 <fck <110 Mpa
fcd = 13.4 Mpa

12 12
Ultimate
Ast Asc nutral Strain at Strain at Stress at Stress at Force in Force in Net mome.
Men Force in maximun
Section provided provided axis the level the level the level the level bottom top layer force at carring
No concrete BM
(mm2) (mm2) depth of Ast of Asc of Ast of Asc Steel steel NA capacity
about NA

1 3 1277.58 753.982 48.90 0.01042 0.00021 -434.783 41.489 524 -555 31 0 96.08 82.41 safe
2 4 1277.58 753.982 48.898 0.01972 0.00021 -434.783 41.489 524 -555 31 0 168.29 126.28 safe
3 7 1277.58 753.982 48.898 0.01972 0.00021 -434.783 41.489 524 -555 31 0 168.29 38.95 safe
4 7 1277.58 753.982 48.898 0.01042 0.00021 -434.783 41.489 524 -555 31 0 96.08 12.72 safe
5 10 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 25.18 safe
6 13 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 11.64 safe
7 14 753.982 753.982 39.168 0.02545 0.00061 -434.783 -122.101 420 -328 -92 0 103.87 53.13 safe
8 17 753.982 753.982 39.168 0.02545 0.00061 -434.783 -122.101 420 -328 -92 0 103.87 46.73 safe
9 17 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 15.62 safe
10 20 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 33.19 safe
11 23 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 14.48 safe
12 24 753.982 753.982 39.168 0.02545 0.00061 -434.783 -122.101 420 -328 -92 0 103.87 53.35 safe
13 27 753.982 753.982 39.168 0.02545 0.00061 -434.783 -122.101 420 -328 -92 0 103.87 41.97 safe
14 27 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 9.67 safe
15 30 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 22.53 safe
16 33 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 10.79 safe
17 34 753.982 753.982 39.168 0.02545 0.00061 -434.783 -122.101 420 -328 -92 0 103.87 33.78 safe
18 37 753.982 753.982 39.168 0.02545 0.00061 -434.783 -122.101 420 -328 -92 0 103.87 23.90 safe
19 37 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 2.17 safe
20 40 753.982 753.982 39.168 0.01384 0.00061 -434.783 -122.101 420 -328 -92 0 61.25 8.01 safe
21 43 1277.58 753.982 48.898 0.01042 0.00021 -434.783 41.489 524 -555 31 0 96.08 4.78 safe
22 44 1277.58 753.982 48.898 0.01972 0.00021 -434.783 41.489 524 -555 31 0 168.29 13.15 safe
23 47 1277.58 753.982 48.898 0.01972 0.00021 -434.783 41.489 524 -555 31 0 168.29 36.23 safe
24 47 1277.58 753.982 48.898 0.01042 0.00021 -434.783 41.489 524 -555 31 0 96.08 25.40 safe

13 13
Calculation of SLS stress for Rare combination.
Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio m or ae 13.33
BM=0.5 scbc x /3 +Asc (x-dc) m scbc /x +Ast (d-x) m scbc /x
2 2 2
fst =scbc m (d-x) /x
fsc =scbc m (x-dc) /x
Rare Ast Asc
Men Combin provided
Section provide
No ation dc in depth of fcc in fst in fsc in check check check for
(mm2) d (mm2)
BM' d in mm mm NA Mpa Mpa Mpa for fcc for fst fsc
1 3 56.65 1277.58 753.98 194.45 46.00 63.93 10.75 292.56 40.18 Safe Safe Safe
2 4 86.56 1277.58 753.98 324.45 46.00 85.66 6.79 252.40 41.92 Safe Safe Safe
3 7 26.38 1277.58 753.98 324.45 46.00 85.66 2.07 76.92 12.78 Safe Safe Safe
4 7 8.608 1277.58 753.98 194.45 46.00 63.93 1.63 44.45 6.11 Safe Safe Safe
5 10 17.012 753.982 753.98 194.00 46.00 52.21 3.93 142.17 6.23 Safe Safe Safe
6 13 7.856 753.982 753.98 194.00 46.00 52.21 1.81 65.65 2.88 Safe Safe Safe
7 14 35.786 753.982 753.98 324.00 46.00 68.46 3.43 170.53 14.99 Safe Safe Safe
8 17 44.868 753.982 753.98 324.00 46.00 68.46 4.30 213.80 18.79 Safe Safe Safe
9 17 12.036 753.982 753.98 194.00 46.00 52.21 2.78 100.59 4.41 Safe Safe Safe
10 20 27.224 753.982 753.98 194.00 46.00 52.21 6.28 227.51 9.97 Safe Safe Safe
11 23 11.136 753.982 753.98 194.00 46.00 52.21 2.57 93.06 4.08 Safe Safe Safe
12 24 45.988 753.982 753.98 324.00 46.00 68.46 4.40 219.14 19.26 Safe Safe Safe
13 27 40.048 753.982 753.98 324.00 46.00 68.46 3.83 190.84 16.77 Safe Safe Safe
14 27 6.546 753.982 753.98 194.00 46.00 52.21 1.51 54.71 2.40 Safe Safe Safe
15 30 15.574 753.982 753.98 194.00 46.00 52.21 3.59 130.15 5.70 Safe Safe Safe
16 33 8.596 753.982 753.98 194.00 46.00 52.21 1.98 71.84 3.15 Safe Safe Safe
17 34 22.898 753.982 753.98 324.00 46.00 68.46 2.19 109.11 9.59 Safe Safe Safe
18 37 16.306 753.982 753.98 324.00 46.00 68.46 1.56 77.70 6.83 Safe Safe Safe
19 37 1.546 753.982 753.98 194.00 46.00 52.21 0.36 12.92 0.57 Safe Safe Safe
20 40 5.572 753.982 753.98 194.00 46.00 52.21 1.29 46.57 2.04 Safe Safe Safe
21 43 3.29 1277.58 753.98 194.45 46.00 63.93 0.62 16.99 2.33 Safe Safe Safe
22 44 9.244 1277.58 753.98 324.45 46.00 85.66 0.73 26.95 4.48 Safe Safe Safe
23 47 26.46 1277.58 753.98 324.45 46.00 85.66 2.08 77.15 12.81 Safe Safe Safe
24 47 18.61 1277.58 753.98 194.45 46.00 63.93 3.53 96.11 13.20 Safe Safe Safe

14 14
Calculation of Stress (Quasi permanent Combination)
Crack width = W r = Sr,max(esm-ecm) k1 0.8 deformed bars, 0.8
Sr,max = 3.4c+0.425k1*k2*f/rpeff 1.6 plain bars
k2 0.5 bending 0.5
1 pure tension
f equvalent bar dia of tension steel
Kt 0.5 fcteff 2.5 N/sqmm
C clear cover 40 mm rpeff = Ast/Acef
Wr =
f Check
Ast Sr,max(es
Men equvalen should
Section provided
No Quasi fcc in fst in fsc in t dia of m-ecm) be
(mm2)
BM' Mpa Mpa Mpa Acef rpeff = bar Sr,max = (esm-ecm) = <0.3mm
1 3 18.070 3.43 93.32 12.82 1278 58691 0.022 11.09 222.62 0.00028 0.06 safe
2 4 25.470 2.00 74.27 12.34 1278 94779 0.013 11.09 275.88 0.00022 0.06 safe
3 7 5.210 0.41 15.19 2.52 1278 94779 0.013 11.09 275.88 0.00005 0.01 safe
4 7 1.588 0.30 8.20 1.13 1278 58691 0.022 11.09 222.62 0.00002 0.01 safe
5 10 2.912 0.67 24.34 1.07 754 62596 0.012 12.00 305.36 0.00007 0.02 safe
6 13 1.226 0.28 10.25 0.45 754 62596 0.012 12.00 305.36 0.00003 0.01 safe
7 14 4.696 0.45 22.38 1.97 754 100514 0.008 12.00 407.95 0.00007 0.03 safe
8 17 4.858 0.47 23.15 2.03 754 100514 0.008 12.00 407.95 0.00007 0.03 safe
9 17 1.296 0.30 10.83 0.47 754 62596 0.012 12.00 305.36 0.00003 0.01 safe
10 20 3.014 0.70 25.19 1.10 754 62596 0.012 12.00 305.36 0.00008 0.02 safe
11 23 1.306 0.30 10.91 0.48 754 62596 0.012 12.00 305.36 0.00003 0.01 safe
12 24 4.858 0.47 23.15 2.03 754 100514 0.008 12.00 407.95 0.00007 0.03 safe
13 27 4.858 0.47 23.15 2.03 754 100514 0.008 12.00 407.95 0.00007 0.03 safe
14 27 1.306 0.30 10.91 0.48 754 62596 0.012 12.00 305.36 0.00003 0.01 safe
15 30 3.014 0.70 25.19 1.10 754 62596 0.012 12.00 305.36 0.00008 0.02 safe
16 33 1.296 0.30 10.83 0.47 754 62596 0.012 12.00 305.36 0.00003 0.01 safe
17 34 4.858 0.47 23.15 2.03 754 100514 0.008 12.00 407.95 0.00007 0.03 safe
18 37 4.816 0.46 22.95 2.02 754 100514 0.008 12.00 407.95 0.00007 0.03 safe
19 37 1.296 0.30 10.83 0.47 754 62596 0.012 12.00 305.36 0.00003 0.01 safe
20 40 2.992 0.69 25.00 1.10 754 62596 0.012 12.00 305.36 0.00008 0.02 safe
21 43 1.370 0.26 7.08 0.97 1278 58691 0.022 11.09 222.62 0.00002 0.00 safe
22 44 5.754 0.45 16.78 2.79 1278 94779 0.013 11.09 275.88 0.00005 0.01 safe
23 47 23.070 1.81 67.27 11.17 1278 94779 0.013 11.09 275.88 0.00020 0.06 safe
24 47 16.750 3.18 86.50 11.88 1278 58691 0.022 11.09 222.62 0.00026 0.06 safe

15 15
Check for Ultimate SF
Maximum shear capacty of the section

Shear capacity of concrete with out reinforcement


Minimum of VRD.C = [0.12K*(80r1*fck)0.33+0.15scp]bwd
and [nmin + 0.15scp]bd
Where depth at d from face of wall = 754 mm
nmin = 0.031K3/2*(fck)1/2bd
scp 0 (No axial or prestressing force)

Actual
sectio MEM LOCATIO VRD.C in nmin = Design Shear
n No. N k r1 KN in KN capacity force Check
2 End 2.0 0.0066 115.96 93.39 115.96 99.34 safe
8 End 2.0 0.0066 115.96 93.39 115.96 49.69 safe
12 End 2.0 0.0039 97.28 93.17 97.28 56.97 safe
18 End 2.0 0.0039 97.28 93.17 97.28 66.28 safe
22 End 2.0 0.0039 97.28 93.17 97.28 67.43 safe
28 End 2.0 0.0039 97.28 93.17 97.28 66.28 safe
32 End 2.0 0.0039 97.28 93.17 97.28 66.28 safe
38 End 2.0 0.0039 162.47 155.60 162.47 66.49 safe
42 End 2.0 0.0066 193.21 155.60 193.21 66.66 safe
48 End 2.0 0.0066 115.69 93.17 115.69 82.36 safe

16 16
STAAD Space
START JOB INFORMATION
ENGINEER DATE 21-JAN-17
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0;
2 1.112 0 0;
3 1.306 0 0;
4 1.5 0 0;
5 1.85 0 0;
6 2 0 0;
7 2.15 0 0;
8 2.5 0 0;
9 2.694 0 0;
10 2.888 0 0;
11 3.5 0 0;
12 4.112 0 0;
13 4.306 0 0;
14 4.5 0 0;
15 4.85 0 0;
16 5 0 0;
17 5.15 0 0;
18 5.5 0 0;
19 5.694 0 0;
20 5.888 0 0;
21 6.5 0 0;
22 7.112 0 0;
23 7.306 0 0;
24 7.5 0 0;
25 7.85 0 0;
26 8 0 0;
27 8.15 0 0;
28 8.5 0 0;
29 8.694 0 0;
30 8.888 0 0;
31 9.5 0 0;
32 10.112 0 0;
33 10.306 0 0;
34 10.5 0 0;
35 10.85 0 0;
36 11 0 0;
37 11.15 0 0;
38 11.5 0 0;
39 11.694 0 0;
40 11.888 0 0;
41 12.5 0 0;
42 13.112 0 0;
43 13.306 0 0;
44 13.5 0 0;
45 13.85 0 0;
46 14 0 0;
47 14.15 0 0;
48 14.5 0 0;
49 14.694 0 0;

17 17
50 14.888 0 0;
51 16 0 0;
MEMBER INCIDENCES
1 1 2 50;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 31e+06
Poisson 0.17
DENSITY 25
ALPHA 1e-05
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 50 PRIS YD 0.24 ZD 1
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
5 TO 7 PINNED
15 16 17 PINNED
25 26 27 PINNED
35 36 37 PINNED
45 46 47 PINNED
LOAD 1 DL
SELFWEIGHT Y -1
LOAD 2 WC
MEMBER LOAD
1 UNI GY -2.2 0.5 1.112
2 UNI GY -2.2 0 0.194
3 UNI GY -2.2 0 0.194
4 UNI GY -2.2 0 0.35
5 UNI GY -2.2 0 0.15
6 UNI GY -2.2 0 0.15
7 UNI GY -2.2 0 0.35
8 UNI GY -2.2 0 0.194
9 UNI GY -2.2 0 0.194
10 UNI GY -2.2 0 0.612
11 UNI GY -2.2 0 0.612
12 UNI GY -2.2 0 0.194
13 UNI GY -2.2 0 0.194
14 UNI GY -2.2 0 0.35
15 UNI GY -2.2 0 0.15
16 UNI GY -2.2 0 0.15
17 UNI GY -2.2 0 0.35
18 UNI GY -2.2 0 0.194
19 UNI GY -2.2 0 0.194
20 UNI GY -2.2 0 0.612
21 UNI GY -2.2 0 0.612
22 UNI GY -2.2 0 0.194
23 UNI GY -2.2 0 0.194
24 UNI GY -2.2 0 0.35
25 UNI GY -2.2 0 0.15
26 UNI GY -2.2 0 0.15
27 UNI GY -2.2 0 0.35
28 UNI GY -2.2 0 0.194
29 UNI GY -2.2 0 0.194
30 UNI GY -2.2 0 0.611
31 UNI GY -2.2 0 0.612
32 UNI GY -2.2 0 0.194
33 UNI GY -2.2 0 0.193

18 18
34 UNI GY -2.2 0 0.35
35 UNI GY -2.2 0 0.15
36 UNI GY -2.2 0 0.15
37 UNI GY -2.2 0 0.35
38 UNI GY -2.2 0 0.194
39 UNI GY -2.2 0 0.194
40 UNI GY -2.2 0 0.611
41 UNI GY -2.2 0 0.612
42 UNI GY -2.2 0 0.194
43 UNI GY -2.2 0 0.193
LOAD 3 CB
MEMBER LOAD
1 UNI GY -16 0 0.5
44 UNI GY -16 0 0.35
45 UNI GY -16 0 0.15
LOAD 4 HR
MEMBER LOAD
50 UNI GY -16 0.612 1.112
LOAD 5 FPDL
MEMBER LOAD
46 UNI GY -0 0 0.15
47 UNI GY -0 0 0.35
48 UNI GY -0 0 0.194
49 UNI GY -0 0 0.193
50 UNI GY -0 0 0.612
LOAD 6 FPLL
MEMBER LOAD
46 UNI GY -3.72 0 0.15
47 UNI GY -3.72 0 0.35
48 UNI GY -3.72 0 0.194
49 UNI GY -3.72 0 0.193
50 UNI GY -3.72 0 0.612
LOAD 7 Class A 1st case
MEMBER LOAD
1 UNI GY -58.243 0.348 1.112
2 UNI GY -58.243 0 0.194
3 UNI GY -58.243 0 0.146
6 UNI GY -52.064 0.148 0.15
7 UNI GY -52.064 0 0.35
8 UNI GY -52.064 0 0.194
9 UNI GY -52.064 0 0.194
10 UNI GY -52.064 0 0.364
11 UNI GY -54.78 0.348 0.612
12 UNI GY -54.78 0 0.194
13 UNI GY -54.78 0 0.194
14 UNI GY -54.78 0 0.35
15 UNI GY -54.78 0 0.102
18 UNI GY -44.869 0.148 0.194
19 UNI GY -44.869 0 0.194
20 UNI GY -44.869 0 0.612
21 UNI GY -44.869 0 0.252
23 UNI GY -123.145 0.042 0.194
24 UNI GY -123.145 0 0.35
25 UNI GY -123.145 0 0.15
26 UNI GY -123.145 0 0.15
27 UNI GY -123.145 0 0.302
30 UNI GY -44.312 0.26 0.611
31 UNI GY -44.312 0 0.612
32 UNI GY -44.312 0 0.14

19 19
LOAD 8 Class A 2nd case
MEMBER LOAD
6 UNI GY -54.78 0.048 0.15
7 UNI GY -54.78 0 0.35
8 UNI GY -54.78 0 0.194
9 UNI GY -54.78 0 0.194
10 UNI GY -54.78 0 0.264
11 UNI GY -54.78 0.348 0.612
12 UNI GY -54.78 0 0.194
13 UNI GY -54.78 0 0.194
14 UNI GY -54.78 0 0.35
15 UNI GY -54.78 0 0.102
18 UNI GY -45.672 0.048 0.194
19 UNI GY -45.672 0 0.194
20 UNI GY -45.672 0 0.612
21 UNI GY -45.672 0 0.152
23 UNI GY -123.145 0.042 0.194
24 UNI GY -123.145 0 0.35
25 UNI GY -123.145 0 0.15
26 UNI GY -123.145 0 0.15
27 UNI GY -123.145 0 0.302
30 UNI GY -43.985 0.16 0.611
31 UNI GY -43.985 0 0.612
32 UNI GY -43.985 0 0.04
34 UNI GY -62.442 0.348 0.35
35 UNI GY -62.442 0 0.15
36 UNI GY -62.442 0 0.15
37 UNI GY -62.442 0 0.35
38 UNI GY -62.442 0 0.194
39 UNI GY -62.442 0 0.194
40 UNI GY -62.442 0 0.064
LOAD 9 Class A 3rd case
MEMBER LOAD
11 UNI GY -53.348 0.298 0.612
12 UNI GY -53.348 0 0.194
13 UNI GY -53.348 0 0.194
14 UNI GY -53.348 0 0.35
15 UNI GY -53.348 0 0.052
18 UNI GY -45.238 0.098 0.194
19 UNI GY -45.238 0 0.194
20 UNI GY -45.238 0 0.612
21 UNI GY -45.238 0 0.202
22 UNI GY -103.513 0.186 0.194
23 UNI GY -103.513 0 0.194
24 UNI GY -103.513 0 0.35
25 UNI GY -103.513 0 0.15
26 UNI GY -103.513 0 0.15
27 UNI GY -103.513 0 0.252
30 UNI GY -44.121 0.21 0.611
31 UNI GY -44.121 0 0.612
32 UNI GY -44.121 0 0.09
LOAD 10 Class A 4th case
MEMBER LOAD
4 UNI GY -65.527 0.298 0.35
5 UNI GY -65.527 0 0.15
6 UNI GY -65.527 0 0.15
7 UNI GY -65.527 0 0.35
8 UNI GY -65.527 0 0.194
9 UNI GY -65.527 0 0.194

20 20
10 UNI GY -65.527 0 0.014
11 UNI GY -48.959 0.098 0.612
12 UNI GY -48.959 0 0.194
13 UNI GY -48.959 0 0.194
14 UNI GY -48.959 0 0.202
13 UNI GY -205.241 0.142 0.194
14 UNI GY -205.241 0 0.35
15 UNI GY -205.241 0 0.15
16 UNI GY -205.241 0 0.15
17 UNI GY -205.241 0 0.35
18 UNI GY -205.241 0 0.052
20 UNI GY -44.869 0.36 0.612
21 UNI GY -44.869 0 0.612
22 UNI GY -44.869 0 0.194
23 UNI GY -44.869 0 0.046
LOAD 11 Class A 5th case
MEMBER LOAD
14 UNI GY -65.527 0.298 0.35
15 UNI GY -65.527 0 0.15
16 UNI GY -65.527 0 0.15
17 UNI GY -65.527 0 0.35
18 UNI GY -65.527 0 0.194
19 UNI GY -65.527 0 0.194
20 UNI GY -65.527 0 0.014
21 UNI GY -48.959 0.098 0.612
22 UNI GY -48.959 0 0.194
23 UNI GY -48.959 0 0.194
24 UNI GY -48.959 0 0.202
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 12 Class A 6th case
MEMBER LOAD
11 UNI GY -53.348 0.298 0.612
12 UNI GY -53.348 0 0.194
13 UNI GY -53.348 0 0.194
14 UNI GY -53.348 0 0.35
15 UNI GY -53.348 0 0.052
18 UNI GY -45.238 0.098 0.194
19 UNI GY -45.238 0 0.194
20 UNI GY -45.238 0 0.612
21 UNI GY -45.238 0 0.202
20 UNI GY -46.748 0.56 0.612
21 UNI GY -46.748 0 0.612
22 UNI GY -46.748 0 0.194
23 UNI GY -46.748 0 0.194
24 UNI GY -46.748 0 0.052
27 UNI GY -49.883 0.098 0.35
28 UNI GY -49.883 0 0.194
29 UNI GY -49.883 0 0.194
30 UNI GY -49.883 0 0.464
LOAD 13 Class A 7th case

21 21
MEMBER LOAD
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 14 40 R + class A -CASE 1
MEMBER LOAD
3 UNI GY -42.252 0.095 0.194
4 UNI GY -42.252 0 0.35
5 UNI GY -42.252 0 0.15
6 UNI GY -42.252 0 0.15
7 UNI GY -42.252 0 0.35
8 UNI GY -42.252 0 0.194
9 UNI GY -42.252 0 0.146
10 UNI GY -52.542 0.572 0.612
11 UNI GY -52.542 0 0.612
12 UNI GY -52.542 0 0.194
13 UNI GY -52.542 0 0.194
14 UNI GY -52.542 0 0.35
15 UNI GY -52.542 0 0.05
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 15 40 R + class A -CASE 2
MEMBER LOAD
6 UNI GY -53.959 0.031 0.15
7 UNI GY -53.959 0 0.35
8 UNI GY -53.959 0 0.194
9 UNI GY -53.959 0 0.194
10 UNI GY -53.959 0 0.582
11 UNI GY -39.142 0.591 0.612
12 UNI GY -39.142 0 0.194
13 UNI GY -39.142 0 0.194
14 UNI GY -39.142 0 0.35
15 UNI GY -39.142 0 0.15
16 UNI GY -39.142 0 0.15
17 UNI GY -39.142 0 0.35
18 UNI GY -39.142 0 0.03
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612

22 22
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 16 40 R + class A -CASE 3
MEMBER LOAD
10 UNI GY -50.937 0.477 0.612
11 UNI GY -50.937 0 0.612
12 UNI GY -50.937 0 0.194
13 UNI GY -50.937 0 0.194
14 UNI GY -50.937 0 0.305
17 UNI GY -48.282 0.275 0.35
18 UNI GY -48.282 0 0.194
19 UNI GY -48.282 0 0.194
20 UNI GY -48.282 0 0.612
21 UNI GY -48.282 0 0.365
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 17 40 R + class A -CASE 4
MEMBER LOAD
10 UNI GY -47.258 0.082 0.612
11 UNI GY -47.258 0 0.612
12 UNI GY -47.258 0 0.194
13 UNI GY -47.258 0 0.104
16 UNI GY -53.959 0.031 0.15
17 UNI GY -53.959 0 0.35
18 UNI GY -53.959 0 0.194
19 UNI GY -53.959 0 0.194
20 UNI GY -53.959 0 0.582
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 18 40 R + class A -CASE 5
MEMBER LOAD
10 UNI GY -50.937 0.477 0.612
11 UNI GY -50.937 0 0.612
12 UNI GY -50.937 0 0.194
13 UNI GY -50.937 0 0.194
14 UNI GY -50.937 0 0.305
17 UNI GY -48.282 0.275 0.35
18 UNI GY -48.282 0 0.194
19 UNI GY -48.282 0 0.194
20 UNI GY -48.282 0 0.612
21 UNI GY -48.282 0 0.365
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35

23 23
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 19 40 R + class A -CASE 6
MEMBER LOAD
10 UNI GY -47.258 0.082 0.612
11 UNI GY -47.258 0 0.612
12 UNI GY -47.258 0 0.194
13 UNI GY -47.258 0 0.104
16 UNI GY -53.959 0.031 0.15
17 UNI GY -53.959 0 0.35
18 UNI GY -53.959 0 0.194
19 UNI GY -53.959 0 0.194
20 UNI GY -53.959 0 0.582
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 20 70 R Track + CLASS A CASE 1
MEMBER LOAD
3 UNI GY -61.381 0.104 0.194
4 UNI GY -61.381 0 0.35
5 UNI GY -61.381 0 0.15
6 UNI GY -61.381 0 0.15
7 UNI GY -61.381 0 0.35
8 UNI GY -61.381 0 0.194
9 UNI GY -61.381 0 0.136
10 UNI GY -49.145 0.582 0.612
11 UNI GY -49.145 0 0.612
12 UNI GY -49.145 0 0.194
13 UNI GY -49.145 0 0.194
14 UNI GY -49.145 0 0.35
15 UNI GY -49.145 0 0.04
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 21 70 R Track + CLASS A CASE 2
MEMBER LOAD
6 UNI GY -49.834 0.04 0.15
7 UNI GY -49.834 0 0.35
8 UNI GY -49.834 0 0.194

24 24
9 UNI GY -49.834 0 0.194
10 UNI GY -49.834 0 0.572
11 UNI GY -59.448 0.601 0.612
12 UNI GY -59.448 0 0.194
13 UNI GY -59.448 0 0.194
14 UNI GY -59.448 0 0.35
15 UNI GY -59.448 0 0.15
16 UNI GY -59.448 0 0.15
17 UNI GY -59.448 0 0.35
18 UNI GY -59.448 0 0.02
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 22 70 R Track + CLASS A CASE 3
MEMBER LOAD
10 UNI GY -48.228 0.472 0.612
11 UNI GY -48.228 0 0.612
12 UNI GY -48.228 0 0.194
13 UNI GY -48.228 0 0.194
14 UNI GY -48.228 0 0.28
17 UNI GY -47.029 0.27 0.35
18 UNI GY -47.029 0 0.194
19 UNI GY -47.029 0 0.194
20 UNI GY -47.029 0 0.612
21 UNI GY -47.029 0 0.34
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 23 70 R Track + CLASS A CASE 4
MEMBER LOAD
10 UNI GY -46.41 0.093 0.612
11 UNI GY -46.41 0 0.612
12 UNI GY -46.41 0 0.194
13 UNI GY -46.41 0 0.094
16 UNI GY -49.834 0.04 0.15
17 UNI GY -49.834 0 0.35
18 UNI GY -49.834 0 0.194
19 UNI GY -49.834 0 0.194
20 UNI GY -49.834 0 0.572
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052

25 25
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 24 70 R Track + CLASS A CASE 5
MEMBER LOAD
10 UNI GY -48.228 0.472 0.612
11 UNI GY -48.228 0 0.612
12 UNI GY -48.228 0 0.194
13 UNI GY -48.228 0 0.194
14 UNI GY -48.228 0 0.28
17 UNI GY -47.029 0.27 0.35
18 UNI GY -47.029 0 0.194
19 UNI GY -47.029 0 0.194
20 UNI GY -47.029 0 0.612
21 UNI GY -47.029 0 0.34
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 25 70 R Track + CLASS A CASE 6
MEMBER LOAD
10 UNI GY -46.41 0.093 0.612
11 UNI GY -46.41 0 0.612
12 UNI GY -46.41 0 0.194
13 UNI GY -46.41 0 0.094
16 UNI GY -49.834 0.04 0.15
17 UNI GY -49.834 0 0.35
18 UNI GY -49.834 0 0.194
19 UNI GY -49.834 0 0.194
20 UNI GY -49.834 0 0.572
23 UNI GY -205.241 0.142 0.194
24 UNI GY -205.241 0 0.35
25 UNI GY -205.241 0 0.15
26 UNI GY -205.241 0 0.15
27 UNI GY -205.241 0 0.35
28 UNI GY -205.241 0 0.052
30 UNI GY -44.869 0.36 0.611
31 UNI GY -44.869 0 0.612
32 UNI GY -44.869 0 0.194
33 UNI GY -44.869 0 0.046
LOAD 26 SV Vehical 1
MEMBER LOAD
17 UNI GY -64.432 0.036 0.35
18 UNI GY -64.432 0 0.194
19 UNI GY -64.432 0 0.194
20 UNI GY -64.432 0 0.377
20 UNI GY -49.363 0.048 0.612
21 UNI GY -49.363 0 0.515
21 UNI GY -83.563 0.485 0.612
22 UNI GY -83.563 0 0.194
23 UNI GY -83.563 0 0.194
24 UNI GY -83.563 0 0.35

26 26
25 UNI GY -83.563 0 0.15
26 UNI GY -83.563 0 0.064
24 UNI GY -118.854 0.235 0.35
25 UNI GY -118.854 0 0.15
26 UNI GY -118.854 0 0.15
27 UNI GY -118.854 0 0.35
28 UNI GY -118.854 0 0.194
29 UNI GY -118.854 0 0.12
LOAD 27 SV Vehical 2
MEMBER LOAD
19 UNI GY -49.46 0.192 0.194
20 UNI GY -49.46 0 0.612
21 UNI GY -49.46 0 0.465
21 UNI GY -60.005 0.136 0.612
22 UNI GY -60.005 0 0.194
23 UNI GY -60.005 0 0.194
24 UNI GY -60.005 0 0.215
24 UNI GY -134.65 0.185 0.35
25 UNI GY -134.65 0 0.15
26 UNI GY -134.65 0 0.15
27 UNI GY -134.65 0 0.35
28 UNI GY -134.65 0 0.194
29 UNI GY -134.65 0 0.07
27 UNI GY -55.29 0.285 0.35
28 UNI GY -55.29 0 0.194
29 UNI GY -55.29 0 0.194
30 UNI GY -55.29 0 0.611
31 UNI GY -55.29 0 0.015
PERFORM ANALYSIS
PRINT MEMBER FORCES
FINISH

27 27
STAAD Space
START JOB INFORMATION
ENGINEER DATE 21-JAN-17
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0;
2 1.112 0 0;
3 1.306 0 0;
4 1.5 0 0;
5 1.85 0 0;
6 2 0 0;
7 2.15 0 0;
8 2.5 0 0;
9 2.694 0 0;
10 2.888 0 0;
11 3.5 0 0;
12 4.112 0 0;
13 4.306 0 0;
14 4.5 0 0;
15 4.85 0 0;
16 5 0 0;
17 5.15 0 0;
18 5.5 0 0;
19 5.694 0 0;
20 5.888 0 0;
21 6.5 0 0;
22 7.112 0 0;
23 7.306 0 0;
24 7.5 0 0;
25 7.85 0 0;
26 8 0 0;
27 8.15 0 0;
28 8.5 0 0;
29 8.694 0 0;
30 8.888 0 0;
31 9.5 0 0;
32 10.112 0 0;
33 10.306 0 0;
34 10.5 0 0;
35 10.85 0 0;
36 11 0 0;
37 11.15 0 0;
38 11.5 0 0;
39 11.694 0 0;
40 11.888 0 0;
41 12.5 0 0;
42 13.112 0 0;
43 13.306 0 0;
44 13.5 0 0;
45 13.85 0 0;
46 14 0 0;
47 14.15 0 0;
48 14.5 0 0;
49 14.694 0 0;

28 28
50 14.888 0 0;
51 16 0 0;
MEMBER INCIDENCES
1 1 2 50;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 31e+06
Poisson 0.17
DENSITY 25
ALPHA 1e-05
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 50 PRIS YD 0.24 ZD 1
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
5 TO 7 PINNED
15 16 17 PINNED
25 26 27 PINNED
35 36 37 PINNED
45 46 47 PINNED
LOAD 1 DL
SELFWEIGHT Y -1
LOAD 2 WC
MEMBER LOAD
1 UNI GY -2.2 0.5 1.112
2 UNI GY -1.1 0 0.194
3 UNI GY -1.1 0 0.194
4 UNI GY -1.1 0 0.35
5 UNI GY -1.1 0 0.15
6 UNI GY -1.1 0 0.15
7 UNI GY -1.1 0 0.35
8 UNI GY -1.1 0 0.194
9 UNI GY -1.1 0 0.194
10 UNI GY -2.2 0 0.612
11 UNI GY -2.2 0 0.612
12 UNI GY -1.1 0 0.194
13 UNI GY -1.1 0 0.194
14 UNI GY -1.1 0 0.35
15 UNI GY -1.1 0 0.15
16 UNI GY -1.1 0 0.15
17 UNI GY -1.1 0 0.35
18 UNI GY -1.1 0 0.194
19 UNI GY -1.1 0 0.194
20 UNI GY -2.2 0 0.612
21 UNI GY -2.2 0 0.612
22 UNI GY -1.1 0 0.194
23 UNI GY -1.1 0 0.194
24 UNI GY -1.1 0 0.35
25 UNI GY -1.1 0 0.15
26 UNI GY -1.1 0 0.15
27 UNI GY -1.1 0 0.35
28 UNI GY -1.1 0 0.194
29 UNI GY -1.1 0 0.194
30 UNI GY -2.2 0 0.611
31 UNI GY -2.2 0 0.612
32 UNI GY -1.1 0 0.194
33 UNI GY -1.1 0 0.193

29 29
34 UNI GY -1.1 0 0.35
35 UNI GY -1.1 0 0.15
36 UNI GY -1.1 0 0.15
37 UNI GY -1.1 0 0.35
38 UNI GY -1.1 0 0.194
39 UNI GY -1.1 0 0.194
40 UNI GY -2.2 0 0.611
41 UNI GY -2.2 0 0.612
42 UNI GY -1.1 0 0.194
43 UNI GY -1.1 0 0.193
LOAD 3 CB
MEMBER LOAD
1 UNI GY -16 0 0.5
44 UNI GY -8 0 0.35
45 UNI GY -8 0 0.15
LOAD 4 HR
MEMBER LOAD
50 UNI GY -16 0.612 1.112
LOAD 5 FPDL
MEMBER LOAD
46 UNI GY -0 0 0.15
47 UNI GY -0 0 0.35
48 UNI GY -0 0 0.194
49 UNI GY -0 0 0.193
50 UNI GY -0 0 0.612
LOAD 6 FPLL
MEMBER LOAD
46 UNI GY -1.86 0 0.15
47 UNI GY -1.86 0 0.35
48 UNI GY -1.86 0 0.194
49 UNI GY -1.86 0 0.193
50 UNI GY -3.72 0 0.612
LOAD 7 Class A 1st case
MEMBER LOAD
1 UNI GY -58.244 0.348 1.112
2 UNI GY -29.122 0 0.194
3 UNI GY -29.122 0 0.146
6 UNI GY -26.032 0.148 0.15
7 UNI GY -26.032 0 0.35
8 UNI GY -26.032 0 0.194
9 UNI GY -26.032 0 0.194
10 UNI GY -52.064 0 0.364
11 UNI GY -54.78 0.348 0.612
12 UNI GY -27.39 0 0.194
13 UNI GY -27.39 0 0.194
14 UNI GY -27.39 0 0.35
15 UNI GY -27.39 0 0.102
18 UNI GY -22.435 0.148 0.194
19 UNI GY -22.435 0 0.194
20 UNI GY -44.87 0 0.612
21 UNI GY -44.87 0 0.252
23 UNI GY -61.573 0.042 0.194
24 UNI GY -61.573 0 0.35
25 UNI GY -61.573 0 0.15
26 UNI GY -61.573 0 0.15
27 UNI GY -61.573 0 0.302
30 UNI GY -44.312 0.26 0.611
31 UNI GY -44.312 0 0.612
32 UNI GY -22.156 0 0.14

30 30
LOAD 8 Class A 2nd case
MEMBER LOAD
6 UNI GY -27.39 0.048 0.15
7 UNI GY -27.39 0 0.35
8 UNI GY -27.39 0 0.194
9 UNI GY -27.39 0 0.194
10 UNI GY -54.78 0 0.264
11 UNI GY -54.78 0.348 0.612
12 UNI GY -27.39 0 0.194
13 UNI GY -27.39 0 0.194
14 UNI GY -27.39 0 0.35
15 UNI GY -27.39 0 0.102
18 UNI GY -22.836 0.048 0.194
19 UNI GY -22.836 0 0.194
20 UNI GY -45.672 0 0.612
21 UNI GY -45.672 0 0.152
23 UNI GY -61.573 0.042 0.194
24 UNI GY -61.573 0 0.35
25 UNI GY -61.573 0 0.15
26 UNI GY -61.573 0 0.15
27 UNI GY -61.573 0 0.302
30 UNI GY -43.986 0.16 0.611
31 UNI GY -43.986 0 0.612
32 UNI GY -21.993 0 0.04
34 UNI GY -31.221 0.348 0.35
35 UNI GY -31.221 0 0.15
36 UNI GY -31.221 0 0.15
37 UNI GY -31.221 0 0.35
38 UNI GY -31.221 0 0.194
39 UNI GY -31.221 0 0.194
40 UNI GY -62.442 0 0.064
LOAD 9 Class A 3rd case
MEMBER LOAD
11 UNI GY -53.348 0.298 0.612
12 UNI GY -26.674 0 0.194
13 UNI GY -26.674 0 0.194
14 UNI GY -26.674 0 0.35
15 UNI GY -26.674 0 0.052
18 UNI GY -22.619 0.098 0.194
19 UNI GY -22.619 0 0.194
20 UNI GY -45.238 0 0.612
21 UNI GY -45.238 0 0.202
22 UNI GY -51.757 0.186 0.194
23 UNI GY -51.757 0 0.194
24 UNI GY -51.757 0 0.35
25 UNI GY -51.757 0 0.15
26 UNI GY -51.757 0 0.15
27 UNI GY -51.757 0 0.252
30 UNI GY -44.122 0.21 0.611
31 UNI GY -44.122 0 0.612
32 UNI GY -22.061 0 0.09
LOAD 10 Class A 4th case
MEMBER LOAD
4 UNI GY -32.764 0.298 0.35
5 UNI GY -32.764 0 0.15
6 UNI GY -32.764 0 0.15
7 UNI GY -32.764 0 0.35
8 UNI GY -32.764 0 0.194
9 UNI GY -32.764 0 0.194

31 31
10 UNI GY -65.528 0 0.014
11 UNI GY -48.96 0.098 0.612
12 UNI GY -24.48 0 0.194
13 UNI GY -24.48 0 0.194
14 UNI GY -24.48 0 0.202
13 UNI GY -102.621 0.142 0.194
14 UNI GY -102.621 0 0.35
15 UNI GY -102.621 0 0.15
16 UNI GY -102.621 0 0.15
17 UNI GY -102.621 0 0.35
18 UNI GY -102.621 0 0.052
20 UNI GY -44.87 0.36 0.612
21 UNI GY -44.87 0 0.612
22 UNI GY -22.435 0 0.194
23 UNI GY -22.435 0 0.046
LOAD 11 Class A 5th case
MEMBER LOAD
14 UNI GY -32.764 0.298 0.35
15 UNI GY -32.764 0 0.15
16 UNI GY -32.764 0 0.15
17 UNI GY -32.764 0 0.35
18 UNI GY -32.764 0 0.194
19 UNI GY -32.764 0 0.194
20 UNI GY -65.528 0 0.014
21 UNI GY -48.96 0.098 0.612
22 UNI GY -24.48 0 0.194
23 UNI GY -24.48 0 0.194
24 UNI GY -24.48 0 0.202
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 12 Class A 6th case
MEMBER LOAD
11 UNI GY -53.348 0.298 0.612
12 UNI GY -26.674 0 0.194
13 UNI GY -26.674 0 0.194
14 UNI GY -26.674 0 0.35
15 UNI GY -26.674 0 0.052
18 UNI GY -22.619 0.098 0.194
19 UNI GY -22.619 0 0.194
20 UNI GY -45.238 0 0.612
21 UNI GY -45.238 0 0.202
20 UNI GY -46.748 0.56 0.612
21 UNI GY -46.748 0 0.612
22 UNI GY -23.374 0 0.194
23 UNI GY -23.374 0 0.194
24 UNI GY -23.374 0 0.052
27 UNI GY -24.942 0.098 0.35
28 UNI GY -24.942 0 0.194
29 UNI GY -24.942 0 0.194
30 UNI GY -49.884 0 0.464
LOAD 13 Class A 7th case

32 32
MEMBER LOAD
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 14 40 R + class A -CASE 1
MEMBER LOAD
3 UNI GY -21.126 0.095 0.194
4 UNI GY -21.126 0 0.35
5 UNI GY -21.126 0 0.15
6 UNI GY -21.126 0 0.15
7 UNI GY -21.126 0 0.35
8 UNI GY -21.126 0 0.194
9 UNI GY -21.126 0 0.146
10 UNI GY -52.542 0.572 0.612
11 UNI GY -52.542 0 0.612
12 UNI GY -26.271 0 0.194
13 UNI GY -26.271 0 0.194
14 UNI GY -26.271 0 0.35
15 UNI GY -26.271 0 0.05
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 15 40 R + class A -CASE 2
MEMBER LOAD
6 UNI GY -26.98 0.031 0.15
7 UNI GY -26.98 0 0.35
8 UNI GY -26.98 0 0.194
9 UNI GY -26.98 0 0.194
10 UNI GY -53.96 0 0.582
11 UNI GY -39.142 0.591 0.612
12 UNI GY -19.571 0 0.194
13 UNI GY -19.571 0 0.194
14 UNI GY -19.571 0 0.35
15 UNI GY -19.571 0 0.15
16 UNI GY -19.571 0 0.15
17 UNI GY -19.571 0 0.35
18 UNI GY -19.571 0 0.03
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612

33 33
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 16 40 R + class A -CASE 3
MEMBER LOAD
10 UNI GY -50.938 0.477 0.612
11 UNI GY -50.938 0 0.612
12 UNI GY -25.469 0 0.194
13 UNI GY -25.469 0 0.194
14 UNI GY -25.469 0 0.305
17 UNI GY -24.141 0.275 0.35
18 UNI GY -24.141 0 0.194
19 UNI GY -24.141 0 0.194
20 UNI GY -48.282 0 0.612
21 UNI GY -48.282 0 0.365
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 17 40 R + class A -CASE 4
MEMBER LOAD
10 UNI GY -47.258 0.082 0.612
11 UNI GY -47.258 0 0.612
12 UNI GY -23.629 0 0.194
13 UNI GY -23.629 0 0.104
16 UNI GY -26.98 0.031 0.15
17 UNI GY -26.98 0 0.35
18 UNI GY -26.98 0 0.194
19 UNI GY -26.98 0 0.194
20 UNI GY -53.96 0 0.582
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 18 40 R + class A -CASE 5
MEMBER LOAD
10 UNI GY -50.938 0.477 0.612
11 UNI GY -50.938 0 0.612
12 UNI GY -25.469 0 0.194
13 UNI GY -25.469 0 0.194
14 UNI GY -25.469 0 0.305
17 UNI GY -24.141 0.275 0.35
18 UNI GY -24.141 0 0.194
19 UNI GY -24.141 0 0.194
20 UNI GY -48.282 0 0.612
21 UNI GY -48.282 0 0.365
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35

34 34
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 19 40 R + class A -CASE 6
MEMBER LOAD
10 UNI GY -47.258 0.082 0.612
11 UNI GY -47.258 0 0.612
12 UNI GY -23.629 0 0.194
13 UNI GY -23.629 0 0.104
16 UNI GY -26.98 0.031 0.15
17 UNI GY -26.98 0 0.35
18 UNI GY -26.98 0 0.194
19 UNI GY -26.98 0 0.194
20 UNI GY -53.96 0 0.582
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 20 70 R Track + CLASS A CASE 1
MEMBER LOAD
3 UNI GY -30.691 0.104 0.194
4 UNI GY -30.691 0 0.35
5 UNI GY -30.691 0 0.15
6 UNI GY -30.691 0 0.15
7 UNI GY -30.691 0 0.35
8 UNI GY -30.691 0 0.194
9 UNI GY -30.691 0 0.136
10 UNI GY -49.146 0.582 0.612
11 UNI GY -49.146 0 0.612
12 UNI GY -24.573 0 0.194
13 UNI GY -24.573 0 0.194
14 UNI GY -24.573 0 0.35
15 UNI GY -24.573 0 0.04
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 21 70 R Track + CLASS A CASE 2
MEMBER LOAD
6 UNI GY -24.917 0.04 0.15
7 UNI GY -24.917 0 0.35
8 UNI GY -24.917 0 0.194

35 35
9 UNI GY -24.917 0 0.194
10 UNI GY -49.834 0 0.572
11 UNI GY -59.448 0.601 0.612
12 UNI GY -29.724 0 0.194
13 UNI GY -29.724 0 0.194
14 UNI GY -29.724 0 0.35
15 UNI GY -29.724 0 0.15
16 UNI GY -29.724 0 0.15
17 UNI GY -29.724 0 0.35
18 UNI GY -29.724 0 0.02
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 22 70 R Track + CLASS A CASE 3
MEMBER LOAD
10 UNI GY -48.228 0.472 0.612
11 UNI GY -48.228 0 0.612
12 UNI GY -24.114 0 0.194
13 UNI GY -24.114 0 0.194
14 UNI GY -24.114 0 0.28
17 UNI GY -23.515 0.27 0.35
18 UNI GY -23.515 0 0.194
19 UNI GY -23.515 0 0.194
20 UNI GY -47.03 0 0.612
21 UNI GY -47.03 0 0.34
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 23 70 R Track + CLASS A CASE 4
MEMBER LOAD
10 UNI GY -46.41 0.093 0.612
11 UNI GY -46.41 0 0.612
12 UNI GY -23.205 0 0.194
13 UNI GY -23.205 0 0.094
16 UNI GY -24.917 0.04 0.15
17 UNI GY -24.917 0 0.35
18 UNI GY -24.917 0 0.194
19 UNI GY -24.917 0 0.194
20 UNI GY -49.834 0 0.572
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052

36 36
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 24 70 R Track + CLASS A CASE 5
MEMBER LOAD
10 UNI GY -48.228 0.472 0.612
11 UNI GY -48.228 0 0.612
12 UNI GY -24.114 0 0.194
13 UNI GY -24.114 0 0.194
14 UNI GY -24.114 0 0.28
17 UNI GY -23.515 0.27 0.35
18 UNI GY -23.515 0 0.194
19 UNI GY -23.515 0 0.194
20 UNI GY -47.03 0 0.612
21 UNI GY -47.03 0 0.34
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 25 70 R Track + CLASS A CASE 6
MEMBER LOAD
10 UNI GY -46.41 0.093 0.612
11 UNI GY -46.41 0 0.612
12 UNI GY -23.205 0 0.194
13 UNI GY -23.205 0 0.094
16 UNI GY -24.917 0.04 0.15
17 UNI GY -24.917 0 0.35
18 UNI GY -24.917 0 0.194
19 UNI GY -24.917 0 0.194
20 UNI GY -49.834 0 0.572
23 UNI GY -102.621 0.142 0.194
24 UNI GY -102.621 0 0.35
25 UNI GY -102.621 0 0.15
26 UNI GY -102.621 0 0.15
27 UNI GY -102.621 0 0.35
28 UNI GY -102.621 0 0.052
30 UNI GY -44.87 0.36 0.611
31 UNI GY -44.87 0 0.612
32 UNI GY -22.435 0 0.194
33 UNI GY -22.435 0 0.046
LOAD 26 SV Vehical 1
MEMBER LOAD
17 UNI GY -32.216 0.036 0.35
18 UNI GY -32.216 0 0.194
19 UNI GY -32.216 0 0.194
20 UNI GY -64.432 0 0.377
20 UNI GY -49.364 0.048 0.612
21 UNI GY -49.364 0 0.515
21 UNI GY -83.564 0.485 0.612
22 UNI GY -41.782 0 0.194
23 UNI GY -41.782 0 0.194
24 UNI GY -41.782 0 0.35

37 37
25 UNI GY -41.782 0 0.15
26 UNI GY -41.782 0 0.064
24 UNI GY -59.427 0.235 0.35
25 UNI GY -59.427 0 0.15
26 UNI GY -59.427 0 0.15
27 UNI GY -59.427 0 0.35
28 UNI GY -59.427 0 0.194
29 UNI GY -59.427 0 0.12
LOAD 27 SV Vehical 2
MEMBER LOAD
19 UNI GY -24.73 0.192 0.194
20 UNI GY -49.46 0 0.612
21 UNI GY -49.46 0 0.465
21 UNI GY -60.006 0.136 0.612
22 UNI GY -30.003 0 0.194
23 UNI GY -30.003 0 0.194
24 UNI GY -30.003 0 0.215
24 UNI GY -67.325 0.185 0.35
25 UNI GY -67.325 0 0.15
26 UNI GY -67.325 0 0.15
27 UNI GY -67.325 0 0.35
28 UNI GY -67.325 0 0.194
29 UNI GY -67.325 0 0.07
27 UNI GY -27.645 0.285 0.35
28 UNI GY -27.645 0 0.194
29 UNI GY -27.645 0 0.194
30 UNI GY -55.29 0 0.611
31 UNI GY -55.29 0 0.015
PERFORM ANALYSIS
PRINT MEMBER FORCES
FINISH

38 38
DESIGN OF SUPER STRUCTURE

39 39
DETAILS OF STAAD MODEL SPAN DETAILS
Overall width of Bridge = 16.00 m C/C of expansion joint = 15.000 m
No of Girders = 5 No's C/C of bearings = 13.96 m
Spacing of Girders = 3.00 m Carraigeway width = 0.50 m 13.50 m
Wearing Coat thickness = 75 mm Skew Angle = 0.00
Spacing of Jack = 0.60 m Length of Diaphragm = 12.00 m
FP LL = 0.38 t/sq.m
wearing coat load is cosiderd as 0.25 t/sqm
CRASH BARRIER LOAD = 0.90 t/m
HAND RAIL LOAD = 0.90 t/m

40 40
DETAILS OF GIRDERS CONSIDERED FOR ANALYSIS
Effective width of Beams
1. LONGITUDINAL GIRDER Beff = bw + Lo/5 (For T-Beams)
Beff = bw + Lo/10 (For L-Beams)
Beff Hence

0.240 m
1.000 0.130 m Lo = 13.960 m
0.100 m C/C of Girders = 3.000 m
Dist to Cant. Edge = 2.000 m

Hence Beff = 3.00 m


1.180 m 0.300m (For Internal Girders)
0.550 m
Hence Beff = 3.18 m
(For External Girders)

Impact factors
1.225 Cl. A- Wheel
0.150 m 1.227 Cl. 70R wheel
0.250 m 1.100 Cl. 70R track

0.650 m
C/S OF GIRDER AT MID SECTION

Beff 0.52

0.240 m
1 m 0.130 m 0.240 m
0.075 m
0.45m 0.780 m

0.65m Section Through Diaphragm


0.725 m
1.180m

0 m
0.250 m

0.65 m
C/S OF GIRDER AT END SECTION

0.52 m
CL of Girder
0.65 m 0.3 m

Plan showing web widening of Girder

41 41
CALCULATION OF SECTION PROPERTIES:
EXTERNAL GIRDER-CENTER SECTION

2.000 1.50
Xc Grade of Girder = M 30
Y 1 0.240 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.100 m E of Slab = 31000 Gpa
x x

X
1.420 5
0.550 m
0.3

6 7 0.150 m
8 0.250 m
0.65
Y
Section
Type L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No
1 R 3.50 0.240 0.8400 0.2500 0.1200 0.2100 0.1008 0.0040 0.8575 0.0081 -0.1095 0.3046 0.0101 0.0779
2 R 1 0.130 0.1300 0.0000 0.3050 0.0000 0.0397 0.0002 0.0108 0.0007 0.1405 0.1196 0.0026 0.0019
3 T 0.35 0.100 0.0350 -0.2667 0.4033 -0.0093 0.0141 0.0000 0.0001 0.0000 0.4071 0.0212 0.0058 0.0000
4 T 0.35 0.100 0.0350 0.2667 0.4033 0.0093 0.0141 0.0000 0.0001 0.0000 -0.1262 0.0212 0.0006 0.0000
5 R 0.3 0.800 0.2400 0.0000 0.8200 0.0000 0.1968 0.0128 0.0018 0.0072 0.1405 -0.3954 0.0047 0.0375
6 T 0.175 0.150 0.0263 -0.3833 1.1200 -0.0101 0.0294 0.0000 0.0000 0.0001 0.5238 -0.6954 0.0072 0.0127
7 T 0.175 0.150 0.0263 0.3833 1.1200 0.0101 0.0294 0.0000 0.0000 0.0001 -0.2429 -0.6954 0.0015 0.0127
8 R 0.65 0.250 0.1625 0.0000 1.2950 0.0000 0.2104 0.0008 0.0057 0.0034 0.1405 -0.8704 0.0032 0.1231
1.4950 0.2100 0.6347 0.0179 0.8761 0.0196 0.0357 0.2658

4 4 2
Yc = 0.635 / 1.495 = 0.4246 m Iz = 0.2838 m Itor = 0.0196 m Total Area = 1.4950 m
4 2
Xc = 0.210 / 1.495 = 0.1405 m Iy = 0.9118 m Area of Girder = 0.6550 m
Perimeter expose to atmosphere = 7.438988
2Ac/U = 0.401936

42 42
CALCULATION OF SECTION PROPERTIES:
EXTERNAL GIRDER-END SECTION

2.000 1.500
Xc Grade of Girder = M 30
Y 1 0.240 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.0750 m E of Slab = 31000 Gpa

X X
1.420 5
0.725 m
0.65

6 7 0.000 m
8 0.250 m
0.65
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 3.50 0.240 0.8400 0.2500 0.1200 0.2100 0.1008 0.0040 0.8575 0.0081 -0.1249 0.3453 0.0131 0.1002
2 R 1 0.130 0.1300 0.0000 0.3050 0.0000 0.0397 0.0002 0.0108 0.0007 0.1251 0.1603 0.0020 0.0033
3 T 0.175 0.075 0.0131 -0.3833 0.3950 -0.0050 0.0052 0.0000 0.0000 0.0000 0.5084 0.0703 0.0034 0.0001
4 T 0.175 0.075 0.0131 0.3833 0.3950 0.0050 0.0052 0.0000 0.0000 0.0000 -0.2582 0.0703 0.0009 0.0001
5 R 0.65 0.800 0.5200 0.0000 0.8075 0.0000 0.4199 0.0277 0.0183 0.0732 0.1251 -0.3422 0.0081 0.0609
6 T 0 0.000 0.0000 -0.3250 1.1700 0.0000 0.0000 0.0000 0.0000 0.0000 0.4501 -0.7047 0.0000 0.0000
7 T 0 0.000 0.0000 0.3250 1.1700 0.0000 0.0000 0.0000 0.0000 0.0000 -0.1999 -0.7047 0.0000 0.0000
8 R 0.65 0.250 0.1625 0.0000 1.2950 0.0000 0.2104 0.0008 0.0057 0.0034 0.1251 -0.8297 0.0025 0.1119
1.6788 0.2100 0.7812 0.0328 0.8924 0.0854 0.0301 0.2764

4 4 2
Yc = 0.781 / 1.679 = 0.46532 m Iz = 0.3092 m Itor = 0.0854 m Total Area = 1.6788 m
4 2
Xc = 0.210 / 1.679 = 0.125093 m Iy = 0.9225 m Area of Girder = 0.8388 m
Perimeter expose to atmosphere = 6.980789
2Ac/U = 0.480963

43 43
CALCULATION OF SECTION PROPERTIES:
INTERNAL GIRDER-CENTER SECTION

1.50 1.50
Xc Grade of Girder = M 30
Y 1 0.240 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.100 m E of Slab = 31000 Gpa

X X
1.420 5
0.550 m
0.3

6 7 0.150 m
8 0.250 m
0.65
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 3.00 0.240 0.7200 0.0000 0.1200 0.0000 0.0864 0.0035 0.5400 0.0069 0.0000 0.3311 0.0000 0.0790
2 R 1 0.130 0.1300 0.0000 0.3050 0.0000 0.0397 0.0002 0.0108 0.0007 0.0000 0.1461 0.0000 0.0028
3 T 0.35 0.100 0.0350 -0.2667 0.4033 -0.0093 0.0141 0.0000 0.0001 0.0000 0.2667 0.0478 0.0025 0.0001
4 T 0.35 0.100 0.0350 0.2667 0.4033 0.0093 0.0141 0.0000 0.0001 0.0000 -0.2667 0.0478 0.0025 0.0001
5 R 0.3 0.800 0.2400 0.0000 0.8200 0.0000 0.1968 0.0128 0.0018 0.0072 0.0000 -0.3689 0.0000 0.0327
6 T 0.175 0.150 0.0263 -0.3833 1.1200 -0.0101 0.0294 0.0000 0.0000 0.0001 0.3833 -0.6689 0.0039 0.0117
7 T 0.175 0.150 0.0263 0.3833 1.1200 0.0101 0.0294 0.0000 0.0000 0.0001 -0.3833 -0.6689 0.0039 0.0117
8 R 0.65 0.250 0.1625 0.0000 1.2950 0.0000 0.2104 0.0008 0.0057 0.0034 0.0000 -0.8439 0.0000 0.1157
1.3750 0.0000 0.6203 0.0173 0.5586 0.0184 0.0127 0.2537

4 4 2
Yc = 0.620 / 1.375 = 0.451142 m Iz = 0.2711 m Itor = 0.0184 m Total Area = 1.3750 m
4 2
Xc = 0.000 / 1.375 = 0 m Iy = 0.5713 m Area of Girder = 0.6550 m
Perimeter expose to atmosphere = 6.698988
2Ac/U = 0.41051

44 44
CALCULATION OF SECTION PROPERTIES:
INTERNAL GIRDER-END SECTION

1.50 1.50
Xc Grade of Girder = M 30
Y 1 0.240 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.075 m E of Slab = 31000 Gpa

X X
1.420 5
0.725 m
0.65

6 7 0.000 m
8 0.250 m
0.65
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 3.00 0.240 0.7200 0.0000 0.1200 0.0000 0.0864 0.0035 0.5400 0.0069 0.0000 0.3719 0.0000 0.0996
2 R 1 0.130 0.1300 0.0000 0.3050 0.0000 0.0397 0.0002 0.0108 0.0007 0.0000 0.1869 0.0000 0.0045
3 T 0.175 0.075 0.0131 -0.3833 0.3950 -0.0050 0.0052 0.0000 0.0000 0.0000 0.3833 0.0969 0.0019 0.0001
4 T 0.175 0.075 0.0131 0.3833 0.3950 0.0050 0.0052 0.0000 0.0000 0.0000 -0.3833 0.0969 0.0019 0.0001
5 R 0.65 0.800 0.5200 0.0000 0.8075 0.0000 0.4199 0.0277 0.0183 0.0732 0.0000 -0.3156 0.0000 0.0518
6 T 0 0.000 0.0000 -0.3250 1.1700 0.0000 0.0000 0.0000 0.0000 0.0000 0.3250 -0.6781 0.0000 0.0000
7 T 0 0.000 0.0000 0.3250 1.1700 0.0000 0.0000 0.0000 0.0000 0.0000 -0.3250 -0.6781 0.0000 0.0000
8 R 0.65 0.250 0.1625 0.0000 1.2950 0.0000 0.2104 0.0008 0.0057 0.0034 0.0000 -0.8031 0.0000 0.1048
1.5588 0.0000 0.7668 0.0322 0.5749 0.0843 0.0039 0.2610

4 4 2
Yc = 0.767 / 1.559 = 0.491905 m Iz = 0.2932 m Itor = 0.0843 m Total Area = 1.5588 m
4 2
Xc = 0.000 / 1.559 = 0 m Iy = 0.5787 m Area of Girder = 0.8388 m
Perimeter expose to atmosphere = 6.240789
2Ac/U = 0.499536

45 45
CALCULATION OF SECTION PROPERTIES:
END DIAPHRAGM
Xc
0.52 0.52
Xc Grade of Girder = M 30
Y 1 0.240 m E of Girder = 31000 Gpa
0.45 2 0.000 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.000 m E of Slab = 31000 Gpa

0.780 m
X X
1.020 5
0.45

6 7 0.000 m
8 0.000 m
0.45
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 1.04 0.240 0.2496 0.0000 0.1200 0.0000 0.0300 0.0012 0.0225 0.0024 0.0000 0.2981 0.0000 0.0222
2 R 0.45 0.000 0.0000 0.0000 0.2400 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.1781 0.0000 0.0000
3 T 0 0.000 0.0000 -0.2250 0.2400 0.0000 0.0000 0.0000 0.0000 0.0000 0.2250 0.1781 0.0000 0.0000
4 T 0 0.000 0.0000 0.2250 0.2400 0.0000 0.0000 0.0000 0.0000 0.0000 -0.2250 0.1781 0.0000 0.0000
5 R 0.45 0.780 0.3510 0.0000 0.6300 0.0000 0.2211 0.0178 0.0059 0.0237 0.0000 -0.2119 0.0000 0.0158
6 T 0 0.000 0.0000 -0.2250 1.0200 0.0000 0.0000 0.0000 0.0000 0.0000 0.2250 -0.6019 0.0000 0.0000
7 T 0 0.000 0.0000 0.2250 1.0200 0.0000 0.0000 0.0000 0.0000 0.0000 -0.2250 -0.6019 0.0000 0.0000
8 R 0.45 0.000 0.0000 0.0000 1.0200 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 -0.6019 0.0000 0.0000
0.6006 0.0000 0.2511 0.0190 0.0284 0.0261 0.0000 0.0379

4 4 2
Yc = 0.251 / 0.601 = 0.418052 m Iz = 0.0569 m Itor = 0.0261 m Total Area = 0.6006 m
4 2
Xc = 0.000 / 0.601 = 0 m Iy = 0.0284 m Area of Girder = 0.3510 m

46 46
CALCULATION OF SECTION PROPERTIES:
EXTERNAL GIRDER-CENTER ALONE SECTION

2.000 1.50
Xc Grade of Girder = M 30
Y 1 0.000 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.100 m E of Slab = 31000 Gpa
x x

X
1.180 5
0.550 m
0.3

6 7 0.150 m
8 0.250 m
0.65
Y
Section
Type L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No
1 R 3.50 0.000 0.0000 0.2500 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 -0.2500 0.5751 0.0000 0.0000
2 R 1 0.130 0.1300 0.0000 0.0650 0.0000 0.0085 0.0002 0.0108 0.0007 0.0000 0.5101 0.0000 0.0338
3 T 0.35 0.100 0.0350 -0.2667 0.1633 -0.0093 0.0057 0.0000 0.0001 0.0000 0.2667 0.4118 0.0025 0.0059
4 T 0.35 0.100 0.0350 0.2667 0.1633 0.0093 0.0057 0.0000 0.0001 0.0000 -0.2667 0.4118 0.0025 0.0059
5 R 0.3 0.800 0.2400 0.0000 0.5800 0.0000 0.1392 0.0128 0.0018 0.0072 0.0000 -0.0049 0.0000 0.0000
6 T 0.175 0.150 0.0263 -0.3833 0.8800 -0.0101 0.0231 0.0000 0.0000 0.0001 0.3833 -0.3049 0.0039 0.0024
7 T 0.175 0.150 0.0263 0.3833 0.8800 0.0101 0.0231 0.0000 0.0000 0.0001 -0.3833 -0.3049 0.0039 0.0024
8 R 0.65 0.250 0.1625 0.0000 1.0550 0.0000 0.1714 0.0008 0.0057 0.0034 0.0000 -0.4799 0.0000 0.0374
0.6550 0.0000 0.3767 0.0139 0.0186 0.0115 0.0127 0.0880

4 4 2
Yc = 0.377 / 0.655 = 0.5751 m Iz = 0.1019 m Itor = 0.0115 m Total Area = 0.6550 m
4 2
Xc = 0.000 / 0.655 = 0.0000 m Iy = 0.0313 m Area of Girder = 0.6550 m
Perimeter expose to atmosphere = 7.198988
2Ac/U = 0.18197

47 47
CALCULATION OF SECTION PROPERTIES:
EXTERNAL GIRDER-END ALONE SECTION

2.000 1.500
Xc Grade of Girder = M 30
Y 1 0.000 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.0750 m E of Slab = 31000 Gpa

X X
1.180 5
0.725 m
0.65

6 7 0.000 m
8 0.250 m
0.65
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 3.50 0.000 0.0000 0.2500 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 -0.2500 0.5712 0.0000 0.0000
2 R 1 0.130 0.1300 0.0000 0.0650 0.0000 0.0085 0.0002 0.0108 0.0007 0.0000 0.5062 0.0000 0.0333
3 T 0.175 0.075 0.0131 -0.3833 0.1550 -0.0050 0.0020 0.0000 0.0000 0.0000 0.3833 0.4162 0.0019 0.0023
4 T 0.175 0.075 0.0131 0.3833 0.1550 0.0050 0.0020 0.0000 0.0000 0.0000 -0.3833 0.4162 0.0019 0.0023
5 R 0.65 0.800 0.5200 0.0000 0.5675 0.0000 0.2951 0.0277 0.0183 0.0732 0.0000 0.0037 0.0000 0.0000
6 T 0 0.000 0.0000 -0.3250 0.9300 0.0000 0.0000 0.0000 0.0000 0.0000 0.3250 -0.3588 0.0000 0.0000
7 T 0 0.000 0.0000 0.3250 0.9300 0.0000 0.0000 0.0000 0.0000 0.0000 -0.3250 -0.3588 0.0000 0.0000
8 R 0.65 0.250 0.1625 0.0000 1.0550 0.0000 0.1714 0.0008 0.0057 0.0034 0.0000 -0.4838 0.0000 0.0380
0.8388 0.0000 0.4791 0.0288 0.0349 0.0774 0.0039 0.0759

4 4 2
Yc = 0.479 / 0.839 = 0.571155 m Iz = 0.1047 m Itor = 0.0774 m Total Area = 0.8388 m
4 2
Xc = 0.000 / 0.839 = 0 m Iy = 0.0387 m Area of Girder = 0.8388 m
Perimeter expose to atmosphere = 6.740789
2Ac/U = 0.248858

48 48
CALCULATION OF SECTION PROPERTIES:
INTERNAL GIRDER-CENTER ALONE SECTION

1.50 1.50
Xc Grade of Girder = M 30
Y 1 0.000 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.100 m E of Slab = 31000 Gpa

X X
1.180 5
0.550 m
0.3

1.425

6 7 0.150 m
8 0.250 m
0.65
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 3.00 0.000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.5751 0.0000 0.0000
2 R 1 0.130 0.1300 0.0000 0.0650 0.0000 0.0085 0.0002 0.0108 0.0007 0.0000 0.5101 0.0000 0.0338
3 T 0.35 0.100 0.0350 -0.2667 0.1633 -0.0093 0.0057 0.0000 0.0001 0.0000 0.2667 0.4118 0.0025 0.0059
4 T 0.35 0.100 0.0350 0.2667 0.1633 0.0093 0.0057 0.0000 0.0001 0.0000 -0.2667 0.4118 0.0025 0.0059
5 R 0.3 0.800 0.2400 0.0000 0.5800 0.0000 0.1392 0.0128 0.0018 0.0072 0.0000 -0.0049 0.0000 0.0000
6 T 0.175 0.150 0.0263 -0.3833 0.8800 -0.0101 0.0231 0.0000 0.0000 0.0001 0.3833 -0.3049 0.0039 0.0024
7 T 0.175 0.150 0.0263 0.3833 0.8800 0.0101 0.0231 0.0000 0.0000 0.0001 -0.3833 -0.3049 0.0039 0.0024
8 R 0.65 0.250 0.1625 0.0000 1.0550 0.0000 0.1714 0.0008 0.0057 0.0034 0.0000 -0.4799 0.0000 0.0374
0.6550 0.0000 0.3767 0.0139 0.0186 0.0115 0.0127 0.0880

4 4 2
Yc = 0.377 / 0.655 = 0.575146 m Iz = 0.1019 m Itor = 0.0115 m Total Area = 0.6550 m
4 2
Xc = 0.000 / 0.655 = 0 m Iy = 0.0313 m Area of Girder = 0.6550 m
Perimeter expose to atmosphere = 6.698988
2Ac/U = 0.195552

49 49
CALCULATION OF SECTION PROPERTIES:
INTERNAL GIRDER-END ALONE SECTION

1.50 1.50
Xc Grade of Girder = M 30
Y 1 0.000 m E of Girder = 31000 Gpa
1 2 0.130 m Grade of cast-in-situ slab = M 30
3 4 Yc 0.075 m E of Slab = 31000 Gpa

X X
1.180 5
0.725 m
0.65

6 7 0.000 m
8 0.250 m
0.65
Y
Section
L H Area (A) CGx CGy ACGx ACGy X Y Torsion X-X bar Y-Y Bar X Y
No Type
1 R 3.00 0.000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.5712 0.0000 0.0000
2 R 1 0.130 0.1300 0.0000 0.0650 0.0000 0.0085 0.0002 0.0108 0.0007 0.0000 0.5062 0.0000 0.0333
3 T 0.175 0.075 0.0131 -0.3833 0.1550 -0.0050 0.0020 0.0000 0.0000 0.0000 0.3833 0.4162 0.0019 0.0023
4 T 0.175 0.075 0.0131 0.3833 0.1550 0.0050 0.0020 0.0000 0.0000 0.0000 -0.3833 0.4162 0.0019 0.0023
5 R 0.65 0.800 0.5200 0.0000 0.5675 0.0000 0.2951 0.0277 0.0183 0.0732 0.0000 0.0037 0.0000 0.0000
6 T 0 0.000 0.0000 -0.3250 0.9300 0.0000 0.0000 0.0000 0.0000 0.0000 0.3250 -0.3588 0.0000 0.0000
7 T 0 0.000 0.0000 0.3250 0.9300 0.0000 0.0000 0.0000 0.0000 0.0000 -0.3250 -0.3588 0.0000 0.0000
8 R 0.65 0.250 0.1625 0.0000 1.0550 0.0000 0.1714 0.0008 0.0057 0.0034 0.0000 -0.4838 0.0000 0.0380
0.8388 0.0000 0.4791 0.0288 0.0349 0.0774 0.0039 0.0759

4 4 2
Yc = 0.479 / 0.839 = 0.571155 m Iz = 0.1047 m Itor = 0.0774 m Total Area = 0.8388 m
4 2
Xc = 0.000 / 0.839 = 0 m Iy = 0.0387 m Area of Girder = 0.8388 m
Perimeter expose to atmosphere = 6.240789
2Ac/U = 0.268796

50 50
SUMMARY OF GOVERNING BENDING MOMENTS AND SHEAR FORCES BM are in t-m, SF in T
Bending Moments Shear Force LL -BM LL - SF
LOCATION

Memb
Location
No. SLAB CD+FPD SLAB CD+FP
Distance DL WC FPLL DL WC FPLL sag
LOADS L LOADS DL
1 2 3 4 5 6 7 8 9 10 11 8 10
Load no in staad 1 2 3 4 5
0.000 23 Start 0.00 0.00 0.00 0.00 0.00 12.32 14.93 9.34 4.41 0.01 0.00 41.96
0.313 23 End -3.75 -4.67 -2.88 -1.35 0.00 -11.66 -14.93 -9.06 -4.22 -0.01 -12.91 41.96
0.625 24 End -7.29 -9.22 -5.61 -2.63 -0.01 -11.01 -14.56 -8.61 -4.02 -0.01 -25.22 40.17
0.938 25 End -10.63 -13.65 -8.20 -3.86 -0.01 -10.35 -14.18 -8.14 -3.82 -0.01 -36.44 39.61
1.250 26 End -13.76 -17.96 -10.64 -5.03 -0.02 -9.70 -13.81 -7.69 -3.63 -0.01 -46.91 37.22
1.875 27 End -19.42 -25.89 -15.10 -7.17 -0.02 -8.46 -12.69 -6.87 -3.24 -0.01 -65.78 34.74
2.500 28 End -24.36 -32.88 -19.01 -9.07 -0.03 -7.36 -11.20 -6.00 -2.84 -0.01 -84.45 32.23
3.396 29 End -30.30 -41.30 -23.69 -11.36 -0.04 -5.89 -9.40 -4.83 -2.28 -0.01 -104.84 27.18
4.292 30 End -34.91 -47.84 -27.30 -13.15 -0.04 -4.42 -7.30 -3.64 -1.71 -0.01 -123.36 23.15
5.188 31 End -38.21 -52.50 -29.86 -14.43 -0.05 -2.95 -5.21 -2.46 -1.14 -0.01 -138.05 19.27
GIRDER G1

6.084 32 End -40.19 -55.29 -31.39 -15.19 -0.05 -1.47 -3.12 -1.31 -0.57 0.00 -143.81 16.30
6.980 33 End -40.85 -56.22 -31.90 -15.45 -0.05 0.00 -1.04 -0.17 0.00 0.00 -146.68 13.54
7.876 34 End -40.19 -55.29 -31.39 -15.19 -0.05 1.47 1.04 0.97 0.56 0.00 -141.66 14.74
8.772 35 End -38.21 -52.50 -29.86 -14.43 -0.05 2.94 3.12 2.11 1.13 0.00 -130.89 16.95
9.668 36 End -34.91 -47.83 -27.29 -13.15 -0.04 4.41 5.21 3.27 1.70 0.01 -123.49 21.08
10.564 37 End -30.30 -41.30 -23.68 -11.37 -0.04 5.89 7.30 4.44 2.27 0.01 -108.71 25.65
11.460 38 End -24.36 -32.88 -19.00 -9.07 -0.03 7.36 9.40 5.64 2.84 0.01 -87.35 30.78
12.085 39 End -19.42 -25.88 -15.09 -7.17 -0.02 8.46 11.20 6.56 3.23 0.01 -70.39 34.97
12.710 40 End -13.76 -17.96 -10.63 -5.03 -0.02 9.70 12.69 7.44 3.63 0.01 -49.91 38.24
13.023 41 End -10.62 -13.64 -8.19 -3.86 -0.01 10.35 13.81 7.97 3.82 0.01 -39.67 40.69
13.335 42 End -7.29 -9.21 -5.61 -2.63 -0.01 11.01 14.18 8.43 4.02 0.01 -26.45 43.13
13.648 43 End -3.74 -4.66 -2.87 -1.35 0.00 11.66 14.56 8.89 4.22 0.01 -13.95 43.05
13.960 44 End 0.00 0.00 0.00 0.00 0.00 12.32 14.93 9.34 4.41 0.01 0.00 45.45
0.000 45 Start 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -2.82 5.15 -0.02 0.00 48.16
0.313 45 End -3.73 -3.13 0.88 -1.57 0.01 -11.59 -9.99 2.82 -4.91 0.02 -15.07 48.16
0.625 46 End -7.25 -6.18 1.69 -3.07 0.01 -10.94 -9.77 2.60 -4.68 0.02 -29.31 46.65
0.938 47 End -10.57 -9.16 2.43 -4.50 0.02 -10.28 -9.55 2.37 -4.44 0.02 -41.78 44.59
1.250 48 End -13.67 -12.07 3.10 -5.85 0.02 -9.63 -9.32 2.15 -4.21 0.02 -53.83 41.45
1.875 49 End -19.30 -17.48 4.25 -8.33 0.03 -8.39 -8.64 1.85 -3.74 0.01 -74.50 38.12
2.500 50 End -24.19 -22.30 5.18 -10.53 0.04 -7.30 -7.71 1.52 -3.28 0.01 -94.52 35.40
3.396 51 End -30.08 -28.17 6.21 -13.17 0.04 -5.83 -6.54 1.16 -2.62 0.01 -116.53 30.72
4.292 52 End -34.65 -32.78 6.93 -15.23 0.05 -4.37 -5.13 0.82 -1.96 0.00 -137.37 27.54
5.188 53 End -37.92 -36.09 7.40 -16.69 0.05 -2.91 -3.69 0.54 -1.30 0.00 -151.63 24.58
GIRDER - G2

6.084 54 End -39.88 -38.08 7.66 -17.57 0.05 -1.45 -2.23 0.30 -0.64 0.00 -156.62 21.69
6.980 55 End -40.53 -38.75 7.75 -17.86 0.05 0.00 -0.74 0.10 0.01 0.00 -159.87 18.68
7.876 56 End -39.88 -38.08 7.66 -17.57 0.05 1.46 0.74 -0.10 0.66 0.00 -155.00 19.90
8.772 57 End -37.92 -36.09 7.40 -16.69 0.05 2.92 2.23 -0.30 1.32 0.00 -144.39 21.51
9.668 58 End -34.65 -32.78 6.91 -15.23 0.05 4.38 3.69 -0.54 1.97 0.00 -135.90 25.12
10.564 59 End -30.08 -28.18 6.19 -13.17 0.04 5.84 5.13 -0.82 2.63 0.00 -121.10 29.44
11.460 60 End -24.19 -22.31 5.17 -10.53 0.04 7.30 6.54 -1.16 3.29 -0.01 -98.20 34.58
12.085 61 End -19.30 -17.48 4.24 -8.33 0.03 8.39 7.71 -1.52 3.75 -0.01 -80.13 39.19
12.710 62 End -13.67 -12.08 3.09 -5.85 0.02 9.63 8.64 -1.85 4.21 -0.01 -57.77 43.14
13.023 63 End -10.56 -9.16 2.43 -4.49 0.02 10.28 9.32 -2.15 4.44 -0.02 -46.77 46.45
13.335 64 End -7.25 -6.18 1.69 -3.07 0.01 10.94 9.55 -2.37 4.68 -0.02 -31.20 50.01
13.648 65 End -3.72 -3.12 0.88 -1.57 0.01 11.59 9.77 -2.60 4.91 -0.02 -16.75 49.95
13.960 66 End 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -2.82 5.15 -0.02 0.00 53.72

51 51
Bending Moments Shear Force LL -BM LL - SF
LOCATION
Memb
Location
No. SLAB CD+FPD SLAB CD+FP
Distance DL WC FPLL DL WC FPLL sag
LOADS L LOADS DL
1 2 3 4 5 6 7 8 9 10 11 8 10
Load no in staad 1 2 3 4 5
0.000 67 Start 0.00 0.00 0.00 0.00 0.00 12.34 11.19 -0.81 5.32 -0.16 0.00 48.74
0.313 67 End -3.76 -3.50 0.25 -1.63 0.05 -11.68 -11.19 0.81 -5.08 0.16 -15.26 48.74
0.625 68 End -7.30 -6.90 0.53 -3.18 0.10 -11.02 -10.88 0.90 -4.85 0.16 -29.82 46.80
0.938 69 End -10.65 -10.21 0.84 -4.66 0.15 -10.37 -10.57 0.99 -4.61 0.17 -43.82 45.73
1.250 70 End -13.78 -13.41 1.17 -6.06 0.21 -9.71 -10.27 1.06 -4.38 0.18 -56.09 42.83
1.875 71 End -19.46 -19.27 1.88 -8.65 0.32 -8.47 -9.38 1.13 -3.91 0.18 -79.48 40.75
2.500 72 End -24.40 -24.40 2.60 -10.94 0.43 -7.38 -8.22 1.16 -3.43 0.18 -98.78 37.42
3.396 73 End -30.35 -30.53 3.60 -13.71 0.58 -5.90 -6.84 1.12 -2.75 0.17 -121.48 34.10
4.292 74 End -34.97 -35.25 4.48 -15.86 0.71 -4.43 -5.26 0.97 -2.07 0.14 -138.09 30.34
GIRDER - G3

5.188 75 End -38.28 -38.59 5.15 -17.40 0.80 -2.96 -3.73 0.75 -1.38 0.11 -149.81 26.91
6.084 76 End -40.26 -40.58 5.58 -18.33 0.86 -1.48 -2.22 0.48 -0.70 0.07 -156.37 23.74
6.980 77 End -40.92 -41.24 5.73 -18.64 0.88 0.00 -0.74 0.17 -0.01 0.02 -158.14 20.74
7.876 78 End -40.26 -40.58 5.58 -18.33 0.86 1.47 0.74 -0.17 0.68 -0.02 -156.06 20.71
8.772 79 End -38.28 -38.59 5.15 -17.40 0.80 2.95 2.22 -0.48 1.37 -0.07 -148.94 23.78
9.668 80 End -34.97 -35.24 4.48 -15.86 0.71 4.42 3.73 -0.75 2.06 -0.11 -136.96 26.90
10.564 81 End -30.35 -30.53 3.60 -13.71 0.58 5.90 5.26 -0.97 2.74 -0.14 -119.94 30.06
11.460 82 End -24.40 -24.40 2.60 -10.94 0.43 7.37 6.84 -1.12 3.43 -0.17 -97.68 33.60
12.085 83 End -19.45 -19.27 1.88 -8.65 0.32 8.47 8.22 -1.16 3.90 -0.18 -78.72 37.55
12.710 84 End -13.78 -13.41 1.17 -6.06 0.21 9.71 9.38 -1.13 4.38 -0.18 -55.73 41.37
13.023 85 End -10.64 -10.20 0.84 -4.65 0.15 10.37 10.27 -1.06 4.61 -0.18 -44.74 44.46
13.335 86 End -7.30 -6.90 0.53 -3.18 0.10 11.02 10.57 -0.99 4.85 -0.17 -29.85 47.77
13.648 87 End -3.75 -3.49 0.25 -1.62 0.05 11.68 10.88 -0.90 5.08 -0.16 -15.97 47.77
13.960 88 End 0.00 0.00 0.00 0.00 0.00 12.34 11.19 -0.81 5.32 -0.16 0.00 51.18
0.000 89 Start 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -1.24 5.15 -0.15 0.00 46.89
0.313 89 End -3.73 -3.13 0.39 -1.57 0.05 -11.59 -9.99 1.24 -4.91 0.15 -14.45 46.89
0.625 90 End -7.25 -6.18 0.72 -3.07 0.08 -10.94 -9.77 1.08 -4.68 0.12 -28.05 45.38
0.938 91 End -10.57 -9.16 1.00 -4.50 0.11 -10.28 -9.55 0.91 -4.44 0.09 -39.90 43.25
1.250 92 End -13.67 -12.07 1.24 -5.85 0.13 -9.63 -9.32 0.75 -4.21 0.06 -51.36 40.13
1.875 93 End -19.30 -17.48 1.58 -8.33 0.14 -8.39 -8.64 0.56 -3.74 0.02 -71.29 37.08
2.500 94 End -24.19 -22.30 1.79 -10.53 0.13 -7.30 -7.71 0.36 -3.28 -0.01 -89.58 34.06
3.396 95 End -30.08 -28.17 1.93 -13.17 0.09 -5.83 -6.54 0.18 -2.62 -0.04 -110.09 30.98
4.292 96 End -34.65 -32.78 1.96 -15.23 0.04 -4.37 -5.13 0.05 -1.96 -0.05 -129.64 27.70
GIRDER - G4

5.188 97 End -37.92 -36.09 1.93 -16.69 0.00 -2.91 -3.69 -0.01 -1.30 -0.05 -143.07 24.86
6.084 98 End -39.88 -38.08 1.90 -17.57 -0.03 -1.45 -2.23 -0.04 -0.64 -0.03 -147.71 22.24
6.980 99 End -40.53 -38.75 1.88 -17.86 -0.04 0.00 -0.74 -0.02 0.01 -0.01 -150.58 19.72
7.876 100 End -39.88 -38.08 1.90 -17.57 -0.03 1.46 0.74 0.02 0.66 0.01 -145.74 19.73
8.772 101 End -37.92 -36.09 1.93 -16.69 0.00 2.92 2.23 0.04 1.32 0.03 -135.63 22.22
9.668 102 End -34.65 -32.78 1.94 -15.23 0.04 4.38 3.69 0.01 1.97 0.05 -128.06 24.85
10.564 103 End -30.08 -28.18 1.91 -13.17 0.09 5.84 5.13 -0.05 2.63 0.05 -114.59 28.34
11.460 104 End -24.19 -22.31 1.77 -10.53 0.13 7.30 6.54 -0.18 3.29 0.04 -93.33 33.20
12.085 105 End -19.30 -17.48 1.56 -8.33 0.14 8.39 7.71 -0.36 3.75 0.01 -76.43 37.71
12.710 106 End -13.67 -12.08 1.23 -5.85 0.13 9.63 8.64 -0.56 4.21 -0.02 -55.28 41.66
13.023 107 End -10.56 -9.16 1.00 -4.49 0.11 10.28 9.32 -0.75 4.44 -0.06 -44.93 44.98
13.335 108 End -7.25 -6.18 0.72 -3.07 0.08 10.94 9.55 -0.91 4.68 -0.09 -29.97 48.60
13.648 109 End -3.72 -3.12 0.38 -1.57 0.05 11.59 9.77 -1.08 4.91 -0.12 -16.14 48.65
13.960 110 End 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -1.24 5.15 -0.15 0.00 52.43
0.000 111 Start 0.00 0.00 0.00 0.00 0.00 12.32 14.93 14.37 4.41 4.29 0.00 14.50
0.313 111 End -3.75 -4.67 -4.41 -1.35 -1.32 -11.66 -14.93 -13.81 -4.22 -4.12 -4.07 14.50
0.625 112 End -7.29 -9.22 -8.59 -2.63 -2.56 -11.01 -14.56 -13.12 -4.02 -3.91 -7.74 13.85
0.938 113 End -10.63 -13.65 -12.57 -3.86 -3.75 -10.35 -14.18 -12.43 -3.82 -3.71 -11.63 13.90
1.250 114 End -13.76 -17.96 -16.32 -5.03 -4.87 -9.70 -13.81 -11.75 -3.63 -3.51 -14.75 13.20
1.875 115 End -19.42 -25.89 -23.19 -7.17 -6.93 -8.46 -12.69 -10.46 -3.24 -3.12 -20.97 12.47
2.500 116 End -24.36 -32.88 -29.24 -9.07 -8.74 -7.36 -11.20 -9.13 -2.84 -2.72 -26.37 11.70
3.396 117 End -30.30 -41.30 -36.48 -11.36 -10.91 -5.89 -9.40 -7.30 -2.28 -2.17 -32.47 10.37
4.292 118 End -34.91 -47.84 -42.08 -13.15 -12.58 -4.42 -7.30 -5.46 -1.71 -1.62 -37.38 8.85
5.188 119 End -38.21 -52.50 -46.06 -14.43 -13.78 -2.95 -5.21 -3.65 -1.14 -1.08 -40.92 7.20
GIRDER - G5

6.084 120 End -40.19 -55.29 -48.44 -15.19 -14.49 -1.47 -3.12 -1.86 -0.57 -0.54 -42.79 5.80
6.980 121 End -40.85 -56.22 -49.23 -15.45 -14.73 0.00 -1.04 -0.08 0.00 -0.01 -43.30 4.80
7.876 122 End -40.19 -55.29 -48.44 -15.19 -14.49 1.47 1.04 1.69 0.56 0.52 -42.12 4.50
8.772 123 End -38.21 -52.50 -46.06 -14.43 -13.78 2.94 3.12 3.47 1.13 1.05 -39.53 5.99
9.668 124 End -34.91 -47.83 -42.06 -13.15 -12.58 4.41 5.21 5.26 1.70 1.59 -34.75 7.42
10.564 125 End -30.30 -41.30 -36.46 -11.37 -10.90 5.89 7.30 7.07 2.27 2.13 -29.75 8.59
11.460 126 End -24.36 -32.88 -29.22 -9.07 -8.73 7.36 9.40 8.91 2.84 2.68 -23.38 9.47
12.085 127 End -19.42 -25.88 -23.18 -7.17 -6.92 8.46 11.20 10.26 3.23 3.08 -18.23 10.42
12.710 128 End -13.76 -17.96 -16.31 -5.03 -4.87 9.70 12.69 11.58 3.63 3.47 -12.92 10.89
52 52
LOCATION GIRDER -
Bending Moments Shear Force LL -BM LL - SF
Memb
Location
No. SLAB CD+FPD SLAB CD+FP
Distance DL WC FPLL DL WC FPLL sag
LOADS L LOADS DL
1 2 3 4 5 6 7 8 9 10 11 8 10
Load no in staad 1 2 3 4 5
13.023 129 End -10.62 -13.64 -12.55 -3.86 -3.75 10.35 13.81 12.31 3.82 3.68 -9.68 11.66
13.335 130 End -7.29 -9.21 -8.59 -2.63 -2.56 11.01 14.18 13.00 4.02 3.89 -6.64 11.65
13.648 131 End -3.74 -4.66 -4.39 -1.35 -1.31 11.66 14.56 13.69 4.22 4.09 -3.35 12.00
13.960 132 End 0.00 0.00 0.00 0.00 0.00 12.32 14.93 14.37 4.41 4.29 0.00 12.09
155 End 1.76 0.00 0.00 0.00 0.00 1.76 0.00 0.00 0.00 0.00 -0.01 6.99
156 Start 1.76 0.01 0.25 0.00 0.00 1.79 0.00 0.10 0.00 0.00 -0.18 12.43
156 End 0.84 0.01 0.18 0.00 0.00 -1.26 0.00 -0.10 0.00 0.00 -2.29 8.58
END DIAPHRAGM - LHS

157 End -0.01 0.00 0.00 0.00 0.00 0.32 0.00 -0.10 0.00 0.00 -2.01 9.49
158 End 0.34 0.00 -0.07 0.00 0.00 0.85 0.00 -0.10 0.00 0.00 -1.12 9.49
159 End -0.19 0.00 -0.05 0.00 0.00 -0.63 0.00 0.03 0.00 0.00 -0.61 8.43
160 End 0.09 0.00 0.01 0.00 0.00 0.95 0.00 0.03 0.00 0.00 -0.66 4.18
161 End 0.82 0.00 0.03 0.00 0.00 1.47 0.00 0.03 0.00 0.00 -0.90 12.29
162 End 0.09 0.00 0.01 0.00 0.00 -0.95 0.00 -0.03 0.00 0.00 -0.85 4.90
163 End -0.19 0.00 -0.04 0.00 -0.01 0.63 0.00 -0.03 0.00 0.00 -1.37 8.54
164 End 0.35 0.00 -0.05 0.00 -0.01 1.16 0.00 -0.03 0.00 0.00 -0.34 8.54
165 Start 0.34 0.00 -0.05 0.00 -0.01 0.85 0.00 -0.08 0.00 -0.02 -0.32 9.76
165 End -0.01 0.00 -0.01 0.00 0.00 -0.32 0.00 0.08 0.00 0.02 -1.12 9.18
166 End 0.84 0.01 0.13 0.00 0.03 1.26 0.00 0.08 0.00 0.02 -2.89 5.30
167 End 1.76 0.01 0.18 0.00 0.04 1.79 0.00 0.08 0.00 0.02 -0.15 5.30
168 Start 1.76 0.00 0.00 0.00 0.00 1.76 0.00 0.00 0.00 0.00 -0.01 0.01
169 End 1.76 0.00 0.00 0.00 0.00 1.76 0.00 0.00 0.00 0.00 -0.02 1.19
170 Start 1.76 0.01 0.25 0.00 0.00 1.79 0.00 0.10 0.00 0.00 -0.27 2.94
170 End 0.84 0.01 0.18 0.00 0.00 -1.26 0.00 -0.10 0.00 0.00 -0.99 1.51
END DIAPHRAGM - RHS

171 End -0.01 0.00 0.00 0.00 0.00 0.32 0.00 -0.10 0.00 0.00 -0.90 3.00
172 End 0.34 0.00 -0.07 0.00 0.00 0.85 0.00 -0.10 0.00 0.00 -0.25 3.01
173 Start 0.35 0 -0.07 0 0 1.16 0 -0.03 0 0 -0.27 1.68
174 End 0.09 0 0.01 0 0 0.95 0 0.03 0 0 -0.34 2.81
175 End 0.82 0 0.03 0 0 1.47 0 0.03 0 0 -0.25 2.81
176 End 0.09 0 0.01 0 0 -0.95 0 -0.03 0 0 -0.25 2.08
177 End -0.19 0 -0.04 0 -0.01 0.63 0 -0.03 0 0 -0.33 1.95
178 End 0.35 0 -0.05 0 -0.01 1.16 0 -0.03 0 0 -0.19 1.95
179 End -0.01 0 -0.01 0 0 -0.32 0 0.07 0 0.02 -0.25 2.77
180 Start -0.01 0 -0.01 0 0 0.32 0 -0.07 0 -0.02 -0.25 2.77
181 End 1.76 0.01 0.17 0 0.04 1.79 0 0.07 0 0.02 -0.20 0.81
182 Start 1.76 0 0 0 0 1.76 0 0 0 0 -0.02 0.01

53 53
SUMMARY OF GOVERNING BENDING MOMENTS AND SHEAR FORCES
Memb Bending Moments Shear Force
Location
No. DL SLAB DL SLAB LOADS
LOCATION Distance
1 2 3 7 8
Load no in staad 1 2
0.000 23 Start 0.00 0.00 12.29 14.66
0.313 23 End -3.75 -4.49 -11.64 -14.00
0.625 24 End -7.27 -8.75 -10.98 -13.35
0.938 25 End -10.61 -12.83 -10.33 -12.69
1.250 26 End -13.73 -16.68 -9.67 -12.03
1.875 27 End -19.38 -23.79 -8.43 -10.72
2.500 28 End -24.30 -30.08 -7.34 -9.41
3.396 29 End -30.22 -37.67 -5.87 -7.53
4.292 30 End -34.82 -43.57 -4.40 -5.64
5.188 31 End -38.11 -47.78 -2.94 -3.76
GIRDER G1

6.084 32 End -40.08 -50.31 -1.47 -1.88


6.980 33 End -40.74 -51.16 0.00 0.00
7.876 34 End -40.08 -50.31 1.47 1.88
8.772 35 End -38.11 -47.78 2.94 3.76
9.668 36 End -34.82 -43.57 4.40 5.64
10.564 37 End -30.22 -37.67 5.87 7.53
11.460 38 End -24.30 -30.08 7.34 9.41
12.085 39 End -19.38 -23.79 8.43 10.72
12.710 40 End -13.73 -16.68 9.67 12.03
13.023 41 End -10.60 -12.81 10.33 12.69
13.335 42 End -7.27 -8.75 10.98 13.35
13.648 43 End -3.73 -4.47 11.64 14.00
13.960 44 End 0.00 0.00 12.29 14.66
0.000 45 Start 0.00 0.00 12.29 12.56
0.313 45 End -3.75 -3.84 -11.64 -12.00
0.625 46 End -7.27 -7.50 -10.98 -11.44
0.938 47 End -10.61 -10.99 -10.33 -10.88
1.250 48 End -13.73 -14.30 -9.67 -10.31
1.875 49 End -19.38 -20.39 -8.43 -9.19
2.500 50 End -24.30 -25.78 -7.34 -8.06
3.396 51 End -30.22 -32.29 -5.87 -6.45
4.292 52 End -34.82 -37.35 -4.40 -4.84
5.188 53 End -38.11 -40.96 -2.94 -3.23
GIRDER - G2

6.084 54 End -40.08 -43.13 -1.47 -1.61


6.980 55 End -40.74 -43.85 0.00 0.00
7.876 56 End -40.08 -43.13 1.47 1.61
8.772 57 End -38.11 -40.96 2.94 3.23
9.668 58 End -34.82 -37.35 4.40 4.84
10.564 59 End -30.22 -32.29 5.87 6.45
11.460 60 End -24.30 -25.79 7.34 8.06
12.085 61 End -19.38 -20.39 8.43 9.19
12.710 62 End -13.73 -14.30 9.67 10.31
13.023 63 End -10.60 -10.98 10.33 10.88
13.335 64 End -7.27 -7.50 10.98 11.44
13.648 65 End -3.73 -3.83 11.64 12.00
13.960 66 End 0.00 0.00 12.29 12.56

54 54
Memb Bending Moments Shear Force
Location
No. DL SLAB DL SLAB LOADS
LOCATION Distance
1 2 3 7 8
Load no in staad 1 2
0.000 67 Start 0.00 0.00 12.29 12.56
0.313 67 End -3.75 -3.84 -11.64 -12.00
0.625 68 End -7.27 -7.50 -10.98 -11.44
0.938 69 End -10.61 -10.99 -10.33 -10.88
1.250 70 End -13.73 -14.30 -9.67 -10.31
1.875 71 End -19.38 -20.39 -8.43 -9.19
2.500 72 End -24.30 -25.78 -7.34 -8.06
3.396 73 End -30.22 -32.29 -5.87 -6.45
4.292 74 End -34.82 -37.35 -4.40 -4.84
GIRDER - G3

5.188 75 End -38.11 -40.96 -2.94 -3.23


6.084 76 End -40.08 -43.13 -1.47 -1.61
6.980 77 End -40.74 -43.85 0.00 0.00
7.876 78 End -40.08 -43.13 1.47 1.61
8.772 79 End -38.11 -40.96 2.94 3.23
9.668 80 End -34.82 -37.35 4.40 4.84
10.564 81 End -30.22 -32.29 5.87 6.45
11.460 82 End -24.30 -25.79 7.34 8.06
12.085 83 End -19.38 -20.39 8.43 9.19
12.710 84 End -13.73 -14.30 9.67 10.31
13.023 85 End -10.60 -10.98 10.33 10.88
13.335 86 End -7.27 -7.50 10.98 11.44
13.648 87 End -3.73 -3.83 11.64 12.00
13.960 88 End 0.00 0.00 12.29 12.56
0.000 89 Start 0.00 0.00 12.29 12.56
0.313 89 End -3.75 -3.84 -11.64 -12.00
0.625 90 End -7.27 -7.50 -10.98 -11.44
0.938 91 End -10.61 -10.99 -10.33 -10.88
1.250 92 End -13.73 -14.30 -9.67 -10.31
1.875 93 End -19.38 -20.39 -8.43 -9.19
2.500 94 End -24.30 -25.78 -7.34 -8.06
3.396 95 End -30.22 -32.29 -5.87 -6.45
4.292 96 End -34.82 -37.35 -4.40 -4.84
GIRDER - G4

5.188 97 End -38.11 -40.96 -2.94 -3.23


6.084 98 End -40.08 -43.13 -1.47 -1.61
6.980 99 End -40.74 -43.85 0.00 0.00
7.876 100 End -40.08 -43.13 1.47 1.61
8.772 101 End -38.11 -40.96 2.94 3.23
9.668 102 End -34.82 -37.35 4.40 4.84
10.564 103 End -30.22 -32.29 5.87 6.45
11.460 104 End -24.30 -25.79 7.34 8.06
12.085 105 End -19.38 -20.39 8.43 9.19
12.710 106 End -13.73 -14.30 9.67 10.31
13.023 107 End -10.60 -10.98 10.33 10.88
13.335 108 End -7.27 -7.50 10.98 11.44
13.648 109 End -3.73 -3.83 11.64 12.00
13.960 110 End 0.00 0.00 12.29 12.56
0.000 111 Start 0.00 0.00 12.29 14.66
0.313 111 End -3.75 -4.49 -11.64 -14.00
0.625 112 End -7.27 -8.75 -10.98 -13.35
0.938 113 End -10.61 -12.83 -10.33 -12.69
1.250 114 End -13.73 -16.68 -9.67 -12.03
1.875 115 End -19.38 -23.79 -8.43 -10.72
2.500 116 End -24.30 -30.08 -7.34 -9.41
3.396 117 End -30.22 -37.67 -5.87 -7.53
4.292 118 End -34.82 -43.57 -4.40 -5.64
GIRDER - G5

5.188 119 End -38.11 -47.78 -2.94 -3.76


6.084 120 End -40.08 -50.31 -1.47 -1.88
6.980 121 End -40.74 -51.16 0.00 0.00
7.876 122 End -40.08 -50.31 1.47 1.88
55 55
Memb Bending Moments Shear Force

GIRDER - G5
Location
No. DL SLAB DL SLAB LOADS
LOCATION Distance
1 2 3 7 8
Load no in staad 1 2
8.772 123 End -38.11 -47.78 2.94 3.76
9.668 124 End -34.82 -43.57 4.40 5.64
10.564 125 End -30.22 -37.67 5.87 7.53
11.460 126 End -24.30 -30.08 7.34 9.41
12.085 127 End -19.38 -23.79 8.43 10.72
12.710 128 End -13.73 -16.68 9.67 12.03
13.023 129 End -10.60 -12.81 10.33 12.69
13.335 130 End -7.27 -8.75 10.98 13.35
13.648 131 End -3.73 -4.47 11.64 14
13.960 132 End 0 0 12.29 14.66

56 56
SUMMARY OF GOVERNING BENDING MOMENTS AND SHEAR FORCES
LOCATION
Memb Bending Moments Shear Force Sum BM Sum SF
Location
No. SLAB CD+FPD SLAB CD+FP
DL WC DL WC Sag Hog
LOADS L LOADS DL
1 2 3 4 5 7 8 9 10 8 9 10
Load no in staad 1 2 3 4
155 End 1.76 0 0 0 1.76 0 0 0 0.000 1.760 1.760
156 Start 1.75 0.01 0.25 0 -14.06 -14.92 -9.33 -5 0.000 2.010 43.310
156 End 10.35 8.96 5.84 3 14.58 14.92 9.33 5 0.000 28.150 43.830
157 End -2.03 -2.01 -2.04 -0.52 -6.09 -6.09 -4.38 -1.95 6.600 0.000 18.510
END DIAPHRAGM - LHS

158 End -4.08 -3.44 -0.09 -1.62 -3.15 -2.38 3.26 -1.83 9.230 0.000 10.620
159 End 1.56 1.14 0.18 0.5 9.66 7.64 0.46 3.53 0.000 3.380 21.290
160 End 0.76 0.55 -0.09 0.28 0.35 -0.33 -0.15 -0.12 0.000 1.500 0.950
161 End -3.09 -2.8 0.1 -1.35 -6.15 -5.58 0.31 -2.73 7.140 0.000 14.770
162 End 0.76 0.55 -0.22 0.28 6.68 5.58 -0.52 2.73 0.000 1.370 15.510
163 End 1.56 1.14 0.53 0.5 1.23 0.33 0.41 0.12 0.000 3.730 2.090
164 End -4.08 -3.44 -0.8 -1.62 -9.14 -7.64 -2.21 -3.53 9.940 0.000 22.520
165 Start -4.08 -3.44 -0.8 -1.62 -3.15 -2.38 3.42 -1.83 9.940 0.000 10.780
165 End -2.03 -2.01 -2.85 -0.52 3.67 2.38 -3.42 1.83 7.410 0.000 11.300
166 End 10.35 8.96 8.79 3 7.67 6.09 6.47 1.95 0.000 31.100 22.180
167 End 1.75 0.01 0.17 0 -14.06 -14.92 -14.36 -5 0.000 1.930 48.340
168 Start 1.76 0 0 0 1.76 0 0 0 0.000 1.760 1.760
169 End 1.76 0 0 0 1.76 0 0 0 0.000 1.760 1.760
170 Start 1.75 0.01 0.24 0 -14.06 -14.92 -9.33 -5 0.000 2.000 43.310
170 End 10.35 8.96 5.84 3 14.58 14.92 9.33 5 0.000 28.150 43.830
171 End -2.03 -2.01 -2.04 -0.52 -6.09 -6.1 -4.38 -1.95 6.600 0.000 18.520
END DIAPHRAGM - RHS

172 End -4.08 -3.44 -0.09 -1.62 -3.15 -2.38 3.26 -1.83 9.230 0.000 10.620
173 Start -4.08 -3.44 -0.09 -1.62 -9.14 -7.64 -0.46 -3.53 9.230 0.000 20.770
174 End 0.76 0.55 -0.09 0.28 0.35 -0.33 -0.15 -0.12 0.000 1.500 0.950
175 End -3.09 -2.8 0.1 -1.35 -6.15 -5.58 0.31 -2.73 7.140 0.000 14.770
176 End 0.76 0.55 -0.22 0.28 6.68 5.58 -0.52 2.73 0.000 1.370 15.510
177 End 1.56 1.14 0.53 0.5 1.23 0.33 0.41 0.12 0.000 3.730 2.090
178 End -4.08 -3.44 -0.8 -1.62 -9.14 -7.64 -2.21 -3.53 9.940 0.000 22.520
179 End -2.03 -2.01 -2.85 -0.52 3.67 2.38 -3.42 1.83 7.410 0.000 11.300
180 Start -2.03 -2.01 -2.85 -0.52 -6.09 -6.09 -6.47 -1.95 7.410 0.000 20.600
181 End 1.75 0.01 0.17 0 -14.06 -14.92 -14.36 -5 0.000 1.930 48.340
182 Start 1.76 0 0 0 1.76 0 0 0 0.000 1.760 1.760
INETRNAL DIAPHRAGMS INETRNAL DIAPHRAGMS

183 Start 0 1.08 1.25 0 0 1.01 0.35 0 0.000 2.330 1.360


183 End 0 0.17 0.72 -0.01 0 -0.2 -0.35 0 0.000 0.880 0.550
184 End -0.01 0.47 0.2 -0.01 0 0.6 -0.35 0 0.000 0.650 0.950
185 End 0 -0.22 0.03 -0.01 0 -0.05 -0.11 0 0.200 0.000 0.160
186 End 0 0.31 -0.13 0 0 0.75 -0.11 0 0.000 0.180 0.860
187 End 0 -0.22 0.11 -0.01 0 0.05 0.16 0 0.120 0.000 0.210
188 End -0.01 0.47 0.35 -0.01 0 0.86 0.16 0 0.000 0.800 1.020
189 End 0 0.17 0.62 -0.01 0 0.2 0.18 0 0.000 0.780 0.380
190 End 0 1.08 0.89 0 0 1.01 0.18 0 0.000 1.970 1.190
191 Start 0 1.08 1.25 0 0 1.01 0.35 0 0.000 2.330 1.360
191 End 0 0.17 0.72 -0.01 0 -0.2 -0.35 0 0.000 0.880 0.550
192 End -0.01 0.47 0.2 -0.01 0 0.6 -0.35 0 0.000 0.650 0.950
193 End 0 -0.22 0.03 -0.01 0 -0.05 -0.11 0 0.200 0.000 0.160
194 End 0 0.31 -0.13 0 0 0.75 -0.11 0 0.000 0.180 0.860
195 End 0 -0.22 0.11 -0.01 0 0.05 0.16 0 0.120 0.000 0.210
196 End -0.01 0.47 0.35 -0.01 0 0.86 0.16 0 0.000 0.800 1.020
197 End 0 0.17 0.62 -0.01 0 0.2 0.18 0 0.000 0.780 0.380
198 End 0 1.08 0.89 0 0 1.01 0.18 0 0.000 1.970 1.190

57 57
SUMMARY OF BENDING MOMENTS AND SHEAR FORCES
Total loads under service
LOCATION
Memb Under Jacking condition Total design forces Total
Sl. No.

Location condition
No.
BM - Sag BM - Hog SF BM - Sag BM - Hog SF BM - Sag BM - Hog SF

Load no in staad 5
1 155 End 0.00 1.76 1.76 0.00 1.76 1.76 0.00 1.76 1.76
2 156 Start 0.00 2.01 43.31 0.00 2.02 1.89 0.00 2.02 43.31
3 156 End 0.00 28.15 43.83 0.00 1.03 1.36 0.00 28.15 43.83
4 157 End 6.60 0.00 18.51 0.01 0.00 0.42 6.60 0.00 18.51
5 158 End 9.23 0.00 10.62 0.00 0.27 0.95 9.23 0.27 10.62
END DIAPHRAGM - LHS

6 159 End 0.00 3.38 21.29 0.24 0.00 0.66 0.24 3.38 21.29
7 160 End 0.00 1.50 0.95 0.00 0.10 0.98 0.00 1.50 0.98
8 161 End 7.14 0.00 14.77 0.00 0.85 1.50 7.14 0.85 14.77
9 162 End 0.00 1.37 15.51 0.00 0.10 0.98 0.00 1.37 15.51
10 163 End 0.00 3.73 2.09 0.24 0.00 0.66 0.24 3.73 2.09
11 164 End 9.94 0.00 22.52 0.00 0.29 1.19 9.94 0.29 22.52
12 165 Start 9.94 0.00 10.78 0.00 0.28 0.95 9.94 0.28 10.78
13 165 End 7.41 0.00 11.30 0.02 0.00 0.42 7.41 0.00 11.30
14 166 End 0.00 31.10 22.18 0.00 1.01 1.36 0.00 31.10 22.18
15 167 End 0.00 1.93 48.34 0.00 1.99 1.89 0.00 1.99 48.34
16 168 Start 0.00 1.76 1.76 0.00 1.76 1.76 0.00 1.76 1.76
17 169 End 0.00 1.76 1.76 0.00 1.76 1.76 0.00 1.76 1.76
18 170 Start 0.00 2.00 43.31 0.00 2.02 1.89 0.00 2.02 43.31
19 170 End 0.00 28.15 43.83 0.00 1.03 1.36 0.00 28.15 43.83
INETRNAL DIAPHRAGMS END DIAPHRAGM - RHS

20 171 End 6.60 0.00 18.52 0.01 0.00 0.42 6.60 0.00 18.52
21 172 End 9.23 0.00 10.62 0.00 0.27 0.95 9.23 0.27 10.62
22 173 Start 9.23 0.00 20.77 0.00 0.28 1.19 9.23 0.28 20.77
23 174 End 0.00 1.50 0.95 0.00 0.10 0.98 0.00 1.50 0.98
24 175 End 7.14 0.00 14.77 0.00 0.85 1.50 7.14 0.85 14.77
25 176 End 0.00 1.37 15.51 0.00 0.10 0.98 0.00 1.37 15.51
26 177 End 0.00 3.73 2.09 0.24 0.00 0.66 0.24 3.73 2.09
27 178 End 9.94 0.00 22.52 0.00 0.29 1.19 9.94 0.29 22.52
28 179 End 7.41 0.00 11.30 0.02 0.00 0.41 7.41 0.00 11.30
29 180 Start 7.41 0.00 20.60 0.02 0.00 0.41 7.41 0.00 20.60
30 181 End 0.00 1.93 48.34 0.00 1.98 1.88 0.00 1.98 48.34
31 182 Start 0.00 1.76 1.76 0.00 1.76 1.76 0.00 1.76 1.76
32 183 Start 0.00 2.33 1.36 0.00 2.33 1.37 0.00 2.33 1.37
33 183 End 0.00 0.88 0.55 0.00 0.86 0.56 0.00 0.88 0.56
34 184 End 0.00 0.65 0.95 0.00 0.60 0.96 0.00 0.65 0.96
35 185 End 0.20 0.00 0.16 0.23 0.00 0.17 0.23 0.00 0.17
36 186 End 0.00 0.18 0.86 0.00 0.17 0.88 0.00 0.18 0.88
37 187 End 0.12 0.00 0.21 0.09 0.00 0.26 0.12 0.00 0.26
38 188 End 0.00 0.80 1.02 0.00 0.87 1.07 0.00 0.87 1.07
39 189 End 0.00 0.78 0.38 0.00 0.90 0.42 0.00 0.90 0.42
INETRNAL DIAPHRAGMS

40 190 End 0.00 1.97 1.19 0.00 2.16 1.23 0.00 2.16 1.23
41 191 Start 0.00 2.33 1.36 0.00 2.33 1.37 0.00 2.33 1.37
42 191 End 0.00 0.88 0.55 0.00 0.86 0.56 0.00 0.88 0.56
43 192 End 0.00 0.65 0.95 0.00 0.60 0.96 0.00 0.65 0.96
44 193 End 0.20 0.00 0.16 0.23 0.00 0.17 0.23 0.00 0.17
45 194 End 0.00 0.18 0.86 0.00 0.17 0.88 0.00 0.18 0.88
46 195 End 0.12 0.00 0.21 0.09 0.00 0.26 0.12 0.00 0.26
47 196 End 0.00 0.80 1.02 0.00 0.87 1.07 0.00 0.87 1.07
48 197 End 0.00 0.78 0.38 0.00 0.90 0.42 0.00 0.90 0.42
49 198 End 0.00 1.97 1.19 0.00 2.16 1.23 0.00 2.16 1.23

58 58
Bending Moments Impact Factor = 1.225
CLASS A LOADING
Ld. Start 1 101 201 301 401 501 601 701 3Ls CLASS A 3Ls CLASS A Governing
Ld. End 100 200 300 400 500 600 700 800 1+2+3 4+5+6
mem MAX.
Location
.no BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF
23 Start 0.00 29.62 0.00 2.00 0.00 0.69 0.00 2.31 0.00 0.70 0.00 0.10 0.00 0.67 0.00 2.64 0.00 39.51 0.00 3.80 0.00 39.51
23 End 9.27 29.62 0.63 2.00 0.01 0.69 0.72 2.31 0.00 0.70 0.00 0.10 0.01 0.67 0.83 2.64 12.14 39.51 0.88 3.80 12.14 39.51
24 End 17.44 27.91 1.25 2.00 0.01 0.68 1.44 2.30 0.00 0.70 0.00 0.09 0.01 0.67 1.64 2.61 22.91 37.40 1.76 3.78 22.91 37.40
25 End 26.16 27.84 1.86 1.95 0.00 0.68 2.13 2.23 0.00 0.70 0.00 0.09 0.00 0.66 2.44 2.60 34.34 37.26 2.61 3.69 34.34 37.26
26 End 32.71 26.17 2.46 1.94 0.00 0.68 2.82 2.22 0.00 0.70 0.00 0.08 0.00 0.66 3.24 2.58 43.10 35.20 3.46 3.67 43.10 35.20
27 End 45.86 24.50 3.64 1.86 0.00 0.66 4.15 2.15 0.00 0.67 0.00 0.07 0.00 0.64 4.78 2.50 60.66 33.03 5.09 3.53 60.66 33.03
28 End 56.97 22.89 4.73 1.76 0.00 0.62 5.41 2.04 0.00 0.64 0.00 0.07 0.00 0.61 6.21 2.37 75.61 30.89 6.63 3.36 75.61 30.89
29 End 68.38 20.05 6.18 1.61 0.00 0.56 7.11 1.88 0.00 0.57 0.00 0.06 0.00 0.54 8.13 2.18 91.37 27.16 8.71 3.07 91.37 27.16
30 End 77.73 17.12 7.39 1.36 0.00 0.46 8.48 1.60 0.00 0.47 0.00 0.06 0.00 0.45 9.63 1.85 104.31 23.15 10.39 2.60 104.31 23.15
31 End 84.24 14.12 8.29 1.04 0.00 0.36 9.50 1.23 0.00 0.35 0.00 0.05 0.00 0.37 10.77 1.44 113.39 18.97 11.64 1.99 113.39 18.97
32 End 87.63 11.84 8.81 0.72 0.00 0.25 10.07 0.87 0.00 0.24 0.00 0.04 0.00 0.26 11.40 1.04 118.18 15.67 12.34 1.40 118.18 15.67
33 End 88.42 10.56 8.97 0.39 0.00 0.11 10.24 0.52 0.00 0.10 0.00 0.03 0.00 0.12 11.58 0.66 119.35 13.54 12.55 0.79 119.35 13.54
34 End 86.27 9.84 8.75 0.38 0.00 0.10 9.98 0.50 0.00 0.09 0.00 0.03 0.00 0.12 11.28 0.63 116.44 12.63 12.23 0.76 116.44 12.63
35 End 81.55 12.30 8.09 0.73 0.00 0.23 9.21 0.89 0.00 0.23 0.00 0.04 0.00 0.22 10.39 1.06 109.85 16.22 11.29 1.42 109.85 16.22
36 End 72.93 14.82 7.18 1.02 0.00 0.35 8.12 1.22 0.00 0.36 0.00 0.05 0.00 0.35 9.14 1.43 98.17 19.80 9.95 1.99 98.17 19.80
37 End 63.87 16.93 6.03 1.29 0.00 0.47 6.81 1.49 0.00 0.48 0.00 0.06 0.00 0.47 7.64 1.72 85.66 22.85 8.35 2.48 85.66 22.85
38 End 51.06 18.33 4.68 1.54 0.00 0.57 5.31 1.76 0.00 0.58 0.00 0.06 0.00 0.57 5.97 1.98 68.31 24.98 6.51 2.93 68.31 24.98
39 End 41.29 20.52 3.63 1.75 0.00 0.63 4.13 2.00 0.00 0.64 0.00 0.06 0.00 0.62 4.67 2.26 55.05 27.99 5.06 3.30 55.05 27.99
40 End 29.98 21.63 2.46 1.88 0.00 0.66 2.81 2.15 0.00 0.67 0.00 0.06 0.00 0.64 3.19 2.43 39.75 29.54 3.44 3.52 39.75 29.54
41 End 22.49 23.98 1.84 1.94 0.00 0.68 2.12 2.23 0.00 0.69 0.00 0.07 0.00 0.67 2.42 2.53 29.82 32.51 2.60 3.66 29.82 32.51
42 End 15.74 24.01 1.23 1.95 0.00 0.68 1.41 2.25 0.00 0.69 0.00 0.07 0.00 0.67 1.61 2.58 20.80 32.56 1.73 3.68 20.80 32.56
43 End 7.87 25.15 0.62 1.96 0.00 0.68 0.72 2.25 0.00 0.70 0.00 0.07 0.00 0.66 0.82 2.57 10.40 33.97 0.88 3.69 10.40 33.97
44 End 0.00 25.21 0.00 1.99 0.00 0.68 0.00 2.30 0.00 0.70 0.00 0.07 0.00 0.66 0.00 2.62 0.00 34.08 0.00 3.75 0.00 34.08
45 Start 0.00 1.09 0.00 20.90 0.00 2.16 0.00 21.10 0.00 2.37 0.00 0.54 0.00 1.96 0.00 21.26 0.00 29.46 0.00 29.36 0.00 29.46
45 End 0.34 1.09 6.54 20.90 0.68 2.16 6.60 21.10 0.74 2.37 0.04 0.54 0.61 1.96 6.65 21.26 9.22 29.46 9.04 29.36 9.22 29.46
46 End 0.68 1.08 12.14 19.43 1.35 2.15 12.25 19.61 1.48 2.36 0.06 0.54 1.23 1.95 12.34 19.75 17.28 27.64 16.89 27.52 17.28 27.64
47 End 1.02 1.07 18.22 19.43 2.02 2.14 18.39 19.61 2.22 2.35 0.08 0.53 1.83 1.94 18.51 19.74 25.93 27.61 25.34 27.50 25.93 27.61
48 End 1.35 1.05 22.48 18.02 2.68 2.12 22.68 18.18 2.94 2.34 0.07 0.53 2.43 1.92 22.83 18.30 32.32 25.84 31.47 25.73 32.32 25.84
49 End 1.97 1.03 31.16 16.72 3.96 2.06 31.42 16.86 4.36 2.27 0.04 0.51 3.59 1.87 31.61 16.97 45.21 24.15 43.89 24.01 45.21 24.15
50 End 2.52 1.25 38.33 15.57 5.17 1.96 38.64 15.71 5.71 2.15 0.00 0.50 4.69 1.78 38.86 15.80 56.09 22.86 54.35 22.44 56.09 22.86
51 End 3.12 1.34 45.03 13.49 6.75 1.76 45.35 13.60 7.45 1.93 0.00 0.51 6.11 1.64 45.58 13.68 66.89 20.17 64.70 19.59 66.89 20.17
52 End 3.61 1.48 50.64 11.54 8.02 1.56 50.98 11.64 8.84 1.59 0.00 0.50 7.28 1.54 51.21 11.70 75.87 17.69 73.31 16.76 75.87 17.69
53 End 3.93 1.44 54.41 9.65 8.88 1.32 54.75 9.73 9.81 1.30 0.00 0.44 8.03 1.32 54.98 9.79 81.89 15.05 79.12 14.00 81.89 15.05
54 End 3.87 1.31 56.32 8.33 9.27 0.98 56.66 8.41 10.32 0.93 0.00 0.35 8.34 1.02 56.88 8.47 84.65 12.89 82.08 11.83 84.65 12.89
55 End 4.26 0.94 56.71 7.81 9.57 0.50 57.05 7.90 10.60 0.43 0.00 0.21 8.68 0.56 57.27 7.98 85.92 11.27 82.90 10.44 85.92 11.27
56 End 4.41 1.01 55.46 7.25 9.54 0.50 55.80 7.34 10.49 0.41 0.00 0.22 8.66 0.57 56.02 7.41 84.52 10.67 81.24 9.74 84.52 10.67
57 End 4.20 1.19 52.76 8.68 9.01 0.84 53.10 8.77 9.90 0.79 0.00 0.30 8.20 0.88 53.32 8.83 80.33 13.02 77.20 12.05 80.33 13.02
58 End 3.72 1.26 47.90 10.23 8.10 1.15 48.23 10.33 8.89 1.23 0.00 0.36 7.36 1.11 48.46 10.40 72.73 15.35 70.00 14.56 72.73 15.35
59 End 3.02 1.33 42.75 11.59 6.78 1.54 43.08 11.69 7.45 1.65 0.00 0.42 6.15 1.44 43.32 11.76 64.03 17.56 61.92 16.81 64.03 17.56
60 End 2.30 1.15 35.00 12.40 5.13 1.87 35.31 12.50 5.67 2.01 0.00 0.50 4.65 1.73 35.54 12.58 51.71 18.76 50.22 18.33 51.71 18.76
61 End 1.76 1.12 28.82 14.08 3.92 2.04 29.09 14.21 4.34 2.21 0.03 0.54 3.57 1.89 29.30 14.30 42.06 20.99 41.00 20.72 42.06 20.99
62 End 1.21 1.15 21.32 14.95 2.66 2.11 21.54 15.08 2.93 2.28 0.04 0.55 2.42 1.95 21.71 15.18 30.72 22.17 30.03 21.88 30.72 22.17
63 End 0.91 1.16 15.98 17.09 2.00 2.18 16.15 17.26 2.20 2.35 0.06 0.56 1.82 2.02 16.27 17.39 23.04 24.89 22.55 24.65 23.04 24.89
64 End 0.61 1.08 11.38 17.08 1.34 2.18 11.50 17.25 1.47 2.37 0.06 0.55 1.22 2.00 11.59 17.38 16.26 24.79 15.96 24.65 16.26 24.79
65 End 0.31 1.31 5.68 18.20 0.67 2.13 5.74 18.40 0.74 2.35 0.05 0.52 0.61 1.94 5.79 18.55 8.12 26.36 8.00 26.00 8.12 26.36
66 End 0.00 1.45 0.00 18.21 0.00 2.14 0.00 18.41 0.00 2.36 0.00 0.53 0.00 1.95 0.00 18.56 0.00 26.54 0.00 26.04 0.00 26.54
67 Start 0.00 0.98 0.00 6.42 0.00 18.96 0.00 5.78 0.00 19.35 0.00 1.53 0.00 18.51 0.00 5.16 0.00 32.18 0.00 32.48 0.00 32.48
67 End 0.05 0.98 2.01 6.42 5.93 18.96 1.81 5.78 6.06 19.35 0.48 1.53 5.79 18.51 1.62 5.16 9.79 32.18 10.17 32.48 10.17 32.48
68 End 0.07 0.98 3.91 6.26 11.00 17.61 3.55 5.67 11.22 17.96 0.95 1.52 10.75 17.20 3.19 5.11 18.35 30.33 19.15 30.63 19.15 30.63
69 End 0.09 0.97 5.87 6.25 16.51 17.61 5.32 5.67 16.84 17.96 1.43 1.51 16.13 17.20 4.79 5.10 27.52 30.31 28.73 30.62 28.73 30.62
70 End 0.07 0.96 7.59 6.05 20.35 16.31 6.92 5.52 20.75 16.63 1.89 1.49 19.90 15.95 6.28 5.00 34.32 28.46 35.99 28.79 35.99 28.79
71 End 0.02 0.93 10.96 5.79 28.18 15.13 10.05 5.30 28.71 15.42 2.78 1.41 27.57 14.79 9.17 4.83 47.99 26.66 50.56 26.95 50.56 26.95
72 End 0.00 0.89 13.95 5.45 34.65 14.09 12.85 4.99 35.29 14.36 3.57 1.52 33.91 12.73 11.78 4.55 59.56 24.93 62.93 25.39 62.93 25.39
73 End 0.00 0.85 17.59 4.89 40.67 12.21 16.34 4.51 41.37 12.43 4.59 1.58 39.84 11.95 15.12 4.13 71.39 21.89 75.78 22.50 75.78 22.50
74 End 0.00 0.81 20.47 4.16 45.72 10.45 19.09 3.82 46.49 10.64 5.45 1.63 44.81 10.23 17.73 3.50 81.11 18.80 86.38 19.52 86.38 19.52
75 End 0.00 0.70 22.59 3.32 49.12 8.74 21.12 3.03 49.92 8.91 5.97 1.50 48.18 8.55 19.69 2.76 87.88 15.55 93.64 16.29 93.64 16.29
59 59
Bending Moments Impact Factor = 1.225
CLASS A LOADING
Ld. Start 1 101 201 301 401 501 601 701 3Ls CLASS A 3Ls CLASS A Governing
Ld. End 100 200 300 400 500 600 700 800 1+2+3 4+5+6
mem MAX.
Location
.no BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF
76 End 0.00 0.55 23.73 2.57 50.84 7.56 22.23 2.32 51.65 7.71 6.05 1.29 49.88 7.22 20.76 2.07 91.38 13.02 97.21 13.71 97.21 13.71
77 End 0.00 0.31 24.05 1.96 51.19 7.10 22.55 1.70 52.00 7.26 6.51 0.85 50.23 6.91 21.07 1.46 92.20 11.44 98.54 11.92 98.54 11.92
78 End 0.00 0.32 23.38 1.85 50.06 6.59 21.93 1.61 50.86 6.74 6.56 0.90 49.17 6.70 20.50 1.39 90.00 10.70 96.44 11.23 96.44 11.23
79 End 0.00 0.48 21.79 2.65 47.63 7.88 20.37 2.38 48.41 8.04 6.27 1.14 46.75 7.69 18.98 2.12 85.07 13.43 91.20 14.03 91.20 14.03
80 End 0.00 0.59 18.88 3.38 43.25 9.28 17.64 3.08 43.99 9.47 5.56 1.28 42.39 9.06 16.48 2.78 76.14 16.16 81.66 16.79 81.66 16.79
81 End 0.00 0.74 15.84 3.96 38.62 10.50 14.63 3.62 39.32 10.70 4.62 1.41 37.81 10.47 13.70 3.28 66.74 18.54 71.21 19.10 71.21 19.10
82 End 0.00 0.88 12.26 4.42 31.65 11.22 11.43 4.06 32.26 11.43 3.49 1.47 30.95 11.42 10.74 3.71 53.81 20.14 57.39 20.60 57.39 20.60
83 End 0.01 0.95 9.64 4.78 26.09 12.74 9.05 4.39 26.61 12.99 2.68 1.55 25.48 12.45 8.47 4.11 43.80 22.52 46.66 23.01 46.66 23.01
84 End 0.04 0.98 6.72 5.09 19.32 13.52 6.28 4.77 19.73 13.79 1.83 1.59 18.85 13.69 5.85 4.45 31.95 23.89 33.89 24.50 33.89 24.50
85 End 0.04 1.00 5.21 5.35 14.49 15.49 4.85 5.00 14.79 15.81 1.37 1.65 14.13 15.11 4.49 4.66 24.19 26.64 25.58 27.32 25.58 27.32
86 End 0.04 0.99 3.48 5.56 10.32 15.47 3.24 5.17 10.55 15.80 0.92 1.58 10.07 15.10 3.00 4.78 16.96 26.86 17.91 27.44 17.91 27.44
87 End 0.04 0.96 1.79 5.56 5.15 16.52 1.65 5.17 5.27 16.88 0.46 1.47 5.03 16.11 1.52 4.79 8.55 28.12 8.99 28.64 8.99 28.64
88 End 0.00 0.97 0.00 5.73 0.00 16.52 0.00 5.30 0.00 16.88 0.00 1.47 0.00 16.71 0.00 4.87 0.00 28.34 0.00 28.80 0.00 28.80
89 Start 0.00 0.19 0.00 0.73 0.00 9.74 0.00 0.69 0.00 9.04 0.00 18.17 0.00 10.46 0.00 0.65 0.00 13.04 0.00 34.11 0.00 34.11
89 End 0.00 0.19 0.01 0.73 3.05 9.74 0.00 0.69 2.83 9.04 5.69 18.17 3.27 10.46 0.00 0.65 3.75 13.04 10.44 34.11 10.44 34.11
90 End 0.00 0.18 0.01 0.66 5.83 9.33 0.00 0.64 5.43 8.68 10.55 16.88 6.24 9.99 0.00 0.61 7.16 12.44 19.58 32.03 19.58 32.03
91 End 0.00 0.17 0.02 0.66 8.75 9.33 0.00 0.64 8.14 8.68 15.81 16.83 9.37 9.99 0.00 0.61 10.75 12.43 29.35 31.97 29.35 31.97
92 End 0.00 0.16 0.02 0.60 11.12 8.89 0.00 0.58 10.39 8.30 19.49 15.61 11.87 9.49 0.00 0.57 13.65 11.81 36.62 29.94 36.62 29.94
93 End 0.00 0.15 0.03 0.54 15.82 8.41 0.00 0.54 14.82 7.87 26.97 14.48 16.84 8.96 0.00 0.53 19.42 11.13 51.21 27.98 51.21 27.98
94 End 0.00 0.14 0.03 0.49 19.90 7.88 0.00 0.49 18.69 7.38 33.12 13.48 21.14 8.39 0.00 0.49 24.42 10.41 63.49 26.10 63.49 26.10
95 End 0.00 0.13 0.01 0.41 24.50 6.99 0.00 0.41 23.12 6.56 38.78 11.66 25.92 7.43 0.00 0.41 30.04 9.21 75.86 22.78 75.86 22.78
96 End 0.00 0.12 0.01 0.34 28.19 5.95 0.00 0.35 26.66 5.58 43.53 9.98 29.75 6.33 0.00 0.35 34.56 7.84 86.01 19.45 86.01 19.45
97 End 0.00 0.10 0.00 0.30 30.84 4.82 0.00 0.30 29.21 4.51 46.70 8.36 32.49 5.14 0.00 0.29 37.79 6.38 93.02 16.10 93.02 16.10
98 End 0.00 0.08 0.00 0.30 32.25 3.89 0.00 0.27 30.58 3.61 48.30 7.25 33.95 4.18 0.00 0.25 39.52 5.22 96.66 13.61 96.66 13.61
99 End 0.00 0.07 0.00 0.32 32.61 3.23 0.00 0.29 30.94 2.95 48.62 6.86 34.32 3.52 0.00 0.25 39.96 4.43 97.50 12.34 97.50 12.34
100 End 0.00 0.06 0.00 0.31 31.74 3.03 0.00 0.27 30.10 2.77 47.57 6.36 33.41 3.29 0.00 0.23 38.90 4.16 95.18 11.49 95.18 11.49
101 End 0.00 0.08 0.00 0.30 29.80 4.02 0.00 0.28 28.22 3.73 45.30 7.57 31.42 4.33 0.00 0.26 36.52 5.38 90.10 14.16 90.10 14.16
102 End 0.00 0.10 0.01 0.33 26.22 4.99 0.00 0.32 24.75 4.66 41.22 8.89 27.71 5.34 0.00 0.31 32.14 6.63 80.84 16.96 80.84 16.96
103 End 0.00 0.12 0.02 0.36 22.46 5.77 0.00 0.36 21.12 5.39 36.91 10.05 23.84 6.15 0.00 0.35 27.55 7.64 71.11 19.32 71.11 19.32
104 End 0.00 0.12 0.03 0.38 17.66 6.35 0.00 0.39 16.56 5.95 30.33 10.73 18.81 6.76 0.00 0.39 21.68 8.38 57.46 20.87 57.46 20.87
105 End 0.00 0.12 0.02 0.47 13.78 6.99 0.00 0.46 12.85 6.54 25.05 12.20 14.76 7.47 0.00 0.45 16.91 9.27 46.44 23.47 46.44 23.47
106 End 0.00 0.12 0.02 0.52 9.75 7.31 0.00 0.51 9.02 6.82 18.58 12.97 10.49 7.81 0.00 0.49 11.97 9.73 33.82 24.81 33.82 24.81
107 End 0.00 0.14 0.01 0.64 7.31 7.80 0.00 0.60 6.84 7.21 13.94 14.87 7.87 8.39 0.00 0.56 8.97 10.50 25.46 27.72 25.46 27.72
108 End 0.00 0.14 0.01 0.65 5.00 7.80 0.00 0.60 4.61 7.30 9.93 14.89 5.41 8.40 0.00 0.56 6.14 10.51 17.82 27.85 17.82 27.85
109 End 0.00 0.15 0.00 0.71 2.52 8.01 0.00 0.65 2.38 7.38 4.96 15.87 2.70 8.66 0.00 0.59 3.09 10.85 8.99 29.21 8.99 29.21
110 End 0.00 0.15 0.00 0.71 0.00 8.09 0.00 0.65 0.00 7.62 0.00 15.92 0.00 8.65 0.00 0.59 0.00 10.95 0.00 29.56 0.00 29.56
111 Start 0.00 0.06 0.00 0.29 0.00 1.03 0.00 0.27 0.00 1.01 0.00 10.58 0.00 1.03 0.00 0.25 0.00 1.68 0.00 14.50 0.00 14.50
111 End 0.02 0.06 0.01 0.29 0.00 1.03 0.01 0.27 0.00 1.01 3.31 10.58 0.00 1.03 0.01 0.25 0.04 1.68 4.07 14.50 4.07 14.50
112 End 0.04 0.06 0.01 0.29 0.00 0.97 0.01 0.27 0.00 0.96 6.31 10.10 0.00 0.96 0.01 0.25 0.06 1.61 7.74 13.85 7.74 13.85
113 End 0.06 0.06 0.02 0.28 0.00 0.97 0.01 0.26 0.00 0.97 9.48 10.14 0.00 0.97 0.01 0.24 0.10 1.60 11.63 13.90 11.63 13.90
114 End 0.07 0.06 0.01 0.28 0.00 0.91 0.01 0.26 0.00 0.92 12.03 9.62 0.00 0.90 0.01 0.24 0.10 1.52 14.75 13.20 14.75 13.20
115 End 0.11 0.06 0.00 0.27 0.00 0.85 0.00 0.25 0.00 0.86 17.11 9.09 0.00 0.84 0.00 0.23 0.13 1.44 20.97 12.47 20.97 12.47
116 End 0.14 0.05 0.00 0.26 0.00 0.79 0.00 0.24 0.00 0.80 21.52 8.53 0.00 0.78 0.00 0.22 0.17 1.34 26.37 11.70 26.37 11.70
117 End 0.18 0.05 0.00 0.23 0.00 0.69 0.00 0.21 0.00 0.71 26.50 7.56 0.00 0.67 0.00 0.20 0.22 1.18 32.47 10.37 32.47 10.37
118 End 0.22 0.04 0.00 0.21 0.00 0.59 0.00 0.20 0.00 0.60 30.50 6.44 0.00 0.57 0.00 0.18 0.27 1.02 37.38 8.85 37.38 8.85
119 End 0.25 0.04 0.00 0.18 0.00 0.48 0.00 0.17 0.00 0.49 33.39 5.23 0.00 0.48 0.00 0.15 0.31 0.85 40.92 7.20 40.92 7.20
120 End 0.27 0.03 0.00 0.14 0.00 0.41 0.00 0.13 0.00 0.40 34.92 4.22 0.00 0.41 0.00 0.12 0.33 0.71 42.79 5.80 42.79 5.80
121 End 0.27 0.01 0.00 0.08 0.00 0.37 0.00 0.07 0.00 0.35 35.33 3.50 0.00 0.38 0.00 0.06 0.33 0.56 43.30 4.80 43.30 4.80
122 End 0.26 0.01 0.00 0.08 0.00 0.34 0.00 0.07 0.00 0.33 34.37 3.28 0.00 0.35 0.00 0.06 0.32 0.53 42.12 4.50 42.12 4.50
123 End 0.24 0.03 0.00 0.13 0.00 0.42 0.00 0.11 0.00 0.42 32.26 4.37 0.00 0.42 0.00 0.10 0.29 0.71 39.53 5.99 39.53 5.99
124 End 0.21 0.04 0.00 0.16 0.00 0.51 0.00 0.14 0.00 0.51 28.36 5.42 0.00 0.50 0.00 0.13 0.26 0.87 34.75 7.42 34.75 7.42
125 End 0.18 0.04 0.00 0.20 0.00 0.58 0.00 0.19 0.00 0.59 24.28 6.25 0.00 0.57 0.00 0.17 0.22 1.00 29.75 8.59 29.75 8.59
126 End 0.14 0.05 0.00 0.25 0.00 0.64 0.00 0.23 0.00 0.65 19.08 6.87 0.00 0.62 0.00 0.21 0.17 1.15 23.38 9.47 23.38 9.47
127 End 0.11 0.05 0.00 0.27 0.00 0.72 0.00 0.25 0.00 0.72 14.88 7.56 0.00 0.71 0.00 0.23 0.13 1.27 18.23 10.42 18.23 10.42
128 End 0.07 0.06 0.01 0.28 0.00 0.76 0.00 0.26 0.00 0.76 10.54 7.89 0.00 0.75 0.00 0.24 0.10 1.34 12.92 10.89 12.92 10.89
129 End 0.06 0.06 0.01 0.29 0.00 0.84 0.00 0.27 0.00 0.83 7.90 8.44 0.00 0.85 0.00 0.25 0.09 1.45 9.68 11.66 9.68 11.66
60 60
Bending Moments Impact Factor = 1.225
CLASS A LOADING
Ld. Start 1 101 201 301 401 501 601 701 3Ls CLASS A 3Ls CLASS A Governing
Ld. End 100 200 300 400 500 600 700 800 1+2+3 4+5+6
mem MAX.
Location
.no BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF MAX. BM MAX. SF
130 End 0.04 0.06 0.01 0.29 0.00 0.84 0.00 0.27 0.00 0.83 5.42 8.43 0.00 0.85 0.00 0.25 0.06 1.45 6.64 11.65 6.64 11.65
131 End 0.02 0.06 0.00 0.28 0.00 0.88 0.00 0.26 0.00 0.86 2.73 8.70 0.00 0.90 0.00 0.25 0.02 1.49 3.35 12.00 3.35 12.00
132 End 0.00 0.06 0.00 0.29 0.00 0.88 0.00 0.27 0.00 0.85 0.00 8.77 0.00 0.90 0.00 0.25 0.00 1.50 0.00 12.09 0.00 12.09
155 End 0.00 5.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.99 0.00 0.00 0.00 6.99
156 Start 0.00 6.68 0.01 0.25 0.00 0.08 0.02 0.40 0.00 0.06 0.00 0.05 0.01 0.10 0.03 0.56 0.01 8.58 0.02 0.62 0.04 8.58
156 End 0.00 6.68 0.15 0.25 0.05 0.08 0.24 0.40 0.03 0.06 0.00 0.05 0.06 0.10 0.34 0.56 0.25 8.58 0.33 0.62 0.42 8.58
157 End 0.08 0.98 0.60 5.45 0.19 0.08 0.38 5.30 0.14 0.06 0.00 0.05 0.23 0.10 0.20 5.14 1.06 7.97 0.64 6.62 1.06 7.97
158 End 0.67 0.98 0.00 5.45 0.24 0.08 0.00 5.30 0.17 0.06 0.00 0.05 0.29 0.10 0.00 5.14 1.12 7.97 0.21 6.62 1.12 7.97
159 End 0.50 0.28 0.00 4.04 0.00 0.40 0.00 4.31 0.00 0.29 0.00 0.23 0.00 0.49 0.00 4.57 0.61 5.75 0.00 5.89 0.61 5.89
160 End 0.00 0.28 0.18 1.66 0.00 0.40 0.13 1.39 0.00 0.29 0.41 0.23 0.00 0.49 0.10 1.13 0.22 2.83 0.66 2.31 0.66 2.83
161 End 0.00 0.28 0.01 1.66 0.00 6.10 0.01 1.39 0.00 5.99 0.54 0.23 0.00 0.49 0.01 1.13 0.01 9.82 0.67 9.30 0.67 9.82
162 End 0.00 0.07 0.00 0.34 0.02 2.55 0.00 0.29 0.01 2.88 0.03 0.86 0.16 2.22 0.00 0.24 0.02 3.62 0.05 4.90 0.20 4.90
163 End 0.00 0.07 0.00 0.34 0.62 3.15 0.00 0.29 0.52 2.82 0.00 0.86 0.74 3.48 0.00 0.24 0.76 4.35 0.64 4.83 0.91 4.83
164 End 0.04 0.07 0.21 0.34 0.02 3.15 0.18 0.29 0.02 2.82 0.00 0.86 0.02 3.48 0.15 0.24 0.33 4.35 0.25 4.83 0.33 4.83
165 Start 0.04 0.01 0.21 0.07 0.00 0.42 0.18 0.06 0.00 0.39 0.00 7.52 0.00 0.45 0.15 0.05 0.31 0.61 0.22 9.76 0.31 9.76
165 End 0.04 0.01 0.16 0.07 0.00 0.42 0.14 0.06 0.00 0.39 0.77 1.82 0.00 0.45 0.12 0.05 0.25 0.61 1.12 2.77 1.12 2.77
166 End 0.01 0.01 0.04 0.07 0.00 0.42 0.03 0.06 0.00 0.39 2.33 3.88 0.00 0.45 0.03 0.05 0.06 0.61 2.89 5.30 2.89 5.30
167 End 0.00 0.01 0.00 0.07 0.00 0.42 0.00 0.06 0.00 0.39 0.12 3.88 0.00 0.45 0.00 0.05 0.00 0.61 0.15 5.30 0.15 5.30
168 Start 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01
169 End 0.00 0.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.19 0.00 0.00 0.00 1.19
170 Start 0.00 1.19 0.02 0.03 0.01 0.01 0.03 0.05 0.00 0.01 0.00 0.01 0.01 0.02 0.04 0.08 0.04 1.51 0.04 0.08 0.05 1.51
170 End 0.00 1.19 0.04 0.03 0.01 0.01 0.06 0.05 0.01 0.01 0.00 0.01 0.02 0.02 0.08 0.08 0.06 1.51 0.09 0.08 0.10 1.51
171 End 0.01 0.24 0.09 0.92 0.04 0.01 0.06 0.90 0.03 0.01 0.00 0.01 0.05 0.02 0.03 0.87 0.17 1.43 0.11 1.13 0.17 1.43
172 End 0.15 0.24 0.00 0.92 0.05 0.01 0.00 0.90 0.04 0.01 0.00 0.01 0.06 0.02 0.00 0.87 0.25 1.43 0.05 1.13 0.25 1.43
173 Start 0.18 0.07 0.00 0.68 0.04 0.08 0.00 0.73 0.03 0.06 0.00 0.05 0.05 0.09 0.00 0.77 0.27 1.01 0.04 1.02 0.27 1.02
174 End 0.00 0.07 0.04 0.27 0.00 0.08 0.03 0.22 0.00 0.06 0.09 0.05 0.00 0.09 0.03 0.18 0.05 0.51 0.15 0.40 0.15 0.51
175 End 0.00 0.07 0.01 0.27 0.00 1.03 0.01 0.22 0.00 1.01 0.12 0.05 0.00 0.09 0.01 0.18 0.01 1.67 0.16 1.56 0.16 1.67
176 End 0.00 0.02 0.00 0.06 0.02 0.43 0.00 0.05 0.01 0.49 0.00 0.17 0.05 0.38 0.00 0.04 0.02 0.62 0.01 0.86 0.06 0.86
177 End 0.00 0.02 0.00 0.06 0.13 0.52 0.00 0.05 0.11 0.46 0.00 0.17 0.16 0.57 0.00 0.04 0.16 0.73 0.13 0.83 0.20 0.83
178 End 0.01 0.02 0.03 0.06 0.02 0.52 0.03 0.05 0.02 0.46 0.00 0.17 0.02 0.57 0.02 0.04 0.07 0.73 0.06 0.83 0.07 0.83
179 End 0.01 0.00 0.03 0.01 0.00 0.07 0.03 0.01 0.00 0.06 0.16 0.36 0.00 0.07 0.02 0.01 0.05 0.10 0.23 0.53 0.23 0.53
180 Start 0.01 0.00 0.03 0.01 0.00 0.07 0.03 0.01 0.00 0.06 0.16 0.36 0.00 0.07 0.02 0.01 0.05 0.10 0.23 0.53 0.23 0.53
181 End 0.00 0.00 0.01 0.01 0.00 0.07 0.00 0.01 0.00 0.06 0.16 0.59 0.00 0.07 0.00 0.01 0.01 0.10 0.20 0.81 0.20 0.81
182 Start 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.01 0.02 0.01
183 Start 0.00 6.43 0.00 0.54 0.00 0.15 0.00 0.69 0.00 0.14 0.00 0.04 0.00 0.15 0.00 0.85 0.00 8.71 0.00 1.06 0.00 8.71
183 End 0.00 0.73 0.80 0.54 0.00 0.15 1.03 0.69 0.00 0.14 0.01 0.04 0.00 0.15 1.28 0.85 0.98 1.72 1.27 1.06 1.57 1.72
184 End 0.06 0.73 0.85 5.16 0.00 0.15 0.87 5.01 0.00 0.14 0.01 0.04 0.00 0.15 0.88 4.85 1.12 7.38 1.08 6.36 1.12 7.38
185 End 0.00 0.27 1.99 2.02 0.12 0.38 1.69 1.77 0.14 0.38 0.01 0.17 0.10 0.37 1.41 1.53 2.59 3.24 2.25 2.82 2.59 3.24
186 End 0.06 0.27 0.00 2.02 0.69 5.71 0.00 1.77 0.72 5.59 0.07 0.17 0.66 0.37 0.00 1.53 0.92 9.77 0.97 9.21 0.97 9.77
187 End 0.04 0.06 0.00 0.35 2.67 2.32 0.00 0.32 2.84 2.62 0.09 0.46 2.52 2.02 0.00 0.28 3.32 3.34 3.59 4.13 3.59 4.13
188 End 0.06 0.06 0.03 0.35 0.03 3.38 0.02 0.32 0.00 3.08 0.68 0.46 0.07 3.68 0.01 0.28 0.14 4.64 0.86 4.69 0.86 4.69
189 End 0.03 0.02 0.01 0.07 0.01 0.42 0.01 0.06 0.00 0.40 2.75 1.59 0.03 0.43 0.01 0.06 0.06 0.62 3.38 2.50 3.38 2.50
190 End 0.00 0.02 0.00 0.07 0.00 0.42 0.00 0.06 0.00 0.40 0.00 4.11 0.00 0.43 0.00 0.06 0.00 0.62 0.00 5.59 0.00 5.59
191 Start 0.00 5.90 0.00 0.51 0.00 0.15 0.00 0.65 0.00 0.15 0.00 0.04 0.00 0.15 0.00 0.80 0.00 8.02 0.00 1.02 0.00 8.02
191 End 0.00 0.66 0.76 0.51 0.00 0.15 0.98 0.65 0.00 0.15 0.01 0.04 0.00 0.15 1.20 0.80 0.93 1.60 1.21 1.02 1.47 1.60
192 End 0.00 0.66 0.85 4.73 0.00 0.15 0.87 4.59 0.00 0.15 0.02 0.04 0.00 0.15 0.89 4.44 1.04 6.77 1.09 5.85 1.09 6.77
193 End 0.00 0.27 1.85 1.88 0.12 0.38 1.58 1.65 0.14 0.39 0.00 0.17 0.11 0.37 1.32 1.43 2.41 3.07 2.11 2.69 2.41 3.07
194 End 0.05 0.27 0.00 1.88 0.70 5.23 0.00 1.65 0.73 5.12 0.00 0.17 0.66 0.37 0.00 1.43 0.92 9.01 0.89 8.48 0.92 9.01
195 End 0.04 0.05 0.00 0.32 2.48 2.12 0.00 0.29 2.63 2.39 0.09 0.40 2.34 1.84 0.00 0.26 3.09 3.05 3.33 3.74 3.33 3.74
196 End 0.06 0.05 0.00 0.32 0.03 3.12 0.00 0.29 0.00 2.85 0.69 0.40 0.07 3.40 0.00 0.26 0.11 4.27 0.85 4.30 0.85 4.30
197 End 0.03 0.02 0.00 0.07 0.01 0.38 0.00 0.06 0.00 0.37 2.55 1.44 0.04 0.39 0.00 0.06 0.05 0.57 3.12 2.28 3.12 2.28
198 End 0.00 0.02 0.00 0.07 0.00 0.38 0.00 0.06 0.00 0.37 0.00 3.80 0.00 0.39 0.00 0.06 0.00 0.57 0.00 5.18 0.00 5.18

61 61
Impact Factor =
Bending Moments 1.227
CLASS 70R WHEEL LOADING + CLASS A
Ld. Start 801 901 1001 1101 Governing
Ld. End 900 1000 1100 1200 70 R 1 + A 7th 70 R 2 + A 7th 70 R 3 + A 8th 70 R 4 + A 8th Forces
mem. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
Location BM
no SF BM SF BM SF BM SF BM SF BM SF BM SF BM MAX. SF BM SF
23 Start 0.00 33.61 0.00 6.31 0.00 1.60 0.00 0.58 0.00 41.96 0.00 8.48 0.00 4.87 0.00 3.62 0.00 41.96
23 End 10.52 33.61 1.98 6.31 0.01 1.60 0.02 0.58 12.91 41.96 2.44 8.48 0.93 4.87 0.94 3.62 12.91 41.96
24 End 20.55 32.15 3.91 6.23 0.01 1.60 0.02 0.58 25.22 40.17 4.81 8.38 1.82 4.84 1.83 3.59 25.22 40.17
25 End 29.71 31.70 5.85 6.22 0.00 1.59 0.03 0.57 36.44 39.61 7.18 8.36 2.69 4.82 2.73 3.57 36.44 39.61
26 End 38.24 29.75 7.67 6.07 0.00 1.57 0.02 0.57 46.91 37.22 9.41 8.17 3.57 4.77 3.60 3.54 46.91 37.22
27 End 53.63 27.75 11.18 5.78 0.00 1.54 0.00 0.55 65.78 34.74 13.71 7.80 5.27 4.65 5.27 3.43 65.78 34.74
28 End 68.85 25.73 14.42 5.36 0.00 1.46 0.00 0.53 84.45 32.23 17.69 7.25 6.85 4.40 6.85 3.26 84.45 32.23
29 End 85.47 21.67 18.54 4.62 0.00 1.30 0.00 0.48 104.84 27.18 22.74 6.26 8.97 4.00 8.97 2.99 104.84 27.18
30 End 100.57 18.14 21.84 3.79 0.00 1.09 0.00 0.40 123.36 22.75 26.79 5.15 10.62 3.38 10.62 2.53 123.36 22.75
31 End 112.55 15.03 24.57 3.02 0.00 0.80 0.00 0.30 138.05 18.84 30.14 4.11 11.88 2.57 11.88 1.96 138.05 18.84
32 End 117.24 11.92 25.98 2.02 0.00 0.52 0.00 0.21 143.81 14.91 31.87 2.76 12.57 1.78 12.57 1.40 143.81 14.91
33 End 119.58 8.98 26.52 1.09 0.00 0.21 0.00 0.11 146.68 11.15 32.53 1.47 12.77 0.99 12.77 0.86 146.68 11.15
34 End 115.49 11.91 25.71 1.35 0.00 0.20 0.00 0.09 141.66 14.74 31.54 1.79 12.44 0.94 12.44 0.81 141.66 14.74
35 End 106.71 13.62 24.12 2.07 0.00 0.53 0.00 0.20 130.89 16.95 29.59 2.78 11.46 1.82 11.46 1.41 130.89 16.95
36 End 100.68 16.87 21.97 2.93 0.00 0.85 0.00 0.33 123.49 21.08 26.95 3.98 10.08 2.62 10.08 1.98 123.49 21.08
37 End 88.63 20.49 18.80 3.91 0.00 1.12 0.00 0.43 108.71 25.65 23.06 5.31 8.43 3.27 8.43 2.42 108.71 25.65
38 End 71.21 24.58 14.78 4.91 0.00 1.32 0.00 0.49 87.35 30.78 18.13 6.65 6.58 3.80 6.58 2.78 87.35 30.78
39 End 57.39 27.95 11.52 5.59 0.00 1.46 0.00 0.53 70.39 34.97 14.13 7.54 5.15 4.28 5.15 3.14 70.39 34.97
40 End 40.69 30.60 7.84 6.01 0.00 1.52 0.01 0.55 49.91 38.24 9.62 8.08 3.52 4.54 3.53 3.35 49.91 38.24
41 End 32.34 32.57 5.93 6.22 0.00 1.58 0.01 0.57 39.67 40.69 7.27 8.37 2.67 4.73 2.68 3.49 39.67 40.69
42 End 21.56 34.56 3.95 6.32 0.00 1.59 0.01 0.57 26.45 43.13 4.85 8.49 1.78 4.80 1.79 3.54 26.45 43.13
43 End 11.37 34.50 1.98 6.31 0.01 1.60 0.01 0.58 13.95 43.05 2.43 8.47 0.92 4.80 0.92 3.55 13.95 43.05
44 End 0.00 36.46 0.00 6.34 0.00 1.61 0.00 0.58 0.00 45.45 0.00 8.50 0.00 4.86 0.00 3.60 0.00 45.45
45 Start 0.00 22.65 0.00 37.50 0.00 5.03 0.00 1.17 0.00 29.94 0.00 48.16 0.00 29.62 0.00 24.88 0.00 48.16
45 End 7.09 22.65 11.74 37.50 1.58 5.03 0.00 1.17 9.37 29.94 15.07 48.16 9.27 29.62 7.33 24.88 15.07 48.16
46 End 13.78 21.54 22.79 36.28 3.14 5.01 0.00 1.16 18.26 28.57 29.31 46.65 17.46 27.93 13.61 23.21 29.31 46.65
47 End 19.69 20.98 32.42 34.61 4.70 4.98 0.00 1.08 26.17 27.87 41.78 44.59 26.18 27.88 20.41 23.10 41.78 44.59
48 End 25.18 19.44 41.70 32.07 6.24 4.93 0.00 1.02 33.57 25.96 53.83 41.45 32.83 26.23 25.18 21.43 53.83 41.45
49 End 35.09 17.98 57.51 29.40 9.22 4.82 0.00 0.91 47.00 24.12 74.50 38.12 46.17 24.63 34.86 19.83 74.50 38.12
50 End 44.60 16.67 72.84 27.26 12.06 4.62 0.00 0.82 59.88 22.41 94.52 35.40 57.65 23.09 42.86 18.43 94.52 35.40
51 End 54.65 14.05 89.51 22.96 15.76 4.18 0.00 0.67 73.77 19.04 116.53 29.97 69.60 20.21 50.27 15.91 116.53 29.97
52 End 64.72 11.75 105.45 19.20 18.92 3.50 0.00 0.56 87.41 16.11 137.37 25.25 79.69 17.20 56.48 13.59 137.37 25.25
53 End 71.70 9.89 116.40 16.24 21.16 2.58 0.00 0.50 96.80 13.59 151.63 21.38 86.59 13.96 60.64 11.41 151.63 21.38
54 End 74.19 8.49 120.19 14.29 22.51 1.74 0.00 0.47 100.20 11.54 156.62 18.65 90.34 11.48 62.73 9.92 156.62 18.65
55 End 75.65 7.31 122.53 12.76 23.07 0.84 0.00 0.47 102.37 9.58 159.87 16.27 91.46 9.83 63.16 9.38 159.87 16.27
56 End 73.12 9.15 118.58 15.71 22.74 0.72 0.00 0.55 99.24 11.85 155.00 19.90 89.68 9.06 61.78 8.85 155.00 19.90
57 End 67.92 9.80 110.34 16.53 21.36 1.78 0.00 0.55 92.35 12.99 144.39 21.25 85.01 11.92 58.81 10.41 144.39 21.25
58 End 64.18 11.68 104.18 19.48 18.89 2.85 0.00 0.61 86.84 15.55 135.90 25.12 76.62 14.97 53.45 12.22 135.90 25.12
62 62
Impact Factor =
Bending Moments 1.227
CLASS 70R WHEEL LOADING + CLASS A
Ld. Start 801 901 1001 1101 Governing
Ld. End 900 1000 1100 1200 70 R 1 + A 7th 70 R 2 + A 7th 70 R 3 + A 8th 70 R 4 + A 8th Forces
mem. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
Location BM
no SF BM SF BM SF BM SF BM SF BM SF BM SF BM MAX. SF BM SF
59 End 57.17 13.75 93.20 22.71 15.66 3.72 0.00 0.68 76.91 18.45 121.10 29.44 66.99 17.53 47.78 13.80 121.10 29.44
60 End 46.35 16.21 75.88 26.64 12.00 4.24 0.00 0.78 61.98 21.79 98.20 34.58 53.92 19.08 39.20 14.83 98.20 34.58
61 End 37.84 18.41 62.12 30.25 9.26 4.63 0.00 0.90 50.35 24.67 80.13 39.19 43.67 21.45 32.32 16.88 80.13 39.19
62 End 27.22 20.29 44.92 33.42 6.27 4.75 0.00 1.00 36.06 27.04 57.77 43.14 31.63 22.57 23.94 17.97 57.77 43.14
63 End 21.97 21.81 36.49 36.05 4.71 4.94 0.00 1.09 28.96 28.98 46.77 46.45 23.72 25.24 17.94 20.52 46.77 46.45
64 End 14.67 23.40 24.34 38.97 3.15 4.99 0.00 1.19 19.34 30.91 31.20 50.01 16.65 25.29 12.78 20.63 31.20 50.01
65 End 7.85 23.48 13.11 38.98 1.58 5.03 0.00 1.19 10.30 30.94 16.75 49.95 8.32 26.63 6.39 21.92 16.75 49.95
66 End 0.00 25.16 0.00 42.04 0.00 5.04 0.00 1.29 0.00 33.01 0.00 53.72 0.00 26.65 0.00 22.05 0.00 53.72
67 Start 0.00 1.92 0.00 12.94 0.00 33.35 0.00 12.08 0.00 22.77 0.00 36.29 0.00 46.60 0.00 20.51 0.00 46.60
67 End 0.34 1.92 4.05 12.94 10.43 33.35 3.78 12.08 6.80 22.77 11.35 36.29 14.58 46.60 6.42 20.51 14.58 46.60
68 End 0.67 1.86 7.97 12.56 20.27 32.19 7.45 11.78 12.68 21.25 21.63 34.38 28.38 45.12 12.66 20.09 28.38 45.12
69 End 1.01 1.54 11.78 12.54 28.85 30.79 11.05 11.76 19.03 20.86 32.24 34.35 40.67 43.39 18.84 20.05 40.67 43.39
70 End 1.35 1.23 15.35 12.07 37.01 28.47 14.42 11.36 23.60 19.10 40.78 32.40 52.32 40.44 24.61 19.45 52.32 40.44
71 End 1.99 1.24 22.04 11.42 51.18 26.18 20.80 10.77 32.85 17.83 57.44 30.32 72.89 37.44 35.63 18.54 72.89 37.44
72 End 2.49 1.14 28.39 10.58 64.87 24.28 26.79 9.99 40.45 15.44 72.22 27.02 92.56 34.80 45.85 17.27 92.56 34.80
73 End 3.08 1.15 36.05 8.91 79.65 20.45 34.13 8.45 47.72 14.59 88.16 24.11 114.37 29.64 58.54 14.92 114.37 29.64
74 End 3.45 1.23 42.29 7.47 93.93 17.10 40.05 7.05 53.65 12.79 101.29 20.45 134.77 24.84 68.68 12.51 134.77 24.84
75 End 3.58 1.32 47.63 6.03 103.76 14.46 45.12 5.67 57.53 11.05 111.56 16.83 148.99 20.78 77.06 10.00 148.99 20.78
76 End 3.65 1.41 50.11 4.17 107.17 12.66 47.54 3.89 59.49 9.69 116.48 13.08 154.35 17.81 81.21 7.05 154.35 17.81
77 End 4.10 1.39 51.13 2.72 109.26 11.25 48.52 2.42 60.43 9.33 118.12 10.96 157.26 15.41 82.75 4.58 157.26 15.41
78 End 4.21 1.24 49.52 3.48 105.71 13.88 47.01 3.07 59.39 8.91 114.97 11.66 152.27 18.56 80.27 5.30 152.27 18.56
79 End 3.78 1.07 46.22 4.64 98.33 14.65 43.94 4.23 56.20 9.79 108.25 14.17 141.54 20.31 74.83 7.53 141.54 20.31
80 End 3.68 1.30 42.56 6.20 92.88 17.30 40.32 5.75 51.27 11.59 98.96 17.60 132.10 24.29 67.63 10.12 132.10 24.29
81 End 3.43 1.53 36.80 7.96 83.03 20.20 34.76 7.44 45.91 13.42 86.84 21.31 116.95 28.39 57.75 12.74 116.95 28.39
82 End 2.82 1.41 29.14 9.83 67.56 23.71 27.47 9.23 37.59 14.32 69.88 24.65 94.71 33.17 45.54 15.41 94.71 33.17
83 End 2.24 1.37 23.00 11.20 55.30 26.92 21.61 10.52 30.85 15.41 56.31 27.47 77.17 37.55 35.85 17.44 77.17 37.55
84 End 1.54 1.10 15.90 12.12 39.96 29.73 14.88 11.37 22.68 16.45 40.29 29.97 55.47 41.37 24.70 18.85 55.47 41.37
85 End 1.16 1.19 12.24 12.67 32.44 32.06 11.40 11.85 17.01 18.12 30.60 32.21 44.74 44.46 18.94 19.67 44.74 44.46
86 End 0.78 1.22 8.17 13.05 21.64 34.65 7.61 12.15 12.06 18.15 21.13 32.66 29.85 47.77 12.64 20.18 29.85 47.77
87 End 0.39 1.38 4.17 13.06 11.65 34.64 3.86 12.16 6.03 19.46 10.66 33.79 15.97 47.77 6.41 20.20 15.97 47.77
88 End 0.00 1.84 0.00 13.37 0.00 37.35 0.00 12.38 0.00 20.69 0.00 34.83 0.00 51.18 0.00 20.56 0.00 51.18
89 Start 0.00 1.01 0.00 1.20 0.00 20.66 0.00 37.64 0.00 12.78 0.00 13.01 0.00 26.06 0.00 46.89 0.00 46.89
89 End 0.10 1.01 0.00 1.20 6.47 20.66 11.78 37.64 3.73 12.78 3.61 13.01 7.94 26.06 14.45 46.89 14.45 46.89
90 End 0.20 1.00 0.00 1.20 12.65 19.83 22.87 36.45 7.13 12.24 6.88 12.49 15.52 25.00 28.05 45.38 28.05 45.38
91 End 0.20 1.00 0.00 1.09 18.39 19.60 32.53 34.71 10.58 12.24 10.33 12.36 22.56 24.71 39.90 43.25 39.90 43.25
92 End 0.20 0.98 0.00 1.03 23.73 18.51 41.87 32.20 13.34 11.67 13.09 11.73 29.11 23.33 51.36 40.13 51.36 40.13
93 End 0.19 0.97 0.00 0.88 33.42 17.33 57.67 29.47 18.81 11.07 18.57 10.96 40.99 21.84 70.74 36.73 70.74 36.73
94 End 0.05 0.94 0.00 0.79 43.00 16.06 73.03 27.33 23.38 10.41 23.32 10.22 52.74 20.24 89.58 34.06 89.58 34.06
63 63
Impact Factor =
Bending Moments 1.227
CLASS 70R WHEEL LOADING + CLASS A
Ld. Start801 901 1001 1101 Governing
Ld. End 900 1000 1100 1200 70 R 1 + A 7th 70 R 2 + A 7th 70 R 3 + A 8th 70 R 4 + A 8th Forces
mem. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
Location BM
no SF BM SF BM SF BM SF BM SF BM SF BM SF BM MAX. SF BM SF
95 End 0.00 0.90 0.00 0.62 53.67 13.52 89.75 23.02 28.59 9.30 28.59 8.96 65.83 17.04 110.09 28.69 110.09 28.69
96 End 0.00 0.76 0.00 0.53 62.97 11.32 105.69 19.25 32.81 7.91 32.81 7.63 77.24 14.27 129.64 24.00 129.64 24.00
97 End 0.00 0.62 0.00 0.49 70.71 9.32 116.64 16.29 35.83 6.43 35.83 6.27 86.73 11.75 143.07 20.30 143.07 20.30
98 End 0.00 0.50 0.00 0.49 73.83 7.18 120.42 14.36 37.44 5.22 37.44 5.21 90.56 9.08 147.71 17.89 147.71 17.89
99 End 0.00 0.34 0.00 0.54 75.31 5.27 122.76 12.86 37.85 4.30 37.85 4.54 92.38 6.74 150.58 16.05 150.58 16.05
100 End 0.00 0.26 0.00 0.61 72.80 6.94 118.82 15.81 36.85 3.95 36.85 4.38 89.30 8.77 145.74 19.65 145.74 19.65
101 End 0.00 0.46 0.00 0.58 67.42 8.16 110.57 16.62 34.65 5.34 34.65 5.49 82.70 10.30 135.63 20.67 135.63 20.67
102 End 0.00 0.72 0.00 0.61 63.22 10.27 104.40 19.56 30.56 6.77 30.56 6.64 77.55 12.94 128.06 24.33 128.06 24.33
103 End 0.00 0.90 0.00 0.66 55.43 12.62 93.42 22.79 26.29 7.89 26.29 7.59 67.99 15.87 114.59 28.34 114.59 28.34
104 End 0.02 0.96 0.01 0.74 44.37 15.24 76.09 26.72 20.77 8.63 20.76 8.36 54.42 19.12 93.33 33.20 93.33 33.20
105 End 0.08 1.00 0.01 0.85 35.59 17.34 62.31 30.34 16.38 9.47 16.29 9.28 43.65 21.77 76.43 37.71 76.43 37.71
106 End 0.09 0.94 0.01 0.96 25.09 18.93 45.07 33.52 11.68 9.77 11.58 9.79 30.78 23.76 55.28 41.66 55.28 41.66
107 End 0.09 0.99 0.01 1.06 19.80 20.07 36.63 36.17 8.79 10.47 8.69 10.55 24.29 25.24 44.93 44.98 44.93 44.98
108 End 0.07 1.01 0.01 1.17 13.20 21.13 24.43 39.12 6.05 10.50 5.98 10.70 16.19 26.54 29.97 48.60 29.97 48.60
109 End 0.04 1.01 0.00 1.18 6.91 21.13 13.16 39.13 3.03 10.79 2.98 11.00 8.48 26.57 16.14 48.65 16.14 48.65
110 End 0.00 1.02 0.00 1.30 0.00 22.16 0.00 42.21 0.00 10.79 0.00 11.13 0.00 27.83 0.00 52.43 0.00 52.43
111 Start 0.00 0.08 0.00 0.62 0.00 1.83 0.00 7.04 0.00 1.23 0.00 1.90 0.00 2.52 0.00 8.91 0.00 8.91
111 End 0.00 0.08 0.02 0.62 0.00 1.83 2.21 7.04 0.00 1.23 0.02 1.90 0.01 2.52 2.72 8.91 2.72 8.91
112 End 0.01 0.07 0.03 0.61 0.00 1.76 4.36 6.91 0.01 1.14 0.04 1.81 0.01 2.43 5.36 8.75 5.36 8.75
113 End 0.01 0.06 0.03 0.61 0.00 1.71 6.50 6.91 0.01 1.14 0.04 1.82 0.01 2.36 7.98 8.74 7.98 8.74
114 End 0.01 0.05 0.02 0.60 0.00 1.58 8.50 6.71 0.01 1.05 0.02 1.73 0.01 2.20 10.44 8.50 10.44 8.50
115 End 0.02 0.04 0.00 0.58 0.00 1.46 12.35 6.39 0.02 0.98 0.00 1.64 0.00 2.04 15.15 8.09 15.15 8.09
116 End 0.02 0.04 0.00 0.56 0.00 1.35 15.91 5.92 0.02 0.91 0.00 1.55 0.00 1.90 19.52 7.50 19.52 7.50
117 End 0.03 0.04 0.00 0.51 0.00 1.14 20.40 5.06 0.04 0.79 0.00 1.36 0.00 1.62 25.02 6.43 25.02 6.43
118 End 0.03 0.04 0.00 0.43 0.00 0.95 24.00 4.18 0.04 0.68 0.00 1.16 0.00 1.36 29.44 5.33 29.44 5.33
119 End 0.03 0.04 0.00 0.32 0.00 0.80 27.03 3.34 0.04 0.58 0.00 0.92 0.00 1.15 33.15 4.26 33.15 4.26
120 End 0.03 0.04 0.00 0.23 0.00 0.69 28.53 2.26 0.04 0.50 0.00 0.73 0.00 0.98 34.99 2.90 34.99 2.90
121 End 0.02 0.04 0.00 0.12 0.00 0.60 29.13 1.28 0.02 0.47 0.00 0.57 0.00 0.80 35.73 1.64 35.73 1.64
122 End 0.03 0.04 0.00 0.10 0.00 0.75 28.23 1.60 0.04 0.44 0.00 0.51 0.00 0.99 34.63 2.03 34.63 2.03
123 End 0.04 0.03 0.00 0.22 0.00 0.80 26.45 2.36 0.05 0.50 0.00 0.73 0.00 1.09 32.44 3.01 32.44 3.01
124 End 0.04 0.04 0.00 0.36 0.00 0.95 24.17 3.30 0.05 0.60 0.00 0.99 0.00 1.31 29.65 4.19 29.65 4.19
125 End 0.04 0.04 0.00 0.46 0.00 1.11 20.72 4.35 0.05 0.68 0.00 1.19 0.00 1.55 25.42 5.52 25.42 5.52
126 End 0.04 0.04 0.00 0.52 0.00 1.31 16.33 5.44 0.05 0.73 0.00 1.32 0.00 1.84 20.03 6.90 20.03 6.90
127 End 0.03 0.04 0.00 0.56 0.00 1.49 12.77 6.20 0.04 0.83 0.00 1.47 0.00 2.08 15.66 7.86 15.66 7.86
128 End 0.02 0.04 0.01 0.58 0.00 1.64 8.72 6.67 0.02 0.88 0.01 1.54 0.00 2.28 10.70 8.45 10.70 8.45
129 End 0.02 0.05 0.01 0.60 0.00 1.77 6.63 6.92 0.02 1.00 0.01 1.67 0.00 2.45 8.13 8.76 8.13 8.76
130 End 0.01 0.05 0.01 0.61 0.00 1.90 4.42 7.07 0.01 1.00 0.01 1.69 0.00 2.61 5.42 8.95 5.42 8.95
131 End 0.01 0.06 0.01 0.62 0.00 1.90 2.23 7.05 0.01 1.07 0.01 1.75 0.00 2.61 2.74 8.92 2.74 8.92
64 64
Impact Factor =
Bending Moments 1.227
CLASS 70R WHEEL LOADING + CLASS A
Ld. Start801 901 1001 1101 Governing
Ld. End 900 1000 1100 1200 70 R 1 + A 7th 70 R 2 + A 7th 70 R 3 + A 8th 70 R 4 + A 8th Forces
mem. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
Location BM
no SF BM SF BM SF BM SF BM SF BM SF BM SF BM MAX. SF BM SF
132 End 0.00 0.08 0.00 0.62 0.00 2.04 0.00 7.13 0.00 1.09 0.00 1.75 0.00 2.78 0.00 9.02 0.00 9.02
155 End 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01
156 Start 0.14 10.04 0.05 0.85 0.01 0.10 0.00 0.07 0.18 12.43 0.07 1.15 0.05 0.74 0.03 0.70 0.18 12.43
156 End 1.81 1.54 0.51 0.85 0.06 0.10 0.04 0.07 2.29 2.00 0.69 1.15 0.45 0.74 0.42 0.70 2.29 2.00
157 End 1.43 6.96 0.25 7.65 0.24 0.10 0.18 0.07 2.01 8.65 0.56 9.49 0.51 5.79 0.44 5.75 2.01 9.49
158 End 0.00 6.96 0.00 7.65 0.30 0.10 0.22 0.07 0.32 8.65 0.32 9.49 0.37 5.79 0.27 5.75 0.37 9.49
159 End 0.00 1.16 0.00 6.43 0.00 0.50 0.00 0.37 0.00 1.96 0.00 8.43 0.00 5.65 0.00 5.49 0.00 8.43
160 End 0.04 1.16 0.21 2.07 0.00 0.50 0.00 0.37 0.05 1.96 0.26 3.08 0.11 1.86 0.11 1.70 0.26 3.08
161 End 0.73 1.16 0.01 2.07 0.00 9.00 0.00 0.37 0.90 1.96 0.01 3.08 0.01 12.29 0.01 1.70 0.90 12.29
162 End 0.55 0.30 0.00 0.43 0.01 3.48 0.17 1.75 0.85 2.82 0.18 2.98 0.01 4.53 0.21 2.41 0.85 4.53
163 End 0.00 0.30 0.00 0.43 1.12 5.02 0.00 6.75 0.82 4.21 0.82 4.37 1.37 6.42 0.00 8.54 1.37 8.54
164 End 0.00 0.30 0.26 0.43 0.03 5.02 0.00 6.75 0.02 4.21 0.34 4.37 0.20 6.42 0.17 8.54 0.34 8.54
165 Start 0.00 0.06 0.26 0.09 0.00 0.63 0.00 7.44 0.00 0.57 0.32 0.61 0.17 0.83 0.17 9.18 0.32 9.18
165 End 0.00 0.06 0.21 0.09 0.00 0.63 0.03 7.44 0.00 0.57 0.26 0.61 0.13 0.83 0.17 9.18 0.26 9.18
166 End 0.00 0.06 0.05 0.09 0.00 0.63 0.63 1.06 0.00 0.57 0.06 0.61 0.03 0.83 0.81 1.36 0.81 1.36
167 End 0.00 0.06 0.01 0.09 0.00 0.63 0.06 1.06 0.00 0.57 0.01 0.61 0.00 0.83 0.07 1.36 0.07 1.36
168 Start 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00
169 End 0.02 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.02 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.02 0.01
170 Start 0.21 1.94 0.07 0.14 0.01 0.02 0.01 0.01 0.27 2.40 0.10 0.19 0.06 0.11 0.06 0.10 0.27 2.40
170 End 0.50 0.25 0.14 0.14 0.02 0.02 0.01 0.01 0.64 0.33 0.19 0.19 0.11 0.11 0.10 0.10 0.64 0.33
171 End 0.32 1.44 0.04 1.55 0.06 0.02 0.04 0.01 0.45 1.79 0.10 1.92 0.11 0.98 0.08 0.97 0.45 1.92
172 End 0.01 1.44 0.00 1.55 0.07 0.02 0.05 0.01 0.08 1.79 0.07 1.92 0.09 0.98 0.06 0.97 0.09 1.92
173 Start 0.00 0.27 0.00 1.29 0.06 0.11 0.04 0.08 0.06 0.43 0.06 1.68 0.07 0.98 0.05 0.95 0.07 1.68
174 End 0.00 0.27 0.06 0.39 0.00 0.11 0.00 0.08 0.00 0.43 0.07 0.58 0.03 0.33 0.03 0.30 0.07 0.58
175 End 0.16 0.27 0.03 0.39 0.00 1.80 0.00 0.08 0.20 0.43 0.04 0.58 0.01 2.41 0.01 0.30 0.20 2.41
176 End 0.14 0.08 0.00 0.09 0.02 0.70 0.05 0.33 0.23 0.52 0.06 0.53 0.02 0.90 0.06 0.45 0.23 0.90
177 End 0.00 0.08 0.00 0.09 0.27 0.98 0.00 1.36 0.18 0.73 0.18 0.74 0.33 1.25 0.00 1.71 0.33 1.71
178 End 0.00 0.08 0.05 0.09 0.06 0.98 0.00 1.36 0.02 0.73 0.08 0.74 0.10 1.25 0.02 1.71 0.10 1.71
179 End 0.00 0.01 0.05 0.02 0.00 0.12 0.00 1.51 0.00 0.09 0.06 0.10 0.02 0.16 0.02 1.86 0.06 1.86
180 Start 0.00 0.01 0.05 0.02 0.00 0.12 0.00 1.51 0.00 0.09 0.06 0.10 0.02 0.16 0.02 1.86 0.06 1.86
181 End 0.00 0.01 0.01 0.02 0.00 0.12 0.09 0.18 0.00 0.09 0.01 0.10 0.00 0.16 0.11 0.23 0.11 0.23
182 Start 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00
183 Start 0.00 10.24 0.00 1.53 0.00 0.34 0.00 0.14 0.00 12.73 0.00 2.04 0.00 1.35 0.00 1.11 0.00 12.73
183 End 3.50 1.74 2.29 1.53 0.00 0.34 0.00 0.14 4.29 2.30 2.81 2.04 1.41 1.35 1.41 1.11 4.29 2.30
184 End 0.59 6.76 2.01 6.97 0.00 0.34 0.00 0.14 0.72 8.46 2.47 8.71 0.97 5.77 0.97 5.52 2.47 8.71
185 End 0.00 0.75 2.80 2.95 0.27 0.85 0.00 0.45 0.11 1.33 3.54 4.03 1.89 2.73 1.56 2.24 3.54 4.03
186 End 0.15 0.75 0.00 2.95 1.55 8.13 0.00 0.45 0.91 1.33 0.73 4.03 1.90 11.66 0.00 2.24 1.90 11.66
187 End 0.03 0.32 0.00 0.47 3.86 2.99 2.44 2.66 2.82 2.62 2.78 2.80 4.73 3.98 2.99 3.57 4.73 3.98
65 65
Impact Factor =
Bending Moments 1.227
CLASS 70R WHEEL LOADING + CLASS A
Ld. Start801 901 1001 1101 Governing
Ld. End 900 1000 1100 1200 70 R 1 + A 7th 70 R 2 + A 7th 70 R 3 + A 8th 70 R 4 + A 8th Forces
mem. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
Location BM
no SF BM SF BM SF BM SF BM SF BM SF BM SF BM MAX. SF BM SF
188 End 0.08 0.32 0.00 0.47 0.13 5.51 2.03 5.84 0.18 4.45 0.08 4.64 0.17 7.07 2.50 7.47 2.50 7.47
189 End 0.04 0.03 0.00 0.15 0.06 0.59 2.62 1.75 0.08 0.51 0.03 0.66 0.08 0.79 3.22 2.21 3.22 2.21
190 End 0.00 0.03 0.00 0.15 0.00 0.59 0.00 1.75 0.00 0.51 0.00 0.66 0.00 0.79 0.00 2.21 0.00 2.21
191 Start 0.00 9.51 0.00 1.36 0.00 0.34 0.00 0.14 0.00 11.83 0.00 1.83 0.00 1.30 0.00 1.05 0.00 11.83
191 End 3.23 1.60 2.04 1.36 0.00 0.34 0.01 0.14 3.96 2.13 2.50 1.83 1.32 1.30 1.34 1.05 3.96 2.13
192 End 0.60 6.31 2.04 6.55 0.00 0.34 0.02 0.14 0.74 7.91 2.50 8.20 0.98 5.31 1.01 5.07 2.50 8.20
193 End 0.00 0.65 2.54 2.67 0.27 0.87 0.00 0.42 0.12 1.21 3.24 3.68 1.79 2.64 1.46 2.09 3.24 3.68
194 End 0.12 0.65 0.00 2.67 1.57 7.63 0.00 0.42 0.88 1.21 0.73 3.68 1.93 10.94 0.00 2.09 1.93 10.94
195 End 0.03 0.33 0.00 0.44 3.51 2.82 2.21 2.40 2.62 2.43 2.58 2.57 4.31 3.75 2.71 3.23 4.31 3.75
196 End 0.09 0.33 0.02 0.44 0.13 5.09 2.06 5.51 0.19 4.15 0.10 4.29 0.16 6.53 2.53 7.05 2.53 7.05
197 End 0.04 0.03 0.01 0.15 0.06 0.56 2.35 1.57 0.09 0.47 0.06 0.61 0.07 0.75 2.88 1.99 2.88 1.99
198 End 0.00 0.03 0.00 0.15 0.00 0.56 0.00 1.57 0.00 0.47 0.00 0.61 0.00 0.75 0.00 1.99 0.00 1.99

66 66
Bending Moments Impact Factor = 1.10
CLASS 70R TRACK LOADING
Ld. Start 1201 1301 1401 1501 7OR 1 +7th 7OR 2 +7th 7OR 3 +8th 7OR 4 +8th
Ld. End 1300 1400 1500 1600 CLASS A CLASS A CLASS A CLASS A Governing

mem.n Location MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
o BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF
23.00 Start 0.00 29.09 0.00 2.62 0.00 1.71 0.00 0.74 0.00 32.74 0.00 3.62 0.00 4.79 0.00 3.73 0.00 32.74
23.00 End 9.11 29.09 0.82 2.62 0.00 1.71 0.02 0.74 10.03 32.74 0.91 3.62 0.92 4.79 0.94 3.73 10.03 32.74
24.00 End 17.84 28.00 1.64 2.62 0.00 1.71 0.04 0.74 19.64 31.54 1.82 3.62 1.81 4.76 1.85 3.69 19.64 31.54
25.00 End 26.26 28.00 2.46 2.60 0.00 1.70 0.04 0.74 28.89 31.53 2.71 3.59 2.69 4.74 2.74 3.68 28.89 31.53
26.00 End 34.44 26.87 3.27 2.58 0.00 1.69 0.03 0.73 37.88 30.28 3.60 3.57 3.57 4.70 3.61 3.65 37.88 30.28
27.00 End 49.58 25.68 4.85 2.50 0.00 1.65 0.00 0.70 54.54 28.95 5.34 3.46 5.27 4.57 5.27 3.53 54.54 28.95
28.00 End 62.82 24.22 6.34 2.33 0.00 1.57 0.00 0.65 69.10 27.31 6.97 3.24 6.85 4.34 6.85 3.33 69.10 27.31
29.00 End 79.41 22.17 8.22 2.07 0.00 1.44 0.00 0.56 87.35 24.98 9.04 2.87 8.97 3.99 8.97 3.02 87.35 24.98
30.00 End 92.45 19.71 9.76 1.67 0.00 1.23 0.00 0.43 101.70 22.18 10.74 2.33 10.62 3.39 10.62 2.51 101.70 22.18
31.00 End 101.58 17.15 10.86 1.21 0.00 0.98 0.00 0.34 111.74 19.27 11.95 1.74 11.88 2.67 11.88 1.96 111.74 19.27
32.00 End 107.05 14.56 11.53 0.75 0.00 0.71 0.00 0.29 117.76 16.30 12.68 1.11 12.57 1.93 12.57 1.47 117.76 16.30
33.00 End 108.81 11.96 11.76 0.27 0.00 0.44 0.00 0.20 119.69 13.29 12.94 0.43 12.77 1.21 12.77 0.95 119.69 13.29
34.00 End 107.07 11.98 11.54 0.27 0.00 0.44 0.00 0.20 117.78 13.31 12.69 0.43 12.44 1.18 12.44 0.91 117.78 13.31
35.00 End 101.57 14.54 10.86 0.75 0.00 0.71 0.00 0.29 111.73 16.24 11.95 1.07 11.46 1.95 11.46 1.49 111.73 16.24
36.00 End 92.31 17.14 9.78 1.21 0.00 0.98 0.00 0.34 101.54 19.24 10.76 1.72 10.08 2.66 10.08 1.95 101.54 19.24
37.00 End 79.50 19.69 8.26 1.67 0.00 1.23 0.00 0.43 87.45 22.18 9.09 2.36 8.43 3.25 8.43 2.37 87.45 22.18
38.00 End 62.80 22.16 6.38 2.07 0.00 1.44 0.00 0.56 69.08 25.00 7.02 2.91 6.58 3.77 6.58 2.80 69.08 25.00
39.00 End 49.50 24.23 4.89 2.33 0.00 1.57 0.00 0.65 54.45 27.34 5.38 3.25 5.15 4.22 5.15 3.21 54.45 27.34
40.00 End 34.36 25.60 3.29 2.50 0.00 1.65 0.03 0.70 37.80 28.87 3.62 3.46 3.52 4.50 3.55 3.45 37.80 28.87
41.00 End 26.36 26.80 2.46 2.58 0.00 1.69 0.04 0.73 29.00 30.22 2.71 3.58 2.67 4.65 2.71 3.59 29.00 30.22
42.00 End 17.85 27.93 1.65 2.60 0.00 1.70 0.04 0.74 19.64 31.46 1.82 3.60 1.78 4.72 1.82 3.66 19.64 31.46
43.00 End 9.05 28.10 0.82 2.62 0.00 1.71 0.02 0.74 9.96 31.64 0.90 3.61 0.90 4.72 0.93 3.65 9.96 31.64
44.00 End 0.00 29.02 0.00 2.62 0.00 1.71 0.00 0.74 0.00 32.65 0.00 3.61 0.00 4.77 0.00 3.70 0.00 32.65
45.00 Start 0.00 28.92 0.00 37.45 0.00 8.52 0.00 1.64 0.00 33.97 0.00 43.36 0.00 32.82 0.00 25.25 0.00 43.36
45.00 End 9.05 28.92 11.72 37.45 2.67 8.52 0.08 1.64 10.63 33.97 13.56 43.36 10.27 32.82 7.42 25.25 13.56 43.36
46.00 End 17.69 27.69 22.91 35.88 5.32 8.50 0.15 1.47 20.82 32.61 26.56 41.62 19.46 31.13 13.77 23.40 26.56 41.62
47.00 End 25.91 27.04 33.59 35.16 7.97 8.47 0.23 1.38 30.52 31.88 38.97 40.82 29.18 31.09 20.67 23.29 38.97 40.82
48.00 End 33.19 25.27 43.14 32.94 10.60 8.43 0.30 1.21 39.19 29.91 50.13 38.35 36.84 29.46 25.51 21.51 50.13 38.35
49.00 End 46.88 24.00 60.97 31.29 15.76 8.24 0.43 1.07 55.53 28.46 71.03 36.48 52.20 27.78 35.34 19.89 71.03 36.48
50.00 End 58.20 22.04 75.92 28.83 20.70 7.89 0.53 0.86 69.19 26.21 88.68 33.68 65.63 26.10 43.44 18.37 88.68 33.68
51.00 End 71.36 20.10 93.36 26.28 27.19 7.30 0.58 0.74 85.23 23.92 109.43 30.72 80.18 23.12 50.91 15.90 109.43 30.72
52.00 End 81.09 17.99 106.45 23.49 32.58 6.29 0.52 0.66 97.23 21.49 125.12 27.54 92.32 19.82 57.05 13.63 125.12 27.54
53.00 End 87.81 16.15 115.43 21.02 36.61 5.10 0.35 0.75 105.45 19.22 135.83 24.58 100.91 16.41 61.02 11.62 135.83 24.58
54.00 End 91.62 14.44 120.56 18.70 39.07 3.79 0.12 0.90 109.98 17.01 141.81 21.69 105.71 13.51 62.87 10.33 141.81 21.69
55.00 End 92.66 12.76 121.99 16.42 39.84 2.44 0.00 0.93 111.50 14.65 143.76 18.68 106.99 11.49 63.16 9.82 143.76 18.68
67 67
Bending Moments Impact Factor = 1.10
CLASS 70R TRACK LOADING
Ld. Start 1201 1301 1401 1501 7OR 1 +7th 7OR 2 +7th 7OR 3 +8th 7OR 4 +8th
Ld. End 1300 1400 1500 1600 CLASS A CLASS A CLASS A CLASS A Governing

mem.n Location MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
o BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF
56.00 End 91.61 12.78 120.54 16.45 39.06 2.45 0.13 0.93 110.32 14.69 142.15 18.72 104.75 10.87 61.93 9.20 142.15 18.72
57.00 End 87.75 14.42 115.36 18.67 36.61 3.79 0.35 0.90 105.57 16.83 135.94 21.51 99.08 13.91 59.19 10.73 135.94 21.51
58.00 End 81.15 16.13 106.39 21.00 32.59 5.10 0.53 0.75 97.38 18.97 125.15 24.32 89.30 17.08 54.03 12.30 125.15 24.32
59.00 End 71.40 17.97 93.39 23.46 27.19 6.29 0.60 0.66 85.32 21.36 109.51 27.39 77.69 19.89 48.44 13.70 109.51 27.39
60.00 End 58.24 20.08 75.97 26.26 20.71 7.30 0.54 0.73 69.19 24.00 88.70 30.79 61.98 21.90 39.79 14.68 88.70 30.79
61.00 End 46.91 22.03 61.00 28.82 15.77 7.88 0.44 0.87 55.54 26.32 71.04 33.79 49.66 24.44 32.80 16.73 71.04 33.79
62.00 End 33.19 23.98 43.03 31.27 10.61 8.24 0.31 1.07 39.18 28.53 50.00 36.55 35.62 25.81 24.29 17.92 50.00 36.55
63.00 End 26.03 25.15 33.74 32.80 7.96 8.42 0.23 1.20 30.64 29.89 39.12 38.31 26.70 28.44 18.20 20.50 39.12 38.31
64.00 End 17.67 26.94 22.89 35.03 5.32 8.47 0.15 1.41 20.78 31.84 26.52 40.74 18.63 28.49 12.95 20.72 26.52 40.74
65.00 End 8.98 27.76 11.63 35.98 2.66 8.50 0.08 1.47 10.55 32.68 13.47 41.72 9.31 29.81 6.47 22.08 13.47 41.72
66.00 End 0.00 28.79 0.00 37.30 0.00 8.52 0.00 1.63 0.00 33.82 0.00 43.18 0.00 29.84 0.00 22.26 0.00 43.18
67.00 Start 0.00 2.45 0.00 19.37 0.00 39.14 0.00 14.21 0.00 23.11 0.00 41.72 0.00 48.74 0.00 21.32 0.00 48.74
67.00 End 0.77 2.45 6.06 19.37 12.25 39.14 4.45 14.21 7.23 23.11 13.05 41.72 15.26 48.74 6.68 21.32 15.26 48.74
68.00 End 1.53 2.44 11.88 18.68 23.91 37.42 8.75 13.99 13.54 21.65 24.92 39.52 29.82 46.80 13.14 21.02 29.82 46.80
69.00 End 2.29 2.42 17.51 18.67 35.03 36.46 13.12 13.98 20.31 21.63 37.05 39.51 43.82 45.73 19.71 21.00 43.82 45.73
70.00 End 3.04 2.39 22.98 17.95 44.69 33.92 17.24 13.70 25.29 20.22 47.23 37.34 56.09 42.83 25.89 20.58 56.09 42.83
71.00 End 4.46 2.26 33.13 17.18 63.06 32.20 25.33 13.29 35.31 18.80 66.85 35.21 79.48 40.75 37.98 19.95 79.48 40.75
72.00 End 5.73 2.01 42.04 16.21 77.99 29.46 32.68 12.63 43.70 16.25 83.64 31.87 98.78 37.42 48.94 18.91 98.78 37.42
73.00 End 7.18 1.63 53.19 14.83 95.28 26.86 41.94 11.58 51.84 14.97 102.45 29.49 121.48 34.10 62.81 17.29 121.48 34.10
74.00 End 8.11 1.73 61.97 13.17 107.76 24.07 49.39 10.24 58.34 13.19 117.59 25.77 138.09 30.34 73.88 15.12 138.09 30.34
75.00 End 8.40 2.04 68.13 11.45 116.45 21.70 54.76 8.72 62.38 11.67 128.08 22.02 149.81 26.91 81.95 12.64 149.81 26.91
76.00 End 8.03 2.04 71.82 9.70 121.34 19.51 58.05 7.13 63.85 10.21 134.01 18.63 156.37 23.74 86.75 10.13 156.37 23.74
77.00 End 6.93 1.79 73.01 7.94 122.64 17.39 59.17 5.52 63.02 9.59 135.71 16.36 158.14 20.74 88.33 7.68 158.14 20.74
78.00 End 8.03 1.79 71.83 7.95 121.32 17.43 58.06 5.53 63.06 9.36 133.24 16.13 156.06 20.71 86.48 7.62 156.06 20.71
79.00 End 8.41 2.05 68.12 9.69 116.37 19.49 54.77 7.12 60.81 10.74 126.49 19.14 148.94 23.78 81.18 10.17 148.94 23.78
80.00 End 8.14 2.04 61.88 11.44 107.99 21.67 49.35 8.71 55.71 12.24 114.82 22.58 136.96 26.90 72.46 12.65 136.96 26.90
81.00 End 7.20 1.73 53.25 13.16 95.30 24.04 42.01 10.23 49.62 13.45 100.28 26.02 119.94 30.06 61.32 14.87 119.94 30.06
82.00 End 5.75 1.63 42.02 14.83 78.03 26.83 32.70 11.58 40.46 14.39 80.36 28.91 97.68 33.60 47.82 16.83 97.68 33.60
83.00 End 4.48 2.01 33.08 16.22 63.07 29.44 25.32 12.65 33.03 15.94 64.49 31.57 78.72 36.92 37.19 18.45 78.72 36.92
84.00 End 3.05 2.26 22.92 17.13 44.80 32.18 17.23 13.27 24.14 17.58 46.00 33.94 55.73 40.31 25.40 19.50 55.73 40.31
85.00 End 2.29 2.39 17.55 17.91 35.18 33.76 13.10 13.68 18.10 19.29 34.89 36.37 43.65 42.28 19.36 20.19 43.65 42.28
86.00 End 1.53 2.42 11.89 18.63 23.88 36.30 8.75 13.96 12.79 19.32 24.19 37.15 29.58 45.20 12.93 20.63 29.58 45.20
87.00 End 0.77 2.44 6.03 18.72 12.16 37.51 4.43 13.98 6.39 20.45 12.18 38.36 15.05 46.54 6.55 20.66 15.05 46.54
88.00 End 0.00 2.45 0.00 19.32 0.00 38.98 0.00 14.20 0.00 21.12 0.00 39.68 0.00 48.25 0.00 20.99 0.00 48.25
89.00 Start 0.00 1.18 0.00 1.77 0.00 12.96 0.00 40.01 0.00 12.83 0.00 13.48 0.00 14.97 0.00 44.73 0.00 44.73
68 68
Bending Moments Impact Factor = 1.10
CLASS 70R TRACK LOADING
Ld. Start 1201 1301 1401 1501 7OR 1 +7th 7OR 2 +7th 7OR 3 +8th 7OR 4 +8th
Ld. End 1300 1400 1500 1600 CLASS A CLASS A CLASS A CLASS A Governing

mem.n Location MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
o BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF
89.00 End 0.10 1.18 0.28 1.77 4.06 12.96 12.52 40.01 3.72 12.83 3.91 13.48 4.47 14.97 13.77 44.73 13.77 44.73
90.00 End 0.17 1.17 0.57 1.48 8.07 12.91 24.47 38.30 7.07 12.31 7.51 12.65 8.88 14.87 26.92 42.80 26.92 42.80
91.00 End 0.20 1.16 0.85 1.33 12.11 12.89 35.85 37.42 10.55 12.29 11.27 12.48 13.32 14.85 39.44 41.83 39.44 41.83
92.00 End 0.21 1.15 1.12 1.05 16.00 12.76 45.90 34.94 13.32 11.73 14.32 11.62 17.60 14.66 50.49 39.06 50.49 39.06
93.00 End 0.14 1.10 1.64 0.82 23.61 12.46 64.81 33.18 18.73 11.09 20.38 10.78 25.97 14.29 71.29 37.08 71.29 37.08
94.00 End 0.00 1.01 2.09 0.69 30.71 11.89 80.42 30.45 23.32 10.36 25.61 10.01 33.78 13.62 88.46 34.04 88.46 34.04
95.00 End 0.00 0.86 2.55 0.62 39.75 10.90 98.56 27.75 28.59 9.14 31.39 8.88 43.73 12.44 108.42 30.98 108.42 30.98
96.00 End 0.00 0.64 2.74 0.94 47.02 9.62 111.88 24.83 32.81 7.69 35.83 8.02 51.72 10.97 123.07 27.70 123.07 27.70
97.00 End 0.00 0.63 2.65 1.19 52.35 8.11 121.08 22.31 35.83 6.36 38.75 6.98 57.59 9.24 133.19 24.86 133.19 24.86
98.00 End 0.00 0.56 2.24 1.30 55.60 6.51 126.28 19.97 37.44 5.23 39.91 6.04 61.16 7.44 138.91 22.24 138.91 22.24
99.00 End 0.00 0.41 1.58 1.24 56.67 4.89 127.70 17.68 37.85 4.33 39.59 5.25 62.34 5.65 140.47 19.72 140.47 19.72
100.00 End 0.00 0.41 2.25 1.25 55.57 4.90 126.27 17.71 36.85 4.08 39.32 5.00 61.13 5.64 138.90 19.73 138.90 19.73
101.00 End 0.00 0.56 2.65 1.30 52.31 6.51 121.00 19.94 34.65 5.39 37.57 6.21 57.54 7.45 133.10 22.22 133.10 22.22
102.00 End 0.00 0.63 2.76 1.18 46.98 8.10 111.97 22.28 30.56 6.58 33.60 7.19 51.68 9.25 123.17 24.85 123.17 24.85
103.00 End 0.00 0.64 2.57 0.94 39.74 9.61 98.58 24.80 26.29 7.49 29.12 7.82 43.71 10.96 108.44 27.67 108.44 27.67
104.00 End 0.00 0.86 2.11 0.62 30.74 10.91 80.47 27.72 20.75 8.40 23.07 8.14 33.81 12.43 88.52 30.92 88.52 30.92
105.00 End 0.14 1.01 1.66 0.69 23.62 11.90 64.83 30.44 16.43 9.35 18.10 9.00 25.98 13.59 71.31 33.98 71.31 33.98
106.00 End 0.21 1.10 1.13 0.81 15.99 12.45 45.89 33.16 11.80 9.82 12.81 9.50 17.59 14.24 50.48 37.02 50.48 37.02
107.00 End 0.20 1.15 0.85 1.03 12.09 12.75 36.01 34.78 8.90 10.52 9.61 10.39 13.30 14.64 39.61 38.88 39.61 38.88
108.00 End 0.17 1.16 0.57 1.37 8.07 12.89 24.44 37.27 6.15 10.54 6.59 10.77 8.88 14.80 26.88 41.61 26.88 41.61
109.00 End 0.10 1.17 0.29 1.50 4.04 12.91 12.42 38.40 3.09 10.84 3.30 11.20 4.44 14.85 13.66 42.89 13.66 42.89
110.00 End 0.00 1.18 0.00 1.75 0.00 12.96 0.00 39.84 0.00 10.84 0.00 11.47 0.00 14.91 0.00 44.47 0.00 44.47
111.00 Start 0.00 0.12 0.00 0.94 0.00 1.80 0.00 4.62 0.00 1.27 0.00 2.17 0.00 2.26 0.00 5.36 0.00 5.36
111.00 End 0.00 0.12 0.03 0.94 0.00 1.80 1.45 4.62 0.00 1.27 0.03 2.17 0.01 2.26 1.61 5.36 1.61 5.36
112.00 End 0.00 0.10 0.05 0.94 0.00 1.79 2.89 4.61 0.00 1.17 0.06 2.09 0.01 2.24 3.19 5.35 3.19 5.35
113.00 End 0.00 0.09 0.05 0.93 0.00 1.79 4.33 4.59 0.00 1.17 0.06 2.09 0.01 2.23 4.77 5.31 4.77 5.31
114.00 End 0.00 0.08 0.04 0.92 0.00 1.78 5.76 4.57 0.00 1.08 0.04 2.00 0.01 2.22 6.35 5.29 6.35 5.29
115.00 End 0.00 0.08 0.00 0.89 0.00 1.74 8.57 4.46 0.00 1.01 0.00 1.91 0.00 2.17 9.43 5.16 9.43 5.16
116.00 End 0.00 0.07 0.00 0.82 0.00 1.66 11.27 4.27 0.00 0.94 0.00 1.76 0.00 2.07 12.40 4.94 12.40 4.94
117.00 End 0.00 0.07 0.00 0.71 0.00 1.51 14.84 3.95 0.00 0.82 0.00 1.52 0.00 1.88 16.32 4.57 16.32 4.57
118.00 End 0.00 0.07 0.00 0.54 0.00 1.33 17.83 3.40 0.00 0.71 0.00 1.22 0.00 1.66 19.61 3.94 19.61 3.94
119.00 End 0.00 0.06 0.00 0.43 0.00 1.12 20.06 2.73 0.00 0.60 0.00 1.00 0.00 1.40 22.07 3.17 22.07 3.17
120.00 End 0.00 0.06 0.00 0.37 0.00 0.90 21.44 1.99 0.00 0.52 0.00 0.86 0.00 1.12 23.58 2.32 23.58 2.32
121.00 End 0.00 0.05 0.00 0.25 0.00 0.68 21.87 1.21 0.00 0.47 0.00 0.69 0.00 0.81 24.06 1.40 24.06 1.40
122.00 End 0.00 0.05 0.00 0.25 0.00 0.68 21.45 1.21 0.00 0.44 0.00 0.66 0.00 0.81 23.60 1.40 23.60 1.40
69 69
Bending Moments Impact Factor = 1.10
CLASS 70R TRACK LOADING
Ld. Start 1201 1301 1401 1501 7OR 1 +7th 7OR 2 +7th 7OR 3 +8th 7OR 4 +8th
Ld. End 1300 1400 1500 1600 CLASS A CLASS A CLASS A CLASS A Governing

mem.n Location MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
o BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF
123.00 End 0.00 0.06 0.00 0.37 0.00 0.90 20.06 1.98 0.00 0.53 0.00 0.87 0.00 1.10 22.07 2.29 22.07 2.29
124.00 End 0.00 0.06 0.00 0.43 0.00 1.12 17.84 2.73 0.00 0.62 0.00 1.02 0.00 1.38 19.62 3.15 19.62 3.15
125.00 End 0.00 0.07 0.00 0.54 0.00 1.33 14.87 3.40 0.00 0.71 0.00 1.22 0.00 1.65 16.36 3.93 16.36 3.93
126.00 End 0.00 0.07 0.00 0.71 0.00 1.51 11.30 3.95 0.00 0.76 0.00 1.46 0.00 1.89 12.43 4.58 12.43 4.58
127.00 End 0.00 0.07 0.00 0.82 0.00 1.66 8.60 4.27 0.00 0.86 0.00 1.69 0.00 2.08 9.46 4.95 9.46 4.95
128.00 End 0.00 0.08 0.04 0.89 0.00 1.74 5.78 4.46 0.00 0.92 0.04 1.81 0.00 2.18 6.36 5.17 6.36 5.17
129.00 End 0.00 0.08 0.05 0.92 0.00 1.78 4.33 4.57 0.00 1.03 0.06 1.95 0.00 2.23 4.76 5.30 4.76 5.30
130.00 End 0.00 0.10 0.05 0.93 0.00 1.79 2.89 4.59 0.00 1.05 0.06 1.96 0.00 2.24 3.18 5.32 3.18 5.32
131.00 End 0.00 0.10 0.03 0.94 0.00 1.79 1.45 4.61 0.00 1.10 0.03 2.03 0.00 2.24 1.60 5.35 1.60 5.35
132.00 End 0.00 0.12 0.00 0.94 0.00 1.80 0.00 4.62 0.00 1.12 0.00 2.03 0.00 2.26 0.00 5.36 0.00 5.36
155.00 End 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00
156.00 Start 0.10 2.99 0.00 0.04 0.00 0.06 0.00 0.04 0.12 3.40 0.01 0.15 0.03 0.68 0.03 0.66 0.12 3.40
156.00 End 0.98 0.04 0.00 0.04 0.00 0.06 0.03 0.04 1.14 0.15 0.07 0.15 0.37 0.68 0.41 0.66 1.14 0.68
157.00 End 0.86 3.05 0.00 0.04 0.00 0.06 0.10 0.04 1.20 3.47 0.25 0.15 0.22 5.73 0.33 5.71 1.20 5.73
158.00 End 0.00 3.05 0.00 3.06 0.00 0.06 0.12 0.04 0.32 3.47 0.32 3.48 0.00 5.73 0.13 5.71 0.32 5.73
159.00 End 0.00 0.42 0.01 1.33 0.03 0.35 0.00 0.21 0.00 1.00 0.01 2.00 0.03 5.43 0.00 5.27 0.03 5.43
160.00 End 0.01 0.42 0.35 1.69 0.12 2.67 0.00 0.21 0.01 1.00 0.39 2.40 0.24 4.18 0.11 1.48 0.39 4.18
161.00 End 0.26 0.42 0.02 1.69 0.00 2.67 0.00 0.21 0.29 1.00 0.02 2.40 0.01 4.18 0.01 1.48 0.29 4.18
162.00 End 0.20 0.11 0.00 0.28 0.00 2.09 0.16 1.07 0.40 2.57 0.18 2.76 0.00 2.56 0.18 1.44 0.40 2.76
163.00 End 0.00 0.11 0.00 0.28 0.15 0.93 0.00 1.95 0.82 3.96 0.82 4.15 0.17 1.29 0.00 2.41 0.82 4.15
164.00 End 0.00 0.11 0.17 0.28 0.02 0.93 0.00 1.95 0.02 3.96 0.21 4.15 0.19 1.29 0.17 2.41 0.21 4.15
165.00 Start 0.00 0.02 0.17 0.06 0.00 0.14 0.00 2.82 0.00 0.52 0.19 0.56 0.17 0.21 0.17 3.16 0.19 3.16
165.00 End 0.00 0.02 0.14 0.06 0.00 0.14 0.24 2.82 0.00 0.52 0.15 0.56 0.13 0.21 0.40 3.16 0.40 3.16
166.00 End 0.00 0.02 0.04 0.06 0.00 0.14 0.13 0.20 0.00 0.52 0.04 0.56 0.03 0.21 0.18 0.28 0.18 0.56
167.00 End 0.00 0.02 0.01 0.06 0.00 0.14 0.02 0.20 0.00 0.52 0.01 0.56 0.00 0.21 0.02 0.28 0.02 0.56
168.00 Start 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
169.00 End 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00
170.00 Start 0.10 2.65 0.00 0.04 0.00 0.05 0.00 0.04 0.12 2.94 0.01 0.07 0.04 0.14 0.04 0.13 0.12 2.94
170.00 End 0.88 0.03 0.00 0.04 0.00 0.05 0.02 0.04 0.99 0.06 0.02 0.07 0.09 0.14 0.11 0.13 0.99 0.14
171.00 End 0.77 2.71 0.00 0.04 0.00 0.05 0.09 0.04 0.90 3.00 0.06 0.07 0.03 1.01 0.13 1.00 0.90 3.00
172.00 End 0.00 2.71 0.00 2.72 0.00 0.05 0.11 0.04 0.07 3.00 0.07 3.01 0.00 1.01 0.12 1.00 0.12 3.01
173.00 Start 0.00 0.37 0.00 1.18 0.01 0.31 0.11 0.18 0.06 0.51 0.06 1.40 0.01 1.19 0.12 1.05 0.12 1.40
174.00 End 0.01 0.37 0.31 1.50 0.11 2.37 0.00 0.18 0.01 0.51 0.34 1.75 0.15 2.81 0.03 0.40 0.34 2.81
175.00 End 0.23 0.37 0.02 1.50 0.00 2.37 0.00 0.18 0.25 0.51 0.02 1.75 0.01 2.81 0.01 0.40 0.25 2.81
176.00 End 0.18 0.10 0.00 0.25 0.00 1.85 0.14 0.95 0.25 0.53 0.06 0.69 0.00 2.08 0.15 1.09 0.25 2.08
70 70
Bending Moments Impact Factor = 1.10
CLASS 70R TRACK LOADING
Ld. Start 1201 1301 1401 1501 7OR 1 +7th 7OR 2 +7th 7OR 3 +8th 7OR 4 +8th
Ld. End 1300 1400 1500 1600 CLASS A CLASS A CLASS A CLASS A Governing

mem.n Location MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX. MAX.
o BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF BM SF
177.00 End 0.00 0.10 0.00 0.25 0.13 0.83 0.00 1.73 0.18 0.74 0.18 0.90 0.14 0.96 0.00 1.95 0.18 1.95
178.00 End 0.00 0.10 0.15 0.25 0.02 0.83 0.00 1.73 0.02 0.74 0.19 0.90 0.04 0.96 0.02 1.95 0.19 1.95
179.00 End 0.00 0.02 0.12 0.05 0.00 0.12 0.21 2.51 0.00 0.10 0.13 0.13 0.02 0.14 0.25 2.77 0.25 2.77
180.00 Start 0.00 0.02 0.12 0.05 0.00 0.12 0.21 2.51 0.00 0.10 0.13 0.13 0.02 0.14 0.25 2.77 0.25 2.77
181.00 End 0.00 0.02 0.01 0.05 0.00 0.12 0.02 0.18 0.00 0.10 0.01 0.13 0.00 0.14 0.02 0.21 0.02 0.21
182.00 Start 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
183.00 Start 0.00 7.18 0.00 0.49 0.00 0.39 0.00 0.17 0.00 8.06 0.00 0.70 0.00 1.37 0.00 1.12 0.00 8.06
183.00 End 2.61 0.29 0.73 0.49 0.00 0.39 0.00 0.17 2.87 0.48 0.80 0.70 1.41 1.37 1.41 1.12 2.87 1.37
184.00 End 0.82 6.68 1.39 6.53 0.00 0.39 0.00 0.17 0.90 7.51 1.53 7.35 0.97 5.78 0.97 5.54 1.53 7.51
185.00 End 0.00 0.55 3.14 2.56 1.30 1.64 0.00 0.42 0.11 1.01 3.56 3.22 2.99 3.49 1.56 2.15 3.56 3.49
186.00 End 0.00 0.55 0.05 4.37 1.49 5.34 0.00 0.42 0.73 1.01 0.78 5.22 1.64 7.56 0.00 2.15 1.64 7.56
187.00 End 0.00 0.29 0.00 0.43 2.91 2.85 3.27 3.17 2.78 2.55 2.78 2.70 3.20 3.44 3.60 3.80 3.60 3.80
188.00 End 0.04 0.29 0.00 0.43 0.00 2.85 1.60 3.79 0.12 4.38 0.08 4.53 0.01 3.44 1.77 4.48 1.77 4.53
189.00 End 0.02 0.03 0.00 0.21 0.00 0.46 1.61 1.08 0.06 0.51 0.03 0.71 0.01 0.57 1.78 1.25 1.78 1.25
190.00 End 0.00 0.03 0.00 0.21 0.00 0.46 0.00 1.08 0.00 0.51 0.00 0.71 0.00 0.57 0.00 1.25 0.00 1.25
191.00 Start 0.00 7.19 0.00 0.49 0.00 0.39 0.00 0.17 0.00 8.07 0.00 0.70 0.00 1.31 0.00 1.07 0.00 8.07
191.00 End 2.61 0.29 0.73 0.49 0.00 0.39 0.00 0.17 2.87 0.48 0.80 0.70 1.32 1.31 1.32 1.07 2.87 1.31
192.00 End 0.82 6.67 1.39 6.53 0.00 0.39 0.00 0.17 0.90 7.50 1.53 7.35 0.98 5.33 0.98 5.08 1.53 7.50
193.00 End 0.00 0.55 3.14 2.56 1.30 1.64 0.00 0.42 0.12 1.01 3.58 3.22 2.89 3.38 1.46 2.04 3.58 3.38
194.00 End 0.00 0.55 0.05 4.37 1.48 5.34 0.00 0.42 0.73 1.01 0.78 5.22 1.63 7.45 0.00 2.04 1.63 7.45
195.00 End 0.00 0.30 0.00 0.44 2.91 2.85 3.27 3.17 2.58 2.36 2.58 2.51 3.20 3.42 3.60 3.77 3.60 3.77
196.00 End 0.04 0.30 0.00 0.44 0.00 2.85 1.59 3.79 0.12 4.08 0.08 4.23 0.00 3.42 1.75 4.46 1.75 4.46
197.00 End 0.02 0.03 0.00 0.21 0.00 0.46 1.61 1.08 0.07 0.46 0.04 0.66 0.00 0.57 1.77 1.25 1.77 1.25
198.00 End 0.00 0.03 0.00 0.21 0.00 0.46 0.00 1.08 0.00 0.46 0.00 0.66 0.00 0.57 0.00 1.25 0.00 1.25

71 71
DESIGN VALUES AT VARIOUS SECTIONS BM are in t-m, SF in T
Distance
Section
SL. NO

Girder

Bending Moments Shear Force LL -BM LL - SF Governing Bending Moments Governing Shear Force Governing LL -BM Governing
SLAB DL- SLAB DL- SLAB DL- SLAB LL - SF
DL SIDL SIDL-CB SIDL-WC FPLL SIDL-CB SIDL-WC FPLL SIDL-CB SIDL-WC FPLL Hog
LOADS Girder LOADS Girder LOADS Girder LOADS
1 0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 12.32 14.93 9.34 4.41 0.01 0.00 41.96 0.00 0.00 0.00 0.00 0.00 12.32 14.93 14.37 4.41 4.29 0.00 0.00 45.45
2 0.067 L 0.94 -10.61 -13.62 -8.18 -3.85 -0.01 -10.35 -14.18 -8.14 -3.82 -0.01 -36.36 39.62 -10.61 -13.62 -12.54 -3.85 -3.74 10.35 14.18 12.43 3.82 3.71 -39.58 0.00 40.71
3 0.125 L 1.75 -18.24 -24.24 -14.17 -6.72 -0.02 -8.72 -12.92 -7.04 -3.32 -0.01 -61.86 35.26 -18.24 -24.24 -21.76 -6.72 -6.50 8.72 12.92 10.73 3.32 3.20 -66.13 0.00 35.65
4 0.250 L 3.49 -30.78 -41.99 -24.07 -11.55 -0.04 -5.74 -9.18 -4.71 -2.22 -0.01 -106.78 26.75 -30.78 -41.99 -37.07 -11.56 -11.09 5.74 9.18 7.11 2.22 2.11 -110.26 0.00 26.75
GIRDER G1

5 0.375 L 5.24 -38.31 -52.65 -29.94 -14.47 -0.05 -2.87 -5.10 -2.40 -1.11 -0.01 -138.36 19.12 -38.31 -52.65 -46.18 -14.47 -13.82 2.87 5.10 3.56 1.11 1.05 -138.36 0.00 19.12
6 0.500 L 6.98 -40.85 -56.22 -31.90 -15.45 -0.05 0.00 -1.04 -0.17 0.00 0.00 -146.68 13.54 -40.85 -56.22 -49.23 -15.45 -14.73 0.00 1.04 0.17 0.00 0.01 -146.68 0.00 13.54
7 0.625 L 8.73 -38.31 -52.65 -29.94 -14.47 -0.05 2.86 3.01 2.05 1.10 0.00 -131.46 16.83
8 0.750 L 10.47 -30.78 -41.99 -24.06 -11.56 -0.04 5.73 7.08 4.32 2.21 0.01 -110.26 25.17
9 0.875 L 12.22 -18.24 -24.23 -14.16 -6.72 -0.02 8.72 11.51 6.74 3.31 0.01 -66.13 35.65
10 0.933 L 13.02 -10.60 -13.61 -8.17 -3.85 -0.01 10.35 13.81 7.97 3.82 0.01 -39.58 40.71
11 1.0 L 13.96 0.00 0.00 0.00 0.00 0.00 12.32 14.93 9.34 4.41 0.01 0.00 45.45

1 0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -2.82 5.15 -0.02 0.00 48.16 0.00 0.00 0.00 0.00 0.00 12.34 11.19 2.82 5.32 0.16 0.00 0.00 53.72
2 0.067 L 0.94 -10.55 -9.14 2.42 -4.49 0.02 -10.28 -9.55 2.37 -4.44 0.02 -41.70 44.61 -10.63 -10.19 0.84 -4.65 0.02 10.37 10.57 2.37 4.61 0.18 -46.66 0.00 46.47
3 0.125 L 1.75 -18.13 -16.35 4.01 -7.81 0.03 -8.65 -8.78 1.91 -3.84 0.01 -70.20 38.82 -18.28 -18.05 1.49 -8.11 0.03 8.73 9.57 1.91 4.01 0.18 -75.48 0.00 41.18
4 0.250 L 3.49 -30.56 -28.65 6.29 -13.39 0.04 -5.68 -6.39 1.12 -2.55 0.01 -118.72 30.38 -30.83 -31.03 1.91 -13.94 0.04 5.75 6.67 1.12 2.68 0.17 -123.23 0.00 33.71
GIRDER G2

5 0.375 L 5.24 -38.02 -36.19 7.41 -16.74 0.05 -2.83 -3.61 0.53 -1.27 0.00 -151.89 24.43 -38.38 -38.69 1.93 -17.45 0.00 2.88 3.65 0.74 1.34 0.11 -151.89 0.00 26.75
6 0.500 L 6.98 -40.53 -38.75 7.75 -17.86 0.05 0.00 -0.74 0.10 0.01 0.00 -159.87 18.68 -40.92 -41.24 1.88 -18.64 -0.04 0.00 0.74 0.17 0.01 0.02 -159.87 0.00 20.74
7 0.625 L 8.73 -38.02 -36.19 7.41 -16.74 0.05 2.84 2.15 -0.29 1.29 0.00 -144.94 21.42
8 0.750 L 10.47 -30.56 -28.66 6.27 -13.39 0.04 5.69 4.98 -0.79 2.56 0.00 -122.65 28.99
9 0.875 L 12.22 -18.13 -16.36 4.00 -7.81 0.03 8.65 7.90 -1.59 3.85 -0.01 -75.48 40.01
10 0.933 L 13.02 -10.54 -9.14 2.42 -4.48 0.02 10.28 9.32 -2.15 4.44 -0.02 -46.66 46.47
11 1.0 L 13.96 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -2.82 5.15 -0.02 0.00 53.72

1 0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 12.34 11.19 -0.81 5.32 -0.16 0.00 48.74
2 0.067 L 0.94 -10.63 -10.19 0.84 -4.65 0.15 -10.37 -10.57 0.99 -4.61 0.17 -43.72 45.74
3 0.125 L 1.75 -18.28 -18.05 1.73 -8.11 0.30 -8.73 -9.57 1.12 -4.01 0.18 -74.61 41.18
4 0.250 L 3.49 -30.83 -31.03 3.69 -13.94 0.59 -5.75 -6.67 1.10 -2.68 0.17 -123.23 33.71
GIRDER G3

5 0.375 L 5.24 -38.38 -38.69 5.17 -17.45 0.80 -2.88 -3.65 0.74 -1.34 0.11 -150.16 26.75
6 0.500 L 6.98 -40.92 -41.24 5.73 -18.64 0.88 0.00 -0.74 0.17 -0.01 0.02 -158.14 20.74
7 0.625 L 8.73 -38.38 -38.69 5.17 -17.45 0.80 2.87 2.14 -0.46 1.33 -0.07 -149.31 23.62
8 0.750 L 10.47 -30.83 -31.02 3.69 -13.94 0.59 5.74 5.10 -0.95 2.67 -0.14 -121.73 29.73
9 0.875 L 12.22 -18.27 -18.05 1.73 -8.11 0.30 8.73 8.46 -1.15 4.00 -0.18 -73.94 38.35
10 0.933 L 13.02 -10.62 -10.18 0.84 -4.64 0.15 10.37 10.27 -1.06 4.61 -0.18 -44.64 44.49
11 1.0 L 13.96 0.00 0.00 0.00 0.00 0.00 12.34 11.19 -0.81 5.32 -0.16 0.00 51.18

1 0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -1.24 5.15 -0.15 0.00 46.89
2 0.067 L 0.94 -10.55 -9.14 1.00 -4.49 0.11 -10.28 -9.55 0.91 -4.44 0.09 -39.82 43.26
3 0.125 L 1.75 -18.13 -16.35 1.51 -7.81 0.14 -8.65 -8.78 0.60 -3.84 0.03 -67.14 37.72
4 0.250 L 3.49 -30.56 -28.65 1.93 -13.39 0.08 -5.68 -6.39 0.17 -2.55 -0.04 -112.14 30.63
GIRDER G4

5 0.375 L 5.24 -38.02 -36.19 1.93 -16.74 0.00 -2.83 -3.61 -0.01 -1.27 -0.05 -143.31 24.72
6 0.500 L 6.98 -40.53 -38.75 1.88 -17.86 -0.04 0.00 -0.74 -0.02 0.01 -0.01 -150.58 19.72
7 0.625 L 8.73 -38.02 -36.19 1.93 -16.74 0.00 2.84 2.15 0.04 1.29 0.03 -136.16 22.09
8 0.750 L 10.47 -30.56 -28.66 1.91 -13.39 0.08 5.69 4.98 -0.04 2.56 0.05 -116.00 27.97
9 0.875 L 12.22 -18.13 -16.36 1.49 -7.81 0.14 8.65 7.90 -0.40 3.85 0.00 -72.03 38.53
10 0.933 L 13.02 -10.54 -9.14 1.00 -4.48 0.11 10.28 9.32 -0.75 4.44 -0.06 -44.83 45.01
11 1.0 L 13.96 0.00 0.00 0.00 0.00 0.00 12.25 9.99 -1.24 5.15 -0.15 0.00 52.43

1 0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 12.32 14.93 14.37 4.41 4.29 0.00 14.50
2 0.067 L 0.94 -10.61 -13.62 -12.54 -3.85 -3.74 -10.35 -14.18 -12.43 -3.82 -3.71 -11.60 13.90
3 0.125 L 1.75 -18.24 -24.24 -21.76 -6.72 -6.50 -8.72 -12.92 -10.73 -3.32 -3.20 -19.68 12.62
4 0.250 L 3.49 -30.78 -41.99 -37.07 -11.55 -11.09 -5.74 -9.18 -7.11 -2.22 -2.11 -32.99 10.21
GIRDER G5

5 0.375 L 5.24 -38.31 -52.65 -46.18 -14.47 -13.82 -2.87 -5.10 -3.56 -1.11 -1.05 -41.02 7.12
6 0.500 L 6.98 -40.85 -56.22 -49.23 -15.45 -14.73 0.00 -1.04 -0.08 0.00 -0.01 -43.30 4.80
7 0.625 L 8.73 -38.31 -52.65 -46.18 -14.47 -13.82 2.86 3.01 3.38 1.10 1.02 -39.67 5.91
8 0.750 L 10.47 -30.78 -41.99 -37.05 -11.56 -11.08 5.73 7.08 6.88 2.21 2.07 -30.28 8.47
9 0.875 L 12.22 -18.24 -24.23 -21.75 -6.72 -6.49 8.72 11.51 10.53 3.31 3.16 -17.13 10.52
10 0.933 L 13.02 -10.60 -13.61 -12.52 -3.85 -3.74 10.35 13.81 12.31 3.82 3.68 -9.66 11.66
11 1.0 L 13.96 0.00 0.00 0.00 0.00 0.00 12.32 14.93 14.37 4.41 4.29 0.00 12.09

72 72
Calculation of ULS Forces BM are in t-m, SF in T
ULS-Factor for
SLAB
DL-Girder LOADS SIDL-CB SIDL-WC FPLL LL
SLAB
DL-Girder LOADS SIDL-CB SIDL-WC FPLL LL 1.35 1.35 1.35 1.75 1.15 1.5
0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Outer Girder BM

0.067 L -10.61 -13.62 -12.54 -3.85 -3.74 -39.58 -14.32 -18.39 -16.93 -6.74 -4.30 -59.36 -120.04
0.125 L -18.24 -24.24 -21.76 -6.72 -6.50 -66.13 -24.63 -32.72 -29.38 -11.77 -7.48 -99.20 -205.18
0.250 L -30.78 -41.99 -37.07 -11.56 -11.09 -110.26 -41.56 -56.68 -50.04 -20.22 -12.75 -165.40 -346.65
0.375 L -38.31 -52.65 -46.18 -14.47 -13.82 -138.36 -51.72 -71.07 -62.35 -25.32 -15.89 -207.53 -433.89
0.500 L -40.85 -56.22 -49.23 -15.45 -14.73 -146.68 -55.15 -75.90 -66.46 -27.04 -16.94 -220.02 -461.50
0.0 L 12.32 14.93 14.37 4.41 4.29 45.45 16.63 20.16 19.40 7.72 4.93 68.17 137.01
Outer Girder SF

0.067 L 10.35 14.18 12.43 3.82 3.71 40.71 13.98 19.15 16.79 6.69 4.27 61.06 121.93
0.125 L 8.72 12.92 10.73 3.32 3.20 35.65 11.77 17.45 14.48 5.81 3.68 53.47 106.66
0.250 L 5.74 9.18 7.11 2.22 2.11 26.75 7.74 12.39 9.59 3.89 2.43 40.13 76.18
0.375 L 2.87 5.10 3.56 1.11 1.05 19.12 3.88 6.89 4.80 1.94 1.21 28.68 47.39
0.500 L 0.00 1.04 0.17 0.00 0.01 13.54 0.00 1.40 0.23 0.00 0.01 20.31 21.96
0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Inner Girder BM

0.067 L -10.63 -10.19 0.84 -4.65 0.02 -46.66 -14.35 -13.75 1.13 -8.14 0.02 -69.99 -105.07
0.125 L -18.28 -18.05 1.49 -8.11 0.03 -75.48 -24.68 -24.37 2.01 -14.19 0.03 -113.22 -174.42
0.250 L -30.83 -31.03 1.91 -13.94 0.04 -123.23 -41.63 -41.88 2.58 -24.39 0.05 -184.84 -290.11
0.375 L -38.38 -38.69 1.93 -17.45 0.00 -151.89 -51.82 -52.24 2.60 -30.54 0.00 -227.84 -359.83
0.500 L -40.92 -41.24 1.88 -18.64 -0.04 -159.87 -55.24 -55.67 2.54 -32.62 -0.05 -239.80 -380.85
0.0 L 12.34 11.19 2.82 5.32 0.16 53.72 16.66 15.11 3.81 9.31 0.18 80.58 125.64
Inner Girder SF

0.067 L 10.37 10.57 2.37 4.61 0.18 46.47 14.01 14.27 3.20 8.07 0.21 69.71 109.46
0.125 L 8.73 9.57 1.91 4.01 0.18 41.18 11.78 12.91 2.58 7.01 0.21 61.77 96.27
0.250 L 5.75 6.67 1.12 2.68 0.17 33.71 7.76 9.01 1.52 4.69 0.19 50.56 73.72
0.375 L 2.88 3.65 0.74 1.34 0.11 26.75 3.89 4.93 0.99 2.35 0.12 40.12 52.41

73 73
Inner Girder
0.500 L 0.00 0.74 0.17 0.01 0.02 20.74 0.00 1.00 0.23 0.02 0.02 31.11 32.38

74 74
Calculation of SLS Rare combination Forces BM are in t-m, SF in T
SLS rare combination
SLAB
SLAB DL-Girder LOADS SIDL-CB SIDL-WC FPLL LL
DL-Girder LOADS SIDL-CB SIDL-WC FPLL LL 1.00 1.00 1.00 1.20 0.75 1.00
0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Outer Girder BM

0.067 L -10.61 -13.62 -12.54 -3.85 -3.74 -39.58 -10.61 -13.62 -12.54 -4.62 -2.81 -39.58 -83.77
0.125 L -18.24 -24.24 -21.76 -6.72 -6.50 -66.13 -18.24 -24.24 -21.76 -8.07 -4.88 -66.13 -143.32
0.250 L -30.78 -41.99 -37.07 -11.56 -11.09 -110.26 -30.78 -41.99 -37.07 -13.87 -8.31 -110.26 -242.28
0.375 L -38.31 -52.65 -46.18 -14.47 -13.82 -138.36 -38.31 -52.65 -46.18 -17.36 -10.36 -138.36 -303.23
0.500 L -40.85 -56.22 -49.23 -15.45 -14.73 -146.68 -40.85 -56.22 -49.23 -18.54 -11.05 -146.68 -322.56
0.0 L 12.32 14.93 14.37 4.41 4.29 45.45 12.32 14.93 14.37 5.29 3.22 45.45 95.58
Outer Girder SF

0.067 L 10.35 14.18 12.43 3.82 3.71 40.71 10.35 14.18 12.43 4.59 2.78 40.71 85.05
0.125 L 8.72 12.92 10.73 3.32 3.20 35.65 8.72 12.92 10.73 3.99 2.40 35.65 74.40
0.250 L 5.74 9.18 7.11 2.22 2.11 26.75 5.74 9.18 7.11 2.66 1.58 26.75 53.02
0.375 L 2.87 5.10 3.56 1.11 1.05 19.12 2.87 5.10 3.56 1.33 0.79 19.12 32.77
0.500 L 0.00 1.04 0.17 0.00 0.01 13.54 0.00 1.04 0.17 0.00 0.01 13.54 14.76
0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Inner Girder BM

0.067 L -10.63 -10.19 0.84 -4.65 0.02 -46.66 -10.63 -10.19 0.84 -5.58 0.01 -46.66 -72.20
0.125 L -18.28 -18.05 1.49 -8.11 0.03 -75.48 -18.28 -18.05 1.49 -9.73 0.02 -75.48 -120.03
0.250 L -30.83 -31.03 1.91 -13.94 0.04 -123.23 -30.83 -31.03 1.91 -16.72 0.03 -123.23 -199.86
0.375 L -38.38 -38.69 1.93 -17.45 0.00 -151.89 -38.38 -38.69 1.93 -20.94 0.00 -151.89 -247.98
0.500 L -40.92 -41.24 1.88 -18.64 -0.04 -159.87 -40.92 -41.24 1.88 -22.37 -0.03 -159.87 -262.55
0.0 L 12.34 11.19 2.82 5.32 0.16 53.72 12.34 11.19 2.82 6.38 0.12 53.72 86.57
Inner Girder SF

0.067 L 10.37 10.57 2.37 4.61 0.18 46.47 10.37 10.57 2.37 5.53 0.13 46.47 75.46
0.125 L 8.73 9.57 1.91 4.01 0.18 41.18 8.73 9.57 1.91 4.81 0.14 41.18 66.33
0.250 L 5.75 6.67 1.12 2.68 0.17 33.71 5.75 6.67 1.12 3.21 0.13 33.71 50.59
0.375 L 2.88 3.65 0.74 1.34 0.11 26.75 2.88 3.65 0.74 1.61 0.08 26.75 35.71
0.500 L 0.00 0.74 0.17 0.01 0.02 20.74 0.00 0.74 0.17 0.01 0.02 20.74 21.68

75 75
Calculation of SLS Quasi permanent combination Forces BM are in t-m, SF in T
SLS combination for crack check
SLAB
SLAB DL-Girder LOADS SIDL-CB SIDL-WC FPLL LL
DL-Girder LOADS SIDL-CB SIDL-WC FPLL LL 1 1 1 1.2 0 0
0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Outer Girder BM

0.067 L -10.61 -13.62 -12.54 -3.85 -3.74 -39.58 -10.61 -13.62 -12.54 -4.62 0.00 0.00 -41.39
0.125 L -18.24 -24.24 -21.76 -6.72 -6.50 -66.13 -18.24 -24.24 -21.76 -8.07 0.00 0.00 -72.31
0.250 L -30.78 -41.99 -37.07 -11.56 -11.09 -110.26 -30.78 -41.99 -37.07 -13.87 0.00 0.00 -123.71
0.375 L -38.31 -52.65 -46.18 -14.47 -13.82 -138.36 -38.31 -52.65 -46.18 -17.36 0.00 0.00 -154.51
0.500 L -40.85 -56.22 -49.23 -15.45 -14.73 -146.68 -40.85 -56.22 -49.23 -18.54 0.00 0.00 -164.84
0.0 L 12.32 14.93 14.37 4.41 4.29 45.45 12.32 14.93 14.37 5.29 0.00 0.00 46.91
Outer Girder SF

0.067 L 10.35 14.18 12.43 3.82 3.71 40.71 10.35 14.18 12.43 4.59 0.00 0.00 41.56
0.125 L 8.72 12.92 10.73 3.32 3.20 35.65 8.72 12.92 10.73 3.99 0.00 0.00 36.35
0.250 L 5.74 9.18 7.11 2.22 2.11 26.75 5.74 9.18 7.11 2.66 0.00 0.00 24.69
0.375 L 2.87 5.10 3.56 1.11 1.05 19.12 2.87 5.10 3.56 1.33 0.00 0.00 12.86
0.500 L 0.00 1.04 0.17 0.00 0.01 13.54 0.00 1.04 0.17 0.00 0.00 0.00 1.21
0.0 L 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Inner Girder BM

0.067 L -10.63 -10.19 0.84 -4.65 0.02 -46.66 -10.63 -10.19 0.84 -5.58 0.00 0.00 -25.56
0.125 L -18.28 -18.05 1.49 -8.11 0.03 -75.48 -18.28 -18.05 1.49 -9.73 0.00 0.00 -44.57
0.250 L -30.83 -31.03 1.91 -13.94 0.04 -123.23 -30.83 -31.03 1.91 -16.72 0.00 0.00 -76.67
0.375 L -38.38 -38.69 1.93 -17.45 0.00 -151.89 -38.38 -38.69 1.93 -20.94 0.00 0.00 -96.09
0.500 L -40.92 -41.24 1.88 -18.64 -0.04 -159.87 -40.92 -41.24 1.88 -22.37 0.00 0.00 -102.65
0.0 L 12.34 11.19 2.82 5.32 0.16 53.72 12.34 11.19 2.82 6.38 0.00 0.00 32.73
Inner Girder SF

0.067 L 10.37 10.57 2.37 4.61 0.18 46.47 10.37 10.57 2.37 5.53 0.00 0.00 28.85
0.125 L 8.73 9.57 1.91 4.01 0.18 41.18 8.73 9.57 1.91 4.81 0.00 0.00 25.01
0.250 L 5.75 6.67 1.12 2.68 0.17 33.71 5.75 6.67 1.12 3.21 0.00 0.00 16.76
0.375 L 2.88 3.65 0.74 1.34 0.11 26.75 2.88 3.65 0.74 1.61 0.00 0.00 8.88
0.500 L 0.00 0.74 0.17 0.01 0.02 20.74 0.00 0.74 0.17 0.01 0.00 0.00 0.92

76 76
DESIGN VALUES AT VARIOUS SECTIONS GIRDER ALONE CASE BM are in t-m, SF in T

Distance
Governing Bending Governing Shear

Section
SL. NO

Girder
Bending Moments Shear Force
Moments Force
DL SLAB DL- SLAB DL- SLAB DL- SLAB
LOADS Girder LOADS Girder LOADS Girder LOADS
1 0.0 L 0.00 0.00 0.00 12.29 14.66 0.00 0.00 12.29 14.66
2 0.067 L 0.94 -10.59 -12.80 -10.33 -12.69 -10.59 -12.80 10.33 12.69
3 0.125 L 1.75 -18.20 -22.31 -8.69 -10.99 -18.20 -22.31 8.69 10.99
4 0.250 L 3.49 -30.70 -38.29 -5.72 -7.33 -30.70 -38.29 5.72 7.33
GIRDER G1

5 0.375 L 5.24 -38.21 -47.91 -2.86 -3.66 -38.21 -47.91 2.86 3.66
6 0.500 L 6.98 -40.74 -51.16 0.00 0.00 -40.74 -51.16 0.00 0.00
7 0.625 L 8.73 -38.21 -47.91 2.86 3.66
8 0.750 L 10.47 -30.70 -38.29 5.72 7.33
9 0.875 L 12.22 -18.20 -22.31 8.69 10.99
10 0.933 L 13.02 -10.58 -12.78 10.33 12.69
11 1.0 L 13.96 0.00 0.00 12.29 14.66

1 0.0 L 0.00 0.00 0.00 12.29 12.56 0.00 0.00 12.29 12.56
2 0.067 L 0.94 -10.59 -10.97 -10.33 -10.88 -10.59 -10.97 10.33 10.88
3 0.125 L 1.75 -18.20 -19.12 -8.69 -9.42 -18.20 -19.12 8.69 9.42
4 0.250 L 3.49 -30.70 -32.82 -5.72 -6.28 -30.70 -32.82 5.72 6.28
GIRDER G2

5 0.375 L 5.24 -38.21 -41.07 -2.86 -3.15 -38.21 -41.07 2.86 3.15
6 0.500 L 6.98 -40.74 -43.85 0.00 0.00 -40.74 -43.85 0.00 0.00
7 0.625 L 8.73 -38.21 -41.07 2.86 3.15
8 0.750 L 10.47 -30.70 -32.82 5.72 6.28
9 0.875 L 12.22 -18.20 -19.12 8.69 9.42
10 0.933 L 13.02 -10.58 -10.96 10.33 10.88
11 1.0 L 13.96 0.00 0.00 12.29 12.56

1 0.0 L 0.00 0.00 0.00 12.29 12.56


2 0.067 L 0.94 -10.59 -10.97 -10.33 -10.88
3 0.125 L 1.75 -18.20 -19.12 -8.69 -9.42
4 0.250 L 3.49 -30.70 -32.82 -5.72 -6.28
GIRDER G3

5 0.375 L 5.24 -38.21 -41.07 -2.86 -3.15


6 0.500 L 6.98 -40.74 -43.85 0.00 0.00
7 0.625 L 8.73 -38.21 -41.07 2.86 3.15
8 0.750 L 10.47 -30.70 -32.82 5.72 6.28
9 0.875 L 12.22 -18.20 -19.12 8.69 9.42
10 0.933 L 13.02 -10.58 -10.96 10.33 10.88
11 1.0 L 13.96 0.00 0.00 12.29 12.56

1 0.0 L 0.00 0.00 0.00 12.29 12.56


2 0.067 L 0.94 -10.59 -10.97 -10.33 -10.88
3 0.125 L 1.75 -18.20 -19.12 -8.69 -9.42
4 0.250 L 3.49 -30.70 -32.82 -5.72 -6.28
GIRDER G4

5 0.375 L 5.24 -38.21 -41.07 -2.86 -3.15


6 0.500 L 6.98 -40.74 -43.85 0.00 0.00
7 0.625 L 8.73 -38.21 -41.07 2.86 3.15
8 0.750 L 10.47 -30.70 -32.82 5.72 6.28
9 0.875 L 12.22 -18.20 -19.12 8.69 9.42
10 0.933 L 13.02 -10.58 -10.96 10.33 10.88
11 1.0 L 13.96 0.00 0.00 12.29 12.56

1 0.0 L 0.00 0.00 0.00 12.29 14.66


2 0.067 L 0.94 -10.59 -12.80 -10.33 -12.69
3 0.125 L 1.75 -18.20 -22.31 -8.69 -10.99
4 0.250 L 3.49 -30.70 -38.29 -5.72 -7.33
GIRDER G5

5 0.375 L 5.24 -38.21 -47.91 -2.86 -3.66


6 0.500 L 6.98 -40.74 -51.16 0.00 0.00
7 0.625 L 8.73 -38.21 -47.91 2.86 3.66
8 0.750 L 10.47 -30.70 -38.29 5.72 7.33
9 0.875 L 12.22 -18.20 -22.31 8.69 10.99
10 0.933 L 13.02 -10.58 -12.78 10.33 12.69
11 1.0 L 13.96 0.00 0.00 12.29 14.66
77 77
Calculation of ULS Forces GIRDER ALONE CASE BM are in t-m, SF in T
ULS-Factor for
SLAB
SLAB DL-Girder LOADS
DL-Girder LOADS 1.35 1.35
0.0 L 0.00 0.00 0.00 0.00 0.00
Outer Girder BM

0.067 L -10.59 -12.80 -14.29 -17.28 -31.57


0.125 L -18.20 -22.31 -24.58 -30.12 -54.70
0.250 L -30.70 -38.29 -41.45 -51.69 -93.14
0.375 L -38.21 -47.91 -51.59 -64.68 -116.27
0.500 L -40.74 -51.16 -55.00 -69.07 -124.07
0.0 L 12.29 14.66 16.59 19.79 36.38
Outer Girder SF

0.067 L 10.33 12.69 13.95 17.14 31.09


0.125 L 8.69 10.99 11.73 14.84 26.57
0.250 L 5.72 7.33 7.72 9.90 17.61
0.375 L 2.86 3.66 3.86 4.94 8.81
0.500 L 0.00 0.00 0.00 0.00 0.00
0.0 L 0.00 0.00 0.00 0.00 0.00
Inner Girder BM

0.067 L -10.59 -10.97 -14.29 -14.80 -29.10


0.125 L -18.20 -19.12 -24.58 -25.82 -50.39
0.250 L -30.70 -32.82 -41.45 -44.31 -85.76
0.375 L -38.21 -41.07 -51.59 -55.45 -107.04
0.500 L -40.74 -43.85 -55.00 -59.20 -114.20
0.0 L 12.29 12.56 16.59 16.96 33.55
Inner Girder SF

0.067 L 10.33 10.88 13.95 14.69 28.64


0.125 L 8.69 9.42 11.73 12.72 24.45
0.250 L 5.72 6.28 7.72 8.48 16.20
0.375 L 2.86 3.15 3.86 4.25 8.11
0.500 L 0.00 0.00 0.00 0.00 0.00

78 78
Calculation of SLS Rare combination Forces GIRDER ALONE CASE
BM are in t-m, SF in T SLS rare combination
SLAB
SLAB DL-Girder LOADS
DL-Girder LOADS 1.00 1.00
0.0 L 0.00 0.00 0.00 0.00 0.00
Outer Girder BM

0.067 L -10.59 -12.80 -10.59 -12.80 -23.39


0.125 L -18.20 -22.31 -18.20 -22.31 -40.52
0.250 L -30.70 -38.29 -30.70 -38.29 -68.99
0.375 L -38.21 -47.91 -38.21 -47.91 -86.13
0.500 L -40.74 -51.16 -40.74 -51.16 -91.90
0.0 L 12.29 14.66 12.29 14.66 26.95
Outer Girder SF

0.067 L 10.33 12.69 10.33 12.69 23.03


0.125 L 8.69 10.99 8.69 10.99 19.68
0.250 L 5.72 7.33 5.72 7.33 13.05
0.375 L 2.86 3.66 2.86 3.66 6.52
0.500 L 0.00 0.00 0.00 0.00 0.00
0.0 L 0.00 0.00 0.00 0.00 0.00
Inner Girder BM

0.067 L -10.59 -10.97 -10.59 -10.97 -21.55


0.125 L -18.20 -19.12 -18.20 -19.12 -37.33
0.250 L -30.70 -32.82 -30.70 -32.82 -63.52
0.375 L -38.21 -41.07 -38.21 -41.07 -79.29
0.500 L -40.74 -43.85 -40.74 -43.85 -84.59
0.0 L 12.29 12.56 12.29 12.56 24.85
Inner Girder SF

0.067 L 10.33 10.88 10.33 10.88 21.22


0.125 L 8.69 9.42 8.69 9.42 18.11
0.250 L 5.72 6.28 5.72 6.28 12.00
0.375 L 2.86 3.15 2.86 3.15 6.01
0.500 L 0.00 0.00 0.00 0.00 0.00

79 79
Calculation of SLS Quasi permanent combination Forces GIRDER ALONE CASE
SLS combination for crack check
SLAB
BM are in t-m, SF in T SLAB DL-Girder LOADS
DL-Girder LOADS 1 1
0.0 L 0.00 0.00 0.00 0.00 0.00
Outer Girder BM

0.067 L -10.59 -12.80 -10.59 -12.80 -23.39


0.125 L -18.20 -22.31 -18.20 -22.31 -40.52
0.250 L -30.70 -38.29 -30.70 -38.29 -68.99
0.375 L -38.21 -47.91 -38.21 -47.91 -86.13
0.500 L -40.74 -51.16 -40.74 -51.16 -91.90
0.0 L 12.29 14.66 12.29 14.66 26.95
Outer Girder SF

0.067 L 10.33 12.69 10.33 12.69 23.03


0.125 L 8.69 10.99 8.69 10.99 19.68
0.250 L 5.72 7.33 5.72 7.33 13.05
0.375 L 2.86 3.66 2.86 3.66 6.52
0.500 L 0.00 0.00 0.00 0.00 0.00
0.0 L 0.00 0.00 0.00 0.00 0.00
Inner Girder BM

0.067 L -10.59 -10.97 -10.59 -10.97 -21.55


0.125 L -18.20 -19.12 -18.20 -19.12 -37.33
0.250 L -30.70 -32.82 -30.70 -32.82 -63.52
0.375 L -38.21 -41.07 -38.21 -41.07 -79.29
0.500 L -40.74 -43.85 -40.74 -43.85 -84.59
0.0 L 12.29 12.56 12.29 12.56 24.85
Inner Girder SF

0.067 L 10.33 10.88 10.33 10.88 21.22


0.125 L 8.69 9.42 8.69 9.42 18.11
0.250 L 5.72 6.28 5.72 6.28 12.00
0.375 L 2.86 3.15 2.86 3.15 6.01
0.500 L 0.00 0.00 0.00 0.00 0.00

80 80
Material properties
Concrete mix = M 30
fck = 30 Mpa
Permisible stress in bending compression = 14.4 Mpa

Steel grade = Fe 500


Permissible stress in direct tension and flexure = 300 Mpa
Permissible stress in compression = 300 Mpa

Modular ratio = 12.90


Modulus of elasticity of concrete = 31000 Mpa
Modulus of elasticity of Steel = 200000 Mpa
Design of End Girder for SLS Rare combination GIRDER ALONE CONDITION
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 180 180 180 180 180 180

Effective width of Flange in mm 1000 1000 1000 1000 1000 1000


Over all depth [D] 1180 1180 1180 1180 1180 1180
Clear cover to main bars[d'] 50 50 50 50 50 50
Diameter of bar used in 1st layer 32 32 32 32 32 32
No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.48 8042.48 8042.48 11259.47 12732.09 12732.09
Bending moment [M] in Kn-m 0.00 233.88 405.16 689.92 861.26 919.00
Effective depth in mm 1094.80 1094.80 1094.80 1082.00 1071.30 1071.30
depth of neautral Axis from top fiber 401.34 401.34 409.85 489.03 510.63 510.63
Stress in steel in Mpa 0.00 16.61 28.19 34.29 38.60 41.19
Permissiable stress in steel in Mpa 300.00 300.00 300.00 300.00 300.00 300.00

Stress in the concrete at extrem fiber in Mpa 0.00 0.74 1.31 2.19 2.72 2.91
Permissiable stress in Concrete in Mpa 14.40 14.40 14.40 14.40 14.40 14.40
ok Com ok Com ok Com ok Com ok Com ok Com
ok ten ok ten ok ten ok ten ok ten ok ten

81 81
Design of Middle Girder for SLS rare combination GIRDER ALONE CONDITION
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 180 180 180 180 180 180

Effective width of Flange in mm 1000 1000 1000 1000 1000 1000


Over all depth [D] 1180 1180 1180 1180 1180 1180
Clear cover to main bars[d'] 50 50 50 50 50 50

Diameter of bar used in 1st layer 32 32 32 32 32 32


No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.48 8042.48 8042.48 11259.47 12732.09 12732.09
Bending moment [M] in Kn-m 0.00 215.52 373.28 635.23 792.87 845.90

Effective depth in mm 1094.80 1094.80 1094.80 1082.00 1071.30 1071.30

depth of neautral Axis from top fiber 401.34 401.34 409.85 489.03 510.63 510.63

Stress in steel in Mpa 0.00 15.30 25.97 31.57 35.54 37.92

Permissiable stress in steel in Mpa 300.00 300.00 300.00 300.00 300.00 300.00

Stress in the concrete at extrem fiber in Mpa 0.00 0.69 1.20 2.02 2.51 2.68

Permissiable stress in Concrete in Mpa 14.40 14.40 14.40 14.40 14.40 14.40
ok Com ok Com ok Com ok Com ok Com ok Com
ok ten ok ten ok ten ok ten ok ten ok ten

82 82
Check for Ultimate moment end girder/MID GIRDERS GIRDER ALONE CONDITION
fpyk/1.15 = 434.78 Mpa
modifed yeild strain = (fyk/gs)/E of steel 0.00217

Stressin concrete 13.4 Mpa


fctm 2.5 MPa
fyk 500 MPa
Distance from expansion joint in m 0L 0.067 L 0.125 L 0.25 L 0.375 L 0.5 L
Ultimate Moment in Kn-m FOR END GIRDER 0.00 315.74 546.96 931.39 1162.70 1240.65
Ultimate Moment in Kn-m FOR MID GIRDER 0.00 290.96 503.93 857.57 1070.38 1141.97
w in mm 1000.00 1000.00 1000.00 1000.00 1000.00 1000.00
bw in mm 650.00 650.00 511.40 300.00 300.00 300.00
df in mm 180.00 180.00 180.00 180.00 180.00 180.00
D in mm 1180.00 1180.00 1180.00 1180.00 1180.00 1180.00
d Effective depth in mm 1094.80 1094.80 1094.80 1082.00 1071.30 1071.30
Ast min 0.26 fctm/fyk b1 d 925.11 925.11 727.84 421.98 417.81 417.81
0.0013 b1 d 925.11 925.11 727.84 421.98 417.81 417.81
Ast min 925.11 925.11 727.84 421.98 417.81 417.81
Ast provided 8042.48 8042.48 8042.48 11259.47 12732.09 12732.09
Area of steel in layer 1 from bottom of girder sq.mm 5629.73 5629.73 5629.73 5629.73 5629.73 5629.73
Area of steel in layer 2 from bottom of girder sq.mm 2412.74 2412.74 2412.74 5629.73 5629.73 5629.73
Area of steel in layer 3 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 1472.62 1472.62
Area of steel in layer 4 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 0.00 0.00
Area of steel in layer 5 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 0.00 0.00
Area of steel in layer 6 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 0.00 0.00
Distance from bottom of girder to layer 1 of steel in mm 66.00 66.00 66.00 66.00 66.00 66.00
Distance from bottom of girder to layer 2 of steel in mm 114.00 114.00 114.00 114.00 114.00 114.00
Distance from bottom of girder to layer 3 of steel in mm 162.00 162.00 162.00 162.00 158.50 158.50
Distance from bottom of girder to layer 4 of steel in mm 210.00 210.00 210.00 210.00 206.50 206.50
Distance from bottom of girder to layer 5 of steel in mm 258.00 258.00 258.00 258.00 254.50 254.50
Distance from bottom of girder to layer 6 of steel in mm 306.00 306.00 306.00 306.00 302.50 302.50
Depth of NA x from top of girder in m 538.08 538.08 538.08 538.08 538.08 538.08
Ultimate momet sagging momet capacity in Kn-m 5142 5142 5282 5409 5338 5338
Safe Safe Safe Safe Safe Safe

83 83
Design of Shear reinforcement for End girder GIRDER ALONE CONDITION
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix fck 30 30 30 30 30 30
Grade of steel 500 500 500 500 500 500
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web bw in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 180 180 180 180 180 180
Effective width of Flange in mm 1000 1000 1000 1000 1000 1000
Over all depth [D] 1180 1180 1180 1180 1180 1180
Clear cover to main bars[d'] 50 50 50 50 50 50
Effective depth d in mm 1094.8 1094.8 1094.8 1082 1071.301 1071.301
Area of tensile reinforcement provided
8042.477 8042.477 8042.477 11259.47 12732.09 12732.09
Shear Force V 363.825 310.8934 265.6854 176.1413 88.07771 0
Shear Stress = V/0.9 d bw 0.56807 0.485424 0.527266 0.602934 0.304502 0
K 1.427413 1.427413 1.427413 1.429934 1.432075 1.432075
nmin 0.289565 0.289565 0.289565 0.290333 0.290985 0.290985
r1 0.011302 0.011302 0.014365 0.034687 0.039616 0.039616
VRD.C in Kn 206.0606 206.0606 162.1221 94.24203 93.51986 93.51986

Sh rein. Sh rein. Sh rein. Sh rein. min Sh min Sh


Check Req. Req. Req. Req. rein. Req. rein. Req.
Max Allowble shearForce in Kn (45deg angle)
2325.482 2325.482 1829.618 1060.751 1050.262 1050.262
No No No No No No
Check redesign is redesign is redesign is redesign is redesign is redesign is
Allowble shear Force in Kn corresponds
to(21.8 deg angle) 1603.698 1603.698 1261.74 731.5146 724.2814 724.2814
Min Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8 0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
calcultion of q in case of Allowble shear
Force corresponds to 21.8 deg angle is less
than than the SF coming on to the section NA NA NA NA NA NA
cross checking the q with codel equation
10.8 NA NA NA NA NA NA
Goal Seek NA NA NA NA NA NA
reqiured Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8
deg angle) is less than than the SF coming on
to the section)
NA NA NA NA NA NA
Reqiured Asw/S in Sqmm/mm 0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
Provided dia of the vertical strips 16 16 12 12 12 12
Provided number of legs of the vertical strips
4 4 2 2 2 2
provided spacing of the vertical strips 150 150 150 150 150 150
provided Asw/S in Sqmm/mm 5.361651 5.361651 1.507964 1.507964 1.507964 1.507964
Check ok ok ok ok ok ok

84 84
Design of Shear reinforcement for mid girder GIRDER ALONE CONDITION
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix fck 30 30 30 30 30 30
Grade of steel 500 500 500 500 500 500
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web bw in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 180 180 180 180 180 180
Effective width of Flange in mm 1000 1000 1000 1000 1000 1000
Over all depth [D] 1180 1180 1180 1180 1180 1180
Clear cover to main bars[d'] 50 50 50 50 50 50
Effective depth d in mm 1094.8 1094.8 1094.8 1082 1071.301 1071.301
Area of tensile reinforcement provided 8042.477 8042.477 8042.477 11259.47 12732.09 12732.09
Shear Force V 335.475 286.449 244.4969 161.9578 81.10682 0
Shear Stress = V/0.9 d bw 0.523805 0.447256 0.485216 0.554384 0.280403 0
K 1.427413 1.427413 1.427413 1.429934 1.432075 1.432075
nmin 0.289565 0.289565 0.289565 0.290333 0.290985 0.290985
r1 0.011302 0.011302 0.014365 0.034687 0.039616 0.039616
VRD.C in Kn 206.0606 206.0606 162.1221 94.24203 93.51986 93.51986

Sh rein. Sh rein. Sh rein. Sh rein. min Sh min Sh


Check Req. Req. Req. Req. rein. Req. rein. Req.
Max Allowble shearForce in Kn (45deg angle)

2325.482 2325.482 1829.618 1060.751 1050.262 1050.262


No No No No No No
Check redesign is redesign is redesign is redesign is redesign is redesign is
Allowble shear Force in Kn corresponds
to(21.8 deg angle) 1603.698 1603.698 1261.74 731.5146 724.2814 724.2814
Min Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8
deg angle) is grater than than the SF coming
on to the section)
0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
calcultion of q in case of Allowble shear
Force corresponds to 21.8 deg angle is less
than than the SF coming on to the section
and SF is less than the max allowble SF
corresponds to 45 deg angle

NA NA NA NA NA NA
cross checking the q with codel equation
10.8 NA NA NA NA NA NA
Goal Seek NA NA NA NA NA NA
reqiured Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8
deg angle) is less than than the SF coming on
to the section)
NA NA NA NA NA NA
Reqiured Asw/S in Sqmm/mm 0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
Provided dia of the vertical strips 16 16 12 12 12 12
Provided number of legs of the vertical strips
4 4 2 2 2 2
provided spacing of the vertical strips 150 150 150 150 150 150
provided Asw/S in Sqmm/mm 5.361651 5.361651 1.507964 1.507964 1.507964 1.507964
Check ok ok ok ok ok ok

85 85
Design of End Girder for SLS Quasi permanent combination GIRDER ALONE CASE
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 180 180 180 180 180 180

Effective width of Flange in mm 1000 1000 1000 1000 1000 1000


Over all depth [D] 1180 1180 1180 1180 1180 1180
Clear cover to main bars[d'] 50 50 50 50 50 50
Diameter of bar used in 1st layer 32 32 32 32 32 32
No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.5 8042.5 8042.5 11259.5 12732.1 12732.1
Bending moment [M] in Kn-m 0.0 233.9 405.2 689.9 861.3 919.0
Effective depth in mm 1094.80 1094.80 1094.80 1082.00 1071.30 1071.30
depth of neautral Axis from top fiber 401.3 401.3 409.8 489.0 510.6 510.6
Stress in outer most steel in Mpa 0.0 26.7 45.8 64.4 76.7 81.8
Permissiable stress in steel in Mpa 300.0 300.0 300.0 300.0 300.0 300.0
Stress in the concrete at extrem fiber in Mpa 0.0 0.7 1.3 2.2 2.7 2.9
Permissiable stress in Concrete in Mpa 14.4 14.4 14.4 14.4 14.4 14.4

Cracking Check(Quasi Permanent combination)

Bending moment [M] in Kn-m 0 233.8824 405.1592 689.9156 861.2605 919


Wr = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff
Clear cover to main bars c 50 50 50 50 50 50
k1 0.8 deformed bars, 0.8 0.8 0.8 0.8 0.8 0.8
k2 0.5 0.5 0.5 0.5 0.5 0.5
f 32 32 32 32 32 32
Hcef 213 213 213 245 271.7469 271.7469
Width of bottom bulb 650 650 650 650 650 650
Acef 138450 138450 138450 159250 176635.5 176635.5
rpeff = As/Acef 0.058089 0.058089 0.058089 0.070703 0.072081 0.072081
Sr,max 263.6488 263.6488 263.6488 246.9415 245.4705 245.4705
ssc 0 26.67921 45.84998 64.4188 76.7 81.8
fctm - value from table 6.5 page 38 2.5 2.5 2.5 2.5 2.5 2.5
kt 0.5 0.5 0.5 0.5 0.5 0.5
ae = Es/Ecm 12.90323 12.90323 12.90323 12.90323 12.90323 12.90323
esm-ecm 0 8E-05 0.000138 0.000193 0.00023 0.000246
Wr = Sr,max(esm-ecm) 0 0.021102 0.036265 0.047723 0.056484 0.060271
Safe Safe Safe Safe Safe Safe

86 86
Design of Middle Girder for SLS Quasi permanent combination GIRDER ALONE CASE
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Center to Center of Beams in mm 3000 3000 3000 3000 3000 3000
width of flange 1000 1000 1000 1000 1000 1000
Effective width of Flange in mm 1000 1000 1000 1000 1000 1000
Over all depth [D] 1180 1180 1180 1180 1180 1180
Clear cover to main bars[d'] 50 50 50 50 50 50
Design for Flexure
Diameter of bar used in 1st layer 32 32 32 32 32 32
No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.477 8042.477 8042.477 11259.47 12732.09 12732.09
Bending moment [M] in Kn-m 0 215.5235 373.2808 635.2344 792.8717 845.9
Effective depth in mm 1094.80 1094.80 1094.80 1082.00 1071.30 1071.30
depth of neautral Axis from top fiber 392.3 392.3 396.1 463.3 484.4 484.4
Stress in steel in Mpa 0 23.2085 39.98063 55.58162 65.83387 70.23693
Permissiable stress in steel in Mpa 300 300 300 300 300 300
Stress in the concrete at extrem fiber in Mpa 0 0.63 1.10 1.79 2.22 2.37
Permissiable stress in Concrete in Mpa 14.4 14.4 14.4 14.4 14.4 14.4
Cracking Check(Quasi Permanent combination)
Bending moment [M] in Kn-m 0 215.5235 373.2808 635.2344 792.8717 845.9
Wr = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff
Clear cover to main bars c 50 50 50 50 50 50
k1 0.8 deformed bars, 0.8 0.8 0.8 0.8 0.8 0.8
k2 0.5 0.5 0.5 0.5 0.5 0.5
f 32 32 32 32 32 32
Hcef 213 213 213 245 250 250
Width of bottom bulb 650 650 650 650 650 650
Acef 138450 138450 138450 159250 162500 162500
rpeff = As/Acef 0.058089 0.058089 0.058089 0.070703 0.078351 0.078351
Sr,max 263.6488 263.6488 263.6488 246.9415 239.4309 239.4309
fctm - value from table 6.5 page 38 2.5
ssc 0 23.2085 39.98063 55.58162 65.83387 70.23693
fctm - value from table 6.5 page 38 2.5 2.5 2.5 2.5 2.5 2.5
kt 0.5 0.5 0.5 0.5 0.5 0.5
ae = Es/Ecm 12.90323 12.90323 12.90323 12.90323 12.90323 12.90323
esm-ecm 0 6.96E-05 0.00012 0.000167 0.000198 0.000211
Wr = Sr,max(esm-ecm) 0 0.018357 0.031623 0.041176 0.047288 0.050451
Safe Safe Safe Safe Safe Safe

87 87
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date
Outer/ External Girder Inner/Internal Girder
Calculation of shrinkage strain to time at poring deck concrete
Distance from Girder end in m ext gr@0.0 ext gr@0.9 ext gr@1.7 ext gr@3.5 ext gr@5.2 ext gr@7.0 ext gr@0.0 ext gr@0.9 ext gr@1.7 ext gr@3.5 ext gr@5.2 ext gr@7.0
Depth of girder alone in
1.180 1.180 1.180 1.180 1.180 1.180 1.180 1.180 1.180 1.180 1.180 1.180
m
Depth of girder +Deck slab in 1.420 1.420 1.420 1.420 1.420 1.420 1.420 1.420 1.420 1.420 1.420 1.420
m
CG from soffit in m - girder alone case 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605
CG from soffit in m - Composite condition 0.995 0.995 0.995 0.995 0.995 0.995 0.995 0.995 0.995 0.995 0.995 0.995
C/S area of gir. sq.m - girder alone case 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655 0.655
C/S area of gir. sq.m -Compositecondtion 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495
Girder alone Z top of girder 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177 0.177
case Z bottom of girder 0.168 0.168 0.168 0.168 0.168 0.168 0.168 0.168 0.168 0.168 0.168 0.168
Z top of Slab 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.668
Composite Z bottom of Slab
1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537
Girder
Z top of girder 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537 1.537
condition
Z bottom of girder 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285

The Value of total shrikage strain ecs = ecd+eca where eca = autogenous shrinkage ecd = drying shrinkage
fcm is mean compressive strength of concrete in Mpa at 28 day = 30 2
N/mm
Relative humidity at ambient environment in % = 80 %
eca = 35.0 x 1.E-06 ecd = 288.00 x 1.00E-06
(-0.2 √t)
Development of autogenous shrinkage with time= eca (t) = b as (t) x eca Where b as (t) = 1- exp
t is the time in days up to where shrinkage strain needs to be calcualted
Development of drying shrinkage with time= ecd(t) = b ds (t,ts) kh ecd Where kh shall be from tble 6.7 of IRC 112.2011
b ds (t,ts) = (t - ts)/[ (t - ts) + 0.04√ (ho3) if curing days <= first stage stressing than b ds (t,ts) = 0
Distance from Girder end in m ext gr@0.0 ext gr@0.9 ext gr@1.7 ext gr@3.5 ext gr@5.2 ext gr@7.0 ext gr@0.0 ext gr@0.9 ext gr@1.7 ext gr@3.5 ext gr@5.2 ext gr@7.0
ho = 2 Ac/ u = Nominal size of the for girder 181.97 181.97 181.97 181.97 181.97 181.97 195.55 195.55 195.55 195.55 195.55 195.55

Cal. of shrinkage strain up to First stage stressing Girder age at time of deck concrete poring = 28.00 days curing days= 14.00 days

b as (t) = 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65

eca (t) = autogenous shrinkage 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05 2.29.E-05
kh 0.8770 0.8770 0.8770 0.8770 0.8770 0.8770 0.8567 0.8567 0.8567 0.8567 0.8567 0.8567

b ds (t,ts) = 0.1248 0.1248 0.1248 0.1248 0.1248 0.1248 0.1135 0.1135 0.1135 0.1135 0.1135 0.1135

88 88
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date
Outer/ External Girder Inner/Internal Girder
ecd(t) = 3.15.E-05 3.15.E-05 3.15.E-05 3.15.E-05 3.15.E-05 3.15.E-05 2.80.E-05 2.80.E-05 2.80.E-05 2.80.E-05 2.80.E-05 2.80.E-05
ecs = total shrinkage strain up to deck con poring 5.44.E-05 5.44.E-05 5.44.E-05 5.44.E-05 5.44.E-05 5.44.E-05 5.08.E-05 5.08.E-05 5.08.E-05 5.08.E-05 5.08.E-05 5.08.E-05
ecs = differentail Shrinkage strian B/W Girders and Slab 5.44.E-05 5.44.E-05 5.44.E-05 5.44.E-05 5.44.E-05 5.44.E-05 5.08.E-05 5.08.E-05 5.08.E-05 5.08.E-05 5.08.E-05 5.08.E-05

Force generated at deck slab center due to diff shr. 1393.06 1393.06 1393.06 1393.06 1393.06 1393.06 1302.73 1302.73 1302.73 1302.73 1302.73 1302.73

Force generated in deck slab due to shrinkage strain = differencetial shrinkage strain* Ec of deck concrete * C/S area of deck slab
This force is considerd to act at mid height of deck slab

Force oposided by girder = Force generated in deck slab due to


differentail shrinkage strain
Differentail shrinkage strain

Force genarated in deck slab at acting at a height from


soffit of girder in m 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
CG of composite girder from soffit in m 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lever arm of this force in m 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
Moment genarated in composite gider due to due to
differentail shrinkage strain in Kn-m 424.27 424.27 424.27 424.27 424.27 424.27 396.76 396.76 396.76 396.76 396.76 396.76

89 89
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Calculation of temparature stress


o o
17.8 C 10.6 C

o
h1=0.15 m 4 C h1 = 0.25m h1 = 0.2 h < 0.25 m = 0.25 m
o
h =1.420 m 0.7 C h2 = 0.25 h < 0.25 m = 0.25 m
h2=0.25 m h h1 =0.3h < 0.15 m = 0.150 m h2 = 0.25m h3 = 0.25 h < 0.25 m = 0.25 m
h2 =0.3h>0.10 m<0.25m= 0.250 m h4 = 0.2 h < 0.25 m = 0.25 m
o
h3 =0.3h < 0.15 m = 0.150 m 0.8 C h3 = 0.25m
h3=0.15 m h4 = 0.25m
o o
2.1 C 6.6 C a
Temparature raise at running section - internal girder b
3.000 o
17.8 C c
0.15 o
4 C
0.240 d
0.25
1

0.3

o f
0.150 2.1 C
0.65

Height of
DT at section Width od section CG of DT x DT x
Section section
section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 17.8 º 4.00 º
0.15 3 3 3.00 m 0.075 m 4.905 0.368

Between b-c 4.00 º 2.56 º a=


0.090 3 3 3.00 m 0.195 m 0.886 0.173 1.20E-05 per degrees C
Ec = 30500.0 MPa
Between c-d 2.56 º 0.00 º
0.160 1 1 1.00 m 0.320 m 0.102 0.033
Hence, DT x Area = 5.995 Degrees m2
between e-f 2.10 º 0.00 º
0.150 0.65 0.65 0.65 m 1.345 m 0.102 0.138
a Ec DT Area = Force = 2194.3 kN acting @ 0.1186 m from top
Total 5.995 0.711

90 90
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature raise at end section-internal girder

a
b
3.000 o
17.8 C c
0.15 o
4 C
0.240 d
0.25
1

0.65

o f
0.150 2.1 C
0.65

Height of
DT at section Width od section CG of DT x DT x
Section section
section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 17.8 º 4.00 º
0.15 3 3 3.00 m 0.075 m 4.905 0.368

Between b-c 4.00 º 2.56 º


0.09 3 3 3.00 m 0.195 m 0.886 0.173

Between c-d 2.56 º 0.00 º


0.16 1 1 1.00 m 0.320 m 0.102 0.033

between e-f 2.10 º 0.00 º


0.15 0.65 0.65 0.65 m 1.345 m 0.102 0.138

Total 5.995 0.711

a= 1.20E-05 per degrees C


Ec = 30500.0 MPa

Hence, DT x Area = 5.995 Degrees m2

a Ec DT Area = Force = 2194.3 kN acting @ 0.1186 m from top

91 91
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature fall at running section-internal Girder


a
3.000 b
o
10.6 C c
0.240 0.25 d
o
0.7 C e
0.13
1 0.25
0.1 f
0.3 g
0.25 h
o
0.15 0.8 C i
0.25 0.25
o
6.6 C
0.65
Height of CG of
DT at section Width od section DT x DT x
Section section section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 10.6 º 1.10 º 0.240 3.000 3.000 3.00 m 0.1200 m 4.211 0.505
Between b-c 1.10 º 0.70 º 0.010 1 1 1.00 m 0.2450 m 0.009 0.002
between c-d 0.70 º 0.364 º 0.120 1 1 1.00 m 0.3100 m 0.064 0.020
between d-e 0.36 º 0.00 º 0.130 1 0.09 0.55 m 0.4169 m 0.013 0.005
between f-g 0.00 º 0.48 º 0.100 0.3 0.3 0.30 m 0.970 m 0.007 0.007
between g-h 0.48 º 0.80 º 0.150 0.3 0.65 0.48 m 1.104 m 0.046 0.050
between h-i 0.80 º 6.60 º 0.250 0.65 0.65 0.65 m 1.295 m 0.601 0.779
Total 4.950 1.369

a= 1.20E-05 per degrees C


Ec = 30500.0 MPa

Hence, DT x Area = 4.950 Deg. m2


a Ec DT Area = Force = 1811.8 kN acting @ 0.2765 m from top

92 92
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature fall at end section-internal Girder


a
3.000 b
o
10.6 C c
0.240 0.25 d
o
0.7 C e
0.13
1 0.25
0.1 f
0.65 g
0.25 h
o
0.15 0.8 C i
0.25 0.25
o
6.6 C
0.65
Height of CG of
DT at section Width od section DT x DT x
Section section section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 10.6 º 1.10 º 0.240 3.000 3.000 3.00 m 0.1200 m 4.211 0.505
Between b-c 1.10 º 0.70 º 0.010 1 1 1.00 m 0.2450 m 0.009 0.002
between c-d 0.70 º 0.000 º 0.120 1 1 1.00 m 0.3100 m 0.042 0.013
between d-e 0.00 º 0.31 º 0.110 1 0.615 0.81 m 0.4206 m 0.014 0.006
between f-g 0.00 º 0.000 º 0.000 0.65 0.65 0.65 m 0.4800 m 0.000 0.000
between g-h 0.00 º 0.80 º 0.250 0.65 0.65 0.65 m 1.045 m 0.065 0.068
between h-i 0.80 º 6.60 º 0.250 0.65 0.65 0.65 m 1.295 m 0.601 0.779
Total 4.941 1.373

a= 1.20E-05 per degrees C


Ec = 30500.0 MPa

Hence, DT x Area = 4.941 Deg. m2


a Ec DT Area = Force = 1808.6 kN acting @ 0.2778 m from top

93 93
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature raise at running section - Extrenal girder


a
b
3.500 o
17.8 C c
0.15
4 oC
0.240 d
0.25
1

0.3

o f
0.150 2.1 C
0.65

Height of
DT at section Width od section CG of DT x DT x
Section section
section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 17.8 º 4.00 º
0.15 3.5 3.5 3.50 m 0.075 m 5.723 0.429

Between b-c 4.00 º 2.56 º a=


0.09 3.5 3.5 3.50 m 0.195 m 1.033 0.201 1.20E-05 per degrees C
Ec = 30500.0 MPa
Between c-d 2.56 º 0.00 º
0.16 1 1 1.00 m 0.320 m 0.102 0.033
Hence, DT x Area = 6.960 Degrees m2
between e-f 2.10 º 0.00 º
0.150 0.65 0.65 0.65 m 1.345 m 0.102 0.138
a Ec DT Area = Force = 2547.5 kN acting @ 0.1151 m from top
Total 6.960 0.801

94 94
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature raise at end section-External girder


a
b
3.500 o
17.8 C c
0.15
4 oC
0.240 d
0.25
1

0.65

o f
0.150 2.1 C
0.65

Height of
DT at section Width od section CG of DT x DT x
Section section
section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 17.8 º 4.00 º
0.15 3.5 3.5 3.50 m 0.075 m 5.723 0.429

Between b-c 4.00 º 2.56 º


0.09 3.5 3.5 3.50 m 0.195 m 1.033 0.201

Between c-d 2.56 º 0.00 º


0.16 1 1 1.00 m 0.320 m 0.102 0.033

between e-f 2.10 º 0.00 º


0.15 0.65 0.65 0.65 m 1.345 m 0.102 0.138

Total 6.960 0.801

a= 1.20E-05 per degrees C


Ec = 30500.0 MPa

Hence, DT x Area = 6.960 Degrees m2

a Ec DT Area = Force = 2547.5 kN acting @ 0.1151 m from top

95 95
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature fall at running section-External Girder


a
3.500 b
o
10.6 C c
0.240 0.25 d
o
0.7 C e
0.13
1 0.25
f
0.1
0.3 g
0.25 h
o
0.15 0.8 C i
0.25 0.25
o
6.6 C
0.65
Height of CG of
DT at section Width od section DT x DT x
Section section section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 10.6 º 1.10 º 0.240 3.500 3.500 3.50 m 0.1200 m 4.912 0.589
Between b-c 1.10 º 0.70 º 0.010 1 1 1.00 m 0.2450 m 0.009 0.002
between c-d 0.70 º 0.364 º 0.120 1 1 1.00 m 0.3100 m 0.064 0.020
between d-e 0.36 º 0.00 º 0.130 1 0.09 0.55 m 0.4169 m 0.013 0.005
between f-g 0.00 º 0.48 º 0.100 0.3 0.3 0.30 m 0.970 m 0.007 0.007
between g-h 0.48 º 0.80 º 0.150 0.3 0.65 0.48 m 1.104 m 0.046 0.050
between h-i 0.80 º 6.60 º 0.250 0.65 0.65 0.65 m 1.295 m 0.601 0.779
Total 5.652 1.453

a= 1.20E-05 per degrees C


Ec = 30500.0 MPa

Hence, DT x Area = 5.652 Deg. m2


a Ec DT Area = Force = 2068.7 kN acting @ 0.2570 m from top

96 96
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Temparature fall at end section-External Girder


a
3.500 b
o
10.6 C c
0.240 0.25 d
o
0.7 C e
0.13
1 0.25
0.1 f
1 g
0.25 h
o
0.15 0.8 C i
0.25 0.25
o
6.6 C
1
Height of CG of
DT at section Width od section DT x DT x
Section section section
Top bottom Top bottom Avg Width from top Area Area x CG
Between a-b 10.6 º 1.10 º 0.240 3.500 3.500 3.50 m 0.1200 m 4.912 0.589
Between b-c 1.10 º 0.70 º 0.010 1 1 1.00 m 0.2450 m 0.009 0.002
between c-d 0.70 º 0.000 º 0.120 1 1 1.00 m 0.3100 m 0.042 0.013
between d-e 0.00 º 0.28 º 0.100 1 1 1.00 m 0.4200 m 0.014 0.006
between f-g 0.00 º 0.000 º 0.000 1 1 1.00 m 0.4700 m 0.000 0.000
between g-h 0.00 º 0.80 º 0.250 1 1 1.00 m 1.045 m 0.100 0.105
between h-i 0.80 º 6.60 º 0.250 1 1 1.00 m 1.295 m 0.925 1.198
Total 6.002 1.913

a= 1.20E-05 per degrees C


Ec = 30500.0 MPa

Hence, DT x Area = 6.002 Deg. m2


a Ec DT Area = Force = 2196.8 kN acting @ 0.3187 m from top

97 97
Project:
Part of structure: Job No.
Design by Rev.
Design Consultant: Check by Date

Outer Girder Inner girder


Distance from Girder end in m 0L 0.067 L 0.125 L 0.25 L 0.375 L 0.5 L 0L 0.067 L 0.125 L 0.25 L 0.375 L 0.5 L
Force due to temaprature raise in Kn 2547.53 2547.53 2547.53 2547.53 2547.53 2547.53 2194.31 2194.31 2194.31 2194.31 2194.31 2194.31
CG of Force due to temaprature raise in m from top 0.1151 0.1151 0.1151 0.1151 0.1151 0.1151 0.1186 0.1186 0.1186 0.1186 0.1186 0.1186
Moment due to temaprature raise in Kn-m -2242.70 -2242.70 -2242.70 -2242.70 -2242.70 -2242.70 -1924.06 -1924.06 -1924.06 -1924.06 -1924.06 -1924.06

Force due to temaprature fall in Kn 2068.66 2068.66 2068.66 2068.66 2068.66 2068.66 1811.82 1811.82 1811.82 1811.82 1811.82 1811.82
CG of Force due to temaprature fall in m from top 0.257 0.257 0.257 0.257 0.257 0.257 0.276 0.276 0.276 0.276 0.276 0.276
Moment due to temaprature fall in Kn-m 1527.50 1527.50 1527.50 1527.50 1527.50 1527.50 1302.65 1302.65 1302.65 1302.65 1302.65 1302.65

Check for Inter face shear between web and Top Slab and Design of shear connectors
Distance from Girder end in m @0.00m @0.94m @1.75m @3.49m @5.24m @6.98m @0.00m @0.94m @1.75m @3.49m @5.24m @6.98m
Area of slab in sq.m 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84
Cg of area under consideration from bottom of
girder in m 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
Cg of section from bottom of girder in m 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
I in m4 0.2838 0.2838 0.2838 0.2838 0.2838 0.2838 0.2711 0.2711 0.2711 0.2711 0.2711 0.2711
longitudinal shear per unit length in Kn/m 1235 1099 962 687 427 198 1186 1033 909 696 495 306
VL = V x Ae x ybar / I Hence, Spacing of shear connectors = S Qu / VL Where, S Qu = As x fu
As = Area of shear connectors fu = Ultimate tensile strength of shear connectors = 500 MPa
4 Legs 4 Legs 2 Legs 2 Legs 2 Legs 2 Legs 4 Legs 4 Legs 2 Legs 2 Legs 2 Legs 2 Legs
Thus, using, shear connectors of 16 mm 16 mm 12 mm 12 mm 12 mm 12 mm 16 Legs 16 Legs 12 Legs 12 Legs 12 Legs 12 Legs
Area of shear connectors sharing the shear 804.2477 804.2477 226.195 226.195 226.1947 226.1947 804.248 804.2477 226.1947 226.1947 226.1947 226.1947
Spacing of shear connectors reqiured 325.5332 365.8093 117.607 164.676 264.694 571.3665 339.133 389.2525 124.4855 162.5514 228.6501 370.1256
Spacing of shear connectors provided 150 150 150 150 150 150 150 150 150 150 150 150
DESIGN OF TRANSVERSE REINFORCEMENT IN THE DECK SLAB TO RESIST THE INTERFACE SHEAR
Differeential force in KN 1393.06 1393.06 1393.06 1393.06 1393.06 1393.06 1302.73 1302.73 1302.73 1302.73 1302.73 1302.73
fy in Mpa 500 500 500 500 500 500 500 500 500 500 500 500
Req. area of transverse steel/m run 1393 1393 1393 1393 1393 1393 1303 1303 1303 1303 1303 1303
Provided. area of transverse steel/m run to resist 1508 1508 1508 1508 1508 1508 1508 1508 1508 1508 1508 1508

98 98
Material properties
Concrete mix = M 30
fck = 30 Mpa
Permisible stress in bending compression = 14.4 Mpa

Steel grade = Fe 500


Permissible stress in direct tension and flexure = 300 Mpa
Permissible stress in compression = 300 Mpa

Modular ratio = 13.11


Modulus of elasticity of concrete = 30500 Mpa
Modulus of elasticity of Steel = 200000 Mpa
Design of End Girder for SLS Rare 0.00 m 0.94 m 1.75 m 3.49 m 5.24 m 6.98 m
combination Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 30500 30500 30500 30500 30500 30500
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Center to Center of Beams in mm 3500 3500 3500 3500 3500 3500
3500 3500 3500 3500 3500 3500
Effective width of Flange in mm 3500 3500 3500 3500 3500 3500
Over all depth [D] 1420 1420 1420 1420 1420 1420
Clear cover to main bars[d'] 50 50 50 50 50 50
Diameter of bar used in 1st layer 32 32 32 32 32 32
No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.48 8042.48 8042.48 11259.47 12732.09 12732.09
Bending moment [M] in Kn-m 1340.77 2178.49 2774.02 3763.61 4373.05 4566.42
Effective depth in mm 1334.80 1334.80 1334.80 1322.00 1311.30 1311.30
depth of neautral Axis from top fiber 255.44 255.44 255.46 299.18 316.67 316.67
Stress in steel in Mpa 68.64 111.53 142.01 139.31 144.59 150.98
Permissiable stress in steel in Mpa 300.00 300.00 300.00 300.00 300.00 300.00
Stress in the concrete at extrem fiber in Mpa 0.31 1.08 1.63 2.18 2.58 2.73
Permissiable stress in Concrete in Mpa 14.40 14.40 14.40 14.40 14.40 14.40
ok Com ok Com ok Com ok Com ok Com ok Com
ok ten ok ten ok ten ok ten ok ten ok ten

99 99
Design of Middle Girder for SLS rare 0.00 m 0.94 m 1.75 m 3.49 m 5.24 m 6.98 m
combination Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 30500 30500 30500 30500 30500 30500
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Center to Center of Beams in mm 3000 3000 3000 3000 3000 3000
Beff 3000 3000 3000 3000 3000 3000
Effective width of Flange in mm 3000 3000 3000 3000 3000 3000
Over all depth [D] 1420 1420 1420 1420 1420 1420
Clear cover to main bars[d'] 50 50 50 50 50 50

Diameter of bar used in 1st layer 32 32 32 32 32 32


No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 3 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.48 8042.48 8042.48 11259.47 15144.83 12732.09
Bending moment [M] in Kn-m 1313.26 1900.33 2378.68 3177.00 3658.19 3803.82

Effective depth in mm 1334.80 1334.80 1334.80 1322.00 1278.44 1311.30

depth of neautral Axis from top fiber 274.75 274.75 274.85 323.36 367.81 342.49

Stress in steel in Mpa 67.34 97.44 121.92 117.84 105.07 126.09

Permissiable stress in steel in Mpa 300.00 300.00 300.00 300.00 300.00 300.00

Stress in the concrete at extrem fiber in Mpa 0.46 1.05 1.54 2.04 2.36 2.53

Permissiable stress in Concrete in Mpa 14.40 14.40 14.40 14.40 14.40 14.40
ok Com ok Com ok Com ok Com ok Com ok Com
ok ten ok ten ok ten ok ten ok ten ok ten

100 100
Check for Ultimate moment end girder
fpyk/1.15 = 434.78 Mpa
modifed yeild strain = (fyk/gs)/E of steel 0.00217

Stressin concrete 13.4 Mpa


fctm 2.5 MPa
fyk 500 MPa 0.00 m 0.94 m 1.75 m 3.49 m 5.24 m 6.98 m
Distance from expansion joint in m 0L 0.067 L 0.125 L 0.25 L 0.375 L 0.5 L
Ultimate Moment in Kn-m 1799.02 2999.46 3850.78 5265.51 6137.94 6414.00
w in mm 3500.00 3500.00 3500.00 3500.00 3500.00 3500.00
bw in mm 650.00 650.00 511.40 300.00 300.00 300.00
df in mm 240.00 240.00 240.00 240.00 240.00 240.00
D in mm 1420.00 1420.00 1420.00 1420.00 1420.00 1420.00
d Effective depth in mm 1334.80 1334.80 1334.80 1322.00 1311.30 1311.30
Ast min 0.26 fctm/fyk b1 d 1127.91 1127.91 887.40 515.58 511.41 511.41
0.0013 b1 d 1127.91 1127.91 887.40 515.58 511.41 511.41
Ast min 1127.91 1127.91 887.40 515.58 511.41 511.41
Ast provided 8042.48 8042.48 8042.48 11259.47 12732.09 12732.09
Area of steel in layer 1 from bottom of girder sq.mm 5629.73 5629.73 5629.73 5629.73 5629.73 5629.73
Area of steel in layer 2 from bottom of girder sq.mm 2412.74 2412.74 2412.74 5629.73 5629.73 5629.73
Area of steel in layer 3 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 1472.62 1472.62
Area of steel in layer 4 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 0.00 0.00
Area of steel in layer 5 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 0.00 0.00
Area of steel in layer 6 from bottom of girder sq.mm 0.00 0.00 0.00 0.00 0.00 0.00
Distance from bottom of girder to layer 1 of steel in mm 66.00 66.00 66.00 66.00 66.00 66.00
Distance from bottom of girder to layer 2 of steel in mm 114.00 114.00 114.00 114.00 114.00 114.00
Distance from bottom of girder to layer 3 of steel in mm 162.00 162.00 162.00 162.00 158.50 158.50
Distance from bottom of girder to layer 4 of steel in mm 210.00 210.00 210.00 210.00 206.50 206.50
Distance from bottom of girder to layer 5 of steel in mm 258.00 258.00 258.00 258.00 254.50 254.50
Distance from bottom of girder to layer 6 of steel in mm 306.00 306.00 306.00 306.00 302.50 302.50
Depth of NA x from top of girder in m 93.20 93.20 93.20 130.47 147.54 147.54
Strain at 1st layer of steel 0.05 0.05 0.05 0.03 0.0 0.03
Strain at 2nd layer of steel 0.05 0.05 0.05 0.03 0.0 0.03
Strain at 3rd layer of steel 0.04 0.04 0.04 0.03 0.0 0.03
Strain at 4th layer of steel 0.04 0.04 0.04 0.03 0.0 0.03
Strain at 5th layer of steel 0.04 0.04 0.04 0.03 0.0 0.02
Strain at 6th layer of steel 0.04 0.04 0.04 0.03 0.0 0.02
Stress at 1st layer of steel in Mpa 434.78 434.78 434.78 434.78 434.78 434.78
Stress at 2nd layer of steel in Mpa 434.78 434.78 434.78 434.78 434.78 434.78
Stress at 3rd layer of steel in Mpa 434.78 434.78 434.78 434.78 434.78 434.78
Stress at 4th layer of steel in Mpa 434.78 434.78 434.78 434.78 434.78 434.78
Stress at 5th layer of steel Mpa 434.78 434.78 434.78 434.78 434.78 434.78
Stress at 6th layer of steel Map 434.78 434.78 434.78 434.78 434.78 434.78
Total force in tensile steel in KN 3496.73 3496.73 3496.73 4895.42 5535.69 5535.69
Total compressive force in concrete Fc in Kn 3496.73 3496.73 3496.73 4895.42 5535.69 5535.69
GOAL SEEK 0.00 0.00 0.00 0.00 0.00 0.00
Ultimate momet sagging momet capacity in Kn-m 4537.08 4537.08 4537.08 6216.25 6932.26 6932.26
Safe Safe Safe Safe Safe Safe

101 101
Check for Ultimate moment Inner girder 0.00 m 0.94 m 1.75 m 3.49 m 5.24 m 6.98 m

Distance from expansion joint in m 0L 0.067 L 0.125 L 0.25 L 0.375 L 0.5 L

Ultimate Moment in Kn-m 1569.147 2619.819 3313.316 4470.22 5167.457 5377.615

w in mm 3000 3000 3000 3000 3000 3000

bw in mm 650 650 511.4 300 300 300

df in mm 240 240 240 240 240 240

D in mm 1420 1420 1420 1420 1420 1420

d Effective depth in mm 1334.8 1334.8 1334.8 1322 1278.435 1311.301

Ast min 0.26 fctm/fyk b1 d 1127.906 1127.906 887.4017 515.58 498.5897 511.4075

0.0013 b1 d 1127.906 1127.906 887.4017 515.58 498.5897 511.4075

Ast min 1127.906 1127.906 887.4017 515.58 498.5897 511.4075

Ast provided 8042.477 8042.477 8042.477 11259.47 15144.83 12732.09

Area of steel in layer 1 from bottom of girder sq.mm 5629.734 5629.734 5629.734 5629.734 5629.734 5629.734

Area of steel in layer 2 from bottom of girder sq.mm 2412.743 2412.743 2412.743 5629.734 5629.734 5629.734

Area of steel in layer 3 from bottom of girder sq.mm 0 0 0 0 1472.622 1472.622

Area of steel in layer 4 from bottom of girder sq.mm 0 0 0 0 0 0

Area of steel in layer 5 from bottom of girder sq.mm 0 0 0 0 2412.743 0

Area of steel in layer 6 from bottom of girder sq.mm 0 0 0 0 0 0

Distance from bottom of girder to layer 1 of steel in mm 66 66 66 66 66 66

Distance from bottom of girder to layer 2 of steel in mm 114 114 114 114 114 114

Distance from bottom of girder to layer 3 of steel in mm 162 162 162 162 158.5 158.5

Distance from bottom of girder to layer 4 of steel in mm 210 210 210 210 206.5 206.5

Distance from bottom of girder to layer 5 of steel in mm 258 258 258 258 254.5 254.5

Distance from bottom of girder to layer 6 of steel in mm 306 306 306 306 302.5 302.5

Depth of NA x from top of girder in m 108.73 108.73 108.73 152.22 204.75 172.13
Strain at 1st layer of steel 0.040085 0.040085 0.040085 0.027632 0.019645 0.024032
Strain at 2nd layer of steel 0.03854 0.03854 0.03854 0.026529 0.018825 0.023056
Strain at 3rd layer of steel 0.036995 0.036995 0.036995 0.025425 0.018064 0.022151
Strain at 4th layer of steel 0.03545 0.03545 0.03545 0.024321 0.017244 0.021175
Strain at 5th layer of steel 0.033905 0.033905 0.033905 0.023218 0.016423 0.020199
Strain at 6th layer of steel 0.03236 0.03236 0.03236 0.022114 0.015603 0.019223
Stress at 1st layer of steel in Mpa 434.7826 434.7826 434.7826 434.7826 434.7826 434.7826
Stress at 2nd layer of steel in Mpa 434.7826 434.7826 434.7826 434.7826 434.7826 434.7826
Stress at 3rd layer of steel in Mpa 434.7826 434.7826 434.7826 434.7826 434.7826 434.7826
Stress at 4th layer of steel in Mpa 434.7826 434.7826 434.7826 434.7826 434.7826 434.7826
Stress at 5th layer of steel Mpa 434.7826 434.7826 434.7826 434.7826 434.7826 434.7826
Stress at 6th layer of steel Map 434.7826 434.7826 434.7826 434.7826 434.7826 434.7826
Total force in tensile steel in KN 3497 3497 3497 4895 6585 5536
Total compressive force in concrete Fc in Kn 3497 3497 3497 4895 6585 5536
GOAL SEEK 0.00 0.00 0.00 0.00 0.00 0.00
Ultimate momet sagging momet capacity in Kn-m 4515.36 4515.36 4515.36 6173.67 7878.84 6877.82
Safe Safe Safe Safe Safe Safe

102 102
Design of Shear reinforcement for End 0.00 m 0.94 m 1.75 m 3.49 m 5.24 m 6.98 m
girder Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix fck 30 30 30 30 30 30
Grade of steel 500 500 500 500 500 500
Modulus of elasticity in Mpa 30500 30500 30500 30500 30500 30500
Width of Web bw in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Effective width of Flange in mm 3500 3500 3500 3500 3500 3500
Over all depth [D] 1420 1420 1420 1420 1420 1420
Clear cover to main bars[d'] 50 50 50 50 50 50
Effective depth d in mm 1334.8 1334.8 1334.8 1322 1311.301 1311.301
Area of tensile reinforcement provided
8042.477 8042.477 8042.477 11259.47 12732.09 12732.09
Shear Force V 1370.126 1219.273 1066.636 761.7579 473.9193 219.5501
Shear Stress = V/0.9 d bw 1.754642 1.561453 1.736188 2.134134 1.338561 0.620108
K 1.387085 1.387085 1.387085 1.388955 1.390538 1.390538
nmin 0.277381 0.277381 0.277381 0.277942 0.278418 0.278418
r1 0.00927 0.00927 0.011782 0.02839 0.032365 0.032365
VRD.C in Kn 240.6616 240.6616 189.3451 110.2319 109.5268 109.5268
Sh rein. Sh rein. Sh rein. Sh rein. Sh rein. Sh rein.
Check Req. Req. Req. Req. Req. Req.
Max Allowble shearForce in Kn (45deg angle)
2835.27 2835.27 2230.703 1296.038 1285.549 1285.549
No No No No No No
Check redesign is redesign is redesign is redesign is redesign is redesign is
Allowble shear Force in Kn corresponds
to(21.8 deg angle) 1955.258 1955.258 1538.337 893.7729 886.5397 886.5397
Min Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8 0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
calcultion of q in case of Allowble shear
Force corresponds to 21.8 deg angle is less
than than the SF coming on to the section 26.62389 22.34991 58.45367 31.77392 NA NA
cross checking the q with codel equation
10.8 NA NA NA NA NA NA
Goal Seek NA NA NA NA NA NA
reqiured Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8
deg angle) is less than than the SF coming on
to the section)
NA NA NA NA NA NA
Reqiured Asw/S in Sqmm/mm 0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
Provided dia of the vertical strips 16 16 12 12 12 12
Provided number of legs of the vertical strips
4 4 2 2 2 2
provided spacing of the vertical strips 150 150 150 150 150 150
provided Asw/S in Sqmm/mm 5.361651 5.361651 1.507964 1.507964 1.507964 1.507964
Check ok ok ok ok ok ok

103 103
Design of Shear reinforcement for mid 0.00 m 0.94 m 1.75 m 3.49 m 5.24 m 6.98 m
girder Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix fck 30 30 30 30 30 30
Grade of steel 500 500 500 500 500 500
Modulus of elasticity in Mpa 30500 30500 30500 30500 30500 30500
Width of Web bw in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Effective width of Flange in mm 3000 3000 3000 3000 3000 3000
Over all depth [D] 1420 1420 1420 1420 1420 1420
Clear cover to main bars[d'] 50 50 50 50 50 50
Effective depth d in mm 1334.8 1334.8 1334.8 1322 1278.435 1311.301
Area of tensile reinforcement provided 8042.477 8042.477 8042.477 11259.47 15144.83 12732.09
Shear Force V 1256.419 1094.645 962.6728 737.2362 524.1141 323.7786
Shear Stress = V/0.9 d bw 1.609024 1.401849 1.566965 2.065434 1.51839 0.914496
K 1.387085 1.387085 1.387085 1.388955 1.395527 1.390538
nmin 0.277381 0.277381 0.277381 0.277942 0.279917 0.278418
r1 0.00927 0.00927 0.011782 0.02839 0.039488 0.032365
VRD.C in Kn 240.6616 240.6616 189.3451 110.2319 107.3568 109.5268
Sh rein. Sh rein. Sh rein. Sh rein. Sh rein. Sh rein.
Check Req. Req. Req. Req. Req. Req.
Max Allowble shearForce in Kn (45deg angle)

2835.27 2835.27 2230.703 1296.038 1253.328 1285.549


No No No No No No
Check redesign is redesign is redesign is redesign is redesign is redesign is
Allowble shear Force in Kn corresponds
to(21.8 deg angle) 1955.258 1955.258 1538.337 893.7729 864.3197 886.5397
Min Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8
deg angle) is grater than than the SF coming
on to the section)
0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
calcultion of q in case of Allowble shear
Force corresponds to 21.8 deg angle is less
than than the SF coming on to the section
and SF is less than the max allowble SF
corresponds to 45 deg angle

24.16013 NA 27.62938 28.74607 NA NA


cross checking the q with codel equation
10.8 NA NA NA NA NA NA
Goal Seek NA NA NA NA NA NA
reqiured Asw/S in Sqmm/mm ( in case of
Allowble shear Force corresponds to(21.8
deg angle) is less than than the SF coming on
to the section)
NA NA NA NA NA NA
Reqiured Asw/S in Sqmm/mm 0.190389 0.190389 0.149792 0.087872 0.087872 0.087872
Provided dia of the vertical strips 16 16 12 12 12 12
Provided number of legs of the vertical strips
4 4 2 2 2 2
provided spacing of the vertical strips 150 150 150 150 150 150
provided Asw/S in Sqmm/mm 5.361651 5.361651 1.507964 1.507964 1.507964 1.507964
Check ok ok ok ok ok ok

104 104
Design of End Girder for SLS Quasi permanent combination
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Center to Center of Beams in mm 3500 3500 3500 3500 3500 3500
3400 3400 3400 3400 3400 3400
Effective width of Flange in mm 3400 3400 3400 3400 3400 3400
Over all depth [D] 1420 1420 1420 1420 1420 1420
Clear cover to main bars[d'] 50 50 50 50 50 50
Diameter of bar used in 1st layer 32 32 32 32 32 32
No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.477 8042.477 8042.477 11259.47 12732.09 12732.09
Bending moment [M] in Kn-m 0 413.8974 723.1418 1237.053 1545.089 1648.4
Effective depth in mm 1334.80 1334.80 1334.80 1322.00 1311.30 1311.30
depth of neautral Axis from top fiber 256.96 256.96 256.98 301.08 318.70 318.70
Stress in outer most steel in Mpa 0.00 21.19 37.02 45.80 51.10 54.51
Permissiable stress in steel in Mpa 300 300 300 300 300 300
Stress in the concrete at extrem fiber in Mpa 0.00 0.39 0.68 1.05 1.27 1.36
Permissiable stress in Concrete in Mpa 14.4 14.4 14.4 14.4 14.4 14.4

Cracking Check(Quasi Permanent combination)


Bending moment [M] in Kn-m 0 413.8974 723.1418 1237.053 1545.089 1648.4
Wr = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff
Clear cover to main bars c 50 50 50 50 50 50
k1 0.8 deformed bars, 0.8 0.8 0.8 0.8 0.8 0.8
k2 0.5 0.5 0.5 0.5 0.5 0.5
f 32 32 32 32 32 32
Hcef 213 213 213 245 271.7469 271.7469
Width of bottom bulb 650 650 650 650 650 650
Acef 138450 138450 138450 159250 176635.5 176635.5
rpeff = As/Acef 0.058089 0.058089 0.058089 0.070703 0.072081 0.072081
Sr,max 263.6488 263.6488 263.6488 246.9415 245.4705 245.4705
ssc 0 21.19182 37.02174 45.79859 51.09678 54.51332
fctm - value from table 6.5 page 38 2.5 2.5 2.5 2.5 2.5 2.5
kt 0.5 0.5 0.5 0.5 0.5 0.5
ae = Es/Ecm 12.90323 12.90323 12.90323 12.90323 12.90323 12.90323
esm-ecm 0 6.36E-05 0.000111 0.000137 0.000153 0.000164
Wr = Sr,max(esm-ecm) 0 0.016762 0.029282 0.033929 0.037628 0.040144
Safe Safe Safe Safe Safe Safe

105 105
Design of Middle Girder for SLS Quasi permanent combination
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Span in mm 13960 13960 13960 13960 13960 13960
Concrete Mix 30 30 30 30 30 30
Modulus of elasticity in Mpa 31000 31000 31000 31000 31000 31000
Width of Web in mm 650 650 511.4 300 300 300
Depth of flange [Df] in mm 240 240 240 240 240 240
Center to Center of Beams in mm 3000 3000 3000 3000 3000 3000

Effective width of Flange in mm 3000 3000 3000 3000 3000 3000


Over all depth [D] 1420 1420 1420 1420 1420 1420
Clear cover to main bars[d'] 50 50 50 50 50 50
Design for Flexure
Diameter of bar used in 1st layer 32 32 32 32 32 32
No of bars in 1st layer 7 7 7 7 7 7
Diameter of bar used in 2nd layer 32 32 32 32 32 32
No of bars in 2st layer 3 3 3 7 7 7
Diameter of bar used in 3rd layer 32 32 32 32 25 25
No of bars in 3st layer 0 0 0 0 3 3
Diameter of bar used in 4th layer 32 32 32 32 32 32
No of bars in 4st layer 0 0 0 0 0 0
Diameter of bar used in 5th layer 32 32 32 32 32 32
No of bars in 5st layer 0 0 0 0 0 0
Diameter of bar used 32 32 32 32 32 32
Diameter of bar used in 6th layer 0 0 0 0 0 0
Total area of Steel provided 8042.477 8042.477 8042.477 11259.47 12732.09 12732.09
Bending moment [M] in Kn-m 0 255.5531 445.7186 766.6939 960.8836 1026.48
Effective depth in mm 1334.80 1334.80 1334.80 1322.00 1311.30 1311.30
depth of neautral Axis from top fiber 272.61 272.61 272.70 320.69 339.64 339.64
Stress in steel in Mpa 0 16.7005 29.1197 38.4467 44.37265 47.40182
Permissiable stress in steel in Mpa 300 300 300 300 300 300
Stress in the concrete at extrem fiber in Mpa 0.00 0.26 0.45 0.71 0.86 0.92
Permissiable stress in Concrete in Mpa 14.4 14.4 14.4 14.4 14.4 14.4
Cracking Check(Quasi Permanent combination)
Bending moment [M] in Kn-m 0 255.5531 445.7186 766.6939 960.8836 1026.48
Wr = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff
Clear cover to main bars c 50 50 50 50 50 50
k1 0.8 deformed bars, 0.8 0.8 0.8 0.8 0.8 0.8
k2 0.5 0.5 0.5 0.5 0.5 0.5
f 32 32 32 32 32 32
Hcef 213 213 213 245 250 250
Width of bottom bulb 650 650 650 650 650 650
Acef 138450 138450 138450 159250 162500 162500
rpeff = As/Acef 0.058089 0.058089 0.058089 0.070703 0.078351 0.078351
Sr,max 263.6488 263.6488 263.6488 246.9415 239.4309 239.4309
fctm - value from table 6.5 page 38 2.5
ssc 0 16.7005 29.1197 38.4467 44.37265 47.40182
fctm - value from table 6.5 page 38 2.5 2.5 2.5 2.5 2.5 2.5
kt 0.5 0.5 0.5 0.5 0.5 0.5
ae = Es/Ecm 12.90323 12.90323 12.90323 12.90323 12.90323 12.90323
esm-ecm 0 5.01E-05 8.74E-05 0.000115 0.000133 0.000142
Wr = Sr,max(esm-ecm) 0 0.013209 0.023032 0.028482 0.031873 0.034048
Safe Safe Safe Safe Safe Safe

106 106
DESIGN OF END DIAPHGRAM

107 107
Check for Ultimate moment for diaphgram
Idealized Stress- strain drawing for untensioned steel Idealized Stress- strain drawing for Concrete
Ecu3 =0.0035
Stress h fcd
Fcs
Asc x lx Fc

fyk/gs NA
= fyk/1.15
= 434.783 Mpa

Ast Fts
min modified yeilding strain = 0.00002
l= 0.8 0.80 for fck <=60 Mpa
0.8-(fck-60)/500 for 60 <fck <110 Mpa
modifed yeild strain = (fyk/gs)/E of steel Strain
= 0.00002 h= 1 1 for fck <=60 Mpa
1- (fck-60)/250 for 60 <fck <110 Mpa
fcd = 13.4 Mpa

grade of concrete = 30
fctm = 2.5
fyk = 500
108 108
450

effective cover = 104.5

25 @ 6 mm C/C
1020 mm 16 @ 4 mm C/C

effective cover = 48

Effective depth d in mm 916 mm


b1 in mm 450 mm
Ast min 0.26 fctm/fyk b1 d 536 Sq.mm
0.0013 b1 d 536 Sq.mm
Ast min 536 Sq.mm
Area of steel provided in top ok 2945 Sq.mm
Max Ast 0.025 Ac ok 11475 Sq.mm
Asc minimum= 0.01 Act.ext= 0.01x 92.00x 450.00= 414.000 Sq.mm
Area of steel provided in bottoom ok 804 Sq.mm
Total steel provided 3749 Sq.mm
maximum total steel =0.04 Ac ok 18360 Sq.mm
+ve BM -ve BM
Depth of NA x from top of girder in m 192.966 mm 52.000 mm
Strain at the level of bottom layer steel 0.002629 0.06192
Strain at the level of top layer steel 0.01311 0.003534
Stress at the level of bottom layer steel 434.78 Mpa -434.78 Mpa
Stress at the level of top layer steel -434.78 Mpa -434.78 Mpa
Force in concrete 931 kn 251 kn
Force in bottom Steel 350 kn -350 kn
Force in top layersteel -1281 kn -1281 kn
Net force at NA 0 kn -1379 kn
Ultimate mome. carring capacity about NA 1084 kn-m 397 kn-m
maximun BM ok 420 kn-m 99 kn-m ok

109 109
Check for Ultimate SF
Maximum shear capacty of the section

Shear capacity of concrete with out reinforcement


Minimum of VRD.C = [0.12K*(80r1*fck)0.33+0.15scp]bwd
and [nmin + 0.15scp]bd
Where
nmin = 0.031K3/2*(fck)1/2bd
scp 0 (No axial or prestressing force)
K 1+sqrt*(200/d) 1.47
r1 0.007
VRD.C = kN 185.34
VRD.C min = kN 124.34
Design VRD.C
kN= 124.34
Actual Shear force 652.59
Check Provide SR
SR - Shear reinforcement
Design of vertical shear links
VRDs = Asw*z*fywd*cotq VRDmax = acw*b*z*n1fcd
s cotq + tanq
Asw Area of shear links
s spacing of reinforcement
z lever arm - 0.9 times effective depth
acw =1 - for sections with out prestress
fywd =0.8fyd
n1 0.6 for fck< = 80Mpa

Asw 452.39 sqmm


Dia of bar 12
number of legs 4
spacing, s 180
Cotq (Assuming 45deg) 1
VRDs = 828.32 kN
VRDmax = 1491.64 kN
shear resistance of stirrups 828.32 kN ok

110 110
Ref Calculations for design of for SLS as per table 3.3 IRC 6-2015
Calculation of Stress (rare combination)

IRC 112 Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2.1 Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio m or ae 12.90
Ast 2945 Sq.mm
Asc 804 Sq.mm
d 916 mm
dc 48 mm
b 450 mm
x 303 mm
Maximum BM in rare combination: 311 Kn-m
BM=0.5 scbc x2 /3 +Asc (x-dc)2 m scbc /x +Ast (d-x)2 m scbc /x
fcc 5.534 N/sqmm Safe
fst =scbc m (d-x) /x 144.44 N/sqmm Safe
fsc =scbc m (x-dc) /x 60.08 N/sqmm Safe
Calculation of Stress (Quasi permanent Combination)
Maximum BM in Quasi permanent combination: 311.00 Kn-m
ssc 144.44 N/sqmm
Crack width = W r = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff

C clear cover 50 mm
k1 0.8 deformed bars, 0.8
1.6 plain bars
k2 0.5 bending 0.5
1 pure tension
f bar dia of tension steel 25
rpeff = Ast/Acef
Acef 117562.5 sq.mm
Ast 2945 sq.mm
rpeff = 0.0250526
Sr,max = 339.64325
Kt 0.5
fcteff 0 N/sqmm
(esm-ecm) = 0.0007222
W r = Sr,max(esm-ecm) = 0.2452836 mm
safe

111 111
DESIGN OF LIFTING HOOK

112 112
Ref DESIGN OF LIFTING HOOK
Calculation of Stress

Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm


Self weigth reaction on one side of dirder 123.00 Kn
Ast required 410 Sq.mm
Ast provided 4L- 32 dia 3217 Sq.mm
ok

113 113
DESIGN OF ELASTOMERIC BEARING

114 114
Reference Calculations for -normal case
Input Data:
Code used:IRC 83-2015(Part-II)
Note:Typical Sizes of Laminated Bearings are available in Appendix-2 of IRC 83-2015(Part-II)
Overall width of bearing (along span)-a = 400 mm
Overall length of bearing (transverse)-b = 350 mm
Cl.5.2.2 Thickness of top cover = 3 mm (Minimum of 2.5mm)
Cl.5.2.2 Thickness of bottom cover = 3 mm (Minimum of 2.5mm)
Cl.5.2.2 Thickness of side cover = 4 mm (Minimum of 4mm)
Appendix2 Thickness of individual Elastomer(ti) = 8 mm
Thickness of total elastomer(Te) = 40 mm
Cl.5.2.2 Thickness of reinforcing Plates = 4 mm (Minimum of 3mm)
No.of layers of elastomer(n) 5 Nos
No.of reinforcing Plates = 6 Nos
Effective width of bearing (a') = 392 mm
Effective length of bearing (b') = 342 mm
C/C distance of bearings in transverse dir. = 3000 mm
C/C distance of bearings in traffic dir. = 13960 mm
No.of Bearings = 10 Nos
Angular rotation of a bearing (𝛼) = 0.0006 rad
Table 2 Shear modulus (G), corresponding to hardness 60+-5 = 0.9 Mpa
Cl.5.2.3.7 Bulk modulus of Elastomeric bearing(Eb) = 2000 Mpa
Elastic modulus of concrete(Ecm) = 31000 Mpa
Grade of Concrete of Superstructure(fck) = 30 Mpa
Cross Section area of Superstructure(Ac) = 5740000 mm2
Perimeter of Cross Section area of Superstructure(u) = 28276 mm
IRC 112 Autogenous Shrinkage strain of Concrete (𝜀𝑐𝑎) = 0.000065
Cl.6.4.2.6 Drying Shrinkage Strain (𝜀𝑐𝑑) = 0.00025
o
IRC 6 - Maximum temparature of Bridge = 50 C
2014 Coefficient of thermal expansion of concrete = 0.000012 /oC
Yield stress of the steel(fy) = 500 Mpa
Cl.5.2.3 Partial Safety factor(γm) = 1
Cl.5.2.3 Type loading factor(KL) = 1
Cl.5.2.3.5 Factor for induced tensile stresses in reinforcing plate(Kh) = 1
Cl.5.2.3.5 Stress concentration factor (Kp) = 1.3
Cl.5.2.3.6 Friction factor(Kf) = 0.6
Cl.5.2.3.6 Rotation factor, (Krd) = 3

Typical Diagram
4
3

70 8

Elevation

400

350
Plan
Summary of Loads on Bearings

Vertical Load
Bearing No. 14 26 27 39 40 52 53 65
Item (T) (T)
Due to Suprstr. Dead Load 30.798 30.798
SIDL wearing coat 5.003 5.003
SIDL CB & Railing 18.759 18.759
Due to FPLL 0.000 0.000
LL (Max. Reaction on bearing) 222.462 222.462
Refer Reaction
LL (Min. Summary
Reaction on bearing with 0.000 0.000
Max. Horizontalon
Max.Reaction Force) Refer
Bearing 277.02 277.02
Min.Reaction on bearing 54.56 54.56
Min.Reaction on bearing 54.56 54.56
Note: Above LL values are including the Impact Factor.
Maximum Vertical design force(Fz,d) = 2770.22 kN

115 115
Minimum Vertical design force(Fz,d min) = 545.60 kN
Minimum Vertical design force(Fz,d min)-only permenant loads 545.60 kN
Average of the compressive stress(σm) = (545.6x1000)/(123336.890681541)
4.42 Mpa
Horizontal Force(Longitudinal)
Long. Force due to braking per bearing = 0.200 x 1000.0 + 0.050 x 500.0
(Max. Reaction Case) 10
= 22.50 kN
Resultant of all Horizontal forces(Fxyd) = 22.50 kN
Calculation of rotation

Due to Dead Load SIDL WC LL Total


Longitudinal Direction kNm kNm kNm kNm
Max.Longitudinal Moment 970.70 646.80 0.00 1598.69
Moment of Inertia I mm4 9.12E+11 9.12E+11 9.12E+11 9.1E+11
Rotation across the width 'a' 0.00019 0.00013 0.00000 0.00032 0.0006
Transverse direction
Max.Transverse Moment 97.07 0.00 0.00 0.00
Rotation across the width 'b' 0.00009 0.00000 0.00000 0.00000 0.00009

Typical Rotation Calculation


Angle of rotation across the width 'b'
Maximum Transverse moment due to dead load = 97.07 kN-M
Angle of rotation = #REF!
(31000x42660000000))x10^-3
= 0.00041 rad
Angle of rotation across the width 'a' (𝛼a,d) = 0.0006 rad
Angle of rotation across the width 'b' = 0.0001 rad

IRC 112 Calculation of Total Shrinkage Strain (𝜀𝑐𝑠) Table 6.7 of IRC 112
Cl.6.4.2.6 𝜀𝑐𝑠=𝜀𝑐𝑑,∞+𝜀𝑐𝑎 ho in mm Kh
𝜀𝑐𝑑,∞=Kh.𝜀𝑐𝑑 300 0.75
Kh=2AC/u 500 0.7
406 0.72
Coefficient depending on the notional size ho(Kh) = 0.72
Total shrinkage strain (𝜀𝑐𝑠) = (0.723500325859499x0.00025)+0.000065
= 2.46E-04
Calculation of total temparature coefficient

Total temparature coefficient = (0.000012x50)


= 0.0006 Table 6.9 of IRC 112
Calculation of Creep strain 2Ac/u ɸ
Creep coefficient of concrete = 0.99 150 1.04
Creep strain of concrete = 0.99x(30/31000) 600 0.95
= 9.57E-04 406 0.99
Calculation of translation of superstructure due to temp. ,shrinkage and creep

Longitudinal Direction
Due to temparature = (0.0006x(13960))
= 8.38 mm
Due to Shrinkage = (0.000245875081464875x(13960))
= 3.43 mm
Due to Creep = (0.001x(13960))
= 13.36 mm
Max.Horiz. Relative displacement(In direction of a)-vx,d = (8.38 + 3.43 + 13.36)
= 25.2 mm
Transverse Direction
Due to temparature = (0.0006x(3000)
= 1.80 mm
Due to Shrinkage = (0.000245875081464875x(3000))
= 0.74 mm
Due to Creep (0.001x(3000))
= 2.87 mm
Max.Horiz. Relative displacement(In direction of b)-vy,d = (1.8 + 0.74 + 2.87)
= 5.41 mm
Cl.5.2.3 Maximum design strain (𝜀𝑡,𝑑)
𝜀𝑡,𝑑=K𝐿(𝜀𝑐,𝑑+𝜀𝑞,𝑑+𝜀𝛼,𝑑)
𝜀𝑢,𝑑=𝜀𝑢,𝑘/𝛾𝑚
= 1x(3.28 + 0.56 + 0.14)
= 3.98 < 5 OK
(𝜀𝑐,𝑑)

116 116
Cl.5.2.3.2 Design strain due to compressive design load (𝜀𝑐,𝑑)
𝜀𝑐,𝑑=1.5 Fz,d/G.Ar.S
Ar=A1(1-vx,d/a'-vy,d/b')
S=A1/lp.te
Shape factor(S) = (392x342)/((2x(392 + 342)x8)
= 11.42
te = 8.00

Reduced effective plan area(Ar) = (392x342)x(1-(25.17/392)-(5.41/342))


= 123336.89 mm2
Design strain due to compressive design load (𝜀𝑐,𝑑) = (1.5x2770.22229458918x1000)/(0.9x123336.89x11.42)
= 3.279
Cl.5.2.3.3 Design shear strain due to design translatory movements (𝜀𝑞,𝑑)
𝜀𝑞,𝑑=vxy,d/Tq
Design Shear strain (𝜀𝑞,𝑑) = MIN((SQRT(25.17^2+5.41^2)/(40+3+3)),1)
= 0.560
Cl.5.2.3.4 Design strain due to angular rotation (𝜀𝛼,𝑑)

𝜀α,d=(a'2.𝛼a,d+b'2.𝛼b,d)ti/2Σ(𝑡𝑖3)

Design strain due to angular rotation (𝜀𝛼,𝑑) = (((392^2x0.00064+342^2x0.00009))x8)/


(2x((6)x8^3))
= 0.141
Cl.5.2.3.5 Reinforcing plate thickness(ts)
ts=Kp.Fz,d.(t1+t2).Kh.𝛾𝑚/Ar.fy
Minimum thickness of steel plate required = MAX(((1.3x2770.22229458918x1000x(8+8)x1x1)/
(123336.89x500)),3)
= 3.00 mm
Thickness of steel plate provided = 4 mm > 3.00 OK
Cl.5.2.3.6 Limiting conditions
Total Vertical deflection

Σ𝑉z,d=Σ(Fzd.𝑡𝑖/A1).(1/5.G.S12+1/Eb)
Vertical deflection of Individual layer = ((2770.22229458918x1000x8)/(392x342))x
((1/(5x0.9x11.42^2))+1/2000))
= 0.365 mm
Total Vertical deflection = 1.823 mm
Rotational limitation Condition
For rectangular bearing
Σ𝑉z,d-(a'.𝛼a,d+b'.𝛼𝑏,𝑑)/Kr,d≥0
Rotational limitation Condition = (1.82-(392x0.0006+342x0.0001))/3
= 0.515 > 0 OK
Cl.5.2.3.6 Buckling stability(ULS)
For rectangular bearing
Fz,d/Ar.<2.a'.G.S1/3.Te

Buckling stability(ULS) Fz,d/Ar = (2770.22x1000x1.0)/123336.89


= 22.46
2.a'.G.S1/3.Te = (2x392x0.9x11.42)/(3x40)
67.12
= 22.46 < 67.12 OK
Non Sliding condition(ULS)
Fxyd≤μe.FZ,d min
μe=0.1+1.5Kf/𝜎𝑚
Fxyd = 22.5
= 22.50 kN

μe.FZ,d min = (0.1+1.5x0.6/4.42)x545.6


= 165.563202 kN

Non Sliding condition(ULS) = 22.5 < 165.5632 OK


Under Permanent loads
𝜎𝑐𝑑 𝑚𝑖𝑛=Fz,dmin/Ar≥3𝑀𝑃𝑎

Fz,dmin/Ar = 545.6x1000x1.0/123336.89
= 4.42 N/sqmm

= 4.42 > 3 OK

117 117
Seismic coeffecient calculations
Z = Zone Factor from IRC:6 = 0.10 (zone 2)
R = Response Reduction factor from IRC:6 = 1.00 (for Bearing)
I = A coeff. depending upon the importance of the bridge = 1.20
Sa/g = Avg. response acceleration coefficient from IRC:6 = 2.50
Horizontal seismic coefficient Ah = 0.150
Vertical seismic coefficient Av = 0.100 (67% of Ah )

Computation of Loads in Seismic Case (In longitudnal Direction)

Ver. Seismic Coe. Total DL + SIDL


Vertical seismic force per bearing = 0.100 x ( 109.120 )
10
= 1.091 T

Hor. Seismic Coef. Total DL Total SIDL


Long. seismic force per brg . = 0.150 x ( 61.596 + 47.52 )
10 Nos. of bearings
= 1.637 T

Summary of Total Loads (Seismic Case)(In Long. Direction)


Max. Design vertical Load per bearing = 0.33 T
Min. Design vertical Load per bearing = -0.33 T
Max Longitudinal Horizontal Force acting on each bearing(Max Reacn.) = 6.14 T
Min Longitudinal Horizontal Force acting on each bearing = 1.64 T
Max Transverse Horizontal Force acting on each bearing = 0.63 T
Min Transverse Horizontal Force acting on each bearing = 0.49 T

Computation of Loads in Seismic Case (In transverse Direction)


Horizontal seismic coefficient = 0.15
Hor. Seismic Coe. Total DL + SIDL Total LL
Transverse seismic force per bearing = 0.15 x ( 109.120 + 30.00 )
10
= 2.087 T

Summary of Total Loads (Seismic Case) (Trans. Direction)


Max. Design vertical Load per bearing = 0.42 T
Min. Design vertical Load per bearing = -0.42 T
Longitudinal Horizontal Force (Max Vert.) = 4.50 T
Longitudinal Horizontal Force (Min Vert.) = 4.50 T
Max Transverse Seismic Force on each Bearing = 2.09 T
Min Transverse Seismic Force on each Bearing = 1.64 T
Max Longitudinal Seismic Force on each Bearing = 0.49 T
Min Longitudinal Seismic Force on each Bearing = 0.49 T

Computation of Loads in Seismic Case (In Vertical Direction)

Ver. Seismic Coe. Total DL + SIDL Total LL


Vertical seismic force per bearing = 0.1 x ( 109.120 + 30.00 )
10
= 1.391 T

Summary of Total Loads (Seismic Case) (Vert. Direction)


Max. Design vertical Load per bearing = 1.39 T
Min. Design vertical Load per bearing (With LL) = -1.39 T
Min. Design vertical Load per bearing (No LL) = -1.39 T

118 118
Reference Calculations for - seismic case
Input Data:
Code used:IRC 83-2015(Part-II)
Overall width of bearing (shorter dimension)-a = 400 mm
Overall length of bearing (longer dimension)-b = 350 mm
Cl.5.2.2 Thickness of top cover = 3 mm (Minimum of 2.5mm)
Cl.5.2.2 Thickness of bottom cover = 3 mm (Minimum of 2.5mm)
Cl.5.2.2 Thickness of side cover = 4 mm (Minimum of 4mm)
Appendix2 Thickness of individual Elastomer(ti) = 8 mm
Thickness of total elastomer(Te) = 40 mm
Cl.5.2.2 Thickness of reinforcing Plates = 4 mm (Minimum of 3mm)
No.of layers of elastomer(n) 5 Nos
No.of reinforcing Plates = 6 Nos
Effective width of bearing (a') = 392 mm
Effective length of bearing (b') = 342 mm
C/C distance of bearings in transverse dir. = 3000 mm
C/C distance of bearings in traffic dir. = 13960 mm
No.of Bearings = 10 Nos
Angular rotation of a bearing (𝛼) = 0.0006 rad
Table 2 Shear modulus (G), corresponding to hardness 60+-5 = 0.9 Mpa
Cl.5.2.3.7 Bulk modulus of Elastomeric bearing(Eb) = 2000 Mpa
Elastic modulus of concrete(Ecm) = 31000 Mpa
Grade of Concrete of Superstructure(fck) = 30 Mpa
Cross Section area of Superstructure(Ac) = 5740000 mm2
Perimeter of Cross Section area of Superstructure(u) = 28276 mm
IRC 112 Autogenous Shrinkage strain of Concrete (𝜀𝑐𝑎) = 0.000065
Cl.6.4.2.6 Drying Shrinkage Strain (𝜀𝑐𝑑) = 0.00025
o
IRC 6 - Maximum temparature of Bridge = 50 C
2014 Coefficient of thermal expansion of concrete = 0.000012 /oC
Yield stress of the steel(fy) = 500 Mpa
Cl.5.2.3 Partial Safety factor(γm) = 1
Cl.5.2.3 Type loading factor(KL) = 1
Cl.5.2.3.5 Factor for induced tensile stresses in reinforcing plate(Kh) = 1
Cl.5.2.3.5 Stress concentration factor (Kp) = 1.3
Cl.5.2.3.6 Friction factor(Kf) = 0.6
Cl.5.2.3.6 Rotation factor, (Krd) = 3

Typical Diagram
4
3

70 8

Elevation

400

350
Plan
Maximum Vertical design force(Fz,d) = 2784 kN
Minimum Vertical design force(Fz,d min) = 532 kN
Minimum Vertical design force(Fz,d min)-only permenant loads 545.6 kN
Average of the compressive stress(σm) = (531.688x1000)/(123336.890681541)
4.31 Mpa
seismic case
Resultant of all Horizontal forces(Fxyd) = 61.69 kN
Calculation of rotation

Due to Dead Load SIDL FPLL LL Total


Longitudinal Direction kNm kNm kNm kNm
Max.Longitudinal Moment 970.70 646.80 0.00 1598.69
Moment of Inertia I mm4 9.12E+11 9.12E+11 9.12E+11 9.12E+11
Rotation across the width 'a' 0.00019 0.00013 0.00000 0.00032 0.0006
Transverse direction
Max.Transverse Moment 97.07 0.00 0.00 0.00
Rotation across the width 'b' 0.00009 0.00000 0.00000 0.00000 0.0001

119 119
Typical Rotation Calculation
Angle of rotation across the width 'b'
Maximum Transverse moment due to dead load = 97.07 kN-M
Angle of rotation = #REF!
(31000x42660000000))x10^-3
= 0.00041 rad
Angle of rotation across the width 'a' (𝛼a,d) = 0.0006 rad
Angle of rotation across the width 'b' = 0.0001 rad

IRC 112 Calculation of Total Shrinkage Strain (𝜀𝑐𝑠) Table 6.7 of IRC 112
Cl.6.4.2.6 𝜀𝑐𝑠=𝜀𝑐𝑑,∞+𝜀𝑐𝑎 ho in mm Kh
𝜀𝑐𝑑,∞=Kh.𝜀𝑐𝑑 300 0.75
Kh=2AC/u 500 0.7
406.0 0.72
Coefficient depending on the notional size ho(Kh) = 0.72
Total shrinkage strain (𝜀𝑐𝑠) = (0.723500325859499x0.00025)+0.000065
= 2.46E-04
Calculation of total temparature coefficient

Total temparature coefficient = (0.000012x50)


= 0.0006 Table 6.9 of IRC 112
Calculation of Creep strain 2Ac/u ɸ
Creep coefficient of concrete = 0.99 150 1.04
Creep strain of concrete = 0.99x(30/31000) 600 0.95
= 9.57E-04 406 0.99
Calculation of translation of superstructure due to temp. ,shrinkage and creep

Longitudinal Direction
Due to temparature = (0.0006x(13960))
= 8.38 mm
Due to Shrinkage = (0.000245875081464875x(13960))
= 3.43 mm
Due to Creep = (0.001x(13960))
= 13.36 mm
Max.Horiz. Relative displacement(In direction of a)-vx,d = (8.38 + 3.43 + 13.36)
= 25.2 mm
Transverse Direction
Due to temparature = (0.0006x(3000)
= 1.80 mm
Due to Shrinkage = (0.000245875081464875x(3000))
= 0.74 mm
Due to Creep (0.001x(3000))
= 2.87 mm
Max.Horiz. Relative displacement(In direction of b)-vy,d = (1.8 + 0.74 + 2.87)
= 5.41 mm
Cl.5.2.3 Maximum design strain (𝜀𝑡,𝑑)
𝜀𝑡,𝑑=K𝐿(𝜀𝑐,𝑑+𝜀𝑞,𝑑+𝜀𝛼,𝑑)
𝜀𝑢,𝑑=𝜀𝑢,𝑘/𝛾𝑚
= 1x(3.3 + 0.56 + 0.14)
= 4.00 < 5 OK
(𝜀𝑐,𝑑)

120 120
Cl.5.2.3.2 Design strain due to compressive design load (𝜀𝑐,𝑑)
𝜀𝑐,𝑑=1.5 Fz,d/G.Ar.S
Ar=A1(1-vx,d/a'-vy,d/b')
S=A1/lp.te
Shape factor(S) = (392x342)/((2x(392 + 342)x8)
= 11.42
te = 8.00

Reduced effective plan area(Ar) = (392x342)x(1-(25.17/392)-(5.41/342))


= 123336.89 mm2
Design strain due to compressive design load (𝜀𝑐,𝑑) = (1.5x2784.13429458918x1000)/(0.9x123336.89x11.42)
= 3.296
Cl.5.2.3.3 Design shear strain due to design translatory movements (𝜀𝑞,𝑑)
𝜀𝑞,𝑑=vxy,d/Tq
Design Shear strain (𝜀𝑞,𝑑) = MIN((SQRT(25.17^2+5.41^2)/(40+3+3)),1)
= 0.560
Cl.5.2.3.4 Design strain due to angular rotation (𝜀𝛼,𝑑)

𝜀α,d=(a'2.𝛼a,d+b'2.𝛼b,d)ti/2Σ(𝑡𝑖3)

Design strain due to angular rotation (𝜀𝛼,𝑑) = (((392^2x0.00064+342^2x0.00009))x8)/


(2x((6)x8^3))
= 0.141
Cl.5.2.3.5 Reinforcing plate thickness(ts)
ts=Kp.Fz,d.(t1+t2).Kh.𝛾𝑚/Ar.fy
Minimum thickness of steel plate required = MAX(((1.3x2784.13429458918x1000x(8+8)x1x1)/
(123336.89x500)),3)
= 3.00 mm
Thickness of steel plate provided = 4 mm > 3.00 OK
Cl.5.2.3.6 Limiting conditions
Total Vertical deflection

Σ𝑉z,d=Σ(Fzd.𝑡𝑖/A1).(1/5.G.S12+1/Eb)
Vertical deflection of Individual layer = ((2784.13429458918x1000x8)/(392x342))x
((1/(5x0.9x11.42^2))+1/2000))
= 0.366 mm
Total Vertical deflection = 1.832 mm
Rotational limitation Condition
For rectangular bearing
Σ𝑉z,d-(a'.𝛼a,d+b'.𝛼𝑏,𝑑)/Kr,d≥0
Rotational limitation Condition = (1.83-(392x0.0006+342x0.0001))/3
= 0.518 > 0 OK
Cl.5.2.3.6 Buckling stability(ULS)
For rectangular bearing
Fz,d/Ar.<2.a'.G.S1/3.Te

Buckling stability(ULS) Fz,d/Ar = (2784.13x1000x1.0)/123336.89


= 22.57
2.a'.G.S1/3.Te = (2x392x0.9x11.42)/(3x40)
67.12
= 22.57 < 67.12 OK
Non Sliding condition(ULS)
Fxyd≤μe.FZ,d min
μe=0.1+1.5Kf/𝜎𝑚
Fxyd = 61.69
= 61.69 kN

μe.FZ,d min = (0.1+1.5x0.6/4.31)x531.69


= 164.172 kN

Non Sliding condition(ULS) = 61.6865 < 164.172 OK


Under Permanent loads
𝜎𝑐𝑑 𝑚𝑖𝑛=Fz,dmin/Ar≥3𝑀𝑃𝑎

Fz,dmin/Ar = 545.6x1000x1.0/123336.89
= 4.42 N/sqmm

= 4.42 > 3 OK

121 121
DESIGN OF ABUTMENT
R2

122 122
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
INTRODUCTION :
This report presents design of abutment, with open foundation. the super-structure span arrangement is 1x15m c/c of bearing, Total carriageway width of bridge is 16m. Cross

camber of 2% is provided in one direction.

LOADING CONSIDERED :
1) Selfweight of superstructure
2) Superimposed dead load (crash barrier, wearing coat etc.)
3) Self weight of sub structure and Foundation
4) Live load:
a) Three Lane of class A
b) One lane of class 70 R wheel+Class A
c) One lane of class 70 R Track+Class A d) SV loading
5) Breaking load
6) Earth Preassure
7) Buoyancy
8) Seismic load
9) Wind Load
10) Temparature load.

CODE OF PRACTICE FOLLOWED :


IRC 6 : 2016 Standard specification and code of practice for road bridges (Load and stresses).
IRC 112-2011 Code of Pratice for Concret road bridges.
IS 1893-1984 Criteria for Earthquake Resistance Design of structures
IS 1893- 2000 Criteria for Earthquake Resistance Design of structures
IS SP 22- 1982 Explanatory Hand Book On Codes for Earthquake Engineering

DESIGN PHILOSPHY :
The Abutment shaft is designed as cantilever member as well as column with biaxial bending ,Heel and toe slab are designed as cantilever slab, Effect of side return wall is ignored

on the conservative side, dirt wall is designed as cantilever member.

123 123
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SAILENT FEATURES OF SUPER-STRUCTURE
Radius of curve = 1E+33 m Monolitic return wall thk at bottom = 0.75m
Span c/c of Exp joint = 15 m Monolitic return wall thk at top = 0.50m
Expansion gap = 40 mm on each side
Dirt wall face to dirt wall face = 15.04 m
Effective span (C/C of bearings) = 13.96 SQ m
Wearing coat thickness = 75 mm Elastomeric
Depth of slab+ girder at c/L = 1420 mm Pot Bearing
Bearing type = Elastomeric 1
Height of Brg+ pedestal+camber = 396.5 mm (min) pedestal size in plan = 650 mm x 600 mm
Total width of structure = 16 m ( square ) 16.00 m ( skew )
Equalvalent LL Surchage height = 1.2 m
Friction coefficient between foundation and strata below foundation = 0.7
Height of Crash barrier = 1.1 m Response reduction factor = 2.5
ABUTMENT DETAIL : Importance factor considerd in seismic factor calculations = 1.2
Formation Level at C/L = RL 473.897 Type of soil considerd in calculating Sa/g is = Rocky
Abutment cap top level = RL 472.348
Minimum GL at Footing Corner = RL 468.045
Scour Level = RL 467.545
Embedement of foundation below score level = 0.6 m
Founding level = RL 466.945
Highest flood level = RL 469.757
Skew Angle = 0 Deg 0.000 radians
Basic wind speed = 39 m/sec
Terrain to be considerd in wind load calculations = Plain terrain 1 Plain terrain
Type of deck supporting System = 3
Two or more beams or multiple box girders
Terrain with Obstructions
Bearing Details Soild slab
Number of Elastomeric bearings on abutment = 5 No's Single beam of box girder
Number of Pinned POT bearings on abumnet = 0 No's Two or more beams or multiple box girders
Number of Guided pot bearing in longitudinal direction = 0 No's
Number of Guided pot bearing in Transverse direction = 0 No's
Total Bearing on One abutment = 5 No's
2
Net safe bearing capacity at founding level considered = 20.000 t/m2 Non-seismic case
= 25.000 t/m Seismic case, increase by 25%
Material Data
Density of Concrete = 2.500 t/m3 Angle of internal friction of backfill soil behind abutment in degress= 30.00
Density of Soil in Dry condition = 1.800 t/m3 Surcharge angle of backfill soil behind abutment in degress = 0.00
Density of soil in saturated conditoin = 2.000 t/m3 Modulus of elasticity of untensioned steel = 200.00Gpa
Density of water = 1.000 t/m3 fctm = 2.50Mpa
Grade of concrete = M 30 fcd = 13.40Mpa
Grade of steel fyk = Fe 500

124 124
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
DEAD LOAD , SIDL,LIVE LOAD
MT at
vertical at Veritcal At other
horizontal force at ML at abutment at abutment at
abutment support support at
bearing location bearing location bearing
at bearing locatoin bearing location
location
Reaction on abutment due to Self weight of super strcuture = 0.000 t 136.554 t 136.554 t 0.00t-m 0.00t-m
Reaction on abutment due to SIDL+ FP = 0.000 t 48.999 t 48.999 t 0.00t-m 0.00t-m
Reaction on abutment due to crash barrier = 0.000 t 0.000 t 0.000 t 0.00t-m 0.00t-m
Reaction on abutment due to Footpath self weigh = 0.000 t 0.000 t 0.000 t 0.00t-m 0.00t-m
Reaction on abutment due to Footpath Live load = 0.000 t 0.000 t 0.000 t 0.00t-m 0.00t-m

70 R Wheel 17 17 17 17 12 12 8
1.37 3.05 1.37 2.13 1.52 3.96 1.60
15.00
Total load on span = 92.00 t
1.00 0.91 0.71 0.61
0.37 0.11
0.47 #DIV/0!
Reaction in abutment = 17x 1+17x 0.91+17x 0.71 +17x 0.62 +12 x 0.48+12X0.38+8X0.11= 65.84 t
Reaction in abutment with impact factor = 65.84 t
Class A 11.4 11.4 6.8 6.8 6.8 6.8

1.20 4.30 3 3 3.50


15.00
0.92 Total load on span = 50.00 t
1.00 0.63
0.43 0.23
0.23

Reaction in abutment = 11.4 x 1 + 11.4 x 0.92 + 6.8 x 0.64 + 6.8 x 0.44 + 6.8 x 0.24 + 6.8 x 0.24= 32.31 t
Reaction in abutment with impact factor = 32.31 t
70 R Track Reaction in abutment = 59.34 t Total load on span = 70.00 t
Reaction in abutment with impact factor = 59.34
Rea on abut total span load Mt at abutment Rea on abut tot. span load Mt at abut.
Class A - one lane 32.31 t 50.00 t 172.88t-m Class A - three lane 93.71 t 145.00 t 70.28t-m
Class A - two lane 64.63 t 100.00 t 174.50t-m 70R wheel + Class A One lane 94.92 t 137.00 t 130.66t-m
70 R Wheel 65.84 t 92.00 t 207.73t-m 70R tracked+Class A 88.42 t 115.00 t 106.87t-m
70 R track 59.34 t 70.00 t 183.94t-m
Max 2Lane live load 65.84 t 92.00 t 207.73 t Max 3Lane live load 94.92 t 137.00 t 130.66 t

125 125
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
300 SQ 300 SQ
RL 473.897
300

300
2 CL of Bearing Girder and

1152
Slab Height + Wearing coat
300
3 540 SQ 560 SQ
1

649

4140 396.5 RL 472.348

300 4 300
5 7
300 500 SQ 700 SQ 200 SQ 300
6

18
6952 9 1991
4103
8
10
97 SQ 0.00 SQ HFL RL 469.757

1712

19
2112 GL RL 468.045
12
11 13 500 mm
Point B Scour Level RL 467.545

700 14 15 16 600
700
300 300
17 RL 466.945
Point A
4600 SQ 200 SQ 700 SQ 0 SQ 1800 SQ

7300 SQ

126 126
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC FORCE CALCULATION :
Seismic Zone = III 2 Zone Z
1 II 0.10
Zone factor Z = 0.16 2 III 0.16
Importance factor I = 1.2 3 IV 0.24
Response reduction factor R = 2.5 4 V 0.36
Type of Soil = Rocky Grade of
Time Period T = 2 D Concrete Ec in Gpa
1000 F 15 27
D = Approximate DL of super structure + LL * in kN 20 29
= 56.096 kn *(20% of maximum LL is considered) 25 30
F Horizontal force required to be applied at center of mass of super-structure for 1
y 972.75 30 31
F = mm deflection at the top of pier / abutment along the considered direction of 35 32
horizontal force. 40 33
L Top of abut. cap
1 mm deflection 45 34
x 4703.00 F = 6EI for 1 mm deflection at x 50 35
x2*(2L+y) 55 36
2
F E = 31000 N/mm 60 37
IL = 6.82667E+11 mm4
IT = 2.73067E+14 mm4
FL = 465812.5496 N TL = 0.02194767
= 465.8125496 Kn Sa/g ( L) = 2.5
FT = 186325019.8 N TT = 0.00109738
= 186325.0198 kn Sa/g ( T) = 2.5

Rocky or hard strata , with N>30 Sa/g= 2.500 0.0<= T <=0.40


45.563 0.40<= T <=4.0

Medium Soil 1,N<=30 Sa/g= 2.500 0.0<= T <=0.55 Soft Soil N < 10 Sa/g= 2.500 0.0<= T <=0.670
61.966 0.550<= T <=4.0 1521.802 0.670<= T <=4.0

AhL = 0.0960
Horizontal seismic coefficient Ah = Z I Sa AhT = 0.2400
2Rg Av = 0.0640
Vertical seismic coefficient Av = 2 Ah / 3

127 127
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Active earth preasure coefficents
Normal Dry Case Normal HFL Case
Density of Soil Fill = 1.80 t/m3 Saturated Density of Soil Fill = 2.00 3
t/m
Angle of Internal Friction = f = 30.00 o f= 30.00 o
Surcharge Angle = b = 0.00 o b= 0.00 o
Wall Angle = a = 2.79 o a= 2.79 o
Angle of Wall Friction = d = 20.00 o d= 10.00 o
l
Ka = 0.318 Ka = 0.328

seismic Dry Case


l +ve = 5.16 Deg
l -ve = 5.86 Deg

Ca = 0.405 in case of l +ve


Ca = 0.416 in case of l -ve
As per IS 1893- 1984 Caluse 8.1.1 maximum of Above two is considered for Design I.e Ca = 0.416

Seismic Saturated Case


l +ve = 10.23 Deg
l -ve = 11.59 Deg

Cl a = 0.488 in case of l +ve


Cl a = 0.512 in case of l -ve
As per IS 1893- 1984 Caluse 8.1.1 maximum of Above two is considered for Design I.e Cla = 0.512

Normal Dry Case K a surchrge = 0.318


Normal HFL Case Kl a surchrge = 0.328 x coefficent for earth presure
seismic Dry Case C a surcharge = 0.416
seismic Saturated Case Cl a surcharge = 0.512

128 128
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal Dry Case

0.687x6.96= 0.687 x 6.252 =


4.777 T 4.300 T

3.579 x 6.252/2 =
3.98 x 6.952/2 = 11.190 T
13.835 T 6.252

6.952/2 = 3.48 m

0.42 x 6.252=
3.13 m
2.626 m
0.42 x 6.952=
2.92 m

0.318X1.8X6.26= 0.318x1.8x1.2=
3.579t/m 0.687t/m
0.318x1.8x1.2= 0.687t/m A
0.318X1.8X6.96= 3.980t/m
About Base of footing i.e about point A About Base of Stem i.e about point B

o
Wall Angle W.R.T Vertical 2.79
o
Angle of Wall Friction = d = 20.00
o
The Earth preasure will act at an angle of 22.80

129 129
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal Dry Case
Forces About Base of footing (at point A i.e toe end)

Horizontal Load due to Earth Pressure = 13.835x COS(22.8) = 12.754 T At Lever arm = 2.92 m
Vertical component of Earth Pressure = 13.835x SIN(22.8) = 5.362 T At Lever arm = 7.30 m

Horizontal Load due to Surcharge Pressure = 4.777x COS(22.8)= 4.404 T At Lever arm = 3.48 m
Vertical component of Surcharge Pressure = 4.777x SIN(22.8)= 1.852 T At Lever arm = 2.70 m

Due to Earth preasure Total Horizontal Load per abutment = 12.754x16= 204.064 t
Total Overturning Moment per abutment = (12.754x2.92) x 16= 595.870 t-m
Total Vertical component of Earth preasure per abutment = 5.362x16= 85.792 t
Total Resistaning moment per meter width = (5.362x7.3) x 16= 626.290 t-m
Tot. Sliding resistance due to Vertical component of Earth preasure per abutment = 85.792X 0.70 = 60.055 t

Due to Live load Surcharge Total Horizontal Load per abutment = 4.404x16= 70.464 t
Total Overturning Moment per abutment = (4.404x3.48) x 16= 245.220 t-m
Total Vertical component of Earth preasure per abutment = 1.852x16= 29.632 t
Total Resistaning moment per meter width = (1.852x2.7) x 16= 80.010 t-m
Tot. Sliding resistance due to Vertical component of Earth preasure per abutment = 29.632X 0.70 = 20.743 t

Forces About base of Stem


Due to Earth preasure Horizontal Load due to Earth Pressure = 11.19x COS(22.8) = 10.320 T per m width and per Stem = 165.12 T
Moment at junction of Stem and Heel = 10.32 x 2.626
= 27.10 t-m i.e per stem = 433.61 t-m

Due to Live load Surcharge


Horizontal Load due to Surcharge Pressure = 4.3x COS(22.8) = 3.970 T per Stem = 63.52 T
Moment at junction of Stem and Heel = 3.97 x 3.13
= 12.43 t-m i.e per Stem = 198.82 t-m

130 130
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal Saturated Case (sudden draw down case)

0.709x6.252=
4.102 x 6.252 /2= 4.433
0.709x6.952= 12.823 T
4.929 T

0.33 x 6.252= 2.06 m


4.561 x 6.952/2 =
15.855 T

3.48 m
6.252
6.252/2 =
3.126m

6.952/2 =
0.33 x 6.952=
2.29 m

0.328X2X6.252= 0.328x1.8x1.2=
4.102t/m 0.709t/m

A
0.328X2X6.952= 0.328x1.8x1.2=
4.561t/m 0.709t/m

o
Wall Angle W.R.T Vertical 2.79
o
Angle of Wall Friction = d = 10.00
o
The Earth preasure will act at an angle of 12.80

131 131
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal Saturated Case (sudden draw down case)
Forces About Base of footing (at point A i.e toe end)

Horizontal Load due to Earth Pressure = 15.855x COS(12.8) = 15.461 T At Lever arm = 2.30 m
Vertical component of Earth Pressure = 15.855x SIN(12.8) = 3.513 T At Lever arm = 7.30 m

Horizontal Load due to Surcharge Pressure = 4.929x COS(12.8)= 4.807 T At Lever arm = 3.48 m
Vertical component of Surcharge Pressure = 4.929x SIN(12.8)= 1.093 T At Lever arm = 2.70 m

Due to Earth preasure Total Horizontal Load per abutment = 15.461x16= 247.376 t
Total Overturning Moment per abutment = (15.461x2.3) x 16= 568.970 t-m
Total Vertical component of Earth preasure per abutment = 3.513x16= 56.208 t
Total Resistaning moment per meter width = (3.513x7.3) x 16= 410.320 t-m
Tot. Sliding resistance due to Vertical component of Earth preasure per abutment = 56.208X 0.70 = 39.346 t

Due to Live load Surcharge Total Horizontal Load per abutment = 4.807x16= 76.912 t
Total Overturning Moment per abutment = (4.807x3.48) x 16= 267.660 t-m
Total Vertical component of Earth preasure per abutment = 1.093x16= 17.488 t
Total Resistaning moment per meter width = (1.093x2.7) x 16= 47.220 t-m
Tot. Sliding resistance due to Vertical component of Earth preasure per abutment = 17.488X 0.70 = 12.242 t

Forces About base of Stem


Due to Earth preasure
Horizontal Load due to Earth Pressure = 12.823x COS(12.8) = 12.505 T per m width and per Stem = 200.08 T
Moment at junction of Stem and Heel = 12.505 x 2.06
= 25.81 t-m i.e per Stem = 412.97 t-m

Due to Live load Surcharge


Horizontal Load due to Surcharge Pressure = 4.433x COS(12.8) = 4.323 T per Stem = 69.17 T
Moment at junction of Stem and Heel = 4.323 x 3.13
= 13.51 t-m i.e per Stem = 216.22 t-m

132 132
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal HFL Case

P5
P1=2.72x4.14/2= 0.687x4.14=
5.640 T 2.845 T 4140 mm

0.33 x 4.14= 2.07 m


1.37 m 0.318x1.8x1.2=
HFL 0.687t/m
P2 =2.72x2.82=7.65t/m 0.328x2x4.14=
2.72t/m
P6
P3=0.93 x 2.82/2 = 0.709x2.82=
1.310 T 1.994 T
2812 mm

0.33 x 0.93 m
1.41 m 1.41 m
2.82=

0.328x1.8x1.2= A
0.709t/m
0.328X1X2.82= 0.328x2x4.14=
0.930t/m 2.72t/m

o
Wall Angle W.R.T Vertical 2.79
o
Angle of Wall Friction = d = 10.00
o
The Earth preasure will act at an angle of 12.80

133 133
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal HFL Case
Forces About Base of footing (at point A i.e toe end)

Horiztal Componet Lever arm Vertical component Lever arm


Due to P1 5.64x COS(12.8) = 5.50 4.18 m 5.64x sin(12.8) = 1.25 7.30 m
Due to P2 7.65x COS(12.8) = 7.46 1.41 m 7.65x sin(12.8) = 1.7 7.30 m
Due to P3 1.31x COS(12.8) = 1.28 0.93 m 1.31x sin(12.8) = 0.3 7.30 m

Due to P5 2.845x COS(12.8) = 2.78 4.89 m 2.845xsin(12.8) = 0.64 0.00 m


Due to P6 1.994x COS(12.8) = 1.95 1.41 m 1.994xsin(12.8) = 0.45 0.00 m

Due to Earth preasure Total Horizontal Load per m width = 5.5+7.46+1.28+= 14.240 t
Total Overturning Moment pre width = 5.5x4.18+7.46x1.41+1.28x0.93+x+= 34.70 t-m
Total Vertical component of Earth preasure per meter width = 1.25+1.7+0.3+= 3.250 t
Total Resistaning moment per m width = 1.25x7.3+1.7x7.3+0.3x7.3+x= 23.73 t-m

Total Horizontal Load per abutment = 14.240X 16.00 = 227.84 t


Total Overturning Moment per abutment = 34.699X 16.00 = 555.18 t-m
Total Vertical component of Earth preasure per abutment = 3.250X 16.00 = 52.00 t
Total Resistaning moment per abutment = 23.725X 16.00 = 379.60 t-m
Total Sliding resistance due to Vertical component of Earth preasure per abutment = 52.000X 0.70 = 36.40 t

Due to LL Surchage Total Horizontal Load per m width = 2.78+1.95= 4.730 t


Total Overturning Moment pre width = 2.78x4.89+1.95x1.41= 16.34 t-m
Total Vertical component of Earth preasure per meter width = 0.64+0.45= 1.090 t
Total Resistaning moment per m width = 0.64x0+0.45x0= 0.00 t-m

Total Horizontal Load per abutment = 4.730X 16.00 = 75.68 t


Total Overturning Moment per abutment = 16.344X 16.00 = 261.50 t-m
Total Vertical component of Earth preasure per abutment = 1.090X 16.00 = 17.44 t
Total Resistaning moment per abutment = 0.000X 16.00 = 0.00 t-m
Total Sliding resistance due to Vertical component of Earth preasure per abutment = 17.440X 0.70 = 12.21 t

134 134
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Calculation of Earth Preasure
Normal HFL Case
Forces About base of Stem P11

P7=2.72x4.14/2= 0.687x4.14=
5.640 T 2.845 T 4140.00 mm

0.33 x 4.14= 2.0700 m


1.37 m
HFL
P8 =2.72x2.12=5.75t/m 0.328x2x4.14=
2.72t/m 0.318x1.8x1.2=
0.687t/m
P9=0.7 x 2.12/2 = P12
0.740 T 0.788x2.12=
1.665 T 2112.00 mm

0.33 x 0.70 m
1.06 m
2.12=
0.328x1.8x1.2=
0.788t/m B

Forces About Base of wall 0.328X1X2.12= 0.328x2x4.14= Due to Earth preasure


(at point B) 0.700t/m 2.72t/m Total Horizontal Load per m width = 5.5+5.61+0.73+= 11.84 t
Horiztal Componet Lever arm Total Overturning Moment pre width = 5.5x3.48+5.61x1.06+0.73x0.7+x= 25.60 t-m
Due to P7 5.64x COS(12.8) = 5.50 3.48 m Total Horizontal Load per stem at base of stem= 11.840X 16.00 = 189.44 t
Due to P8 5.75x COS(12.8) = 5.61 1.06 m Total Overturning Moment per stem at base of stem= 25.598X 16.00 = 409.57 t-m
Due to P9 0.74x COS(12.8) = 0.73 0.70 m Due to Live load surcharge
Total Horizontal Load per m width = 2.78+2.02= 4.80 t
Due to P11 2.845x COS(12.8) = 2.78 4.19 m Total Overturning Moment pre width = 2.78x4.19+2.02x1.057= 13.78 t-m
Due to P12 1.665x COS(12.8) = 2.02 1.06 m Total Horizontal Load per stem at base of stem= 4.800X 16.00 = 76.80 t
Tot. Overturning Moment per stem at base of stem= 13.784X 16.00 = 220.54 t-m

135 135
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Load & Moment calculations due to Substructure,Foundation and Soil above heel
NORMAL DRY CASE

Area No. Description Length Height Density Vertical Load Dist. From A Moment at A

1 Vertical Wall 0.300 1.549 2.500 1.162 2.850 3.311


2 Dirtwall Haunch rec portion 0.300 0.300 2.500 0.225 3.150 0.709
3 Dirtwall Haunch Tri Portion 0.300 0.300 2.500 0.113 3.100 0.349
4 Abutment Cap Rec portion 1.400 0.300 2.500 1.050 2.300 2.415
5 Abutment Cap Tri portion 0.500 0.300 2.500 0.188 2.667 0.500
6 Abutment Cap Rec portion 0.700 0.300 2.500 0.525 2.150 1.129
7 Abutment Cap Tri portion 0.200 0.300 2.500 0.075 1.733 0.130
8 Abutment Stem Above HFL Tri portion 0.097 1.991 2.500 0.242 2.532 0.612
9 Abutment Stem Above HFL Rec Portion 0.700 1.991 2.500 3.484 2.150 7.491
10 Abutment Stem Above HFL Tri portion 0.000 1.991 2.500 0.000 1.800 0.000
11 Abutment Stem below HFL Trapizoal portion 0.149 2.112 2.500 0.784 2.577 2.021
12 Abutment Stem Below HFL Rec Portion 0.700 2.112 2.500 3.696 2.150 7.946
13 Abutment Stem Below HFL Trapizoal portion 0.000 2.112 2.500 0.000 0.00 0.000
14 Heel Slab Triangular Portion 4.600 0.400 2.500 2.300 4.233 9.737
15 Stem portion in footing 0.900 0.400 2.500 0.900 2.250 2.025
16 Toe Slab Triangular Portion 1.800 0.400 2.500 0.900 1.200 1.080
17 Footing rectangular portion 7.300 0.300 2.500 5.475 3.650 19.984
18 Soil Above HFL 4.600 4.140 1.800 34.279 5.000 171.396
19 Soil Below HFL 4.600 2.312 1.800 19.143 5.000 95.717

74.54 326.551

Total vertical load of abutment and soil on hell side per meter width of abutment = 74.540 t
Sliding Resistance force per meter width of abutment = 52.178 t
Restoring moment about point A per meter width of abutment = 326.551 t-m
Self weight of the structure upto stem bottom = 11.543 t

Total vertical load of abutment and soil on hell side per abutment = 74.540 X 16.00 = 1192.64 t
Sliding Resistance force per abutment = 52.178 X 16.00 = 834.85 t
Restoring moment about point A per meter abutment = 326.551 X 16.00 = 5224.81 t-m
Self weight of the structure upto stem bottom per abutment = 11.543 X 16.00 = 184.68 t

136 136
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Load & Moment calculations due to Substructure,Foundation and Soil above heel
SUDDEN DRAW DOWN CONDITION

Area No. Description Length Height Density Vertical Load Dist. From A Moment at A

1 Vertical Wall 0.300 1.549 2.500 1.162 2.850 3.311


2 Dirtwall Haunch rec portion 0.300 0.300 2.500 0.225 3.150 0.709
3 Dirtwall Haunch Tri Portion 0.300 0.300 2.500 0.113 3.100 0.349
4 Abutment Cap Rec portion 1.400 0.300 2.500 1.050 2.300 2.415
5 Abutment Cap Tri portion 0.500 0.300 2.500 0.188 2.667 0.500
6 Abutment Cap Rec portion 0.700 0.300 2.500 0.525 2.150 1.129
7 Abutment Cap Tri portion 0.200 0.300 2.500 0.075 1.733 0.130
8 Abutment Stem Above HFL Tri portion 0.097 1.991 2.500 0.242 2.532 0.612
9 Abutment Stem Above HFL Rec Portion 0.700 1.991 2.500 3.484 2.150 7.491
10 Abutment Stem Above HFL Tri portion 0.000 1.991 2.500 0.000 1.800 0.000
11 Abutment Stem below HFL Trapizoal portion 0.149 2.112 2.500 0.784 2.577 2.021
12 Abutment Stem Below HFL Rec Portion 0.700 2.112 2.500 3.696 2.150 7.946
13 Abutment Stem Below HFL Trapizoal portion 0.000 2.112 2.500 0.000 0.000 0.000
14 Heel Slab Triangular Portion 4.600 0.400 2.500 2.300 4.233 9.737
15 Stem portion in footing 0.900 0.400 2.500 0.900 2.250 2.025
16 Toe Slab Triangular Portion 1.800 0.400 2.500 0.900 1.200 1.080
17 Footing rectangular portion 7.300 0.300 2.500 5.475 3.650 19.984
18 Soil Above HFL 4.600 4.140 2.000 38.088 5.000 190.440
19 Soil Below HFL 4.600 2.312 2.000 21.270 5.000 106.352
80.48 356.230

Total vertical load of abutment and soil on hell side per meter width of abutment = 80.476 t
Sliding Resistance force per meter width of abutment = 56.333 t
Restoring moment about point A per meter width of abutment = 356.230 t-m
Self weight of the structure upto stem bottom = 11.543 t

Total vertical load of abutment and soil on hell side per abutment = 80.476 X 16.00 = 1287.62 t
Sliding Resistance force per abutment = 56.333 X 16.00 = 901.33 t
Restoring moment about point A per meter abutment = 356.230 X 16.00 = 5699.68 t-m
Self weight of the structure upto stem bottom per abutment = 11.543 X 16.00 = 184.68 t

137 137
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Load & Moment calculations due to Substructure,Foundation and Soil above heel
HFL CONDITION

Area No. Description Length Height Density Vertical Load Dist. From A Moment at A

1 Vertical Wall 0.300 1.549 2.500 1.162 2.850 3.311


2 Dirtwall Haunch rec portion 0.300 0.300 2.500 0.225 3.150 0.709
3 Dirtwall Haunch Tri Portion 0.300 0.300 2.500 0.113 3.100 0.349
4 Abutment Cap Rec portion 1.400 0.300 2.500 1.050 2.300 2.415
5 Abutment Cap Tri portion 0.500 0.300 2.500 0.188 2.667 0.500
6 Abutment Cap Rec portion 0.700 0.300 2.500 0.525 2.150 1.129
7 Abutment Cap Tri portion 0.200 0.300 2.500 0.075 1.733 0.130
8 Abutment Stem Above HFL Tri portion 0.097 1.991 2.500 0.242 2.532 0.612
9 Abutment Stem Above HFL Rec Portion 0.700 1.991 2.500 3.484 2.150 7.491
10 Abutment Stem Above HFL Tri portion 0.000 1.991 2.500 0.000 1.800 0.000
11 Abutment Stem below HFL Trapizoal portion 0.149 2.112 1.500 0.471 2.577 1.213
12 Abutment Stem Below HFL Rec Portion 0.700 2.112 1.500 2.218 2.150 4.768
13 Abutment Stem Below HFL Trapizoal portion 0.000 2.112 1.500 0.000 0.000 0.000
14 Heel Slab Triangular Portion 4.600 0.400 1.500 1.380 4.233 5.842
15 Stem portion in footing 0.900 0.400 1.500 0.540 2.250 1.215
16 Toe Slab Triangular Portion 1.800 0.400 1.500 0.540 1.200 0.648
17 Footing rectangular portion 7.300 0.300 1.500 3.285 3.650 11.990
18 Soil Above HFL 4.600 4.140 2.000 38.088 5.000 190.440
19 Soil Below HFL 4.600 2.312 2.000 21.270 5.000 106.352

Total vertical load of abutment and soil on hell side per meter width of abutment = 74.854 t 74.85 339.113
Sliding Resistance force per meter width of abutment = 52.398 t
Restoring moment about point A per meter width of abutment = 339.113 t-m
Self weight of the structure upto stem bottom = 9.751 t

Total vertical load of abutment and soil on hell side per abutment = 74.854 X 16.00 = 1197.67 t
Sliding Resistance force per abutment = 52.398 X 16.00 = 838.37 t
Restoring moment about point A per meter abutment = 339.113 X 16.00 = 5425.81 t-m
Self weight of the structure upto stem bottom per abutment = 9.751 X 16.00 = 156.01 t

138 138
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC COMPONENT OF SUBSTRUCTURE IN DRY CASE
Forces about A
Ecce for
Horizontal Seismic Vertical Seismic Ecce. for Vertical ML - due to ML - due to
Area No. Description Vertical Load Horizontal
component Component Seismic seis. horizontal seis. vertical
Seismic
1 Vertical Wall 1.1617 0.1115 0.0744 6.1775 2.8500 0.6890 -0.2119
2 Dirtwall Haunch rec portion 0.2250 0.0216 0.0144 6.5020 3.1500 0.1404 -0.0454
3 Dirtwall Haunch Tri Portion 0.1125 0.0108 0.0072 6.2520 3.1000 0.0675 -0.0223
4 Abutment Cap Rec portion 1.0500 0.1008 0.0672 5.2530 2.3000 0.5295 -0.1546
5 Abutment Cap Tri portion 0.1875 0.0180 0.0120 5.0030 2.6667 0.0901 -0.0320
6 Abutment Cap Rec portion 0.5250 0.0504 0.0336 4.9530 2.1500 0.2496 -0.0722
7 Abutment Cap Tri portion 0.0750 0.0072 0.0048 5.0030 1.7333 0.0360 -0.0083
8 Abutment Stem Above HFL Tri portion 0.2415 0.0232 0.0155 4.1393 2.5324 0.0960 -0.0391
9 Abutment Stem Above HFL Rec Portion 3.4843 0.3345 0.2230 3.8075 2.1500 1.2736 -0.4794
10 Abutment Stem Above HFL Tri portion 0.0000 0.0000 0.0000 4.1393 1.8000 0.0000 0.0000
11 Abutment Stem below HFL Trapizoal portion 0.7842 0.0753 0.0502 1.6340 2.5772 0.1230 -0.1294
12 Abutment Stem Below HFL Rec Portion 3.6960 0.3548 0.2365 1.7560 2.1500 0.6231 -0.5086
13 Abutment Stem Below HFL Trapizoal portion 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
14 Heel Slab Triangular Portion 2.3000 0.2208 0.1472 0.4333 4.2333 0.0957 -0.6231
15 Stem portion in footing 0.9000 0.0864 0.0576 0.5000 2.2500 0.0432 -0.1296
16 Toe Slab Triangular Portion 0.9000 0.0864 0.0576 0.4333 1.2000 0.0374 -0.0691
17 Footing rectangular portion 5.4750 0.5256 0.3504 0.1500 3.6500 0.0788 -1.2790
18 Soil Above HFL 34.2792 3.2908 2.1939 4.8820 5.0000 16.0657 -10.9693
19 Soil Below HFL 19.1434 1.8378 1.2252 1.9560 5.0000 3.5947 -6.1259

Summary per meter width 7.1600 4.7800 23.8400 -20.9000

Additional vertical load of abutment and soil on hell side per meter width of abutment = 4.780 t
Additional horzontal force per meter width of abutment = 7.160 t
Additional overturning moment about point A per meter width of abutment = 23.8400 - 20.90 = 2.940 t-m

Additional vertical load of abutment and soil on hell side per abutment = 4.780 X 16.00 = 76.48 t
Aditional Horizontal force per abutment = 7.160 X 16.00 = 114.56 t
Additional overturning moment about point A per meter abutment = 2.940 X 16.00 = 47.04 t-m
Additional Transverse moment in transverse directon in case of transverse seismic = 59.600 X 16.00 = 953.60 t-m

139 139
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC COMPONENT OF SUBSTRUCTURE IN DRY CASE
Forces about bottom of Stem i.e to the Point B

Horizontal Seismic Ecce for Horizontal Moment at


Area No. Description Vertical Load
component Seismic Bottom of stem

1 Vertical Wall 1.162 0.112 5.478 0.611


2 Dirtwall Haunch rec portion 0.225 0.022 5.802 0.125
3 Dirtwall Haunch Tri Portion 0.113 0.011 5.552 0.060
4 Abutment Cap Rec portion 1.050 0.101 4.553 0.459
5 Abutment Cap Tri portion 0.188 0.018 4.303 0.077
6 Abutment Cap Rec portion 0.525 0.050 4.253 0.214
7 Abutment Cap Tri portion 0.075 0.007 4.303 0.031
8 Abutment Stem Above HFL Tri portion 0.242 0.023 3.439 0.080
9 Abutment Stem Above HFL Rec Portion 3.484 0.334 3.108 1.039
10 Abutment Stem Above HFL Tri portion 0.000 0.000 3.439 0.000
11 Abutment Stem below HFL Trapizoal portion 0.784 0.075 0.934 0.070
12 Abutment Stem Below HFL Rec Portion 3.696 0.355 1.056 0.375
13 Abutment Stem Below HFL Trapizoal portion 0.000 0.000 0.000 0.000
18 Soil Above HFL 34.279 3.291 4.182 13.762
part of 19 Soil Below HFL 17.487 1.679 1.056 1.773
6.0800 18.6800
Transverse moment due to structure alone = 7.8552

Additional horzontal force per meter width of Stem = 6.080 t


Additional overturning moment about point A per meter width of Stem = 18.680 t-m
Tranverse moment due to seismic component of structure up to stem bottom per m width of stem = 7.855 t-m

Additional Horizontal force per Stem = 6.080 X 16.00 = 97.28 t


Additional overturning moment about point A per Stem = 18.680 X 16.00 = 298.88 t-m
Additional tranverse moment at bottom of stem per total stem width = 7.855 X 16.00 = 125.68 t-m

140 140
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC COMPONENT OF SUBSTRUCTURE IN SUDDEN DRAW DOWN CASE
Forces about A
Ecce for
Horizontal Seismic Vertical Seismic Ecce. for Vertical ML - due to ML - due to
Area No. Description Vertical Load Horizontal
component Component Seismic seis. horizontal seis. vertical
Seismic
1 Vertical Wall 1.1617 0.1115 0.0744 6.1775 2.8500 0.6890 -0.2119
2 Dirtwall Haunch rec portion 0.2250 0.0216 0.0144 6.5020 3.1500 0.1404 -0.0454
3 Dirtwall Haunch Tri Portion 0.1125 0.0108 0.0072 6.2520 3.1000 0.0675 -0.0223
4 Abutment Cap Rec portion 1.0500 0.1008 0.0672 5.2530 2.3000 0.5295 -0.1546
5 Abutment Cap Tri portion 0.1875 0.0180 0.0120 5.0030 2.6667 0.0901 -0.0320
6 Abutment Cap Rec portion 0.5250 0.0504 0.0336 4.9530 2.1500 0.2496 -0.0722
7 Abutment Cap Tri portion 0.0750 0.0072 0.0048 5.0030 1.7333 0.0360 -0.0083
8 Abutment Stem Above HFL Tri portion 0.2415 0.0232 0.0155 4.1393 2.5324 0.0960 -0.0391
9 Abutment Stem Above HFL Rec Portion 3.4843 0.3345 0.2230 3.8075 2.1500 1.2736 -0.4794
10 Abutment Stem Above HFL Tri portion 0.0000 0.0000 0.0000 4.1393 1.8000 0.0000 0.0000
11 Abutment Stem below HFL Trapizoal portion 0.7842 0.0753 0.0502 1.6340 2.5772 0.1230 -0.1294
12 Abutment Stem Below HFL Rec Portion 3.6960 0.3548 0.2365 1.7560 2.1500 0.6231 -0.5086
13 Abutment Stem Below HFL Trapizoal portion 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
14 Heel Slab Triangular Portion 2.3000 0.2208 0.1472 0.4333 4.2333 0.0957 -0.6231
15 Stem portion in footing 0.9000 0.0864 0.0576 0.5000 2.2500 0.0432 -0.1296
16 Toe Slab Triangular Portion 0.9000 0.0864 0.0576 0.4333 1.2000 0.0374 -0.0691
17 Footing rectangular portion 5.4750 0.5256 0.3504 0.1500 3.6500 0.0788 -1.2790
18 Soil Above HFL 38.0880 3.6564 2.4376 4.8820 5.0000 17.8508 -12.1882
19 Soil Below HFL 21.2704 2.0420 1.3613 1.9560 5.0000 3.9941 -6.8065

Summary per meter width 7.7300 5.1600 26.0200 -22.8000

Additional vertical load of abutment and soil on hell side per meter width of abutment = 5.160 t
Additional horzontal force per meter width of abutment = 7.730 t
Additional overturning moment about point A per meter width of abutment = 26.0200 - 22.80 = 3.220 t-m

Additional vertical load of abutment and soil on hell side per abutment = 5.160 X 16.00 = 82.56 t
Aditional Horizontal force per abutment = 7.730 X 16.00 = 123.68 t
Additional overturning moment about point A per meter abutment = 3.220 X 16.00 = 51.52 t-m
Additional Transverse moment in transverse directon in case of transverse seismic = 65.050 X 16.00 = 1040.80 t-m

141 141
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC COMPONENT OF SUBSTRUCTURE IN SUDDEN DRAW DOWN CASE
Forces about bottom of Stem i.e to the Point B

Horizontal Seismic Ecce for Horizontal Moment at


Area No. Description Vertical Load
component Seismic Bottom of stem

1 Vertical Wall 1.162 0.112 5.478 0.611


2 Dirtwall Haunch rec portion 0.225 0.022 5.802 0.125
3 Dirtwall Haunch Tri Portion 0.113 0.011 5.552 0.060
4 Abutment Cap Rec portion 1.050 0.101 4.553 0.459
5 Abutment Cap Tri portion 0.188 0.018 4.303 0.077
6 Abutment Cap Rec portion 0.525 0.050 4.253 0.214
7 Abutment Cap Tri portion 0.075 0.007 4.303 0.031
8 Abutment Stem Above HFL Tri portion 0.242 0.023 3.439 0.080
9 Abutment Stem Above HFL Rec Portion 3.484 0.334 3.108 1.039
10 Abutment Stem Above HFL Tri portion 0.000 0.000 3.439 0.000
11 Abutment Stem below HFL Trapizoal portion 0.784 0.075 0.934 0.070
12 Abutment Stem Below HFL Rec Portion 3.696 0.355 1.056 0.375
13 Abutment Stem Below HFL Trapizoal portion 0.000 0.000 0.000 0.000
18 Soil Above HFL 38.088 3.656 4.182 15.291
part of 19 Soil Below HFL 19.430 1.865 1.056 1.970
6.6300 20.4100
Transverse moment due to structure alone = 7.8552

Additional horzontal force per meter width of Stem = 6.630 t


Additional overturning moment about point A per meter width of Stem = 20.410 t-m

Additional Horizontal force per Stem = 6.630 X 16.00 = 106.08 t


Additional overturning moment about point A per Stem = 20.410 X 16.00 = 326.56 t-m
Additional tranverse moment at bottom of stem per total stem width = 7.855 X 16.00 = 125.68 t-m

142 142
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC COMPONENT OF SUBSTRUCTURE IN HFL CASE
Forces about A
Ecce for
Horizontal Seismic Vertical Seismic Ecce. for Vertical ML - due to ML - due to
Area No. Description Vertical Load Horizontal
component Component Seismic seis. horizontal seis. vertical
Seismic
1 Vertical Wall 1.1617 0.1115 0.0744 6.1775 2.8500 0.6890 -0.2119
2 Dirtwall Haunch rec portion 0.2250 0.0216 0.0144 6.5020 3.1500 0.1404 -0.0454
3 Dirtwall Haunch Tri Portion 0.1125 0.0108 0.0072 6.2520 3.1000 0.0675 -0.0223
4 Abutment Cap Rec portion 1.0500 0.1008 0.0672 5.2530 2.3000 0.5295 -0.1546
5 Abutment Cap Tri portion 0.1875 0.0180 0.0120 5.0030 2.6667 0.0901 -0.0320
6 Abutment Cap Rec portion 0.5250 0.0504 0.0336 4.9530 2.1500 0.2496 -0.0722
7 Abutment Cap Tri portion 0.0750 0.0072 0.0048 5.0030 1.7333 0.0360 -0.0083
8 Abutment Stem Above HFL Tri portion 0.2415 0.0232 0.0155 4.1393 2.5324 0.0960 -0.0391
9 Abutment Stem Above HFL Rec Portion 3.4843 0.3345 0.2230 3.8075 2.1500 1.2736 -0.4794
10 Abutment Stem Above HFL Tri portion 0.0000 0.0000 0.0000 4.1393 1.8000 0.0000 0.0000
11 Abutment Stem below HFL Trapizoal portion 0.4705 0.0452 0.0301 1.6340 2.5772 0.0738 -0.0776
12 Abutment Stem Below HFL Rec Portion 2.2176 0.2129 0.1419 1.7560 2.1500 0.3738 -0.3051
13 Abutment Stem Below HFL Trapizoal portion 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
14 Heel Slab Triangular Portion 1.3800 0.1325 0.0883 0.4333 4.2333 0.0574 -0.3739
15 Stem portion in footing 0.5400 0.0518 0.0346 0.5000 2.2500 0.0259 -0.0778
16 Toe Slab Triangular Portion 0.5400 0.0518 0.0346 0.4333 1.2000 0.0225 -0.0415
17 Footing rectangular portion 3.2850 0.3154 0.2102 0.1500 3.6500 0.0473 -0.7674
18 Soil Above HFL 38.0880 3.6564 2.4376 4.8820 5.0000 17.8508 -12.1882
19 Soil Below HFL 21.2704 2.0420 1.3613 1.9560 5.0000 3.9941 -6.8065
Summary per meter width 7.1900 4.8000 25.6200 -21.7100

Additional vertical load of abutment and soil on hell side per meter width of abutment = 4.800 t
Additional horzontal force per meter width of abutment = 7.190 t
Additional overturning moment about point A per meter width of abutment = 25.6200 - 21.71 = 3.910 t-m

Additional vertical load of abutment and soil on hell side per abutment = 4.800 X 16.00 = 76.80 t
Aditional Horizontal force per abutment = 7.190 X 16.00 = 115.04 t
Additional overturning moment about point A per meter abutment = 3.910 X 16.00 = 62.56 t-m
Additional Transverse moment in transverse directon in case of transverse seismic = 64.050 X 16.00 = 1024.80 t-m

143 143
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
SEISMIC COMPONENT OF SUBSTRUCTURE IN HFL CASE
Forces about bottom of Stem i.e to the Point B

Horizontal Seismic Ecce for Horizontal Moment at


Area No. Description Vertical Load
component Seismic Bottom of stem

1 Vertical Wall 1.162 0.112 5.478 0.611


2 Dirtwall Haunch rec portion 0.225 0.022 5.802 0.125
3 Dirtwall Haunch Tri Portion 0.113 0.011 5.552 0.060
4 Abutment Cap Rec portion 1.050 0.101 4.553 0.459
5 Abutment Cap Tri portion 0.188 0.018 4.303 0.077
6 Abutment Cap Rec portion 0.525 0.050 4.253 0.214
7 Abutment Cap Tri portion 0.075 0.007 4.303 0.031
8 Abutment Stem Above HFL Tri portion 0.242 0.023 3.439 0.080
9 Abutment Stem Above HFL Rec Portion 3.484 0.334 3.108 1.039
10 Abutment Stem Above HFL Tri portion 0.000 0.000 3.439 0.000
11 Abutment Stem below HFL Trapizoal portion 0.471 0.045 0.934 0.042
12 Abutment Stem Below HFL Rec Portion 2.218 0.213 1.056 0.225
13 Abutment Stem Below HFL Trapizoal portion 0.000 0.000 0.000 0.000
18 Soil Above HFL 38.088 3.656 4.182 15.291
part of 19 Soil Below HFL 19.430 1.865 1.056 1.970
6.4600 20.2300
Transverse moment due to structure alone = 7.4102
Additional horzontal force per meter width of Stem = 6.460 t
Additional overturning moment about point A per meter width of Stem = 20.230 t-m
Additional Horizontal force per Stem = 6.460 X 16.00 = 103.36 t
Additional overturning moment about point A per Stem = 20.230 X 16.00 = 323.68 t-m

Additional tranverse moment at bottom of stem per total stem width = 7.410 X 16.00 = 118.56 t-m

144 144
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
BREAKING FORCE CALCULATION
Total breaking force per span in 2 lane loading = 18.4 t
Total breaking force per span in 3 lane loading = 20.65 t

Type of bearing is Elastomeric


horizontal force =

Vr = 2.50 Kn/mm
Movement Calculation
Maximum temperature =Tmax 50 °C
Minimum temperature =Tmin 5 °C
Average Temprature Tav
= 27.5 °C
Temperature varation =Tvar K 10 °C
T = Tmax - (Tav - =Tvar) 32.5 °C
Coefficent of thermal expansion
= 0.000012 / °C As per IRC 6-2016 clause 215.4
Movement in longitudinal direction
Movement due to temprature =αL T = 5.85 mm
Shrinkage strain = 0.0002 As per IRC 6-2016clause 217.3
Movement due to shrinkage =€L = 3.00 mm
Total longitudinal movement = 8.85 mm
As per IRC 83: ( part ii ) -1987 Clause 916.3.4
Total longitudinal Strain due to temparature,shrinkage, creep = 0.0005
Total longitudinal movement = 7.5 mm

Design movement in longitudinal direction = max (8.85,7.5) = 8.85 mm

Maximum force from elastomeric bearing = 10.325 + 0.25 x 8.85


= 12.5375 t

145 145
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
WIND LOAD CALCULATION ( for wind speed is 36m/s) Due to crash Due to Deck Due to LL
Barrier Slab and
Transverse Wing force calculation girder
Avg Height from GL = 6.40 m 5.28 m 7.90
Design wing speed = 34.00 m/s 34.00 m/s 34.00
Horizontal wind preasure for 33m/sec basic wind speed for corresponding height = 463.7N/m2 463.7N/m2 463.70
Horizontal wind preasure corresponding to basic wind speed and height Pz = 492.2N/m2 492.2N/m2 492.23
Exposed Length per abutment = 7.50 m 7.50 m 7.50
Effective area per abutment = 8.25 m2 8.64 m2 14.25
G guest factor = 2 2 2.00
Cd Drag coefficent = 1.950 1.950 1.200
Force Pz A1GCd = 1.584 t 1.660 t 1.684
Height of point of action of wind force from Ground level = 6.40 m 5.28 m 7.352
Height of point of action of wind force from foundation bottom = 7.50 m 6.38 m 8.452
Moment about Point A = 11.89 t-m 10.59 t-m 14.234
Height of point of action of wind force from stem bottom = 6.80 m 5.68 m 7.752 m
Moment at bottom of Stem = 10.78 t-m 9.42 t-m 13.055

Due to crash Due to Deck Due to LL


Barrier Slab and
Longitudinal Wind force calculation girder
Force = 0.396 t 0.415 t 0.421 t
Height of point of action of wind force from foundation bottom = 7.50 m 6.38 m 8.452
Height of point of action of wind force from stem bottom = 6.80 m 5.68 m 7.752
Transverse Moment about foundation bottom = 2.97 t-m 2.65 t-m 3.559
Transverse Moment about bottom of stem = 2.69 t-m 2.36 t-m 3.264

146 146
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Summary of Forces and Moments per abutment at point A i.e Sliding Restoring transvers
Vertical load Horizontal load overturning moment
Code no Descriptions at toe edge resistance moment moment
1a Due to Dead load of super structure 136.55 t 0.00 t 95.59 t 294.96 t-m 0.00t-m
2a Due to SIDL (Wearing coat) 49.00 t 0.00 t 34.30 t 105.84 t-m 0.00t-m
3a Due to Crash barrier 0.00 t 0.00 t 0.00 t 0.00 t-m 0.00t-m
4a Due to Foot path dead load 0.00 t 0.00 t 0.00 t 0.00 t-m 0.00t-m
5a Due to Footpath Live load 0.00 t 0.00 t 0.00 t 0.00 t-m 0.00t-m
6a Due to Earth preasure in normal Dry case 85.79 t 204.06 t 60.06 t 595.87 t-m 626.29 t-m 0.00t-m
7a Due to LL surcharge in normal Dry case 29.63 t 70.46 t 20.74 t 245.22 t-m 80.01 t-m 0.00t-m
8a Due to Earth preasure in normal Saturate case(draw down casae) 56.21 t 247.38 t 39.35 t 568.97 t-m 410.32 t-m 0.00t-m
9a Due to LL surcharge in normal Saturate case(draw down casae) 17.49 t 76.91 t 12.24 t 267.66 t-m 47.22 t-m 0.00t-m
10a Due to Earth preasure in normal HFL case 52.00 t 227.84 t 36.40 t 555.18 t-m 379.60 t-m 0.00t-m
11a Due to LL surcharge in normal HFL case 17.44 t 75.68 t 12.21 t 261.50 t-m 0.00 t-m 0.00t-m
12a Due to Substructure,Foundation and Soil above heel in normal Dry case 1192.64 t 834.85 t 5224.81 t-m 0.00t-m
13a Due to Substructure,Foundation and Soil above heel in normal saturated case 1287.62 t 901.33 t 5699.68 t-m 0.00t-m
14a Due to Substructure,Foundation and Soil above heel in normal HFL case 1197.67 t 838.37 t 5425.81 t-m 0.00t-m
15a Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) + Dry case 76.48 t 114.56 t 47.04 t-m 0.00t-m
16a Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) +sat case 82.56 t 123.68 t 51.52 t-m 0.00t-m
17a Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) +HFL case 76.80 t 115.04 t 62.56 t-m 0.00t-m
18a Add. Due to Substr.,Foun. and Soil above heel in seismic(Trans.) + Dry case 953.60t-m
19a Add. Due to Substr.,Foun. and Soil above heel in seismic(Trans.) +sat. case 1040.80t-m
20a Add. Due to Substr.,Foun. and Soil above heel in seismic(trans.) +HFL case 1024.80t-m
21a Due to Live load 94.92 t 66.45 t 205.04 t-m
22a Due to temparature 2.21 t 11.95 t-m
23a Due to breaking 10.33 t 55.79 t-m
24a Due to seismic longitundinal componet of DL+SIDL+WC 17.81 t 103.31 t-m
25a Due to seismic transverse componet of DL+SIDL+WC 44.53 t 258.27t-m
26a wind longitudinal 1.07 t 7.39 t-m
27a Wind transverse 29.56t-m
28a Due to Earth preasure in seismic+ Dry case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m 0.00t-m
29a Due to LL surcharge in seismic+ Dry case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m 0.00t-m
30a Due to Earth preasure in seismic+ saturated case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m 0.00t-m
31a Due to LL surcharge in seismic+Saturated case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m 0.00t-m
32a Due to Earth preasure in seismic+ HFL case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m 0.00t-m
33a Due to LL surcharge in seismic+HFL case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m 0.00t-m
34a wind longitudinal 1.23 t 9.18 t-m
35a wind Transverse 36.71t-m
36a Due to seismic transverse componet of LL 24.62t-m

147 147
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Summary of Forces and Moments per abutment at middle of the foundation moment at point moment at mid of Transverse
Vertical load
Code no Descriptions A foundation Moment
1b Due to Dead load of super structure 136.55 t -294.96 t-m 203.47 t-m 0.00 t-m
2b Due to SIDL (Wearing coat) 49.00 t -105.84 t-m 73.01 t-m 0.00 t-m
3b Due to Crash barrier 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
4b Due to Foot path dead load 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
5b Due to Footpath Live load 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
6b Due to Earth preasure in normal Dry case 85.79 t -30.42 t-m 282.72 t-m 0.00 t-m
7b Due to LL surcharge in normal Dry case 29.63 t 165.21 t-m 273.37 t-m 0.00 t-m
8b Due to Earth preasure in normal Saturate case(draw down casae) 56.21 t 158.65 t-m 363.81 t-m 0.00 t-m
9b Due to LL surcharge in normal Saturate case(draw down casae) 17.49 t 220.44 t-m 284.27 t-m 0.00 t-m
10b Due to Earth preasure in normal HFL case 52.00 t 175.58 t-m 365.38 t-m 0.00 t-m
11b Due to LL surcharge in normal HFL case 17.44 t 261.50 t-m 325.16 t-m 0.00 t-m
12b Due to Substructure,Foundation and Soil above heel in normal Dry case 1192.64 t -5224.81 t-m -871.66 t-m 0.00 t-m
13b Due to Substructure,Foundation and Soil above heel in normal saturated case 1287.62 t -5699.68 t-m -999.87 t-m 0.00 t-m
14b Due to Substructure,Foundation and Soil above heel in normal HFL case 1197.67 t -5425.81 t-m -1054.33 t-m 0.00 t-m
15b Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) + Dry case 76.48 t 47.04 t-m 326.19 t-m 0.00 t-m
16b Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) +sat case 82.56 t 51.52 t-m 352.86 t-m 0.00 t-m
17b Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) +HFL case 76.80 t 62.56 t-m 342.88 t-m 0.00 t-m
18b Add. Due to Substr.,Foun. and Soil above heel in seismic(Trans.) + Dry case 0.00 t 0.00 t-m 0.00 t-m 953.60 t-m
19b Add. Due to Substr.,Foun. and Soil above heel in seismic(Trans.) +sat. case 0.00 t 0.00 t-m 0.00 t-m 1040.80 t-m
20b Add. Due to Substr.,Foun. and Soil above heel in seismic(trans.) +HFL case 0.00 t 0.00 t-m 0.00 t-m 1024.80 t-m
21b Due to Live load 94.92 t -205.04 t-m 141.44 t-m 0.00 t-m
22b Due to temparature 0.00 t 11.95 t-m 11.95 t-m 0.00 t-m
23b Due to breaking 0.00 t 55.79 t-m 55.79 t-m 0.00 t-m
24b Due to seismic longitundinal componet of DL+SIDL+WC 0.00 t 103.31 t-m 103.31 t-m 0.00 t-m
25b Due to seismic transverse componet of DL+SIDL+WC 0.00 t 0.00 t-m 0.00 t-m 258.27 t-m
26b wind longitudinal 0.00 t 7.39 t-m 7.39 t-m 0.00 t-m
27b Wind transverse 0.00 t 0.00 t-m 0.00 t-m 29.56 t-m
28b Due to Earth preasure in seismic+ Dry case(dynamic increament component) 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
29b Due to LL surcharge in seismic+ Dry case(dynamic increament component) 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
30b Due to Earth preasure in seismic+ saturated case(dynamic increament component) 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
31b Due to LL surcharge in seismic+Saturated case(dynamic increament component) 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
32b Due to Earth preasure in seismic+ HFL case(dynamic increament component) 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
33b Due to LL surcharge in seismic+HFL case(dynamic increament component) 0.00 t 0.00 t-m 0.00 t-m 0.00 t-m
34b wind longitudinal ) 0.00 t 9.18 t-m 9.18 t-m 0.00 t-m
35b wind Transverse 0.00 t 0.00 t-m 0.00 t-m 36.71 t-m
36b Due to seismic transverse componet of LL 0.00 t 0.00 t-m 0.00 t-m 24.62 t-m

148 148
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by : Suresh Date
Check by : Pavan 09-08-2019
Ref Calculations
Summary of Forces and Moments per abutment at point B i.e at Stem botttom
Code no Descriptions Vertical load Horizontal load Long. moment Tran. Moment
1c Due to Dead load of super structure 136.55 t 0.00 t 12.29 t-m 0.00 t-m
2c Due to SIDL (Wearing coat) 49.00 t 0.00 t 4.41 t-m 0.00 t-m
3c Due to Crash barrier 0.00 t 0.00 t 0.00 t-m 0.00 t-m
4c Due to Foot path dead load 0.00 t 0.00 t 0.00 t-m 0.00 t-m
5c Due to Footpath Live load 0.00 t 0.00 t 0.00 t-m 0.00 t-m
6c Due to Earth preasure in normal Dry case 0.00 t 165.12 t 433.61 t-m 0.00 t-m
7c Due to LL surcharge in normal Dry case 0.00 t 63.52 t 198.82 t-m 0.00 t-m
8c Due to Earth preasure in normal Saturate case(draw down casae) 0.00 t 200.08 t 412.97 t-m 0.00 t-m
9c Due to LL surcharge in normal Saturate case(draw down casae) 0.00 t 69.17 t 216.22 t-m 0.00 t-m
10c Due to Earth preasure in normal HFL case 0.00 t 189.44 t 409.57 t-m 0.00 t-m
11c Due to LL surcharge in normal HFL case 0.00 t 76.80 t 220.54 t-m 0.00 t-m
12c Due to Substructure,Foundation and Soil above heel in normal Dry case 184.68 t 0.00 t 0.00 t-m 0.00 t-m
13c Due to Substructure,Foundation and Soil above heel in normal saturated case 184.68 t 0.00 t 0.00 t-m 0.00 t-m
14c Due to Substructure,Foundation and Soil above heel in normal HFL case 156.01 t 0.00 t 0.00 t-m 0.00 t-m
15c Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) + Dry case 0.00 t 97.28 t 298.88 t-m 0.00 t-m
16c Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) +sat case 0.00 t 106.08 t 326.56 t-m 0.00 t-m
17c Add. Due to Substr.,Foun. and Soil above heel in seismic(longi.) +HFL case 0.00 t 103.36 t 323.68 t-m 0.00 t-m
18c Add. Due to Substr.,Foun. and Soil above heel in seismic(Trans.) + Dry case 0.00 t 0.00 t 0.00 t-m 125.68 t-m
19c Add. Due to Substr.,Foun. and Soil above heel in seismic(Trans.) +sat. case 0.00 t 0.00 t 0.00 t-m 125.68 t-m
20c Add. Due to Substr.,Foun. and Soil above heel in seismic(trans.) +HFL case 0.00 t 0.00 t 0.00 t-m 118.56 t-m
21c Due to Live load 94.92 t 0.00 t 8.54 t-m 130.66 t-m
22c Due to temparature 0.00 t 2.21 t 10.41 t-m 0.00 t-m
23c Due to breaking 0.00 t 10.33 t 48.56 t-m 0.00 t-m
24c Due to seismic longitundinal componet of DL+SIDL+WC 0.00 t 17.81 t 90.84 t-m 0.00 t-m
25c Due to seismic transverse componet of DL+SIDL+WC 0.00 t 0.00 t 0.00 t-m 90.84 t-m
26c wind longitudinal 0.00 t 1.07 t 29.56 t-m 0.00 t-m
27c Wind transverse 0.00 t 0.00 t 0.00 t-m 26.58 t-m
28c Due to Earth preasure in seismic+ Dry case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m
29c Due to LL surcharge in seismic+ Dry case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m
30c Due to Earth preasure in seismic+ saturated case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m
31c Due to LL surcharge in seismic+Saturated case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m
32c Due to Earth preasure in seismic+ HFL case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m
33c Due to LL surcharge in seismic+HFL case(dynamic increament component) 0.00 t 0.00 t 0.00 t-m 0.00 t-m
34c wind longitudinal 0.00 t 1.23 t 36.71 t-m 0.00 t
35c wind Transverse 0.00 t 0.00 t 0.00 t-m 33.26 t
36c Due to seismic transverse componet of LL 0.00 t 0.00 t 0.00 t-m 24.62 t

149 149
SECTION PROPERTIES
Skew angle = 0.000
Width of foundation along normal (a') = 7.300 Width of foundation along skew (a) = 7.300
Length of the abutment along normal (b) = 16.0000 Length of the abutment along skew (b') = 16.0000
a' tan q = 0.000
Y
A 7.300 B

0.000 1

16.000

7.300 X
3

C
S.NO COMPONENT AREA B H IXX Y AY AY2 Iyy X AX AX2
1 0x 7.3 0.000 7.300 0.000 0 16 0 0 0 2.433333333 0 0
2 7.3x 16 116.800 7.300 16.000 2491.73333 8 934.4 7475.2 518.689 3.65 426.32 1556.068
3 0x 7.3 0.000 7.300 0.000 0 0 0 0 0 4.866666667 0 0

116.800 I XX = 2491.73333 24.0000 934.4000 7475.2000 518.7 11.0 426.3 1556.1


YC= A*Y/A = 8.000 m I g = I self +A*Y 2 = 9966.9333 m
4

I N.A(XX) = I G -A*YC 2 = 2491.733333 m


4

2
XC= A*X/A = 3.650 m I g = I self +A*X = 2074.7573
2
I N.A(YY) = I G -A*XC = 518.6893333
ZL a = 142.107 ZL b = 142.107 ZL c = 142.107 Zl d = 142.107
ZT a = 311.467 ZT b = 311.467 ZT c = 311.467 ZT d = 311.467

150 150
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC non seismic combinations


Before construction of super structure.
Normal Dry case

unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load

6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
vertical load 1308 t ML -316 t-m MT 0 t-m
D A
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT

ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT

Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT

Base Preasure at point D = P/A - ML/ZL + MT/ZT

C B Base Preasure at point D = 13.42 t/m2 8.98 t/m2 = Base Preasure at point A

7.30m Base Preasure at point C = 13.42 t/m2 8.98 t/m2 = Base Preasure at point B

Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
vertical load 1361 t ML -352 t-m MT 0 t-m

Base Preasure at point D = 14.14 t/m2 9.18 t/m2 = Base Preasure at point A
2 2
Base Preasure at point C = 14.14 t/m 9.18 t/m = Base Preasure at point B

HFL case
unfactore Factored
Code no Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
Due to LL surcharge in normal HFL case
11b 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
vertical load 1267 t ML -364 t-m MT 0 t-m

Base Preasure at point D = 13.41 t/m2 8.29 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.41 t/m2 8.29 t/m2 = Base Preasure at point B

151 151
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC non seismic combinations


Live load + thermal load
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 1 0 0 1 11.95414 11.9541 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
vertical load 1589 t ML 170 t-m MT 0 t-m
Base Preasure at point D = 12.41 t/m2 14.8 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.41 t/m2 14.8 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 1 0 0 1 11.95414 11.9541 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
vertical load 1642 t ML 134 t-m MT 0 t-m
Base Preasure at point D = 13.12 t/m2 15 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.12 t/m2 15 t/m2 = Base Preasure at point B
HFL Case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 1 0 0 1 11.95414 11.9541 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
vertical load 1548 t ML 122 t-m MT 0 t-m
Base Preasure at point D = 12.4 t/m2 14.11 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.4 t/m2 14.11 t/m2 = Base Preasure at point B

152 152
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC non seismic combinations


Live load + wind load
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1 0 0 1 9.178 9.178 1 0 0
35b wind Transverse 1 0 0 1 0 0 1 36.705 36.705
vertical load 1589 t ML 167 t-m MT 0 t-m
Base Preasure at point D = 12.43 t/m2 14.78 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.43 t/m2 14.78 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1 0 0 1 9.178 9.178 1 0 0
35b wind Transverse 1 0 0 1 0 0 1 36.705 36.705
vertical load 1642 t ML 131 t-m MT 0 t-m
Base Preasure at point D = 13.14 t/m2 14.98 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.14 t/m2 14.98 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1 0 0 1 9.178 9.178 1 0 0
35b wind Transverse 1 0 0 1 0 0 1 36.705 36.705
vertical load 1548 t ML 119 t-m MT 0 t-m
Base Preasure at point D = 12.42 t/m2 14.09 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.42 t/m2 14.09 t/m2 = Base Preasure at point B

153 153
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC non seismic combinations


Wind load (with out LL)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
26b wind longitudinal 1 0 0 1 7.392 7.392 1 0 0
27b Wind transverse 1 0 0 1 0 0 1 29.56425 29.5643
vertical load 1494 t ML -32 t-m MT 30 t-m
Base Preasure at point D = 13.11 t/m2 12.66 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.92 t/m2 12.47 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
26b wind longitudinal 1 0 0 1 7.392 7.392 1 0 0
27b Wind transverse 1 0 0 1 0 0 1 29.56425 29.5643
vertical load 1547 t ML -68 t-m MT 30 t-m
Base Preasure at point D = 13.82 t/m2 12.87 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.63 t/m2 12.68 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
26b wind longitudinal 1 0 0 1 7.392 7.392 1 0 0
27b Wind transverse 1 0 0 1 0 0 1 29.56425 29.5643
vertical load 1453 t ML -80 t-m MT 30 t-m
Base Preasure at point D = 13.1 t/m2 11.97 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.91 t/m2 11.78 t/m2 = Base Preasure at point B

154 154
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC Seismic combinations


Longitudinal seismic case : Before construction of super structure.
Normal Dry case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15b 1 76.48 76.48 1 326.192 326.192 1 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18b 0.3 0 0 0.3 0 0 0.3 953.6 286.08
seismic(Trans.) + Dry case
Due to Earth preasure in seismic+ Dry
28b 1 0 0 1 0 0 1 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+ Dry
29b 1 0 0 1 0 0 1 0 0
case(dynamic increament component)
D A vertical load 1385 t ML 11 t MT 286 t
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.7 t/m2 12.85 t/m2 = Base Preasure at point A
7.30m Base Preasure at point C = 10.87 t/m2 11.02 t/m2 = Base Preasure at point B
Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
9b Due to LL surcharge in normal Saturate 1 17.488 17.488 1 284.2712 284.271 1 0 0
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16b 1 82.56 82.56 1 352.864 352.864 1 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19b 0.3 0 0 0.3 0 0 0.3 1040.8 312.24
seismic(Trans.) +sat. case
Due to Earth preasure in seismic+ saturated
30b 1 0 0 1 0 0 1 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+Saturated
31b 1 0 0 1 0 0 1 0 0
case(dynamic increament component)
vertical load 1444 t ML 1t MT 312 t
Base Preasure at point D = 13.36 t/m2 13.38 t/m2 = Base Preasure at point A
Base Preasure at point C = 11.36 t/m2 11.37 t/m2 = Base Preasure at point B
HFL case
Code no unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17b 1 76.8 76.8 1 342.88 342.88 1 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20b 0.3 0 0 0.3 0 0 0.3 1024.8 307.44
seismic(trans.) +HFL case
Due to Earth preasure in seismic+ HFL
32b 1 0 0 1 0 0 1 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+HFL
33b 1 0 0 1 0 0 1 0 0
case(dynamic increament component)
vertical load 1344 t ML -21 t MT 307 t
Base Preasure at point D = 12.65 t/m2 12.35 t/m2 = Base Preasure at point A
Base Preasure at point C = 10.67 t/m2 10.38 t/m2 = Base Preasure at point B

155 155
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC Seismic combinations


Transverse seismic case : Before construction of super structure.
Normal Dry case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15b 0.3 76.48 22.944 0.3 326.192 97.8576 0.3 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18b 1 0 0 1 0 0 1 953.6 953.6
seismic(Trans.) + Dry case
Due to Earth preasure in seismic+ Dry
28b 0.3 0 0 0.3 0 0 0.3 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+ Dry
29b 0.3 0 0 0.3 0 0 0.3 0 0
case(dynamic increament component)
vertical load 1331 t ML -218 t MT 954 t

Base Preasure at point D = 15.99 t/m2 12.93 t/m2 = Base Preasure at point A
Base Preasure at point C = 9.87 t/m2 6.81 t/m2 = Base Preasure at point B
Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
9b Due to LL surcharge in normal Saturate 1 17.488 17.488 1 284.2712 284.271 1 0 0
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16b 0.3 82.56 24.768 0.3 352.864 105.859 0.3 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19b 1 0 0 1 0 0 1 1040.8 1040.8
seismic(Trans.) +sat. case
Due to Earth preasure in seismic+ saturated
30b 0.3 0 0 0.3 0 0 0.3 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+Saturated
31b 0.3 0 0 0.3 0 0 0.3 0 0
case(dynamic increament component)
vertical load 1386 t ML -246 t MT 1041 t
Base Preasure at point D = 16.94 t/m2 13.48 t/m2 = Base Preasure at point A
Base Preasure at point C = 10.26 t/m2 6.8 t/m2 = Base Preasure at point B
HFL case
Code no unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17b 0.3 76.8 23.04 0.3 342.88 102.864 0.3 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20b 1 0 0 1 0 0 1 1024.8 1024.8
seismic(trans.) +HFL case
Due to Earth preasure in seismic+ HFL
32b 0.3 0 0 0.3 0 0 0.3 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+HFL
33b 0.3 0 0 0.3 0 0 0.3 0 0
case(dynamic increament component)
vertical load 1290 t ML -261 t MT 1025 t
Base Preasure at point D = 16.18 t/m2 12.5 t/m2 = Base Preasure at point A
Base Preasure at point C = 9.6 t/m2 5.92 t/m2 = Base Preasure at point B

156 156
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC Seismic combinations


Longitudinal seismic case : Live load + Thermal load.
Dry case unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
vertical vertical
ver. load ML ML ML MT MT MT
Code no Descriptions load load
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
12b Due to Substructure,Foundation and Soil above 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
15b Add. Due to Substr.,Foun. and Soil above heel in 1 76.48 76.48 1 326.192 326.192 1 0 0
seismic(longi.) + Dry case
18b Add. Due to Substr.,Foun. and Soil above heel in 0.3 0 0 0.3 0 0 0.3 953.6 286.08
seismic(Trans.) + Dry case
28b Due to Earth preasure in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
29b Due to LL surcharge in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 1570 t ML 287 t-m MT 286 t-m
Base Preasure at point D = 12.35 t/m2 16.39 t/m2 = Base Preasure at point A
Base Preasure at point C = 10.51 t/m2 14.55 t/m2 = Base Preasure at point B
Saturated case unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
vertical vertical
ver. load ML ML ML MT MT MT
Code no Descriptions load load
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
9b Due to LL surcharge in normal Saturate 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
13b Due to Substructure,Foundation and Soil above 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
16b Add. Due to Substr.,Foun. and Soil above heel in 1 82.56 82.56 1 352.864 352.864 1 0 0
seismic(longi.) +sat case
19b Add. Due to Substr.,Foun. and Soil above heel in 0.3 0 0 0.3 0 0 0.3 1040.8 312.24
seismic(Trans.) +sat. case
30b Due to Earth preasure in seismic+ saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
31b Due to LL surcharge in seismic+Saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 1629 t ML 278 t-m MT 312 t-m
Base Preasure at point D = 13 t/m2 16.91 t/m2 = Base Preasure at point A
Base Preasure at point C = 11 t/m2 14.91 t/m2 = Base Preasure at point B
HFL Case unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
vertical vertical
ver. load ML ML ML MT MT MT
Code no Descriptions load load
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
14b Due to Substructure,Foundation and Soil above 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
17b Add. Due to Substr.,Foun. and Soil above heel in 1 76.8 76.8 1 342.88 342.88 1 0 0
seismic(longi.) +HFL case
20b Add. Due to Substr.,Foun. and Soil above heel in 0.3 0 0 0.3 0 0 0.3 1024.8 307.44
seismic(trans.) +HFL case
32b Due to Earth preasure in seismic+ HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
33b Due to LL surcharge in seismic+HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 1529 t ML 256 t-m MT 307 t-m
Base Preasure at point D = 12.29 t/m2 15.89 t/m2 = Base Preasure at point A
Base Preasure at point C = 10.31 t/m2 13.91 t/m2 = Base Preasure at point B

157 157
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SBC Seismic combinations


Transverse seismic case : Live Load + Thermal load .
Dry case Factor for unfac. Ver. Fac. Ver. Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions ver. load load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
12b Due to Substructure,Foundation and Soil above 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
15b Add. Due to Substr.,Foun. and Soil above heel in 0.3 76.48 22.944 0.3 326.192 97.8576 0.3 0 0
seismic(longi.) + Dry case
18b Add. Due to Substr.,Foun. and Soil above heel in 1 0 0 1 0 0 1 953.6 953.6
seismic(Trans.) + Dry case
28b Due to Earth preasure in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
29b Due to LL surcharge in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36b Due to seismic transverse componet of LL 1 0 0 1 0 0 1 24.61811 24.6181
vertical load 1517 t ML 59 t-m MT 978 t-m
Base Preasure at point D = 15.72 t/m2 16.54 t/m2 = Base Preasure at point A
Base Preasure at point C = 9.44 t/m2 10.26 t/m2 = Base Preasure at point B
Saturated case Factor for unfac. Ver. Fac. Ver. Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions ver. load load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
9b Due to LL surcharge in normal Saturate 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
13b Due to Substructure,Foundation and Soil above 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
16b Add. Due to Substr.,Foun. and Soil above heel in 0.3 82.56 24.768 0.3 352.864 105.859 0.3 0 0
seismic(longi.) +sat case
19b Add. Due to Substr.,Foun. and Soil above heel in 1 0 0 1 0 0 1 1040.8 1040.8
seismic(Trans.) +sat. case
30b Due to Earth preasure in seismic+ saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
31b Due to LL surcharge in seismic+Saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36b Due to seismic transverse componet of LL 1 0 0 1 0 0 1 24.61811 24.6181
vertical load 1572 t ML 31 t-m MT 1065 t-m
Base Preasure at point D = 16.67 t/m2 17.1 t/m2 = Base Preasure at point A
Base Preasure at point C = 9.83 t/m2 10.26 t/m2 = Base Preasure at point B
HFL Case Factor for unfac. Ver. Fac. Ver. Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions ver. load load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
14b Due to Substructure,Foundation and Soil above 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
17b Add. Due to Substr.,Foun. and Soil above heel in 0.3 76.8 23.04 0.3 342.88 102.864 0.3 0 0
seismic(longi.) +HFL case
20b Add. Due to Substr.,Foun. and Soil above heel in 1 0 0 1 0 0 1 1024.8 1024.8
seismic(trans.) +HFL case
32b Due to Earth preasure in seismic+ HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
33b Due to LL surcharge in seismic+HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36b Due to seismic transverse componet of LL 1 0 0 1 0 0 1 24.61811 24.6181
vertical load 1476 t ML 16 t-m MT 1049 t-m
Base Preasure at point D = 15.9 t/m2 16.12 t/m2 = Base Preasure at point A
Base Preasure at point C = 9.16 t/m2 9.38 t/m2 = Base Preasure at point B

158 158
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination :before construction of super structure

Normal Dry case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0

7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0

Due to Substructure,Foundation and Soil above heel in


12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
391t 793t 1188t-m 4964t-m
Sliding Check: Safe Over turning check Safe

Saturated case ( sudden draw down)


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

Due to Earth preasure in normal Saturate case(draw down


8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
463t 856t 1175t-m 5415t-m
Sliding Check: Safe Over turning check Safe

HFL case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0

11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0

Due to Substructure,Foundation and Soil above heel in


14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
433t 796t 1147t-m 5155t-m
Sliding Check: Safe Over turning check Safe

159 159
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination: Live load as leading load (with out wind or temparature)

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088

2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378


3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
406t 918t 1272t-m 5350t-m
Sliding Check: Safe Over turning check Safe
Saturated case(sudden draw down case)
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
479t 981t 1258t-m 5801t-m
Sliding Check: Safe Over turning check Safe
HFL case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
448t 922t 1230t-m 5541t-m

Sliding Check: Safe Over turning check Safe

160 160
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination:Live load as leading load and thermal load as accompanying

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
22a Due to temparature 0.9 1.99125 0 0 0.9 10.758724 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
408t 918t 1283t-m 5350t-m
Sliding Check: Safe Over turning check Safe
Saturated case( sudden draw down case)
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
22a Due to temparature 0.9 1.99125 0 0 0.9 10.758724 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
481t 981t 1269t-m 5801t-m
Sliding Check: Safe Over turning check Safe
HFL case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
22a Due to temparature 0.9 1.99125 0 0 0.9 10.758724 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
450t 922t 1241t-m 5541t-m
Sliding Check: Safe Over turning check Safe

161 161
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination :Live load as leading load and Wind load as accompanying

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
34a wind longitudinal 0.9 1.1088 0 0 0.9 8.2602 0 0
35a wind Transverse 0.9 0 0.9 0
407t 918t 1280t-m 5350t-m
Sliding Check: Safe Over turning check Safe

Saturated case(Sudden draw down case)


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
34a wind longitudinal 0.9 1.1088 0 0 0.9 8.2602 0 0
35a wind Transverse 0.9 0 0.9 0
480t 981t 1267t-m 5801t-m
Sliding Check: Safe Over turning check Safe

HFL case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.5 0 0 0 1.5 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
21a Due to Live load 1.5 0 0 0 1.5 0 0 0
23a Due to breaking 1.5 15.4875 0 0 1.5 83.678963 0 0
34a wind longitudinal 0.9 1.1088 0 0 0.9 8.2602 0 0
35a wind Transverse 0.9 0 0.9 0
449t 922t 1239t-m 5541t-m
Sliding Check: Safe Over turning check Safe

162 162
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination:Thermal load as leading load Without Live load

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
22a Due to temparature 1.5 3.31875 0 0 1.5 17.931206 0 0
394t 918t 1206t-m 5350t-m
Sliding Check: Safe Over turning check Safe

Saturated case ( sudden draw down condition)


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
22a Due to temparature 1.5 3.31875 0 0 1.5 17.931206 0 0
467t 981t 1193t-m 5801t-m
Sliding Check: Safe Over turning check Safe

HFL Case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
22a Due to temparature 1.5 3.31875 0 0 1.5 17.931206 0 0
436t 922t 1165t-m 5541t-m
Sliding Check: Safe Over turning check Safe

163 163
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination:Thermal load as leading load With Live load as accompanying

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
21a Due to Live load 1.15 0 0 0 1.15 0 0 0
22a Due to temparature 1.5 3.31875 0 0 1.5 17.931206 0 0
23a Due to breaking 1.15 11.87375 0 0 1.15 64.153871 0 0
406t 918t 1270t-m 5350t-m
Sliding Check: Safe Over turning check Safe

Saturated case(Sudden draw down case)


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
21a Due to Live load 1.15 0 0 0 1.15 0 0 0
22a Due to temparature 1.5 3.31875 0 0 1.5 17.931206 0 0
23a Due to breaking 1.15 11.87375 0 0 1.15 64.153871 0 0
479t 981t 1257t-m 5801t-m
Sliding Check: Safe Over turning check Safe

HFL Case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
21a Due to Live load 1.15 0 0 0 1.15 0 0 0
22a Due to temparature 1.5 3.31875 0 0 1.5 17.931206 0 0
23a Due to breaking 1.15 11.87375 0 0 1.15 64.153871 0 0
448t 922t 1229t-m 5541t-m
Sliding Check: Safe Over turning check Safe

164 164
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination:Wind load as leading load Without Live load

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
26a wind longitudinal 1.5 1.6005 0 0 1.5 11.088 0 0
27a Wind transverse 1.5 0 0 0 1.5 0 0 0
392t 918t 1199t-m 5350t-m
Sliding Check: Safe Over turning check Safe

Saturated case(Sudden draw down case)


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
26a wind longitudinal 1.5 1.6005 0 0 1.5 11.088 0 0
27a Wind transverse 1.5 0 0 0 1.5 0 0 0
465t 981t 1186t-m 5801t-m
Sliding Check: Safe Over turning check Safe

HFL case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
26a wind longitudinal 1.5 1.6005 0 0 1.5 11.088 0 0
27a Wind transverse 1.5 0 0 0 1.5 0 0 0
434t 922t 1158t-m 5541t-m
Sliding Check: Safe Over turning check Safe

165 165
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-basic combination:Wind load as leading load with Live load as accompanying load

Dry case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
6a Due to Earth preasure in normal Dry case 1.5 306.096 0 0 1.5 893.805 0 0
7a Due to LL surcharge in normal Dry case 1.2 84.5568 0 0 1.2 294.264 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
21a Due to Live load 1.15 0 0 0 1.15 0 0 0
23a Due to breaking 1.15 11.87375 0 0 1.15 64.153871 0 0
34a wind longitudinal 1.5 1.848 0 0 1.5 13.767 0 0
35a wind Transverse 1.5 0 0 0 1.5 0 0 0
404t 918t 1266t-m 5350t-m
Sliding Check: Safe Over turning check Safe

Saturated case(Sudden draw down case)


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1.5 371.064 0 0 1.5 853.455 0 0
casae)
Due to LL surcharge in normal Saturate case(draw down
9a 1.2 92.2944 0 0 1.2 321.192 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
21a Due to Live load 1.15 0 0 0 1.15 0 0 0
23a Due to breaking 1.15 11.87375 0 0 1.15 64.153871 0 0
34a wind longitudinal 1.5 1.848 0 0 1.5 13.767 0 0
35a wind Transverse 1.5 0 0 0 1.5 0 0 0
477t 981t 1253t-m 5801t-m
Sliding Check: Safe Over turning check Safe

HFL case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 1.15 0 0 0 1.15 0 0 0
10a Due to Earth preasure in normal HFL case 1.5 341.76 0 0 1.5 832.776 0 0
11a Due to LL surcharge in normal HFL case 1.2 90.816 0 0 1.2 313.8048 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
21a Due to Live load 1.15 0 0 0 1.15 0 0 0
23a Due to breaking 1.15 11.87375 0 0 1.15 64.153871 0 0
34a wind longitudinal 1.5 1.848 0 0 1.5 13.767 0 0
35a wind Transverse 1.5 0 0 0 1.5 0 0 0
446t 922t 1225t-m 5541t-m
Sliding Check: Safe Over turning check Safe

166 166
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-Seismic combination:Before construction of Super structure

Dry case - seismic longitudinal case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
6a Due to Earth preasure in normal Dry case 1 204.064 0 0 1 595.87 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15a 0.75 85.92 0 0 0.75 35.28 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18a 0.225 0 0 0 0.225 0 0 0
seismic(Trans.) + Dry case
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.75 13.359816 0 0 0.75 77.480253 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.225 0 0 0 0.225 0 0 0
Due to Earth preasure in seismic+ Dry case(dynamic
28a 0.75 0 0 0 0.75 0 0 0
increament component)
303t 793t 709t-m 4964t-m

Sliding Check: Safe Over turning check Safe

Saturated case(Sudden draw down) - seismic longitudinal case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
8a Due to Earth preasure in normal Saturate case(draw down 1 247.376 0 0 1 568.97 0 0
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16a 0.75 92.76 0 0 0.75 38.64 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19a 0.225 0 0 0 0.225 0 0 0
seismic(Trans.) +sat. case
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.75 13.359816 0 0 0.75 77.480253 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.225 0 0 0 0.225 0 0 0
Due to Earth preasure in seismic+ saturated case(dynamic
30a 0.75 0 0 0 0.75 0 0 0
increament component)
353t 856t 685t-m 5415t-m
Sliding Check: Safe Over turning check Safe

HFL case - seismic longitudinal case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
10a Due to Earth preasure in normal HFL case 1 227.84 0 0 1 555.184 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17a 0.75 86.28 0 0 0.75 46.92 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20a 0.225 0 0 0 0.225 0 0 0
seismic(trans.) +HFL case
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.75 13.359816 0 0 0.75 77.480253 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.225 0 0 0 0.225 0 0 0
Due to Earth preasure in seismic+ HFL case(dynamic
32a 0.75 0 0 0 0.75 0 0 0
increament component)
327t 796t 680t-m 5155t-m
Sliding Check: Safe Over turning check Safe

167 167
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-Seismic combination:Before construction of Super structure

Dry case - seismic Transverse case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
6a Due to Earth preasure in normal Dry case 1 204.064 0 0 1 595.87 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15a 0.225 25.776 0 0 0.225 10.584 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18a 0.75 0 0 0 0.75 0 0 0
seismic(Trans.) + Dry case
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.225 4.0079448 0 0 0.225 23.244076 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.75 0 0 0 0.75 0 0 0
Due to Earth preasure in seismic+ Dry case(dynamic
28a 0.225 0 0 0 0.225 0 0 0
increament component)
234t 793t 630t-m 4964t-m

Sliding Check: Safe Over turning check Safe

Saturated case(Sudden draw down) - seismic Transverse case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
8a Due to Earth preasure in normal Saturate case(draw down 1 247.376 0 0 1 568.97 0 0
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16a 0.225 27.828 0 0 0.225 11.592 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19a 0.75 0 0 0 0.75 0 0 0
seismic(Trans.) +sat. case
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.225 4.0079448 0 0 0.225 23.244076 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.75 0 0 0 0.75 0 0 0
Due to Earth preasure in seismic+ saturated case(dynamic
30a 0.225 0 0 0 0.225 0 0 0
increament component)
279t 856t 604t-m 5415t-m
Sliding Check: Safe Over turning check Safe

HFL case - seismic Transverse case


Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
10a Due to Earth preasure in normal HFL case 1 227.84 0 0 1 555.184 0 0
Due to Substructure,Foundation and Soil above heel in
14a 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17a 0.225 25.884 0 0 0.225 14.076 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20a 0.75 0 0 0 0.75 0 0 0
seismic(trans.) +HFL case
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.225 4.0079448 0 0 0.225 23.244076 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.75 0 0 0 0.75 0 0 0
Due to Earth preasure in seismic+ HFL case(dynamic
32a 0.225 0 0 0 0.225 0 0 0
increament component)
258t 796t 593t-m 5155t-m
Sliding Check: Safe Over turning check Safe

168 168
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-Seismic combination:
Dry case - seismic longitudinal case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Hor. load
Horizontal Sliding Sliding Over. overtur. Res. Rest.
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 0.2 0 0 0 0.2 0 0 0
6a Due to Earth preasure in normal Dry case 1 204.064 0 0 1 595.87 0 0
Due to Substructure,Foundation and Soil above heel in
12a 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15a 1.5 171.84 0 0 1.5 70.56 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18a 0.45 0 0.45 0
seismic(Trans.) + Dry case
22a Due to temparature 0.5 1.10625 0 0 0.5 5.9770688 0 0
24a Due to seismic longitundinal componet of DL+SIDL+WC 1.5 0 1.5 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.45 0 0 0 0.45 0 0 0
Due to Earth preasure in seismic+ Dry case(dynamic
28a 1.5 0 0 0 1.5 0 0 0
increament component)
Sliding Check: Safe Over turning check: Safe 377t 918t 672t-m 5350t-m
Saturated case(Sudden draw down) - seismic longitudinal case
Factored Factor for Factored Factor for Factored Factor for Factored
Factor for
Code no Descriptions Horizontal Sliding Sliding Over. overtur. Res. Rest.
Hor. load
load resist resistance Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 0.2 0 0 0 0.2 0 0 0
Due to Earth preasure in normal Saturate case(draw down
8a 1 247.376 0 0 1 568.97 0 0
casae)
Due to Substructure,Foundation and Soil above heel in
13a 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16a 1.5 185.52 0 0 1.5 77.28 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19a 0.45 0 0.45 0
seismic(Trans.) +sat. case
22a Due to temparature 0.5 1.10625 0 0 0.5 5.9770688 0 0
24a Due to seismic longitundinal componet of DL+SIDL+WC 1.5 0 1.5 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.45 0 0 0 0.45 0 0 0
Due to Earth preasure in seismic+ saturated case(dynamic
30a 1.5 0 0 0 1.5 0 0 0
increament component)
Sliding Check: Safe Over turning check: Safe 434t 981t 652t-m 5801t-m
HFL case - seismic longitudinal case
Factor for Factored Factor for Factored
Factor for Factored Hor. Factor for Factored Sli.
Code no Descriptions Over. overtur. Res. Rest.
Hor. load load Sli. resist Resis.
Moment moment Moment moment
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 0.2 0 0 0 0.2 0 0 0
10a Due to Earth preasure in normal HFL case 1 227.84 0 0 1 555.184 0 0
14a Due to Substructure,Foundation and Soil above heel in 0 0 0.95 796.4472 0 0 0.95 5154.515
17a Add. Due to Substr.,Foun. and Soil above heel in 1.5 172.56 0 0 1.5 93.84 0 0
Add. Due to Substr.,Foun. and Soil above heel in
20a 0.45 0 0.45 0
seismic(trans.) +HFL case
22a Due to temparature 0.5 1.10625 0 0 0.5 5.9770688 0 0
24a Due to seismic longitundinal componet of DL+SIDL+WC 1.5 0 1.5 0
25a Due to seismic transverse componet of DL+SIDL+WC 0.45 0 0 0 0.45 0 0 0
32a Due to Earth preasure in seismic+ HFL case(dynamic 1.5 0 0 0 1.5 0 0 0
Sliding Check: Safe Over turning check: Safe 402t 922t 655t-m 5541t-m

169 169
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations for verification of Equilibrium as per table 3.1 of IRC 6-2016
Verification of Equilibrium-Seismic combination:
Dry case - seismic Transverse case
Fac for Fac. for Sli. Fac. Sli. Fac. for Fac. overtur. Factor for Factored
Code no Descriptions Fac. Hor. load
Hor. load resist Resis. Over. Mom. moment Res. Mom. Rest. Mom.
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 0.2 0 0 0 0.2 0 0 0
6a Due to Earth preasure in normal Dry case 1 204.064 0 0 1 595.87 0 0
12a Due to Substructure,Foundation and Soil above heel in 0 0 0.95 793.1089 0 0 0.95 4963.571
normal Dry case
15a Add. Due to Substr.,Foun. and Soil above heel in 0.45 51.552 0 0 0.45 21.168 0 0
seismic(longi.) + Dry case
18a Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 0 1.5 0 0 0
seismic(Trans.) + Dry case
21a Due to Live load 0.2 0 0 0 0.2 0 0 0
22a Due to temparature 0.5 1.10625 0 0 0.5 5.9770688 0 0
23a Due to breaking 0.2 2.065 0 0 0.2 11.157195 0 0
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.45 8.0158896 0 0 0.45 46.488152 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 1.5 0 0 0 1.5 0 0 0
28a Due to Earth preasure in seismic+ Dry case(dynamic 0.45 0 0 0 0.45 0 0 0
increament component)
Sliding Check: Safe Over turning check: Safe 267t 918t 681t-m 5350t-m
Saturated case(Sudden draw down) - seismic Transverse case
Fac for Fac. for Sli. Fac. Sli. Fac. for Fac. overtur. Factor for Factored
Code no Descriptions Fac. Hor. load
Hor. load resist Resis. Over. Mom. moment Res. Mom. Rest. Mom.

1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 0.2 0 0 0 0.2 0 0 0
8a Due to Earth preasure in normal Saturate case(draw down 1 247.376 0 0 1 568.97 0 0
casae)
13a Due to Substructure,Foundation and Soil above heel in 0 0 0.95 856.2662 0 0 0.95 5414.696
normal saturated case
16a Add. Due to Substr.,Foun. and Soil above heel in 0.45 55.656 0 0 0.45 23.184 0 0
seismic(longi.) +sat case
19a Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 0 1.5 0 0 0
seismic(Trans.) +sat. case
21a Due to Live load 0.2 0 0 0 0.2 0 0 0
22a Due to temparature 0.5 1.10625 0 0 0.5 5.9770688 0 0
23a Due to breaking 0.2 2.065 0 0 0.2 11.157195 0 0
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.45 8.0158896 0 0 0.45 46.488152 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 1.5 0 0 0 1.5 0 0 0
30a Due to Earth preasure in seismic+ saturated case(dynamic 0.45 0 0 0 0.45 0 0 0
increament component)
Sliding Check: Safe Over turning check: Safe 314t 981t 656t-m 5801t-m
HFL case - seismic Transverse case
Fac for Fac. for Sli. Fac. Sli. Fac. for Fac. overtur. Factor for Factored
Code no Descriptions Fac. Hor. load
Hor. load resist Resis. Over. Mom. moment Res. Mom. Rest. Mom.
1a Due to Dead load of super structure 1.05 0 0.95 90.80841 1.05 0 0.95 280.2088
2a Due to SIDL (Wearing coat) 1.35 0 1 34.2993 1.35 0 1 105.8378
3a Due to Crash barrier 1.05 0 0.95 0 1.05 0 0.95 0
4a Due to Foot path dead load 1.05 0 0.95 0 1.05 0 0.95 0
5a Due to Footpath Live load 0.2 0 0 0 0.2 0 0 0
10a Due to Earth preasure in normal HFL case 1 227.84 0 0 1 555.184 0 0
14a Due to Substructure,Foundation and Soil above heel in 0 0 0.95 796.4472 0 0 0.95 5154.515
normal HFL case
17a Add. Due to Substr.,Foun. and Soil above heel in 0.45 51.768 0 0 0.45 28.152 0 0
seismic(longi.) +HFL case
20a Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 0 1.5 0 0 0
seismic(trans.) +HFL case
21a Due to Live load 0.2 0 0 0 0.2 0 0 0
22a Due to temparature 0.5 1.10625 0 0 0.5 5.9770688 0 0
23a Due to breaking 0.2 2.065 0 0 0.2 11.157195 0 0
24a Due to seismic longitundinal componet of DL+SIDL+WC 0.45 8.0158896 0 0 0.45 46.488152 0 0
25a Due to seismic transverse componet of DL+SIDL+WC 1.5 0 0 0 1.5 0 0 0
32a Due to Earth preasure in seismic+ HFL case(dynamic 0.45 0 0 0 0.45 0 0 0
increament component)
Sliding Check: Safe Over turning check: Safe 291t 922t 647t-m 5541t-m

170 170
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Before construction of super structure.
Normal Dry case

unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load

6b Due to Earth preasure in normal Dry case 1.5 85.792 128.688 1.5 282.7208 424.081 1.5 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
vertical load 1774 t ML -425 t-m MT 0 t-m
D A
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT

ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT

Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT

Base Preasure at point D = P/A - ML/ZL + MT/ZT

C B Base Preasure at point D = 18.18 t/m2 12.21 t/m2 = Base Preasure at point A

7.30m Base Preasure at point C = 18.18 t/m2 12.21 t/m2 = Base Preasure at point B

Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
Due to Earth preasure in normal Saturate
8b 1.5 56.208 84.312 1.5 363.8092 545.714 1.5 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
vertical load 1844 t ML -463 t-m MT 0 t-m

Base Preasure at point D = 19.05 t/m2 12.53 t/m2 = Base Preasure at point A
2 2
Base Preasure at point C = 19.05 t/m 12.53 t/m = Base Preasure at point B

HFL case
unfactore Factored
Code no Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1.5 52 78 1.5 365.384 548.076 1.5 0 0
Due to LL surcharge in normal HFL case
11b 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
vertical load 1716 t ML -485 t-m MT 0 t-m

Base Preasure at point D = 18.11 t/m2 11.28 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.11 t/m2 11.28 t/m2 = Base Preasure at point B

171 171
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
6b Due to Earth preasure in normal Dry case 1.5 85.792 128.688 1.5 282.7208 424.081 1.5 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
22b Due to temparature 0.9 0 0 0.9 11.95414 10.7587 0.9 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
vertical load 2187 t ML 284 t-m MT 0 t-m
Base Preasure at point D = 16.73 t/m2 20.73 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.73 t/m2 20.73 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
Due to Earth preasure in normal Saturate
8b 1.5 56.208 84.312 1.5 363.8092 545.714 1.5 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
22b Due to temparature 0.9 0 0 0.9 11.95414 10.7587 0.9 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
vertical load 2256 t ML 246 t-m MT 0 t-m
Base Preasure at point D = 17.59 t/m2 21.05 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.59 t/m2 21.05 t/m2 = Base Preasure at point B
HFL Case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
10b Due to Earth preasure in normal HFL case 1.5 52 78 1.5 365.384 548.076 1.5 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
22b Due to temparature 0.9 0 0 0.9 11.95414 10.7587 0.9 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
vertical load 2128 t ML 224 t-m MT 0 t-m
Base Preasure at point D = 16.65 t/m2 19.8 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.65 t/m2 19.8 t/m2 = Base Preasure at point B

172 172
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case
Code no Factor for
unfactored Factored
Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
22b Due to temparature 0.9 0 0 0.9 11.95414 10.7587 0.9 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
vertical load 2144 t ML 143 t-m MT 0 t-m
Base Preasure at point D = 17.35 t/m2 19.37 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.35 t/m2 19.37 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
22b Due to temparature 0.9 0 0 0.9 11.95414 10.7587 0.9 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
vertical load 2228 t ML 64 t-m MT 0 t-m
Base Preasure at point D = 18.63 t/m2 19.53 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.63 t/m2 19.53 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
22b Due to temparature 0.9 0 0 0.9 11.95414 10.7587 0.9 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
vertical load 2102 t ML 41 t-m MT 0 t-m
Base Preasure at point D = 17.71 t/m2 18.29 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.71 t/m2 18.29 t/m2 = Base Preasure at point B

173 173
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
6b Due to Earth preasure in normal Dry case 1.5 85.792 128.688 1.5 282.7208 424.081 1.5 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal 0.9 0 0 0.9 9.178 8.2602 0.9 0 0
35b wind Transverse 0.9 0 0 0.9 0 0 0.9 36.705 33.0345
vertical load 2187 t ML 282 t-m MT 0 t-m
Base Preasure at point D = 16.74 t/m2 20.71 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.74 t/m2 20.71 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
Due to Earth preasure in normal Saturate
8b 1.5 56.208 84.312 1.5 363.8092 545.714 1.5 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal 0.9 0 0 0.9 9.178 8.2602 0.9 0 0
35b wind Transverse 0.9 0 0 0.9 0 0 0.9 36.705 33.0345
vertical load 2256 t ML 244 t-m MT 0 t-m
Base Preasure at point D = 17.61 t/m2 21.03 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.61 t/m2 21.03 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
10b Due to Earth preasure in normal HFL case 1.5 52 78 1.5 365.384 548.076 1.5 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal 0.9 0 0 0.9 9.178 8.2602 0.9 0 0
35b wind Transverse 0.9 0 0 0.9 0 0 0.9 36.705 33.0345
vertical load 2128 t ML 221 t-m MT 0 t-m
Base Preasure at point D = 16.67 t/m2 19.78 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.67 t/m2 19.78 t/m2 = Base Preasure at point B

174 174
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal 0.9 0 0 0.9 9.178 8.2602 0.9 0 0
35b wind Transverse 0.9 0 0 0.9 0 0 0.9 36.705 33.0345
vertical load 2144 t ML 141 t-m MT 0 t-m
Base Preasure at point D = 17.37 t/m2 19.35 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.37 t/m2 19.35 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal 0.9 0 0 0.9 9.178 8.2602 0.9 0 0
35b wind Transverse 0.9 0 0 0.9 0 0 0.9 36.705 33.0345
vertical load 2228 t ML 62 t-m MT 0 t-m
Base Preasure at point D = 18.65 t/m2 19.51 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.65 t/m2 19.51 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.5 0 0 1.5 0 0 1.5 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal 0.9 0 0 0.9 9.178 8.2602 0.9 0 0
35b wind Transverse 0.9 0 0 0.9 0 0 0.9 36.705 33.0345
vertical load 2102 t ML 39 t-m MT 0 t-m
Base Preasure at point D = 17.73 t/m2 18.28 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.73 t/m2 18.28 t/m2 = Base Preasure at point B

175 175
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
6b Due to Earth preasure in normal Dry case 1.5 85.792 128.688 1.5 282.7208 424.081 1.5 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
21b Due to Live load 1.15 94.9245 109.163 1.15 141.4376 162.653 1.15 0 0
23b Due to breaking 1.15 0 0 1.15 55.78598 64.1539 1.15 0 0
34b wind longitudinal 1.5 0 0 1.5 9.178 13.767 1.5 0 0
35b wind Transverse 1.5 0 0 1.5 0 0 1.5 36.705 55.0575
vertical load 2154 t ML 218 t-m MT 0 t-m
Base Preasure at point D = 16.91 t/m2 19.98 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.91 t/m2 19.98 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
Due to Earth preasure in normal Saturate
8b 1.5 56.208 84.312 1.5 363.8092 545.714 1.5 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
21b Due to Live load 1.15 94.9245 109.163 1.15 141.4376 162.653 1.15 0 0
23b Due to breaking 1.15 0 0 1.15 55.78598 64.1539 1.15 0 0
34b wind longitudinal 1.5 0 0 1.5 9.178 13.767 1.5 0 0
35b wind Transverse 1.5 0 0 1.5 0 0 1.5 36.705 55.0575
vertical load 2223 t ML 180 t-m MT 0 t-m
Base Preasure at point D = 17.77 t/m2 20.3 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.77 t/m2 20.3 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
10b Due to Earth preasure in normal HFL case 1.5 52 78 1.5 365.384 548.076 1.5 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
21b Due to Live load 1.15 94.9245 109.163 1.15 141.4376 162.653 1.15 0 0
23b Due to breaking 1.15 0 0 1.15 55.78598 64.1539 1.15 0 0
34b wind longitudinal 1.5 0 0 1.5 9.178 13.767 1.5 0 0
35b wind Transverse 1.5 0 0 1.5 0 0 1.5 36.705 55.0575
vertical load 2095 t ML 158 t-m MT 0 t-m
Base Preasure at point D = 16.83 t/m2 19.05 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.83 t/m2 19.05 t/m2 = Base Preasure at point B

176 176
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
21b Due to Live load 1.15 94.9245 109.163 1.15 141.4376 162.653 1.15 0 0
23b Due to breaking 1.15 0 0 1.15 55.78598 64.1539 1.15 0 0
34b wind longitudinal 1.5 0 0 1.5 9.178 13.767 1.5 0 0
35b wind Transverse 1.5 0 0 1.5 0 0 1.5 36.705 55.0575
vertical load 2111 t ML 77 t-m MT 0 t-m
Base Preasure at point D = 17.53 t/m2 18.62 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.53 t/m2 18.62 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
21b Due to Live load 1.15 94.9245 109.163 1.15 141.4376 162.653 1.15 0 0
23b Due to breaking 1.15 0 0 1.15 55.78598 64.1539 1.15 0 0
34b wind longitudinal 1.5 0 0 1.5 9.178 13.767 1.5 0 0
35b wind Transverse 1.5 0 0 1.5 0 0 1.5 36.705 55.0575
vertical load 2195 t ML -2 t-m MT 0 t-m
Base Preasure at point D = 18.81 t/m2 18.78 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.81 t/m2 18.78 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
21b Due to Live load 1.15 94.9245 109.163 1.15 141.4376 162.653 1.15 0 0
23b Due to breaking 1.15 0 0 1.15 55.78598 64.1539 1.15 0 0
34b wind longitudinal 1.5 0 0 1.5 9.178 13.767 1.5 0 0
35b wind Transverse 1.5 0 0 1.5 0 0 1.5 36.705 55.0575
vertical load 2069 t ML -25 t-m MT 0 t-m
Base Preasure at point D = 17.89 t/m2 17.55 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.89 t/m2 17.55 t/m2 = Base Preasure at point B

177 177
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
6b Due to Earth preasure in normal Dry case 1.5 85.792 128.688 1.5 282.7208 424.081 1.5 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
26b wind longitudinal 1.5 0 0 1.5 7.392 11.088 1.5 0 0
27b Wind transverse 1.5 0 0 1.5 0 0 1.5 29.56425 44.3464
vertical load 2044 t ML -11 t-m MT 44 t-m
Base Preasure at point D = 17.73 t/m2 17.57 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.44 t/m2 17.29 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
Due to Earth preasure in normal Saturate
8b 1.5 56.208 84.312 1.5 363.8092 545.714 1.5 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
26b wind longitudinal 1.5 0 0 1.5 7.392 11.088 1.5 0 0
27b Wind transverse 1.5 0 0 1.5 0 0 1.5 29.56425 44.3464
vertical load 2114 t ML -49 t-m MT 44 t-m
Base Preasure at point D = 18.59 t/m2 17.9 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.31 t/m2 17.61 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
10b Due to Earth preasure in normal HFL case 1.5 52 78 1.5 365.384 548.076 1.5 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
26b wind longitudinal 1.5 0 0 1.5 7.392 11.088 1.5 0 0
27b Wind transverse 1.5 0 0 1.5 0 0 1.5 29.56425 44.3464
vertical load 1986 t ML -72 t-m MT 44 t-m
Base Preasure at point D = 17.65 t/m2 16.65 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.37 t/m2 16.36 t/m2 = Base Preasure at point B

178 178
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 1
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 1.2 29.632 35.5584 1.2 273.3668 328.04 1.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
26b wind longitudinal 1.5 0 0 1.5 7.392 11.088 1.5 0 0
27b Wind transverse 1.5 0 0 1.5 0 0 1.5 29.56425 44.3464
vertical load 2002 t ML -152 t-m MT 44 t-m
Base Preasure at point D = 18.36 t/m2 16.21 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.07 t/m2 15.93 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1.2 17.488 20.9856 1.2 284.2712 341.125 1.2 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
26b wind longitudinal 1.5 0 0 1.5 7.392 11.088 1.5 0 0
27b Wind transverse 1.5 0 0 1.5 0 0 1.5 29.56425 44.3464
vertical load 2086 t ML -231 t-m MT 44 t-m
Base Preasure at point D = 19.63 t/m2 16.38 t/m2 = Base Preasure at point A
Base Preasure at point C = 19.35 t/m2 16.09 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 1.15 0 0 1.15 0 0 1.15 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 1.2 17.44 20.928 1.2 325.16 390.192 1.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
26b wind longitudinal 1.5 0 0 1.5 7.392 11.088 1.5 0 0
27b Wind transverse 1.5 0 0 1.5 0 0 1.5 29.56425 44.3464
vertical load 1960 t ML -254 t-m MT 44 t-m
Base Preasure at point D = 18.72 t/m2 15.14 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.43 t/m2 14.85 t/m2 = Base Preasure at point B

179 179
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Before construction of super structure.
Normal Dry case

unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load

6b Due to Earth preasure in normal Dry case 1.3 85.792 111.53 1.3 282.7208 367.537 1.3 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
vertical load 1334 t ML -231 t-m MT 0 t-m
D A
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT

ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT

Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT

Base Preasure at point D = P/A - ML/ZL + MT/ZT

C B Base Preasure at point D = 13.05 t/m2 9.8 t/m2 = Base Preasure at point A

7.30m Base Preasure at point C = 13.05 t/m2 9.8 t/m2 = Base Preasure at point B

Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
Due to Earth preasure in normal Saturate
8b 1.3 56.208 73.0704 1.3 363.8092 472.952 1.3 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
vertical load 1378 t ML -243 t-m MT 0 t-m

Base Preasure at point D = 13.51 t/m2 10.1 t/m2 = Base Preasure at point A
2 2
Base Preasure at point C = 13.51 t/m 10.1 t/m = Base Preasure at point B

HFL case
unfactore Factored
Code no Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1.3 52 67.6 1.3 365.384 474.999 1.3 0 0
Due to LL surcharge in normal HFL case
11b 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
vertical load 1283 t ML -254 t-m MT 0 t-m

Base Preasure at point D = 12.78 t/m2 9.2 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.78 t/m2 9.2 t/m2 = Base Preasure at point B

180 180
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
6b Due to Earth preasure in normal Dry case 1.3 85.792 111.53 1.3 282.7208 367.537 1.3 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
22b Due to temparature 0.8 0 0 0.8 11.95414 9.56331 0.8 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
vertical load 1643 t ML 312 t-m MT 0 t-m
Base Preasure at point D = 11.88 t/m2 16.26 t/m2 = Base Preasure at point A
Base Preasure at point C = 11.88 t/m2 16.26 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
Due to Earth preasure in normal Saturate
8b 1.3 56.208 73.0704 1.3 363.8092 472.952 1.3 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
22b Due to temparature 0.8 0 0 0.8 11.95414 9.56331 0.8 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
vertical load 1687 t ML 300 t-m MT 0 t-m
Base Preasure at point D = 12.34 t/m2 16.56 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.34 t/m2 16.56 t/m2 = Base Preasure at point B
HFL Case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
10b Due to Earth preasure in normal HFL case 1.3 52 67.6 1.3 365.384 474.999 1.3 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
22b Due to temparature 0.8 0 0 0.8 11.95414 9.56331 0.8 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
vertical load 1592 t ML 288 t-m MT 0 t-m
Base Preasure at point D = 11.6 t/m2 15.66 t/m2 = Base Preasure at point A
Base Preasure at point C = 11.6 t/m2 15.66 t/m2 = Base Preasure at point B

181 181
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case
Code no Factor for
unfactored Factored
Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
6b Due to Earth preasure in normal Dry case 0.85 85.792 72.9232 0.85 282.7208 240.313 0.85 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
22b Due to temparature 0.8 0 0 0.8 11.95414 9.56331 0.8 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
vertical load 1604 t ML 184 t-m MT 0 t-m
Base Preasure at point D = 12.44 t/m2 15.04 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.44 t/m2 15.04 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
Due to Earth preasure in normal Saturate
8b 0.85 56.208 47.7768 0.85 363.8092 309.238 0.85 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
22b Due to temparature 0.8 0 0 0.8 11.95414 9.56331 0.8 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
vertical load 1662 t ML 136 t-m MT 0 t-m
Base Preasure at point D = 13.28 t/m2 15.19 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.28 t/m2 15.19 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
10b Due to Earth preasure in normal HFL case 0.85 52 44.2 0.85 365.384 310.576 0.85 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
22b Due to temparature 0.8 0 0 0.8 11.95414 9.56331 0.8 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
vertical load 1568 t ML 124 t-m MT 0 t-m
Base Preasure at point D = 12.56 t/m2 14.3 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.56 t/m2 14.3 t/m2 = Base Preasure at point B

182 182
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
6b Due to Earth preasure in normal Dry case 1.3 85.792 111.53 1.3 282.7208 367.537 1.3 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
34b wind longitudinal 0.8 0 0 0.8 9.178 7.3424 0.8 0 0
35b wind Transverse 0.8 0 0 0.8 0 0 0.8 36.705 29.364
vertical load 1643 t ML 309 t-m MT 0 t-m
Base Preasure at point D = 11.89 t/m2 16.25 t/m2 = Base Preasure at point A
Base Preasure at point C = 11.89 t/m2 16.25 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
Due to Earth preasure in normal Saturate
8b 1.3 56.208 73.0704 1.3 363.8092 472.952 1.3 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
34b wind longitudinal 0.8 0 0 0.8 9.178 7.3424 0.8 0 0
35b wind Transverse 0.8 0 0 0.8 0 0 0.8 36.705 29.364
vertical load 1687 t ML 298 t-m MT 0 t-m
Base Preasure at point D = 12.36 t/m2 16.54 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.36 t/m2 16.54 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
10b Due to Earth preasure in normal HFL case 1.3 52 67.6 1.3 365.384 474.999 1.3 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
34b wind longitudinal 0.8 0 0 0.8 9.178 7.3424 0.8 0 0
35b wind Transverse 0.8 0 0 0.8 0 0 0.8 36.705 29.364
vertical load 1592 t ML 286 t-m MT 0 t-m
Base Preasure at point D = 11.62 t/m2 15.65 t/m2 = Base Preasure at point A
Base Preasure at point C = 11.62 t/m2 15.65 t/m2 = Base Preasure at point B

183 183
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
6b Due to Earth preasure in normal Dry case 0.85 85.792 72.9232 0.85 282.7208 240.313 0.85 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
34b wind longitudinal 0.8 0 0 0.8 9.178 7.3424 0.8 0 0
35b wind Transverse 0.8 0 0 0.8 0 0 0.8 36.705 29.364
vertical load 1604 t ML 182 t-m MT 0 t-m
Base Preasure at point D = 12.46 t/m2 15.02 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.46 t/m2 15.02 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
Due to Earth preasure in normal Saturate
8b 0.85 56.208 47.7768 0.85 363.8092 309.238 0.85 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
34b wind longitudinal 0.8 0 0 0.8 9.178 7.3424 0.8 0 0
35b wind Transverse 0.8 0 0 0.8 0 0 0.8 36.705 29.364
vertical load 1662 t ML 134 t-m MT 0 t-m
Base Preasure at point D = 13.29 t/m2 15.17 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.29 t/m2 15.17 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1.3 0 0 1.3 0 0 1.3 0 0
10b Due to Earth preasure in normal HFL case 0.85 52 44.2 0.85 365.384 310.576 0.85 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1.3 94.9245 123.402 1.3 141.4376 183.869 1.3 0 0
23b Due to breaking 1.3 0 0 1.3 55.78598 72.5218 1.3 0 0
34b wind longitudinal 0.8 0 0 0.8 9.178 7.3424 0.8 0 0
35b wind Transverse 0.8 0 0 0.8 0 0 0.8 36.705 29.364
vertical load 1568 t ML 122 t-m MT 0 t-m
Base Preasure at point D = 12.58 t/m2 14.29 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.58 t/m2 14.29 t/m2 = Base Preasure at point B

184 184
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.8 0 0 0.8 0 0 0.8 0 0
6b Due to Earth preasure in normal Dry case 1.3 85.792 111.53 1.3 282.7208 367.537 1.3 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1.3 0 0 1.3 9.178 11.9314 1.3 0 0
35b wind Transverse 1.3 0 0 1.3 0 0 1.3 36.705 47.7165
vertical load 1614 t ML 255 t-m MT 0 t-m
Base Preasure at point D = 12.03 t/m2 15.62 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.03 t/m2 15.62 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.8 0 0 0.8 0 0 0.8 0 0
Due to Earth preasure in normal Saturate
8b 1.3 56.208 73.0704 1.3 363.8092 472.952 1.3 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1.3 0 0 1.3 9.178 11.9314 1.3 0 0
35b wind Transverse 1.3 0 0 1.3 0 0 1.3 36.705 47.7165
vertical load 1659 t ML 243 t-m MT 0 t-m
Base Preasure at point D = 12.5 t/m2 15.92 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.5 t/m2 15.92 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.8 0 0 0.8 0 0 0.8 0 0
10b Due to Earth preasure in normal HFL case 1.3 52 67.6 1.3 365.384 474.999 1.3 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1.3 0 0 1.3 9.178 11.9314 1.3 0 0
35b wind Transverse 1.3 0 0 1.3 0 0 1.3 36.705 47.7165
vertical load 1563 t ML 231 t-m MT 0 t-m
Base Preasure at point D = 11.76 t/m2 15.02 t/m2 = Base Preasure at point A
Base Preasure at point C = 11.76 t/m2 15.02 t/m2 = Base Preasure at point B

185 185
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.8 0 0 0.8 0 0 0.8 0 0
6b Due to Earth preasure in normal Dry case 0.85 85.792 72.9232 0.85 282.7208 240.313 0.85 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1.3 0 0 1.3 9.178 11.9314 1.3 0 0
35b wind Transverse 1.3 0 0 1.3 0 0 1.3 36.705 47.7165
vertical load 1576 t ML 128 t-m MT 0 t-m
Base Preasure at point D = 12.6 t/m2 14.39 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.6 t/m2 14.39 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.8 0 0 0.8 0 0 0.8 0 0
Due to Earth preasure in normal Saturate
8b 0.85 56.208 47.7768 0.85 363.8092 309.238 0.85 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1.3 0 0 1.3 9.178 11.9314 1.3 0 0
35b wind Transverse 1.3 0 0 1.3 0 0 1.3 36.705 47.7165
vertical load 1633 t ML 79 t-m MT 0 t-m
Base Preasure at point D = 13.43 t/m2 14.55 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.43 t/m2 14.55 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.8 0 0 0.8 0 0 0.8 0 0
10b Due to Earth preasure in normal HFL case 0.85 52 44.2 0.85 365.384 310.576 0.85 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
34b wind longitudinal 1.3 0 0 1.3 9.178 11.9314 1.3 0 0
35b wind Transverse 1.3 0 0 1.3 0 0 1.3 36.705 47.7165
vertical load 1540 t ML 67 t-m MT 0 t-m
Base Preasure at point D = 12.72 t/m2 13.66 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.72 t/m2 13.66 t/m2 = Base Preasure at point B

186 186
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6b Due to Earth preasure in normal Dry case 1.3 85.792 111.53 1.3 282.7208 367.537 1.3 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
26b wind longitudinal 0 0 0 0 7.392 0 0 0 0
27b Wind transverse 1.3 0 0 1.3 0 0 1.3 29.56425 38.4335
vertical load 1519 t ML 46 t-m MT 38 t-m
Base Preasure at point D = 12.81 t/m2 13.46 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.57 t/m2 13.21 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8b 1.3 56.208 73.0704 1.3 363.8092 472.952 1.3 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
26b wind longitudinal 0 0 0 0 7.392 0 0 0 0
27b Wind transverse 1.3 0 0 1.3 0 0 1.3 29.56425 38.4335
vertical load 1564 t ML 34 t-m MT 38 t-m
Base Preasure at point D = 13.28 t/m2 13.75 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.03 t/m2 13.51 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10b Due to Earth preasure in normal HFL case 1.3 52 67.6 1.3 365.384 474.999 1.3 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
26b wind longitudinal 0 0 0 0 7.392 0 0 0 0
27b Wind transverse 1.3 0 0 1.3 0 0 1.3 29.56425 38.4335
vertical load 1468 t ML 22 t-m MT 38 t-m
Base Preasure at point D = 12.54 t/m2 12.86 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.3 t/m2 12.61 t/m2 = Base Preasure at point B

187 187
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Combination 2
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6b Due to Earth preasure in normal Dry case 0.85 85.792 72.9232 0.85 282.7208 240.313 0.85 0 0
7b Due to LL surcharge in normal Dry case 1 29.632 29.632 1 273.3668 273.367 1 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
26b wind longitudinal 1.3 0 0 1.3 7.392 9.6096 1.3 0 0
27b Wind transverse 1.3 0 0 1.3 0 0 1.3 29.56425 38.4335
vertical load 1481 t ML -72 t-m MT 38 t-m
Base Preasure at point D = 13.31 t/m2 12.3 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.07 t/m2 12.05 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8b 0.85 56.208 47.7768 0.85 363.8092 309.238 0.85 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 1 17.488 17.488 1 284.2712 284.271 1 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
26b wind longitudinal 1.3 0 0 1.3 7.392 9.6096 1.3 0 0
27b Wind transverse 1.3 0 0 1.3 0 0 1.3 29.56425 38.4335
vertical load 1538 t ML -120 t-m MT 38 t-m
Base Preasure at point D = 14.15 t/m2 12.45 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.9 t/m2 12.21 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1 48.999 48.999 1 73.00851 73.0085 1 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10b Due to Earth preasure in normal HFL case 0.85 52 44.2 0.85 365.384 310.576 0.85 0 0
11b Due to LL surcharge in normal HFL case 1 17.44 17.44 1 325.16 325.16 1 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
26b wind longitudinal 1.3 0 0 1.3 7.392 9.6096 1.3 0 0
27b Wind transverse 1.3 0 0 1.3 0 0 1.3 29.56425 38.4335
vertical load 1445 t ML -133 t-m MT 38 t-m
Base Preasure at point D = 13.43 t/m2 11.57 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.18 t/m2 11.32 t/m2 = Base Preasure at point B

188 188
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Seismic Combination 2
Longitudinal seismic case : Before construction of super structure.
Normal Dry case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.2 29.632 5.9264 0.2 273.3668 54.6734 0.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15b 0.75 76.48 57.36 0.75 326.192 244.644 0.75 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18b 0.225 0 0 0.225 0 0 0.225 953.6 214.56
seismic(Trans.) + Dry case
Due to Earth preasure in seismic+ Dry
28b 0.75 0 0 0.75 0 0 0.75 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+ Dry
29b 0.75 0 0 0.75 0 0 0.75 0 0
case(dynamic increament component)
D A vertical load 1759 t ML -595 t MT 215 t
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 19.94 t/m2 11.57 t/m2 = Base Preasure at point A
7.30m Base Preasure at point C = 18.56 t/m2 10.19 t/m2 = Base Preasure at point B
Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
9b Due to LL surcharge in normal Saturate 0.2 17.488 3.4976 0.2 284.2712 56.8542 0.2 0 0
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16b 0.75 82.56 61.92 0.75 352.864 264.648 0.75 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19b 0.225 0 0 0.225 0 0 0.225 1040.8 234.18
seismic(Trans.) +sat. case
Due to Earth preasure in seismic+ saturated
30b 0.75 0 0 0.75 0 0 0.75 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+Saturated
31b 0.75 0 0 0.75 0 0 0.75 0 0
case(dynamic increament component)
vertical load 1860 t ML -665 t MT 234 t
Base Preasure at point D = 21.36 t/m2 12 t/m2 = Base Preasure at point A
Base Preasure at point C = 19.85 t/m2 10.5 t/m2 = Base Preasure at point B
HFL case
Code no unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.2 17.44 3.488 0.2 325.16 65.032 0.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17b 0.75 76.8 57.6 0.75 342.88 257.16 0.75 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20b 0.225 0 0 0.225 0 0 0.225 1024.8 230.58
seismic(trans.) +HFL case
Due to Earth preasure in seismic+ HFL
32b 0.75 0 0 0.75 0 0 0.75 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+HFL
33b 0.75 0 0 0.75 0 0 0.75 0 0
case(dynamic increament component)
vertical load 1730 t ML -736 t MT 231 t
Base Preasure at point D = 20.73 t/m2 10.38 t/m2 = Base Preasure at point A
Base Preasure at point C = 19.25 t/m2 8.9 t/m2 = Base Preasure at point B

189 189
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Seismic Combination 2
Transverse seismic case : Before construction of super structure.
Normal Dry case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.2 29.632 5.9264 0.2 273.3668 54.6734 0.2 0 0
Due to Substructure,Foundation and Soil above
12b 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15b 0.225 76.48 17.208 0.225 326.192 73.3932 0.225 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18b 0.75 0 0 0.75 0 0 0.75 953.6 715.2
seismic(Trans.) + Dry case
Due to Earth preasure in seismic+ Dry
28b 0.225 0 0 0.225 0 0 0.225 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+ Dry
29b 0.225 0 0 0.225 0 0 0.225 0 0
case(dynamic increament component)
vertical load 1719 t ML -766 t MT 715 t

Base Preasure at point D = 22.41 t/m2 11.63 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.82 t/m2 7.04 t/m2 = Base Preasure at point B
Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
9b Due to LL surcharge in normal Saturate 0.2 17.488 3.4976 0.2 284.2712 56.8542 0.2 0 0
Due to Substructure,Foundation and Soil above
13b 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16b 0.225 82.56 18.576 0.225 352.864 79.3944 0.225 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19b 0.75 0 0 0.75 0 0 0.75 1040.8 780.6
seismic(Trans.) +sat. case
Due to Earth preasure in seismic+ saturated
30b 0.225 0 0 0.225 0 0 0.225 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+Saturated
31b 0.225 0 0 0.225 0 0 0.225 0 0
case(dynamic increament component)
vertical load 1817 t ML -850 t MT 781 t
Base Preasure at point D = 24.04 t/m2 12.08 t/m2 = Base Preasure at point A
Base Preasure at point C = 19.03 t/m2 7.07 t/m2 = Base Preasure at point B
HFL case
Code no unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.2 17.44 3.488 0.2 325.16 65.032 0.2 0 0
Due to Substructure,Foundation and Soil above
14b 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17b 0.225 76.8 17.28 0.225 342.88 77.148 0.225 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20b 0.75 0 0 0.75 0 0 0.75 1024.8 768.6
seismic(trans.) +HFL case
Due to Earth preasure in seismic+ HFL
32b 0.225 0 0 0.225 0 0 0.225 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+HFL
33b 0.225 0 0 0.225 0 0 0.225 0 0
case(dynamic increament component)
vertical load 1690 t ML -916 t MT 769 t
Base Preasure at point D = 23.38 t/m2 10.49 t/m2 = Base Preasure at point A
Base Preasure at point C = 18.45 t/m2 5.56 t/m2 = Base Preasure at point B

190 190
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Seismic Combination 2
Longitudinal seismic case : Live load as leading load + Thermal load as accompnying load.
Dry case unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
vertical vertical
ver. load ML ML ML MT MT MT
Code no Descriptions load load
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.2 29.632 5.9264 0.2 273.3668 54.6734 0.2 0 0
12b Due to Substructure,Foundation and Soil above 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
15b Add. Due to Substr.,Foun. and Soil above heel in 1.5 76.48 114.72 1.5 326.192 489.288 1.5 0 0
seismic(longi.) + Dry case
18b Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 0.45 0 0 0.45 953.6 429.12
seismic(Trans.) + Dry case
28b Due to Earth preasure in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
29b Due to LL surcharge in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 2087 t ML 52 t-m MT 429 t-m
Base Preasure at point D = 18.88 t/m2 19.62 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.12 t/m2 16.86 t/m2 = Base Preasure at point B
Saturated case unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
vertical vertical
ver. load ML ML ML MT MT MT
Code no Descriptions load load
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
9b Due to LL surcharge in normal Saturate 0.2 17.488 3.4976 0.2 284.2712 56.8542 0.2 0 0
case(draw down casae)
13b Due to Substructure,Foundation and Soil above 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
16b Add. Due to Substr.,Foun. and Soil above heel in 1.5 82.56 123.84 1.5 352.864 529.296 1.5 0 0
seismic(longi.) +sat case
19b Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 0.45 0 0 0.45 1040.8 468.36
seismic(Trans.) +sat. case
30b Due to Earth preasure in seismic+ saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
31b Due to LL surcharge in seismic+Saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 2192 t ML 3 t-m MT 468 t-m
Base Preasure at point D = 20.26 t/m2 20.29 t/m2 = Base Preasure at point A
Base Preasure at point C = 17.25 t/m2 17.29 t/m2 = Base Preasure at point B
HFL Case unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
vertical vertical
ver. load ML ML ML MT MT MT
Code no Descriptions load load
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.2 17.44 3.488 0.2 325.16 65.032 0.2 0 0
14b Due to Substructure,Foundation and Soil above 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
17b Add. Due to Substr.,Foun. and Soil above heel in 1.5 76.8 115.2 1.5 342.88 514.32 1.5 0 0
seismic(longi.) +HFL case
20b Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 0.45 0 0 0.45 1024.8 461.16
seismic(trans.) +HFL case
32b Due to Earth preasure in seismic+ HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
33b Due to LL surcharge in seismic+HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 2058 t ML -76 t-m MT 461 t-m
Base Preasure at point D = 19.64 t/m2 18.57 t/m2 = Base Preasure at point A
Base Preasure at point C = 16.68 t/m2 15.61 t/m2 = Base Preasure at point B

191 191
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of foundation as per Table 3.4 of IRC 6-2016:Seismic Combination 2
Transverse seismic case : Live Load as leading load + Thermal load as accompnying load.
Dry case Factor for unfac. Ver. Fac. Ver. Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions ver. load load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.2 29.632 5.9264 0.2 273.3668 54.6734 0.2 0 0
12b Due to Substructure,Foundation and Soil above 1.35 1192.64 1610.07 1.35 -871.658 -1176.7 1.35 0 0
heel in normal Dry case
15b Add. Due to Substr.,Foun. and Soil above heel in 0.45 76.48 34.416 0.45 326.192 146.786 0.45 0 0
seismic(longi.) + Dry case
18b Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 1.5 0 0 1.5 953.6 1430.4
seismic(Trans.) + Dry case
28b Due to Earth preasure in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
29b Due to LL surcharge in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36b Due to seismic transverse componet of LL 1.5 0 0 1.5 0 0 1.5 24.61811 36.9272
vertical load 2006 t ML -290 t-m MT 1467 t-m
Base Preasure at point D = 23.93 t/m2 19.85 t/m2 = Base Preasure at point A
Base Preasure at point C = 14.51 t/m2 10.43 t/m2 = Base Preasure at point B
Saturated case Factor for unfac. Ver. Fac. Ver. Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions ver. load load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
8b Due to Earth preasure in normal Saturate 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
9b Due to LL surcharge in normal Saturate 0.2 17.488 3.4976 0.2 284.2712 56.8542 0.2 0 0
case(draw down casae)
13b Due to Substructure,Foundation and Soil above 1.35 1287.62 1738.28 1.35 -999.873 -1349.8 1.35 0 0
heel in normal saturated case
16b Add. Due to Substr.,Foun. and Soil above heel in 0.45 82.56 37.152 0.45 352.864 158.789 0.45 0 0
seismic(longi.) +sat case
19b Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 1.5 0 0 1.5 1040.8 1561.2
seismic(Trans.) +sat. case
30b Due to Earth preasure in seismic+ saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
31b Due to LL surcharge in seismic+Saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36b Due to seismic transverse componet of LL 1.5 0 0 1.5 0 0 1.5 24.61811 36.9272
vertical load 2105 t ML -368 t-m MT 1598 t-m
Base Preasure at point D = 25.75 t/m2 20.57 t/m2 = Base Preasure at point A
Base Preasure at point C = 15.49 t/m2 10.31 t/m2 = Base Preasure at point B
HFL Case Factor for unfac. Ver. Fac. Ver. Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions ver. load load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1.35 136.554 184.348 1.35 203.4655 274.678 1.35 0 0
2b Due to SIDL (Wearing coat) 1.75 48.999 85.7483 1.75 73.00851 127.765 1.75 0 0
3b Due to Crash barrier 1.35 0 0 1.35 0 0 1.35 0 0
4b Due to Foot path dead load 1.35 0 0 1.35 0 0 1.35 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.2 17.44 3.488 0.2 325.16 65.032 0.2 0 0
14b Due to Substructure,Foundation and Soil above 1.35 1197.67 1616.85 1.35 -1054.33 -1423.3 1.35 0 0
heel in normal HFL case
17b Add. Due to Substr.,Foun. and Soil above heel in 0.45 76.8 34.56 0.45 342.88 154.296 0.45 0 0
seismic(longi.) +HFL case
20b Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 1.5 0 0 1.5 1024.8 1537.2
seismic(trans.) +HFL case
32b Due to Earth preasure in seismic+ HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
33b Due to LL surcharge in seismic+HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36b Due to seismic transverse componet of LL 1.5 0 0 1.5 0 0 1.5 24.61811 36.9272
vertical load 1977 t ML -436 t-m MT 1574 t-m
Base Preasure at point D = 25.05 t/m2 18.92 t/m2 = Base Preasure at point A
Base Preasure at point C = 14.95 t/m2 8.81 t/m2 = Base Preasure at point B

192 192
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016

Height of soil fill = 6652 mm Height of soil fill = 6252 mm


Clear Cover at Heal = 75 mm
dia of bar Considered for Heal = 25 mm Clear Cover at toe = 75 mm
612.5 dia of bar Considered for toe = 25 mm

700 mm 700 mm C A
300 mm 300 mm
4600 mm 1800 mm

Heel Toe
b e d c a

Base Preasure +
D 7.30 m B
j i h g f

Self Weight of Heel Slab Self Weight of Toe Slab


=
o n

Self Weight of Soil Fill above heel


m L k

q p

Vertical seismic component of Soil weight Fianl Preasure on Toe

s r

Fianl Preasure on Heel excluding Vertical component of Earth preasure


t

Vertical component of Earth Preasure

193 193
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Summary of base pressures
For Combination 1 For Combination 2 For Seismic Combinations
Base Base Base Base Base Base Base Base Base Base Base Base
preasure at preasure at preasure at preasure at preasure at preasure at preasure at preasure at preasure at preasure at preasure at preasure at
A B C D A B C D A B C D
Before construction of super structure. Longitudinal seismic case : Before construction of super structure.
Dry case 12.21 12.21 18.18 18.18 9.8 9.8 13.05 13.05 Dry case 11.57 10.19 18.56 19.94
Saturated case 12.53 12.53 19.05 19.05 10.1 10.1 13.51 13.51 Saturated case 12 10.5 19.85 21.36
HFL case 11.28 11.28 18.11 18.11 9.2 9.2 12.78 12.78 HFL case 10.38 8.9 19.25 20.73
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Transverse seismic case : Before construction of super structure.
Dry case 20.73 20.73 16.73 16.73 16.26 16.26 11.88 11.88 Dry case 11.63 7.04 17.82 22.41
Saturated case 21.05 21.05 17.59 17.59 16.56 16.56 12.34 12.34 Saturated case 12.08 7.07 19.03 24.04
HFL case 19.8 19.8 16.65 16.65 15.66 15.66 11.6 11.6 HFL case 10.49 5.56 18.45 23.38
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) Longitudinal seismic case : Live load as leading load + Thermal load as accompnying load.
Dry case 19.37 19.37 17.35 17.35 15.04 15.04 12.44 12.44 Dry case 19.62 16.86 16.12 18.88
Saturated case 19.53 19.53 18.63 18.63 15.19 15.19 13.28 13.28 Saturated case 20.29 17.29 17.25 20.26
HFL case 18.29 18.29 17.71 17.71 14.3 14.3 12.56 12.56 HFL case 18.57 15.61 16.68 19.64
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load) Transverse seismic case : Live Load as leading load + Thermal load as accompnying load.
Dry case 20.71 20.71 16.74 16.74 16.25 16.25 11.89 11.89 Dry case 19.85 10.43 14.51 23.93
Saturated case 21.03 21.03 17.61 17.61 16.54 16.54 12.36 12.36 Saturated case 20.57 10.31 15.49 25.75
HFL case 19.78 19.78 16.67 16.67 15.65 15.65 11.62 11.62 HFL case 18.92 8.81 14.95 25.05
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 19.35 19.35 17.37 17.37 15.02 15.02 12.46 12.46
Saturated case 19.51 19.51 18.65 18.65 15.17 15.17 13.29 13.29
HFL case 18.28 18.28 17.73 17.73 14.29 14.29 12.58 12.58
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 19.98 19.98 16.91 16.91 15.62 15.62 12.03 12.03
Saturated case 20.3 20.3 17.77 17.77 15.92 15.92 12.5 12.5
HFL case 19.05 19.05 16.83 16.83 15.02 15.02 11.76 11.76
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 18.62 18.62 17.53 17.53 14.39 14.39 12.6 12.6
Saturated case 18.78 18.78 18.81 18.81 14.55 14.55 13.43 13.43
HFL case 17.55 17.55 17.89 17.89 13.66 13.66 12.72 12.72
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 17.57 17.29 17.44 17.73 13.46 13.21 12.57 12.81
Saturated case 17.9 17.61 18.31 18.59 13.75 13.51 13.03 13.28
HFL case 16.65 16.36 17.37 17.65 12.86 12.61 12.3 12.54
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 16.21 15.93 18.07 18.36 12.3 12.05 13.07 13.31
Saturated case 16.38 16.09 19.35 19.63 12.45 12.21 13.9 14.15
HFL case 15.14 14.85 18.43 18.72 11.57 11.32 13.18 13.43

194 194
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Toe at Face A-C
Factor for unit SF at d
Self wt of weight of BM at face from face of
For Combination 1 a c d toe concrete f g h m l k of wall suppor
Before construction of super structure. C A
Dry case 12.21 17.21 16.71 1.35 2.5 1.01 1.90 2.36 14.35 15.31 11.20 19.84 15.74
Saturated case 12.53 17.99 17.44 1.35 2.5 1.01 1.90 2.36 15.08 16.09 11.52 20.58 16.39
HFL case 11.28 17.00 16.43 1.35 1.5 0.61 1.14 1.42 15.01 15.86 10.67 19.63 15.75
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Heel Toe
Dry case 20.73 17.38 17.72 1.35 2.5 1.01 1.90 2.36 15.35 15.48 19.72 29.59 20.90
Saturated case 21.05 18.15 18.44 1.35 2.5 1.01 1.90 2.36 16.08 16.25 20.04 30.32 21.55
HFL case 19.80 17.16 17.43 1.35 1.5 0.61 1.14 1.42 16.01 16.02 19.19 29.37 20.91
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) D B
Dry case 19.37 17.68 17.85 1.35 2.5 1.01 1.90 2.36 15.49 15.78 18.36 28.19 20.27
Saturated case 19.53 18.78 18.85 1.35 2.5 1.01 1.90 2.36 16.49 16.87 18.52 28.90 21.01
HFL case 18.29 17.80 17.85 1.35 1.5 0.61 1.14 1.42 16.44 16.66 17.68 27.97 20.39
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 20.71 17.39 17.72 1.35 2.5 1.01 1.90 2.36 15.36 15.48 19.70 29.57 20.89
Saturated case 21.03 18.17 18.45 1.35 2.5 1.01 1.90 2.36 16.09 16.26 20.02 30.31 21.54
HFL case 19.78 17.18 17.44 1.35 1.5 0.61 1.14 1.42 16.02 16.03 19.17 29.36 20.90
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 19.35 17.69 17.86 1.35 2.5 1.01 1.90 2.36 15.50 15.79 18.34 28.17 20.26
Saturated case 19.51 18.79 18.86 1.35 2.5 1.01 1.90 2.36 16.50 16.89 18.50 28.89 21.01
HFL case 18.28 17.82 17.87 1.35 1.5 0.61 1.14 1.42 16.45 16.68 17.67 27.97 20.40
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 19.98 17.41 17.67 1.35 2.5 1.01 1.90 2.36 15.30 15.51 18.97 28.75 20.47
Saturated case 20.30 18.18 18.39 1.35 2.5 1.01 1.90 2.36 16.03 16.28 19.29 29.49 21.12
HFL case 19.05 17.19 17.38 1.35 1.5 0.61 1.14 1.42 15.96 16.05 18.44 28.54 20.48
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 18.62 17.71 17.80 1.35 2.5 1.01 1.90 2.36 15.44 15.80 17.61 27.35 19.84
Saturated case 18.78 18.81 18.80 1.35 2.5 1.01 1.90 2.36 16.44 16.90 17.77 28.07 20.59
HFL case 17.55 17.83 17.81 1.35 1.5 0.61 1.14 1.42 16.39 16.69 16.94 27.15 19.97
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 17.57 17.46 17.47 1.35 2.5 1.01 1.90 2.36 15.11 15.56 16.56 26.04 19.07
Saturated case 17.90 18.24 18.21 1.35 2.5 1.01 1.90 2.36 15.85 16.34 16.89 26.80 19.73
HFL case 16.65 17.25 17.19 1.35 1.5 0.61 1.14 1.42 15.77 16.11 16.04 25.84 19.09
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 16.21 17.77 17.61 1.35 2.5 1.01 1.90 2.36 15.25 15.86 15.20 24.65 18.44
Saturated case 16.38 18.87 18.62 1.35 2.5 1.01 1.90 2.36 16.26 16.96 15.37 25.37 19.20
HFL case 15.14 17.89 17.62 1.35 1.5 0.61 1.14 1.42 16.20 16.75 14.53 24.44 18.58

195 195
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Toe at Face A-C
Factor for unit SF at d
Self wt of weight of BM at face from face of
For Combination 2 a c d toe concrete f g h m l k of wall suppor
Before construction of super structure. C A
Dry case 9.80 12.52 12.25 1 2.5 0.75 1.41 1.75 10.50 11.11 9.05 15.44 11.97
Saturated case 10.10 12.96 12.67 1 2.5 0.75 1.41 1.75 10.92 11.55 9.35 15.99 12.41
HFL case 9.20 12.20 11.90 1 1.5 0.45 0.85 1.05 10.85 11.35 8.75 15.31 11.94
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Heel Toe
Dry case 16.26 12.59 12.96 1 2.5 0.75 1.41 1.75 11.21 11.18 15.51 22.80 15.85
Saturated case 16.56 13.03 13.38 1 2.5 0.75 1.41 1.75 11.63 11.62 15.81 23.36 16.28
HFL case 15.66 12.26 12.60 1 1.5 0.45 0.85 1.05 11.55 11.41 15.21 22.66 15.81
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) D B
Dry case 15.04 12.86 13.08 1 2.5 0.75 1.41 1.75 11.33 11.45 14.29 21.55 15.29
Saturated case 15.19 13.59 13.75 1 2.5 0.75 1.41 1.75 12.00 12.18 14.44 22.08 15.81
HFL case 14.30 12.84 12.99 1 1.5 0.45 0.85 1.05 11.94 12.00 13.85 21.41 15.35
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.25 12.60 12.97 1 2.5 0.75 1.41 1.75 11.22 11.19 15.50 22.80 15.85
Saturated case 16.54 13.04 13.39 1 2.5 0.75 1.41 1.75 11.64 11.63 15.79 23.34 16.28
HFL case 15.65 12.28 12.61 1 1.5 0.45 0.85 1.05 11.56 11.43 15.20 22.66 15.81
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 15.02 12.88 13.09 1 2.5 0.75 1.41 1.75 11.34 11.47 14.27 21.54 15.28
Saturated case 15.17 13.60 13.75 1 2.5 0.75 1.41 1.75 12.00 12.19 14.42 22.06 15.80
HFL case 14.29 12.86 13.00 1 1.5 0.45 0.85 1.05 11.95 12.01 13.84 21.40 15.35
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 15.62 12.61 12.92 1 2.5 0.75 1.41 1.75 11.17 11.20 14.87 22.09 15.48
Saturated case 15.92 13.06 13.34 1 2.5 0.75 1.41 1.75 11.59 11.65 15.17 22.64 15.92
HFL case 15.02 12.29 12.56 1 1.5 0.45 0.85 1.05 11.51 11.44 14.57 21.95 15.45
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 14.39 12.89 13.04 1 2.5 0.75 1.41 1.75 11.29 11.48 13.64 20.83 14.92
Saturated case 14.55 13.61 13.71 1 2.5 0.75 1.41 1.75 11.96 12.20 13.80 21.36 15.44
HFL case 13.66 12.87 12.95 1 1.5 0.45 0.85 1.05 11.90 12.03 13.21 20.69 14.98
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 13.46 12.71 12.79 1 2.5 0.75 1.41 1.75 11.04 11.31 12.71 19.69 14.26
Saturated case 13.75 13.15 13.21 1 2.5 0.75 1.41 1.75 11.46 11.74 13.00 20.23 14.69
HFL case 12.86 12.39 12.44 1 1.5 0.45 0.85 1.05 11.39 11.55 12.41 19.55 14.22
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 12.30 12.94 12.88 1 2.5 0.75 1.41 1.75 11.13 11.54 11.55 18.48 13.71
Saturated case 12.45 13.66 13.54 1 2.5 0.75 1.41 1.75 11.79 12.25 11.70 19.00 14.22
HFL case 11.57 12.92 12.78 1 1.5 0.45 0.85 1.05 11.73 12.07 11.12 18.35 13.77

196 196
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Toe at Face A-C
Factor for unit SF at d
For Seismic Self wt of weight of BM at face from face of
Combinations a c d toe concrete f g h m l k of wall suppor
Longitudinal seismic case : Before construction of super structure. C A
Dry case 11.57 17.42 16.84 1.35 2.5 1.01 1.90 2.36 14.47 15.52 10.56 19.22 15.48
Saturated case 12.00 18.57 17.91 1.35 2.5 1.01 1.90 2.36 15.55 16.67 10.99 20.26 16.42
HFL case 10.38 17.81 17.06 1.35 1.5 0.61 1.14 1.42 15.65 16.67 9.77 19.00 15.70
Transverse seismic case : Before construction of super structure. Heel Toe
Dry case 11.63 16.81 16.29 1.35 2.5 1.01 1.90 2.36 13.93 14.91 10.62 18.99 15.16
Saturated case 12.08 17.90 17.32 1.35 2.5 1.01 1.90 2.36 14.95 16.00 11.07 20.03 16.07
HFL case 10.49 17.16 16.49 1.35 1.5 0.61 1.14 1.42 15.07 16.01 9.88 18.81 15.38
Longitudinal seismic case : Live load as leading load + Thermal load as accompnying load. D B
Dry case 19.62 16.69 16.98 1.35 2.5 1.01 1.90 2.36 14.62 14.79 18.61 27.99 19.83
Saturated case 20.29 17.74 18.00 1.35 2.5 1.01 1.90 2.36 15.64 15.84 19.28 29.26 20.85
HFL case 18.57 16.99 17.15 1.35 1.5 0.61 1.14 1.42 15.73 15.85 17.96 27.89 20.07
Transverse seismic case : Live Load as leading load + Thermal load as accompnying load.
Dry case 19.85 15.38 15.83 1.35 2.5 1.01 1.90 2.36 13.46 13.48 18.84 27.62 19.19
Saturated case 20.57 16.32 16.74 1.35 2.5 1.01 1.90 2.36 14.38 14.41 19.56 28.89 20.17
HFL case 18.92 15.60 15.93 1.35 1.5 0.61 1.14 1.42 14.51 14.45 18.31 27.61 19.46

Design of Toe at Face B-D


Factor for unit SF at d
For Seismic Self wt of weight of BM at face from face of
Combinations a c d toe concrete f g h m l k of wall suppor
Longitudinal seismic case : Before construction of super structure.
Dry case 10.19 18.35 17.54 1.35 2.5 1.01 1.90 2.36 15.17 16.45 9.18 18.11 15.22
Saturated case 10.50 19.59 18.68 1.35 2.5 1.01 1.90 2.36 16.32 17.69 9.49 19.06 16.14
HFL case 8.90 18.81 17.81 1.35 1.5 0.61 1.14 1.42 16.40 17.66 8.29 17.81 15.41
Transverse seismic case : Before construction of super structure.
Dry case 7.04 19.91 18.62 1.35 2.5 1.01 1.90 2.36 16.26 18.01 6.03 15.29 14.27
Saturated case 7.07 21.28 19.86 1.35 2.5 1.01 1.90 2.36 17.49 19.38 6.06 15.99 15.10
HFL case 5.56 20.48 18.99 1.35 1.5 0.61 1.14 1.42 17.57 19.34 4.95 14.84 14.42
Longitudinal seismic case : Live load as leading load + Thermal load as accompnying load.
Dry case 16.86 18.55 18.38 1.35 2.5 1.01 1.90 2.36 16.02 16.65 15.85 25.77 19.29
Saturated case 17.29 19.78 19.53 1.35 2.5 1.01 1.90 2.36 17.17 17.87 16.28 26.85 20.28
HFL case 15.61 18.98 18.65 1.35 1.5 0.61 1.14 1.42 17.23 17.84 15.00 25.51 19.50
Transverse seismic case : Live Load as leading load + Thermal load as accompnying load.
Dry case 10.43 21.73 20.60 1.35 2.5 1.01 1.90 2.36 18.24 19.83 9.42 20.02 17.37
Saturated case 10.31 23.24 21.94 1.35 2.5 1.01 1.90 2.36 19.58 21.34 9.30 20.61 18.19
HFL case 8.81 22.41 21.05 1.35 1.5 0.61 1.14 1.42 19.63 21.27 8.20 19.46 17.50

197 197
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Toe at Face B-D
Factor for unit SF at d
Self wt of weight of BM at face from face of
For Combination 1 a c d toe concrete f g h m l k of wall suppor
Before construction of super structure. C A
Dry case 12.21 17.21 16.71 1.35 2.5 1.01 1.90 2.36 14.35 15.31 11.20 19.84 15.74
Saturated case 12.53 17.99 17.44 1.35 2.5 1.01 1.90 2.36 15.08 16.09 11.52 20.58 16.39
HFL case 11.28 17.00 16.43 1.35 1.5 0.61 1.14 1.42 15.01 15.86 10.67 19.63 15.75
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Heel Toe
Dry case 20.73 17.38 17.72 1.35 2.5 1.01 1.90 2.36 15.35 15.48 19.72 29.59 20.90
Saturated case 21.05 18.15 18.44 1.35 2.5 1.01 1.90 2.36 16.08 16.25 20.04 30.32 21.55
HFL case 19.80 17.16 17.43 1.35 1.5 0.61 1.14 1.42 16.01 16.02 19.19 29.37 20.91
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) D B
Dry case 19.37 17.68 17.85 1.35 2.5 1.01 1.90 2.36 15.49 15.78 18.36 28.19 20.27
Saturated case 19.53 18.78 18.85 1.35 2.5 1.01 1.90 2.36 16.49 16.87 18.52 28.90 21.01
HFL case 18.29 17.80 17.85 1.35 1.5 0.61 1.14 1.42 16.44 16.66 17.68 27.97 20.39
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 20.71 17.39 17.72 1.35 2.5 1.01 1.90 2.36 15.36 15.48 19.70 29.57 20.89
Saturated case 21.03 18.17 18.45 1.35 2.5 1.01 1.90 2.36 16.09 16.26 20.02 30.31 21.54
HFL case 19.78 17.18 17.44 1.35 1.5 0.61 1.14 1.42 16.02 16.03 19.17 29.36 20.90
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 19.35 17.69 17.86 1.35 2.5 1.01 1.90 2.36 15.50 15.79 18.34 28.17 20.26
Saturated case 19.51 18.79 18.86 1.35 2.5 1.01 1.90 2.36 16.50 16.89 18.50 28.89 21.01
HFL case 18.28 17.82 17.87 1.35 1.5 0.61 1.14 1.42 16.45 16.68 17.67 27.97 20.40
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 19.98 17.41 17.67 1.35 2.5 1.01 1.90 2.36 15.30 15.51 18.97 28.75 20.47
Saturated case 20.30 18.18 18.39 1.35 2.5 1.01 1.90 2.36 16.03 16.28 19.29 29.49 21.12
HFL case 19.05 17.19 17.38 1.35 1.5 0.61 1.14 1.42 15.96 16.05 18.44 28.54 20.48
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 18.62 17.71 17.80 1.35 2.5 1.01 1.90 2.36 15.44 15.80 17.61 27.35 19.84
Saturated case 18.78 18.81 18.80 1.35 2.5 1.01 1.90 2.36 16.44 16.90 17.77 28.07 20.59
HFL case 17.55 17.83 17.81 1.35 1.5 0.61 1.14 1.42 16.39 16.69 16.94 27.15 19.97
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 17.29 17.66 17.62 1.35 2.5 1.01 1.90 2.36 15.26 15.76 16.28 25.82 19.02
Saturated case 17.61 18.43 18.35 1.35 2.5 1.01 1.90 2.36 15.99 16.53 16.60 26.56 19.67
HFL case 16.36 17.44 17.33 1.35 1.5 0.61 1.14 1.42 15.91 16.30 15.75 25.61 19.03
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 15.93 17.96 17.76 1.35 2.5 1.01 1.90 2.36 15.40 16.06 14.92 24.43 18.39
Saturated case 16.09 19.05 18.76 1.35 2.5 1.01 1.90 2.36 16.39 17.15 15.08 25.14 19.14
HFL case 14.85 18.09 17.77 1.35 1.5 0.61 1.14 1.42 16.35 16.95 14.24 24.21 18.52

198 198
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Toe at Face B-D
Factor for unit SF at d
Self wt of weight of BM at face from face of
For Combination 2 a c d toe concrete f g h m l k of wall suppor
Before construction of super structure. C A
Dry case 9.80 12.52 12.25 1 2.5 0.75 1.41 1.75 10.50 11.11 9.05 15.44 11.97
Saturated case 10.10 12.96 12.67 1 2.5 0.75 1.41 1.75 10.92 11.55 9.35 15.99 12.41
HFL case 9.20 12.20 11.90 1 1.5 0.45 0.85 1.05 10.85 11.35 8.75 15.31 11.94
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Heel Toe
Dry case 16.26 12.59 12.96 1 2.5 0.75 1.41 1.75 11.21 11.18 15.51 22.80 15.85
Saturated case 16.56 13.03 13.38 1 2.5 0.75 1.41 1.75 11.63 11.62 15.81 23.36 16.28
HFL case 15.66 12.26 12.60 1 1.5 0.45 0.85 1.05 11.55 11.41 15.21 22.66 15.81
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) D B
Dry case 15.04 12.86 13.08 1 2.5 0.75 1.41 1.75 11.33 11.45 14.29 21.55 15.29
Saturated case 15.19 13.59 13.75 1 2.5 0.75 1.41 1.75 12.00 12.18 14.44 22.08 15.81
HFL case 14.30 12.84 12.99 1 1.5 0.45 0.85 1.05 11.94 12.00 13.85 21.41 15.35
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.25 12.60 12.97 1 2.5 0.75 1.41 1.75 11.22 11.19 15.50 22.80 15.85
Saturated case 16.54 13.04 13.39 1 2.5 0.75 1.41 1.75 11.64 11.63 15.79 23.34 16.28
HFL case 15.65 12.28 12.61 1 1.5 0.45 0.85 1.05 11.56 11.43 15.20 22.66 15.81
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 15.02 12.88 13.09 1 2.5 0.75 1.41 1.75 11.34 11.47 14.27 21.54 15.28
Saturated case 15.17 13.60 13.75 1 2.5 0.75 1.41 1.75 12.00 12.19 14.42 22.06 15.80
HFL case 14.29 12.86 13.00 1 1.5 0.45 0.85 1.05 11.95 12.01 13.84 21.40 15.35
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 15.62 12.61 12.92 1 2.5 0.75 1.41 1.75 11.17 11.20 14.87 22.09 15.48
Saturated case 15.92 13.06 13.34 1 2.5 0.75 1.41 1.75 11.59 11.65 15.17 22.64 15.92
HFL case 15.02 12.29 12.56 1 1.5 0.45 0.85 1.05 11.51 11.44 14.57 21.95 15.45
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 14.39 12.89 13.04 1 2.5 0.75 1.41 1.75 11.29 11.48 13.64 20.83 14.92
Saturated case 14.55 13.61 13.71 1 2.5 0.75 1.41 1.75 11.96 12.20 13.80 21.36 15.44
HFL case 13.66 12.87 12.95 1 1.5 0.45 0.85 1.05 11.90 12.03 13.21 20.69 14.98
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 13.21 12.88 12.91 1 2.5 0.75 1.41 1.75 11.16 11.47 12.46 19.48 14.21
Saturated case 13.51 13.32 13.34 1 2.5 0.75 1.41 1.75 11.59 11.91 12.76 20.04 14.65
HFL case 12.61 12.55 12.56 1 1.5 0.45 0.85 1.05 11.51 11.71 12.16 19.35 14.17
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 12.05 13.11 13.00 1 2.5 0.75 1.41 1.75 11.25 11.70 11.30 18.28 13.65
Saturated case 12.21 13.83 13.67 1 2.5 0.75 1.41 1.75 11.92 12.42 11.46 18.81 14.18
HFL case 11.32 13.09 12.91 1 1.5 0.45 0.85 1.05 11.86 12.24 10.87 18.14 13.72

199 199
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Heel at Face A-C
For Combination 1
factor for
Factor for unit Factor for vertical
Factor for unit Self wt of weight of Facotred Facotred vertical Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at seismic intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o component q p compon. intensity at t at r at s heel of heel
Before construction of super structure.
Dry case 18.18 14.42 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 3.14 -1.00 40.98 12.95
Saturated case 19.05 14.94 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 4.30 -0.08 38.87 14.99
HFL case 18.11 13.81 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 4.49 0.46 41.50 16.26
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.73 19.25 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 -1.70 0.45 34.17 5.17
Saturated case 17.59 19.77 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 -0.53 1.38 32.13 7.24
HFL case 16.65 18.63 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 -0.34 1.92 34.76 8.51
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case 17.35 18.62 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 -1.07 -0.17 19.68 2.51
Saturated case 18.63 19.20 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 0.05 0.34 18.74 4.41
HFL case 17.71 18.08 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 0.22 0.86 21.79 5.73
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.74 19.24 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 -1.69 0.44 34.13 5.17
Saturated case 17.61 19.77 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 -0.52 1.36 32.01 7.20
HFL case 16.67 18.63 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 -0.33 1.90 34.64 8.48
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 17.37 18.62 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 -1.06 -0.19 19.55 2.47
Saturated case 18.65 19.19 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 0.05 0.32 18.62 4.37
HFL case 17.73 18.08 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 0.22 0.84 21.64 5.69
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.91 18.84 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 -1.29 0.27 34.33 5.69
Saturated case 17.77 19.36 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 -0.12 1.20 32.30 7.76
HFL case 16.83 18.23 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 0.07 1.74 34.93 9.03
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 17.53 18.22 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 -0.66 -0.35 19.84 3.03
Saturated case 18.81 18.79 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 0.45 0.16 18.90 4.93
HFL case 17.89 17.68 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 0.62 0.68 21.93 6.24
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 17.44 17.52 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 0.03 -0.26 35.26 7.51
Saturated case 18.31 18.05 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 1.19 0.66 33.12 9.53
HFL case 17.37 16.92 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 1.38 1.20 35.75 10.81
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 18.07 16.90 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 0.66 -0.89 20.68 4.82
Saturated case 19.35 17.48 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 1.76 -0.38 19.72 6.70
HFL case 18.43 16.36 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 1.94 0.14 22.77 8.03

200 200
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Heel at Face A-C
For Combination 2
factor for
Factor for unit Factor for vertical
Factor for unit Self wt of weight of Facotred Facotred vertical Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at seismic intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o component q p compon. intensity at t at r at s heel of heel
Before construction of super structure.
Dry case 13.05 11.00 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 1.30 6.97 2.00 -0.33 36.82 10.82
Saturated case 13.51 11.36 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.57 2.89 0.54 35.05 12.47
HFL case 12.78 10.52 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.23 3.03 0.97 36.99 13.43
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 11.88 14.64 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 1.30 6.97 -1.64 0.84 32.24 5.15
Saturated case 12.34 15.00 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.57 -0.75 1.71 30.47 6.80
HFL case 11.60 14.16 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.23 -0.60 2.15 32.50 7.79
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case 12.44 14.08 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 0.85 4.56 -1.07 0.28 19.18 2.74
Saturated case 13.28 14.48 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.99 -0.23 0.77 18.39 4.24
HFL case 12.56 13.66 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.76 -0.10 1.19 20.77 5.27
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 11.89 14.64 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 1.30 6.97 -1.63 0.83 32.18 5.13
Saturated case 12.36 14.99 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.57 -0.74 1.69 30.35 6.76
HFL case 11.62 14.16 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.23 -0.61 2.13 32.35 7.74
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 12.46 14.07 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 0.85 4.56 -1.07 0.26 19.05 2.70
Saturated case 13.29 14.47 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.99 -0.22 0.76 18.35 4.24
HFL case 12.58 13.66 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.76 -0.10 1.17 20.62 5.22
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.03 14.29 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 1.30 6.97 -1.29 0.69 32.41 5.60
Saturated case 12.50 14.66 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.57 -0.40 1.55 30.55 7.22
HFL case 11.76 13.81 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.23 -0.26 1.99 32.58 8.21
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 12.60 13.73 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 0.85 4.56 -0.72 0.12 19.28 3.18
Saturated case 13.43 14.14 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.99 0.12 0.62 18.55 4.69
HFL case 12.72 13.31 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.76 0.24 1.03 20.85 5.70
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 12.57 13.13 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 1.30 6.97 -0.13 0.15 32.70 7.03
Saturated case 13.03 13.48 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.57 0.77 1.02 30.95 8.69
HFL case 12.30 12.65 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 1.30 4.23 0.90 1.45 32.87 9.64
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 13.07 12.58 1 2.5 1.75 0.75 1 1.80 11.25 11.97 0 0.00 0.00 0.85 4.56 0.42 -0.35 20.00 4.72
Saturated case 13.90 12.99 1 2.5 1.75 0.75 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.99 1.27 0.15 19.29 6.26
HFL case 13.18 12.17 1 1.5 1.05 0.45 1 2.00 12.50 13.30 0 0.00 0.00 0.85 2.76 1.39 0.57 21.65 7.28

201 201
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Heel at Face A-C
For Seismic Combinations
factor for
Factor for unit Factor for vertical
Factor for unit Self wt of weight of Facotred Facotred vertical Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at seismic intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o component q p compon. intensity at t at r at s heel of heel
Longitudinal seismic case : Before construction of super structure.
Dry case 18.56 14.16 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 3.42 -1.36 27.11 10.09
Saturated case 19.85 14.90 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 4.36 -0.86 25.51 11.58
HFL case 19.25 13.66 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 4.66 -0.66 26.73 12.45
Transverse seismic case : Before construction of super structure.
Dry case 17.82 13.92 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 3.66 -0.62 33.16 12.34
Saturated case 19.03 14.65 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 4.61 -0.04 32.19 14.05
HFL case 18.45 13.43 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 4.89 0.14 33.17 14.81
Longitudinal seismic case : Live load as leading load + Thermal load as accompnying load.
Dry case 16.12 18.33 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 -0.75 1.08 29.61 6.11
Saturated case 17.25 19.17 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 0.10 1.74 28.82 7.75
HFL case 16.68 17.87 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 0.45 1.91 30.01 8.68
Transverse seismic case : Live Load as leading load + Thermal load as accompnying load.
Dry case 14.51 17.87 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 -0.30 2.69 42.56 10.85
Saturated case 15.49 18.69 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 0.57 3.50 42.91 12.89
HFL case 14.95 17.45 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 0.87 3.64 43.69 13.62
Design of Heel at Face B-D
For Seismic Combinations
factor for
Factor for unit Factor for vertical
Factor for unit Self wt of weight of Facotred Facotred vertical Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at seismic intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o component q p compon. intensity at t at r at s heel of heel
Longitudinal seismic case : Before construction of super structure.
Dry case 19.94 13.80 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 3.78 -2.74 18.64 7.74
Saturated case 21.36 14.52 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 4.75 -2.37 16.22 8.99
HFL case 20.73 13.28 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 5.04 -2.14 17.65 9.93
Transverse seismic case : Before construction of super structure.
Dry case 22.41 12.72 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 4.85 -5.21 5.00 4.53
Saturated case 24.04 13.35 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 5.92 -5.05 1.45 5.52
HFL case 23.38 12.15 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 6.17 -4.79 2.92 6.42
Longitudinal seismic case : Live load as leading load + Thermal load as accompnying load.
Dry case 18.88 17.61 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 -0.03 -1.68 12.68 1.42
Saturated case 20.26 18.39 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 0.88 -1.27 10.33 2.62
HFL case 19.64 17.10 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 1.22 -1.05 11.84 3.64
Transverse seismic case : Live Load as leading load + Thermal load as accompnying load.
Dry case 23.93 15.42 1.35 2.5 2.36 1.01 1.35 1.80 15.19 16.16 0.0192 0.02 0.02 1 5.36 2.15 -6.73 -15.24 -5.18
Saturated case 25.75 16.02 1.35 2.5 2.36 1.01 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.51 3.24 -6.76 -20.04 -4.56
HFL case 25.05 14.82 1.35 1.5 1.42 0.61 1.35 2.00 16.88 17.96 0.0192 0.02 0.02 1 3.25 3.50 -6.46 -18.26 -3.55

202 202
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Heel at Face B-D
For Combination 1
factor for
Factor for unit Factor for vertical
Factor for unit Self wt of weight of Facotred Facotred vertical Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at seismic intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o component q p compon. intensity at t at r at s heel of heel
Before construction of super structure.
Dry case 18.18 14.42 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 3.14 -1.00 40.98 12.95
Saturated case 19.05 14.94 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 4.30 -0.08 38.87 14.99
HFL case 18.11 13.81 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 4.49 0.46 41.50 16.26
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.73 19.25 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 -1.70 0.45 34.17 5.17
Saturated case 17.59 19.77 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 -0.53 1.38 32.13 7.24
HFL case 16.65 18.63 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 -0.34 1.92 34.76 8.51
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case 17.35 18.62 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 -1.07 -0.17 19.68 2.51
Saturated case 18.63 19.20 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 0.05 0.34 18.74 4.41
HFL case 17.71 18.08 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 0.22 0.86 21.79 5.73
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.74 19.24 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 -1.69 0.44 34.13 5.17
Saturated case 17.61 19.77 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 -0.52 1.36 32.01 7.20
HFL case 16.67 18.63 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 -0.33 1.90 34.64 8.48
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 17.37 18.62 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 -1.06 -0.19 19.55 2.47
Saturated case 18.65 19.19 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 0.05 0.32 18.62 4.37
HFL case 17.73 18.08 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 0.22 0.84 21.64 5.69
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 16.91 18.84 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 -1.29 0.27 34.33 5.69
Saturated case 17.77 19.36 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 -0.12 1.20 32.30 7.76
HFL case 16.83 18.23 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 0.07 1.74 34.93 9.03
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 17.53 18.22 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 -0.66 -0.35 19.84 3.03
Saturated case 18.81 18.79 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 0.45 0.16 18.90 4.93
HFL case 17.89 17.68 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 0.62 0.68 21.93 6.24
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 17.73 17.45 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.50 8.04 0.10 -0.55 33.46 7.01
Saturated case 18.59 17.97 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 5.27 1.27 0.38 31.42 9.07
HFL case 17.65 16.84 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.50 4.88 1.46 0.92 34.05 10.35
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 18.36 16.83 1.35 2.50 2.36 1.01 1.35 1.80 15.19 16.16 0.00 0.00 0.00 1.00 5.36 0.73 -1.18 18.88 4.31
Saturated case 19.63 17.40 1.35 2.50 2.36 1.01 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.51 1.84 -0.66 18.03 6.24
HFL case 18.72 16.28 1.35 1.50 1.42 0.61 1.35 2.00 16.88 17.96 0.00 0.00 0.00 1.00 3.25 2.02 -0.15 20.99 7.54

203 203
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Design of Heel at Face B-D
For Combination 2
factor for
Factor for unit Factor for vertical
Factor for unit Self wt of weight of Facotred Facotred vertical Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at seismic intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o component q p compon. intensity at t at r at s heel of heel
Before construction of super structure.
Dry case 13.05 11.00 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 1.30 6.97 2.00 -0.33 36.82 10.82
Saturated case 13.51 11.36 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 1.30 4.57 2.89 0.54 35.05 12.47
HFL case 12.78 10.52 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 1.30 4.23 3.03 0.97 36.99 13.43
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 11.88 14.64 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 1.30 6.97 -1.64 0.84 32.24 5.15
Saturated case 12.34 15.00 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 1.30 4.57 -0.75 1.71 30.47 6.80
HFL case 11.60 14.16 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 1.30 4.23 -0.60 2.15 32.50 7.79
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case 12.44 14.08 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 0.85 4.56 -1.07 0.28 19.18 2.74
Saturated case 13.28 14.48 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 0.85 2.99 -0.23 0.77 18.39 4.24
HFL case 12.56 13.66 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 0.85 2.76 -0.10 1.19 20.77 5.27
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 11.89 14.64 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 1.30 6.97 -1.63 0.83 32.18 5.13
Saturated case 12.36 14.99 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 1.30 4.57 -0.74 1.69 30.35 6.76
HFL case 11.62 14.16 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 1.30 4.23 -0.61 2.13 32.35 7.74
Live load as leading load+ wind load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 12.46 14.07 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 0.85 4.56 -1.07 0.26 19.05 2.70
Saturated case 13.29 14.47 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 0.85 2.99 -0.22 0.76 18.35 4.24
HFL case 12.58 13.66 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 0.85 2.76 -0.10 1.17 20.62 5.22
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.03 14.29 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 1.30 6.97 -1.29 0.69 32.41 5.60
Saturated case 12.50 14.66 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 1.30 4.57 -0.40 1.55 30.55 7.22
HFL case 11.76 13.81 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 1.30 4.23 -0.26 1.99 32.58 8.21
Wind load as leading load+ Live load as accompanying(considering Earth preasure is relieving the effect of variable load)
Dry case 12.60 13.73 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 0.85 4.56 -0.72 0.12 19.28 3.18
Saturated case 13.43 14.14 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 0.85 2.99 0.12 0.62 18.55 4.69
HFL case 12.72 13.31 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 0.85 2.76 0.24 1.03 20.85 5.70
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 12.81 13.06 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 1.30 6.97 -0.06 -0.09 31.25 6.64
Saturated case 13.28 13.42 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 1.30 4.57 0.83 0.77 29.39 8.25
HFL case 12.54 12.58 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 1.30 4.23 0.97 1.21 31.42 9.25
Wind load as leading load (with out LL) (considering Earth preasure is Relieving the effect of variable load)
Dry case 13.31 12.52 1 2.5 1.75 0.75 1 1.8 11.25 11.97 0 0.00 0.00 0.85 4.56 0.49 -0.59 18.55 4.33
Saturated case 14.15 12.93 1 2.5 1.75 0.75 1 2 12.50 13.30 0 0.00 0.00 0.85 2.99 1.33 -0.10 17.74 5.82
HFL case 13.43 12.10 1 1.5 1.05 0.45 1 2 12.50 13.30 0 0.00 0.00 0.85 2.76 1.45 0.32 20.12 6.85

204 204
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Check for Ultimate moment
Idealized Stress- strain drawing for untensioned steel Idealized Stress- strain drawing for Concrete
Ecu3 =0.0035
Stress h fcd
Fcs
Asc x lx Fc

fyk/gs NA
= fyk/1.15
= 434.783 Mpa

Ast Fts
min modified yeilding strain = 0.00217
l= 0.8 0.80 for fck <=60 Mpa
0.8-(fck-60)/500 for 60 <fck <110 Mpa
modifed yeild strain = (fyk/gs)/E of steel Strain
= 0.00217 h= 1 1 for fck <=60 Mpa
1- (fck-60)/250 for 60 <fck <110 Mpa
fcd = 13.4 Mpa

205 205
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Section of Heel At face of wall 1000 Section of toe At face of wall 1000

Top Face effective cover = 87.5 Top face effective cover = 83

25 @ 180 mm C/C 16 @ 180 mm C/C


700 mm 25 @ 360 mm C/C 700 mm 25 @ 180 mm C/C

Bottom face effective cover = 87.5 Bottom face effective cover = 87.5
Heel TOE
Effective depth d in mm 613 mm Effective depth d in mm 613 mm
b1 in mm 1000 mm b1 in mm 1000 mm
Ast min 0.26 fctm/fyk b1 d 796 Sq.mm Ast min 0.26 fctm/fyk b1 d 796 Sq.mm
0.0013 b1 d 796 Sq.mm 0.0013 b1 d 796 Sq.mm
Ast min 796 Sq.mm Ast min 796 Sq.mm
Area of steel provided in top ok 2727 Sq.mm Area of steel provided in bottom ok 2727 Sq.mm
Max Ast 0.025 Ac ok 17500 Sq.mm Max Ast 0.025 Ac ok 17500 Sq.mm
Asc minimum= 0.01 Act.ext= 0.01x 75.00x 1000.00= 750.000 Sq.mm Asc minimum= 0.01 Act.ext= 0.01x 75.00x 1000.00= 750.000 Sq.mm
Area of steel provided in bottoom ok 1364 Sq.mm Area of steel provided in top ok 1117 Sq.mm
Total steel provided 4091 Sq.mm Total steel provided 3844 Sq.mm
maximum total steel =0.04 Ac ok 28000 Sq.mm maximum total steel =0.04 Ac ok 28000 Sq.mm
+ve BM -ve BM +ve BM -ve BM
Depth of NA x from top of girder in m 99.705 mm 77.717 mm Depth of NA x from top of girder in m 98.887 mm 74.995 mm
Strain at the level of bottom layer steel 0.000428 0.02408 Strain at the level of bottom layer steel 0.01818 0.000584
Strain at the level of top layer steel 0.01800 0.000441 Strain at the level of top layer steel 0.000562 0.02530
Stress at the level of bottom layer steel 85.69 Mpa -434.78 Mpa Stress at the level of bottom layer steel -434.78 Mpa -116.72 Mpa
Stress at the level of top layer steel -434.78 Mpa -88.11 Mpa Stress at the level of top layer steel 112.46 Mpa -434.78 Mpa
Force in concrete 1069 kn 833 kn Force in concrete 1060 kn 804 kn
Force in bottom Steel 117 kn -593 kn Force in bottom Steel -1186 kn -318 kn
Force in top layersteel -1186 kn -240 kn Force in top layersteel 126 kn -486 kn
Net force at NA 0 kn 0 kn Net force at NA 0 kn 0 kn
Ultimate mome. carring capacity about NA 673 kn-m 358 kn-m Ultimate mome. carring capacity about NA 674 kn-m 295 kn-m
maximun BM ok 437 kn-m 200 kn-m ok maximun BM ok 303 kn-m 0 kn-m NA

206 206
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Check for Ultimate SF
Maximum shear capacty of the section
Heel TOE
Shear capacity of concrete with out reinforcement
Minimum of VRD.C = [0.12K*(80r1*fck)0.33+0.15scp]bwd
and [nmin + 0.15scp]bd
Where
nmin = 0.031K3/2*(fck)1/2bd
scp 0 (No axial or prestressing force) depth of toe at d from face of wall = 564 mm
K 1+sqrt*(200/d) 1.57 K 1+sqrt*(200/d) 1.57
r1 0.004 r1 0.004
VRD.C = kN 252.40 VRD.C = kN 232.37
VRD.C min = kN 204.87 VRD.C min = kN 188.61
Design VRD.C
kN= 252.40 Design VRD.C
kN= 232.37
Actual Shear force 162.59 Actual Shear force 215.46
Check No SR Check No SR
SR - Shear reinforcement SR - Shear reinforcement
Design of vertical shear links
VRDs = Asw*z*fywd*cotq VRDmax = acw*b*z*n1fcd
s cotq + tanq
Asw Area of shear links s spacing of reinforcement z lever arm - 0.9 times effective depth
acw =1 - for sections with out prestress fywd =0.8fyd n1 0.6 for fck< = 80Mpa
Asw 475.12 sqmm Asw 475.12 sqmm
Dia of bar 8 Dia of bar 8
number of legs 5.55556 number of legs 5.55556
spacing, s 360 spacing, s 360
Cotq (Assuming 45deg) 1 Cotq (Assuming 45deg) 1

VRDs = 291.01 kN VRDs = 291.01 kN


VRDmax = 2217.68 kN VRDmax = 2217.68 kN
shear resistance of stirrups 291.01 kN shear resistance of stirrups 291.01 kN
ok ok

207 207
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Table 3.3 of IRC 6-2016:Rare combination
Before construction of super structure.
Normal Dry case

unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load

6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.8 29.632 23.7056 0.8 273.3668 218.693 0.8 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
vertical load 1302 t ML -370 t-m MT 0 t-m
D A
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT

ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT

Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT

Base Preasure at point D = P/A - ML/ZL + MT/ZT

C B Base Preasure at point D = 13.76 t/m2 8.55 t/m2 = Base Preasure at point A

7.30m Base Preasure at point C = 13.76 t/m2 8.55 t/m2 = Base Preasure at point B

Saturated case
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Code no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0.8 17.488 13.9904 0.8 284.2712 227.417 0.8 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
vertical load 1358 t ML -409 t-m MT 0 t-m

Base Preasure at point D = 14.51 t/m2 8.75 t/m2 = Base Preasure at point A
2 2
Base Preasure at point C = 14.51 t/m 8.75 t/m = Base Preasure at point B

HFL case
unfactore Factored
Code no Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
Due to LL surcharge in normal HFL case
11b 0.8 17.44 13.952 0.8 325.16 260.128 0.8 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
vertical load 1264 t ML -429 t-m MT 0 t-m

Base Preasure at point D = 13.84 t/m2 7.81 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.84 t/m2 7.81 t/m2 = Base Preasure at point B

208 208
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Table 3.3 of IRC 6-2016:Rare combination
Live load as leading load+ thermal load as accompanying
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.8 29.632 23.7056 0.8 273.3668 218.693 0.8 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 0.6 0 0 0.6 11.95414 7.17248 0.6 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
vertical load 1592 t ML 125 t-m MT 0 t-m
Base Preasure at point D = 12.76 t/m2 14.52 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.76 t/m2 14.52 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0.8 17.488 13.9904 0.8 284.2712 227.417 0.8 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 0.6 0 0 0.6 11.95414 7.17248 0.6 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
vertical load 1648 t ML 87 t-m MT 0 t-m
Base Preasure at point D = 13.5 t/m2 14.73 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.5 t/m2 14.73 t/m2 = Base Preasure at point B
HFL Case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.8 17.44 13.952 0.8 325.16 260.128 0.8 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 0.6 0 0 0.6 11.95414 7.17248 0.6 0 0
23b Due to breaking 1 0 0 1 55.78598 55.786 1 0 0
vertical load 1554 t ML 67 t-m MT 0 t-m
Base Preasure at point D = 12.84 t/m2 13.78 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.84 t/m2 13.78 t/m2 = Base Preasure at point B

209 209
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Table 3.3 of IRC 6-2016:Rare combination
Thermal load as leading load+ Live load as accompanying.
Dry case
Code no Factor for
unfactored Factored
Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.8 29.632 23.7056 0.8 273.3668 218.693 0.8 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 0.75 94.9245 71.1934 0.75 141.4376 106.078 0.75 0 0
22b Due to temparature 1 0 0 1 11.95414 11.9541 1 0 0
23b Due to breaking 0.75 0 0 0.75 55.78598 41.8395 0.75 0 0
vertical load 1569 t ML 81 t-m MT 0 t-m
Base Preasure at point D = 12.87 t/m2 14 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.87 t/m2 14 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0.8 17.488 13.9904 0.8 284.2712 227.417 0.8 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 0.75 94.9245 71.1934 0.75 141.4376 106.078 0.75 0 0
22b Due to temparature 1 0 0 1 11.95414 11.9541 1 0 0
23b Due to breaking 0.75 0 0 0.75 55.78598 41.8395 0.75 0 0
vertical load 1624 t ML 42 t-m MT 0 t-m
Base Preasure at point D = 13.61 t/m2 14.21 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.61 t/m2 14.21 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.8 17.44 13.952 0.8 325.16 260.128 0.8 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 0.75 94.9245 71.1934 0.75 141.4376 106.078 0.75 0 0
22b Due to temparature 1 0 0 1 11.95414 11.9541 1 0 0
23b Due to breaking 0.75 0 0 0.75 55.78598 41.8395 0.75 0 0
vertical load 1530 t ML 22 t-m MT 0 t-m
Base Preasure at point D = 12.95 t/m2 13.26 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.95 t/m2 13.26 t/m2 = Base Preasure at point B

210 210
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Table 3.3 of IRC 6-2016:Rare combination
Live load as leading load+ wind load as accompanying
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.8 29.632 23.7056 0.8 273.3668 218.693 0.8 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal ( for wind speed 36m/s) 0.6 0 0 0.6 9.178 5.5068 0.6 0 0
35b wind Transverse ( for wind speed 36m/s) 0.6 0 0 0.6 0 0 0.6 36.705 22.023
vertical load 1640 t ML 222 t-m MT 0 t-m
Base Preasure at point D = 12.48 t/m2 15.61 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.48 t/m2 15.61 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0.8 17.488 13.9904 0.8 284.2712 227.417 0.8 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal ( for wind speed 36m/s) 0.6 0 0 0.6 9.178 5.5068 0.6 0 0
35b wind Transverse ( for wind speed 36m/s) 0.6 0 0 0.6 0 0 0.6 36.705 22.023
vertical load 1696 t ML 184 t-m MT 0 t-m
Base Preasure at point D = 13.23 t/m2 15.81 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.23 t/m2 15.81 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.8 17.44 13.952 0.8 325.16 260.128 0.8 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1.5 94.9245 142.387 1.5 141.4376 212.156 1.5 0 0
23b Due to breaking 1.5 0 0 1.5 55.78598 83.679 1.5 0 0
34b wind longitudinal ( for wind speed 36m/s) 0.6 0 0 0.6 9.178 5.5068 0.6 0 0
35b wind Transverse ( for wind speed 36m/s) 0.6 0 0 0.6 0 0 0.6 36.705 22.023
vertical load 1601 t ML 164 t-m MT 0 t-m
Base Preasure at point D = 12.56 t/m2 14.87 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.56 t/m2 14.87 t/m2 = Base Preasure at point B

211 211
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Table 3.3 of IRC 6-2016:Rare combination
Wind load as leading load+ Live load as accompanying
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT
1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0
2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.8 29.632 23.7056 0.8 273.3668 218.693 0.8 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 0.75 94.9245 71.1934 0.75 141.4376 106.078 0.75 0 0
23b Due to breaking 0.75 0 0 0.75 55.78598 41.8395 0.75 0 0
34b wind longitudinal ( for wind speed 36m/s) 1 0 0 1 9.178 9.178 1 0 0
35b wind Transverse ( for wind speed 36m/s) 1 0 0 1 0 0 1 36.705 36.705
vertical load 1569 t ML 78 t-m MT 0 t-m
Base Preasure at point D = 12.89 t/m2 13.98 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.89 t/m2 13.98 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0.8 17.488 13.9904 0.8 284.2712 227.417 0.8 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 0.75 94.9245 71.1934 0.75 141.4376 106.078 0.75 0 0
23b Due to breaking 0.75 0 0 0.75 55.78598 41.8395 0.75 0 0
34b wind longitudinal ( for wind speed 36m/s) 1 0 0 1 9.178 9.178 1 0 0
35b wind Transverse ( for wind speed 36m/s) 1 0 0 1 0 0 1 36.705 36.705
vertical load 1624 t ML 40 t-m MT 0 t-m
Base Preasure at point D = 13.63 t/m2 14.19 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.63 t/m2 14.19 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0.75 0 0 0.75 0 0 0.75 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.8 17.44 13.952 0.8 325.16 260.128 0.8 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 0.75 94.9245 71.1934 0.75 141.4376 106.078 0.75 0 0
23b Due to breaking 0.75 0 0 0.75 55.78598 41.8395 0.75 0 0
34b wind longitudinal ( for wind speed 36m/s) 1 0 0 1 9.178 9.178 1 0 0
35b wind Transverse ( for wind speed 36m/s) 1 0 0 1 0 0 1 36.705 36.705
vertical load 1530 t ML 19 t-m MT 0 t-m
Base Preasure at point D = 12.97 t/m2 13.24 t/m2 = Base Preasure at point A
Base Preasure at point C = 12.97 t/m2 13.24 t/m2 = Base Preasure at point B

212 212
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Table 3.3 of IRC 6-2016:Rare combination
Wind load as leading load (with out LL)
Dry case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0.8 29.632 23.7056 0.8 273.3668 218.693 0.8 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
26b wind longitudinal 1 0 0 1 7.392 7.392 1 0 0
27b Wind transverse 1 0 0 1 0 0 1 29.56425 29.5643
vertical load 1497 t ML -72 t-m MT 30 t-m
Base Preasure at point D = 13.43 t/m2 12.42 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.24 t/m2 12.23 t/m2 = Base Preasure at point B
Saturated case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0.8 17.488 13.9904 0.8 284.2712 227.417 0.8 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
26b wind longitudinal 1 0 0 1 7.392 7.392 1 0 0
27b Wind transverse 1 0 0 1 0 0 1 29.56425 29.5643
vertical load 1553 t ML -110 t-m MT 30 t-m
Base Preasure at point D = 14.17 t/m2 12.62 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.98 t/m2 12.43 t/m2 = Base Preasure at point B
HFL case
Code no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0.8 17.44 13.952 0.8 325.16 260.128 0.8 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
26b wind longitudinal 1 0 0 1 7.392 7.392 1 0 0
27b Wind transverse 1 0 0 1 0 0 1 29.56425 29.5643
vertical load 1459 t ML -130 t-m MT 30 t-m
Base Preasure at point D = 13.51 t/m2 11.67 t/m2 = Base Preasure at point A
Base Preasure at point C = 13.32 t/m2 11.48 t/m2 = Base Preasure at point B

213 213
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref balbulations of SLS forbe for design of foundation as per Table 3.3 of IRb 6-2014:Quasi permanent bombination
before bonstrubtion of super strubture.
Normal Dry base

unfactore Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
bode no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load

6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0 29.632 0 0 273.3668 0 0 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
vertical load 1278 t ML -589 t-m MT 0 t-m
D A
Base area of foundation = 116.8 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT

ZL = 142.107 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT

Heel Toe 16.00m ZT = 311.467 m3 Base Preasure at point C = P/A - ML/ZL - MT/ZT

Base Preasure at point D = P/A - ML/ZL + MT/ZT

C B Base Preasure at point D = 15.09 t/m2 6.81 t/m2 = Base Preasure at point A

7.30m Base Preasure at point C = 15.09 t/m2 6.81 t/m2 = Base Preasure at point B

Saturated base
unfactore Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
bode no Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0 17.488 0 0 284.2712 0 0 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
vertical load 1344 t ML -636 t-m MT 0 t-m

Base Preasure at point D = 15.99 t/m2 7.03 t/m2 = Base Preasure at point A
2 2
Base Preasure at point C = 15.99 t/m 7.03 t/m = Base Preasure at point B

HFL base
unfactore Factored
bode no Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions d vertical vertical
ver. load ML ML ML MT MT MT
load load
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
Due to LL surcharge in normal HFL case
11b 0 17.44 0 0 325.16 0 0 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
vertical load 1250 t ML -689 t-m MT 0 t-m

Base Preasure at point D = 15.55 t/m2 5.86 t/m2 = Base Preasure at point A
Base Preasure at point C = 15.55 t/m2 5.86 t/m2 = Base Preasure at point B

214 214
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref balbulations of SLS forbe for design of foundation as per Table 3.3 of IRb 6-2014:Quasi permanent bombination
After super strubture bonstrbtion
Dry base
bode no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Unfactored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
6b Due to Earth preasure in normal Dry case 1 85.792 85.792 1 282.7208 282.721 1 0 0
7b Due to LL surcharge in normal Dry case 0 29.632 0 0 273.3668 0 0 0 0
Due to Substructure,Foundation and Soil above
12b 1 1192.64 1192.64 1 -871.658 -871.66 1 0 0
heel in normal Dry case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 0.5 0 0 0.5 11.95414 5.97707 0.5 0 0
23b Due to breaking 0 0 0 0 55.78598 0 0 0 0
vertical load 1569 t ML -150 t-m MT 0 t-m
Base Preasure at point D = 14.49 t/m2 12.38 t/m2 = Base Preasure at point A
Base Preasure at point C = 14.49 t/m2 12.38 t/m2 = Base Preasure at point B
Saturated base
bode no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
Due to Earth preasure in normal Saturate
8b 1 56.208 56.208 1 363.8092 363.809 1 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9b 0 17.488 0 0 284.2712 0 0 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13b 1 1287.62 1287.62 1 -999.873 -999.87 1 0 0
heel in normal saturated case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 0.5 0 0 0.5 11.95414 5.97707 0.5 0 0
23b Due to breaking 0 0 0 0 55.78598 0 0 0 0
vertical load 1634 t ML -198 t-m MT 0 t-m
Base Preasure at point D = 15.39 t/m2 12.61 t/m2 = Base Preasure at point A
Base Preasure at point C = 15.39 t/m2 12.61 t/m2 = Base Preasure at point B
HFL base
bode no unfactored Factored
Factor for Factor for Unfactored Factored Factor for Factored Factored
Descriptions ver. load
vertical vertical
load load ML ML ML MT MT MT

1b Due to Dead load of super structure 1 136.554 136.554 1 203.4655 203.465 1 0 0


2b Due to SIDL (Wearing coat) 1.2 48.999 58.7988 1.2 73.00851 87.6102 1.2 0 0
3b Due to Crash barrier 1 0 0 1 0 0 1 0 0
4b Due to Foot path dead load 1 0 0 1 0 0 1 0 0
5b Due to Footpath Live load 1 0 0 1 0 0 1 0 0
10b Due to Earth preasure in normal HFL case 1 52 52 1 365.384 365.384 1 0 0
11b Due to LL surcharge in normal HFL case 0 17.44 0 0 325.16 0 0 0 0
Due to Substructure,Foundation and Soil above
14b 1 1197.67 1197.67 1 -1054.33 -1054.3 1 0 0
heel in normal HFL case
21b Due to Live load 1 94.9245 94.9245 1 141.4376 141.438 1 0 0
22b Due to temparature 0.5 0 0 0.5 11.95414 5.97707 0.5 0 0
23b Due to breaking 0 0 0 0 55.78598 0 0 0 0
vertical load 1540 t ML -250 t-m MT 0 t-m
Base Preasure at point D = 14.95 t/m2 11.43 t/m2 = Base Preasure at point A
Base Preasure at point C = 14.95 t/m2 11.43 t/m2 = Base Preasure at point B

215 215
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016

Height of soil fill = 6652 mm Height of soil fill = 6252 mm


Clear Cover at Heal = 75 mm
dia of bar Considered for Heal = 25 mm Clear Cover at toe = 75 mm
612.5 dia of bar Considered for toe = 25 mm

700 mm 700 mm C A
300 mm 300 mm
4600 mm 1800 mm

Heel Toe
b e d c a

Base Preasure +
D 7.30 m B
j i h g f

Self Weight of Heel Slab Self Weight of Toe Slab


=
o n

Self Weight of Soil Fill above heel


m L k

q p

Vertical seismic component of Soil weight Fianl Preasure on Toe

s r

Fianl Preasure on Heel excluding Vertical component of Earth preasure


t

Vertical component of Earth Preasure

216 216
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Summary of base preasures
Rare combinatoin
Base Base Base Base
preasure at preasure at preasure at preasure at
A B C D
Before construction of super structure.
Dry case 8.55 8.55 13.76 13.76
Saturated case 8.75 8.75 14.51 14.51
HFL case 7.81 7.81 13.84 13.84
Live load as leading load+ thermal load as accompanying
Dry case 14.52 14.52 12.76 12.76
Saturated case 14.73 14.73 13.5 13.5
HFL case 13.78 13.78 12.84 12.84
Thermal load as leading load+ Live load as accompanying.
Dry case 14 14 12.87 12.87
Saturated case 14.21 14.21 13.61 13.61
HFL case 13.26 13.26 12.95 12.95
Live load as leading load+ wind load as accompanying
Dry case 15.61 15.61 12.48 12.48
Saturated case 15.81 15.81 13.23 13.23
HFL case 14.87 14.87 12.56 12.56
Wind load as leading load+ Live load as accompanying
Dry case 13.98 13.98 12.89 12.89
Saturated case 14.19 14.19 13.63 13.63
HFL case 13.24 13.24 12.97 12.97
Wind load as leading load (with out LL)
Dry case 12.42 12.23 13.24 13.43
Saturated case 12.62 12.43 13.98 14.17
HFL case 11.67 11.48 13.32 13.51
Quasi permanent combination
Base Base Base Base
preasure at preasure at preasure at preasure at
A B C D
Before construction of super structure.
Dry case 6.81 6.81 15.09 15.09
Saturated case 7.03 7.03 15.99 15.99
HFL case 5.86 5.86 15.55 15.55
Aftre construction of super structure.
Dry case 12.38 12.38 14.49 14.49
Saturated case 12.61 12.61 15.39 15.39
HFL case 11.43 11.43 14.95 14.95

217 217
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Design of Toe at Face A-C
Factor for unit SF at d
Self wt of weight of BM at face from face of
Rare combination a c d toe concrete f g h m l k of wall suppor
Before construction of super structure. C A
Dry case 8.55 12.91 12.48 1 2.5 0.75 1.41 1.75 10.73 11.50 7.80 14.22 11.46
Saturated case 8.75 13.57 13.09 1 2.5 0.75 1.41 1.75 11.34 12.16 8.00 14.76 11.97
HFL case 7.81 12.86 12.35 1 1.5 0.45 0.85 1.05 11.30 12.01 7.36 14.05 11.50
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Heel Toe
Dry case 14.52 13.05 13.19 1 2.5 0.75 1.41 1.75 11.44 11.64 13.77 21.05 15.09
Saturated case 14.73 13.70 13.80 1 2.5 0.75 1.41 1.75 12.05 12.29 13.98 21.61 15.60
HFL case 13.78 12.99 13.07 1 1.5 0.45 0.85 1.05 12.02 12.15 13.33 20.89 15.13
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) D B
Dry case 14.00 13.05 13.15 1 2.5 0.75 1.41 1.75 11.40 11.64 13.25 20.47 14.78
Saturated case 14.21 13.71 13.76 1 2.5 0.75 1.41 1.75 12.01 12.30 13.46 21.02 15.29
HFL case 13.26 13.00 13.03 1 1.5 0.45 0.85 1.05 11.98 12.15 12.81 20.30 14.82
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 15.61 12.99 13.25 1 2.5 0.75 1.41 1.75 11.50 11.58 14.86 22.26 15.70
Saturated case 15.81 13.65 13.87 1 2.5 0.75 1.41 1.75 12.12 12.24 15.06 22.81 16.21
HFL case 14.87 12.94 13.13 1 1.5 0.45 0.85 1.05 12.08 12.09 14.42 22.10 15.74
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 13.98 13.07 13.16 1 2.5 0.75 1.41 1.75 11.41 11.66 13.23 20.45 14.78
Saturated case 14.19 13.72 13.77 1 2.5 0.75 1.41 1.75 12.02 12.31 13.44 21.00 15.29
HFL case 13.24 13.01 13.04 1 1.5 0.45 0.85 1.05 11.99 12.17 12.79 20.29 14.82
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 12.42 13.11 13.04 1 2.5 0.75 1.41 1.75 11.29 11.70 11.67 18.70 13.87
Saturated case 12.62 13.76 13.64 1 2.5 0.75 1.41 1.75 11.89 12.35 11.87 19.24 14.38
HFL case 11.67 13.05 12.91 1 1.5 0.45 0.85 1.05 11.86 12.21 11.22 18.52 13.91
Quasi permanent Combination
Before construction of super structure.
Dry case 6.81 13.74 13.05 1 2.5 0.75 1.41 1.75 11.30 12.33 6.06 12.65 10.92
Saturated case 7.03 14.53 13.78 1 2.5 0.75 1.41 1.75 12.03 13.12 6.28 13.28 11.52
HFL case 5.86 13.97 13.16 1 1.5 0.45 0.85 1.05 12.11 13.13 5.41 12.38 11.01
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.38 14.15 13.97 1 2.5 0.75 1.41 1.75 12.22 12.74 11.63 19.16 14.47
Saturated case 12.61 14.94 14.70 1 2.5 0.75 1.41 1.75 12.95 13.53 11.86 19.80 15.07
HFL case 11.43 14.38 14.08 1 1.5 0.45 0.85 1.05 13.03 13.53 10.98 18.90 14.55

218 218
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Design of Toe at Face B-D
Factor for unit SF at d
Self wt of weight of BM at face from face of
Rare combination a c d toe concrete f g h m l k of wall suppor
Before construction of super structure. C A
Dry case 8.55 12.91 12.48 1 2.5 0.75 1.41 1.75 10.73 11.50 7.80 14.22 11.46
Saturated case 8.75 13.57 13.09 1 2.5 0.75 1.41 1.75 11.34 12.16 8.00 14.76 11.97
HFL case 7.81 12.86 12.35 1 1.5 0.45 0.85 1.05 11.30 12.01 7.36 14.05 11.50
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load) Heel Toe
Dry case 14.52 13.05 13.19 1 2.5 0.75 1.41 1.75 11.44 11.64 13.77 21.05 15.09
Saturated case 14.73 13.70 13.80 1 2.5 0.75 1.41 1.75 12.05 12.29 13.98 21.61 15.60
HFL case 13.78 12.99 13.07 1 1.5 0.45 0.85 1.05 12.02 12.15 13.33 20.89 15.13
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load) D B
Dry case 14.00 13.05 13.15 1 2.5 0.75 1.41 1.75 11.40 11.64 13.25 20.47 14.78
Saturated case 14.21 13.71 13.76 1 2.5 0.75 1.41 1.75 12.01 12.30 13.46 21.02 15.29
HFL case 13.26 13.00 13.03 1 1.5 0.45 0.85 1.05 11.98 12.15 12.81 20.30 14.82
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 15.61 12.99 13.25 1 2.5 0.75 1.41 1.75 11.50 11.58 14.86 22.26 15.70
Saturated case 15.81 13.65 13.87 1 2.5 0.75 1.41 1.75 12.12 12.24 15.06 22.81 16.21
HFL case 14.87 12.94 13.13 1 1.5 0.45 0.85 1.05 12.08 12.09 14.42 22.10 15.74
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 13.98 13.07 13.16 1 2.5 0.75 1.41 1.75 11.41 11.66 13.23 20.45 14.78
Saturated case 14.19 13.72 13.77 1 2.5 0.75 1.41 1.75 12.02 12.31 13.44 21.00 15.29
HFL case 13.24 13.01 13.04 1 1.5 0.45 0.85 1.05 11.99 12.17 12.79 20.29 14.82
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 12.23 13.23 13.13 1 2.5 0.75 1.41 1.75 11.38 11.83 11.48 18.55 13.84
Saturated case 12.43 13.89 13.74 1 2.5 0.75 1.41 1.75 11.99 12.48 11.68 19.09 14.34
HFL case 11.48 13.18 13.01 1 1.5 0.45 0.85 1.05 11.96 12.33 11.03 18.37 13.87
Quasi permanent Combination
Before construction of super structure.
Dry case 6.81 13.74 13.05 1 2.5 0.75 1.41 1.75 11.30 12.33 6.06 12.65 10.92
Saturated case 7.03 14.53 13.78 1 2.5 0.75 1.41 1.75 12.03 13.12 6.28 13.28 11.52
HFL case 5.86 13.97 13.16 1 1.5 0.45 0.85 1.05 12.11 13.13 5.41 12.38 11.01
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.38 14.15 13.97 1 2.5 0.75 1.41 1.75 12.22 12.74 11.63 19.16 14.47
Saturated case 12.61 14.94 14.70 1 2.5 0.75 1.41 1.75 12.95 13.53 11.86 19.80 15.07
HFL case 11.43 14.38 14.08 1 1.5 0.45 0.85 1.05 13.03 13.53 10.98 18.90 14.55

219 219
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Design of Heel at Face A-C
Rare combination
factor for
Factor for unit vertical
Factor for unit Self wt of weight of Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o compon. intensity at t at r at s heel of heel
Before construction of super structure.
Dry case 13.76 10.48 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 2.53 -1.04 26.27 8.79
Saturated case 14.51 10.88 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 3.37 -0.46 24.84 10.22
HFL case 13.84 10.04 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 3.51 -0.09 26.74 11.13
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.76 13.87 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.87 -0.04 21.36 3.29
Saturated case 13.50 14.28 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 -0.02 0.55 19.99 4.74
HFL case 12.84 13.43 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.12 0.91 21.83 5.63
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case 12.87 13.58 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.58 -0.15 21.59 3.69
Saturated case 13.61 13.99 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 0.27 0.44 20.23 5.15
HFL case 12.95 13.15 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.41 0.80 22.06 6.04
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.48 14.45 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -1.45 0.24 21.27 2.59
Saturated case 13.23 14.86 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 -0.60 0.82 19.85 4.02
HFL case 12.56 14.02 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 -0.46 1.19 21.74 4.93
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.89 13.58 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.57 -0.17 21.47 3.66
Saturated case 13.63 13.98 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 0.27 0.42 20.11 5.11
HFL case 12.97 13.14 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.41 0.78 21.94 6.01
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 13.24 12.72 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 0.28 -0.52 22.01 4.82
Saturated case 13.98 13.12 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 1.13 0.07 20.67 6.28
HFL case 13.32 12.28 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 1.27 0.43 22.50 7.18
Quasi permanent Combination
Before construction of super structure.
Dry case 15.09 9.87 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 3.13 -2.37 19.02 7.12
Saturated case 15.99 10.34 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 3.91 -1.94 16.29 8.05
HFL case 15.55 9.44 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 4.11 -1.80 16.78 8.57
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 14.49 13.16 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.16 -1.77 11.65 0.94
Saturated case 15.39 13.64 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 0.62 -1.34 8.91 1.86
HFL case 14.95 12.73 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.82 -1.20 9.41 2.39

220 220
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Design of Heel at Face B-D
Rare combination
factor for
Factor for unit vertical
Factor for unit Self wt of weight of Facotred Facotred eatrh BM at
intensity intensity Self wt of weight of Facotred Facotred Soil Soil back intensity at intensity at pressure Facotred intensity intensity fece of SF at fae
at b at e Heel concrete intensity at i intensity at j backfill fill n o compon. intensity at t at r at s heel of heel
Before construction of super structure.
Dry case 13.76 10.48 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 2.53 -1.04 26.27 8.79
Saturated case 14.51 10.88 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 3.37 -0.46 24.84 10.22
HFL case 13.84 10.04 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 3.51 -0.09 26.74 11.13
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.76 13.87 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.87 -0.04 21.36 3.29
Saturated case 13.50 14.28 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 -0.02 0.55 19.99 4.74
HFL case 12.84 13.43 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.12 0.91 21.83 5.63
Live load as leading load+ thermal load as accompanying(considering Earth preasure is Relieving the effect of variable load)
Dry case 12.87 13.58 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.58 -0.15 21.59 3.69
Saturated case 13.61 13.99 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 0.27 0.44 20.23 5.15
HFL case 12.95 13.15 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.41 0.80 22.06 6.04
Live load as leading load+ wind load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.48 14.45 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -1.45 0.24 21.27 2.59
Saturated case 13.23 14.86 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 -0.60 0.82 19.85 4.02
HFL case 12.56 14.02 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 -0.46 1.19 21.74 4.93
Wind load as leading load+ Live load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 12.89 13.58 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.57 -0.17 21.47 3.66
Saturated case 13.63 13.98 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 0.27 0.42 20.11 5.11
HFL case 12.97 13.14 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.41 0.78 21.94 6.01
Wind load as leading load (with out LL) (considering Earth preasure is adding to the effect of variable load)
Dry case 13.43 12.67 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 0.33 -0.71 20.85 4.50
Saturated case 14.17 13.07 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 1.18 -0.12 19.50 5.96
HFL case 13.51 12.23 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 1.32 0.24 21.34 6.85
Quasi permanent Combination
Before construction of super structure.
Dry case 15.09 9.87 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 3.13 -2.37 19.02 7.12
Saturated case 15.99 10.34 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 3.91 -1.94 16.29 8.05
HFL case 15.55 9.44 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 4.11 -1.80 16.78 8.57
Live load as leading load+ thermal load as accompanying(considering Earth preasure is adding to the effect of variable load)
Dry case 14.49 13.16 1.00 2.50 1.75 0.75 1.00 1.80 11.25 11.97 1.00 5.36 -0.16 -1.77 11.65 0.94
Saturated case 15.39 13.64 1.00 2.50 1.75 0.75 1.00 2.00 12.50 13.30 1.00 3.51 0.62 -1.34 8.91 1.86
HFL case 14.95 12.73 1.00 1.50 1.05 0.45 1.00 2.00 12.50 13.30 1.00 3.25 0.82 -1.20 9.41 2.39

221 221
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design Chainage 70+010
APPLICABLE FOR A1 AND A2 Design by Suresh Date
Check by Pavan 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Calculation of Stress (rare combination)
Heel TOE
IRC 112 Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2.1 Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio m or ae 12.90
Ast 2727 Sq.mm Ast 2727 Sq.mm
Asc 1364 Sq.mm Asc 1117 Sq.mm
d 613 mm d 613 mm
dc 88 mm dc 83 mm
b 1000 mm b 1000 mm
x 169 mm x 169 mm
Maximum BM in rare combination: 267 Kn-m Maximum BM in rare combination: 228 Kn-m
BM=0.5 scbc x2 /3 +Asc (x-dc)2 m scbc /x +Ast (d-x)2 m scbc /x BM=0.5 scbc x2 /3 +Asc (x-dc)2 m scbc /x +Ast (d-x)2 m scbc /x
fcc 5.739 N/sqmm Safe fcc 4.936 N/sqmm Safe
fst =scbc m (d-x) /x 195.13 N/sqmm Safe fst =scbc m (d-x) /x 166.61 N/sqmm Safe
fsc =scbc m (x-dc) /x 35.60 N/sqmm Safe fsc =scbc m (x-dc) /x 32.48 N/sqmm Safe
Calculation of Stress (Quasi permanent Combination)
Maximum BM in Quasi permanent combination: 190.17 Kn-m Maximum BM in Quasi permanent combination: 198.04 Kn-m
ssc 138.79 N/sqmm fst 144.67 N/sqmm
Crack width = W r = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff

C clear cover 75 mm C clear cover 75 mm


k1 0.8 deformed bars, 0.8 k1 0.8 deformed bars, 0.8
1.6 plain bars 1.6 plain bars
k2 0.5 bending 0.5 k2 0.5 bending 0.5
1 pure tension 1 pure tension
f bar dia of tension steel 25 f bar dia of tension steel 25
rpeff = Ast/Acef rpeff = Ast/Acef
Acef 177163.25 sq.mm Acef 176869.14 sq.mm
Ast 2727 sq.mm Ast 2727 sq.mm
rpeff = 0.015393 rpeff = 0.0154186
Sr,max = 531.09921 Sr,max = 530.64086
Kt 0.5 Kt 0.5
fcteff 2.5 N/sqmm fcteff 2.5 N/sqmm
(esm-ecm) = 0.0004164 (esm-ecm) = 0.000434
W r = Sr,max(esm-ecm) = 0.2211371 mm W r = Sr,max(esm-ecm) = 0.2303097 mm
safe safe

222 222
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Before construction of super structure.(Considering the Earth preasure is adding to the effects of variable load)
Normal Dry case
unfactore Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor
d vertical vertical Hor. Load Load d ML ML MT MT
6c Due to Earth preasure in normal Dry case 1.5 load 0 load 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
vertical load 249 t Hor. load 324 t ML 889 t-m MT 0 t-m
Saturated case
unfactore Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor
d vertical vertical Hor. Load Load d ML ML MT MT
8c Due to Earth preasure in normal Saturate 1.5 load 0 load 0 200.08 300.12 412.97 619.455 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
vertical load 249 t Hor. load 383 t ML 879 t-m MT 0 t-m
HFL case
unfactore Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor
d vertical vertical Hor. Load Load d ML ML MT MT
10c Due to Earth preasure in normal HFL case 1.5 load 0 load 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
vertical load 211 t Hor. load 376 t ML 879 t-m MT 0 t-m
Before construction of super structure.(Considering the Earth preasure is adding to the effects of variable load)
Normal Dry case
unfactore Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor
d vertical vertical Hor. Load Load d ML ML MT MT
6c Due to Earth preasure in normal Dry case 1 load 0 load 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
vertical load 249 t Hor. load 241 t ML 672 t-m MT 0 t-m
Saturated case
unfactore Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor
d vertical vertical Hor. Load Load d ML ML MT MT
8c Due to Earth preasure in normal Saturate 1 load 0 load 0 200.08 200.08 412.97 412.97 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
vertical load 249 t Hor. load 283 t ML 672 t-m MT 0 t-m
HFL case
unfactore Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor
d vertical vertical Hor. Load Load d ML ML MT MT
10c Due to Earth preasure in normal HFL case 1 load 0 load 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
vertical load 211 t Hor. load 282 t ML 674 t-m MT 0 t-m

223 223
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Live load as leading load+ wind load as accompanying(considering DL,SIDL,Earth preasure is adding to the effect of variable load)
Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
12c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal Dry case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 662 t Hor. load 341 t ML 1032 t-m MT 226 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1.5 0 0 200.08 300.12 412.97 619.455 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw down casae)
13c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel in normal
Due to saturated case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 662 t Hor. load 400 t ML 1022 t-m MT 226 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 623 t Hor. load 393 t ML 1022 t-m MT 196 t-m

224 224
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Live load as leading load+ wind load as accompanying(considering DL,SIDL is adding to the effect of variable load and EP is relieving the variable load): Dry
case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
12c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal Dry case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 662 t Hor. load 258 t ML 815 t-m MT 226 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw down casae)
13c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal saturated case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 662 t Hor. load 300 t ML 815 t-m MT 226 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 623 t Hor. load 298 t ML 817 t-m MT 226 t-m

225 225
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Live load as leading load+ wind load as accompanying(considering DL,SIDL,Earth preasure is relieving the variable load): Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
12c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal Dry case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 577 t Hor. load 258 t ML 808 t-m MT 226 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw down casae)
13c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal saturated case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 577 t Hor. load 300 t ML 808 t-m MT 226 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 539 t Hor. load 298 t ML 810 t-m MT 226 t-m

226 226
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Live load as leading load+ wind load as accompanying(consideringEarth preasure is adding to the effect of variable load and DL,SIDL is relieving the variable
load): Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
12c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal Dry case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 577 t Hor. load 341 t ML 1024 t-m MT 226 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1.5 0 0 200.08 300.12 412.97 619.455 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw down casae)
13c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
21c heel to
Due in normal saturated case
Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 577 t Hor. load 400 t ML 1014 t-m MT 226 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.5 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.9 0 0 1.232 1.1088 36.705 33.0345 0 0
35c wind Transverse 0.9 0 0 0 0 0 0 33.255 29.9295
vertical load 539 t Hor. load 393 t ML 1014 t-m MT 226 t-m

227 227
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load+ Live load as accompanying(considering DL,SIDL,earth preasure is considerd as adding to effects of variable load)
Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 629 t Hor. load 338 t ML 1034 t-m MT 200 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 629 t Hor. load 397 t ML 1024 t-m MT 200 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 590 t Hor. load 390 t ML 1024 t-m MT 200 t-m

228 228
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load+ Live load as accompanying(considering DL,SIDL,earth preasure is considerd as relieving the effects of variable load)
Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 479 t Hor. load 255 t ML 810 t-m MT 200 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1 0 0 200.08 200.08 412.97 412.97 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 479 t Hor. load 297 t ML 810 t-m MT 200 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 451 t Hor. load 295 t ML 812 t-m MT 200 t-m

229 229
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load+ Live load as accompanying(considering DL,SIDL adding to the effects of varible load and earth preasure is considerd as relieving
the effects of variable load) : Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 629 t Hor. load 255 t ML 817 t-m MT 200 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1 0 0 200.08 200.08 412.97 412.97 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 629 t Hor. load 297 t ML 817 t-m MT 200 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 590 t Hor. load 295 t ML 819 t-m MT 200 t-m

230 230
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load+ Live load as accompanying(considering DL,SIDL are relieving the effects of varible load and earth preasure is considerd as adding
to the effects of variable load) : Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 479 t Hor. load 338 t ML 1026 t-m MT 200 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 479 t Hor. load 397 t ML 1016 t-m MT 200 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1.15 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.15 94.9245 109.163 0 0 8.54321 9.82469 130.6589 150.258
23c Due to breaking 1.15 0 0 10.325 11.87375 48.5585 55.8422 0 0
34c wind longitudinal 1.5 0 0 1.232 1.848 36.705 55.0575 0 0
35c wind Transverse 1.5 0 0 0 0 0 0 33.255 49.8825
vertical load 451 t Hor. load 390 t ML 1016 t-m MT 200 t-m

231 231
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load without Live load (considering DL,SIDL,earth preasure is considerd as adding to effects of variable load)
Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 519 t Hor. load 326 t ML 958 t-m MT 40 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 519 t Hor. load 385 t ML 948 t-m MT 40 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 481 t Hor. load 378 t ML 948 t-m MT 40 t-m

232 232
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load without Live load (considering DL,SIDL,earth preasure is considerd as relieving the effects of variable load)
Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 370 t Hor. load 243 t ML 733 t-m MT 40 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1 0 0 200.08 200.08 412.97 412.97 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 370 t Hor. load 285 t ML 733 t-m MT 40 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 342 t Hor. load 283 t ML 735 t-m MT 40 t-m

233 233
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load with out Live load (considering DL,SIDL adding to the effects of varible load and earth preasure is considerd as relieving the effects
of variable load) : Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 519 t Hor. load 243 t ML 741 t-m MT 40 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1 0 0 200.08 200.08 412.97 412.97 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 519 t Hor. load 285 t ML 741 t-m MT 40 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 481 t Hor. load 283 t ML 743 t-m MT 40 t-m

234 234
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Wind load as leading load without Live load (considering DL,SIDL are relieving the effects of varible load and earth preasure is considerd as adding to the
effects of variable load) : Dry case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 1.2 0 0 63.52 76.224 198.82 238.584 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 370 t Hor. load 326 t ML 950 t-m MT 40 t-m

Saturated case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
9c case(draw
Due down casae)
to LL surcharge in normal Saturate 1.2 0 0 69.17 83.004 216.22 259.464 0 0
case(draw
Due down casae)
to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 370 t Hor. load 385 t ML 940 t-m MT 40 t-m
HFL case
unfactored Factored Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor vertical vertical Hor. Load Load d ML ML MT MT
load load
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1 48.999 48.999 0 0 4.40991 4.40991 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 1.2 0 0 76.8 92.16 220.544 264.653 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 0 94.9245 0 0 0 8.54321 0 130.6589 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
26c wind longitudinal 1.5 0 0 1.067 1.6005 29.5643 44.3464 0 0
27c Wind transverse 1.5 0 0 0 0 0 0 26.577 39.8655
vertical load 342 t Hor. load 378 t ML 940 t-m MT 40 t-m

235 235
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Tacle 3.2 of IRC 6-2016:Seismic comcination
Longitudinal seismic case : cefore construction of super structure.(considering Earth preasure is adding to the effect of variacle load)
Normal Dry case
unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 0.2 0 0 63.52 12.704 198.82 39.764 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15c 0.75 0 0 97.28 72.96 298.88 224.16 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18c 0.225 0 0 0 0 0 0 125.684 28.2789
seismic(Trans.) + Dry case
Due to Earth preasure in seismic+ Dry
28c 0.75 0 0 0 0 0 0 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+ Dry
29c 0.75 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 249 t Hor. load 333 t ML 914 t MT 28 t

Saturated case
unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
9c Due to LL surcharge in normal Saturate 0.2 0 0 69.17 13.834 216.22 43.244 0 0
Due to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16c 0.75 0 0 106.08 79.56 326.56 244.92 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19c 0.225 0 0 0 0 0 0 125.684 28.2789
seismic(Trans.) +sat. case
Due to Earth preasure in seismic+ saturated
30c 0.75 0 0 0 0 0 0 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+Saturated
31c 0.75 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 249 t Hor. load 394 t ML 908 t MT 28 t

HFL case
Code no unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 0.2 0 0 76.8 15.36 220.544 44.1088 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17c 0.75 0 0 103.36 77.52 323.68 242.76 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20c 0.225 0 0 0 0 0 0 118.564 26.6769
seismic(trans.) +HFL case
Due to Earth preasure in seismic+ HFL
32c 0.75 0 0 0 0 0 0 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+HFL
33c 0.75 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 211 t Hor. load 377 t ML 901 t MT 27 t

236 236
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Tacle 3.2 of IRC 6-2016:Seismic comcination
Tranverse seismic case : Before construction of super structure.(considering Earth preasure is adding to the effect of variacle load)
Normal Dry case
unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
6c Due to Earth preasure in normal Dry case 1.35 0 0 165.12 222.912 433.61 585.374 0 0
7c Due to LL surcharge in normal Dry case 0.2 0 0 63.52 12.704 198.82 39.764 0 0
Due to Substructure,Foundation and Soil above
12c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
Add. Due to Substr.,Foun. and Soil above heel in
15c 0.225 0 0 97.28 21.888 298.88 67.248 0 0
seismic(longi.) + Dry case
Add. Due to Substr.,Foun. and Soil above heel in
18c 0.75 0 0 0 0 0 0 125.684 94.263
seismic(Trans.) + Dry case
Due to Earth preasure in seismic+ Dry
28c 0.225 0 0 0 0 0 0 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+ Dry
29c 0.225 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 249 t Hor. load 258 t ML 692 t MT 94 t

Saturated case
unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
8c Due to Earth preasure in normal Saturate 1.35 0 0 200.08 270.108 412.97 557.51 0 0
9c Due to LL surcharge in normal Saturate 0.2 0 0 69.17 13.834 216.22 43.244 0 0
Due to Substructure,Foundation and Soil above
13c 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
Add. Due to Substr.,Foun. and Soil above heel in
16c 0.225 0 0 106.08 23.868 326.56 73.476 0 0
seismic(longi.) +sat case
Add. Due to Substr.,Foun. and Soil above heel in
19c 0.75 0 0 0 0 0 0 125.684 94.263
seismic(Trans.) +sat. case
Due to Earth preasure in seismic+ saturated
30c 0.225 0 0 0 0 0 0 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+Saturated
31c 0.225 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 249 t Hor. load 308 t ML 674 t MT 94 t

HFL case
Code no unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
10c Due to Earth preasure in normal HFL case 1.35 0 0 189.44 255.744 409.568 552.917 0 0
11c Due to LL surcharge in normal HFL case 0.2 0 0 76.8 15.36 220.544 44.1088 0 0
Due to Substructure,Foundation and Soil above
14c 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
Add. Due to Substr.,Foun. and Soil above heel in
17c 0.225 0 0 103.36 23.256 323.68 72.828 0 0
seismic(longi.) +HFL case
Add. Due to Substr.,Foun. and Soil above heel in
20c 0.75 0 0 0 0 0 0 118.564 88.923
seismic(trans.) +HFL case
Due to Earth preasure in seismic+ HFL
32c 0.225 0 0 0 0 0 0 0 0
case(dynamic increament component)
Due to LL surcharge in seismic+HFL
33c 0.225 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 211 t Hor. load 294 t ML 670 t MT 89 t

237 237
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Tacle 3.2 of IRC 6-2016:Seismic comcination
Longitudinal seismic case : Live load as accompaning load(considering DL,SIDl,Earth preasure is adding to the effect of variacle load)
Dry case unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Factor vertical vertical
Code no Descriptions load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.2 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 0.2 0 0 63.52 12.704 198.82 39.764 0 0
12c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
15c Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 97.28 145.92 298.88 448.32 0 0
seismic(longi.) + Dry case
18c Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 0 0 0 0 125.684 56.5578
seismic(Trans.) + Dry case
28c Due to Earth preasure in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
29c Due to LL surcharge in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 519 t Hor. load 406 t ML 1163 t-m MT 57 t-m

Saturated case unfactored Factored


Unfac. Fac. Hor. Unfactore Factored Factored Factored
Factor vertical vertical
Code no Descriptions load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.2 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
case(draw down casae)
9c Due to LL surcharge in normal Saturate 0.2 0 0 69.17 13.834 216.22 43.244 0 0
case(draw down casae)
13c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
16c Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 106.08 159.12 326.56 489.84 0 0
seismic(longi.) +sat case
19c Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 0 0 0 0 125.684 56.5578
seismic(Trans.) +sat. case
30c Due to Earth preasure in seismic+ saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
31c Due to LL surcharge in seismic+Saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 519 t Hor. load 473 t ML 1177 t-m MT 57 t-m

HFL Case unfactored Factored


Unfac. Fac. Hor. Unfactore Factored Factored Factored
Factor vertical vertical
Code no Descriptions load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.2 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 0.2 0 0 76.8 15.36 220.544 44.1088 0 0
14c Due to Substructure,Foundation and Soil above 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
17c Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 103.36 155.04 323.68 485.52 0 0
seismic(longi.) +HFL case
20c Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 0 0 0 0 118.564 53.3538
seismic(trans.) +HFL case
32c Due to Earth preasure in seismic+ HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
33c Due to LL surcharge in seismic+HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
vertical load 481 t Hor. load 455 t ML 1168 t-m MT 53 t-m

238 238
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Tacle 3.2 of IRC 6-2016:Seismic comcination
Transverse seismic case : Live load as accompaning load(considering DL,SIDl,Earth preasure is adding to the effect of variacle load)
Dry case unfac. Ver. Fac. Ver. Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Factor
Code no Descriptions load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.2 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1.5 0 0 165.12 247.68 433.61 650.415 0 0
7c Due to LL surcharge in normal Dry case 0.2 0 0 63.52 12.704 198.82 39.764 0 0
12c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal Dry case
15c Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 97.28 43.776 298.88 134.496 0 0
seismic(longi.) + Dry case
18c Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 0 0 0 0 125.684 188.526
seismic(Trans.) + Dry case
28c Due to Earth preasure in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
29c Due to LL surcharge in seismic+ Dry 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36c Due to seismic transverse componet of LL 1.5 0 0 0 0 0 0 24.61811 36.9272
vertical load 519 t Hor. load 304 t ML 849 t-m MT 225 t-m

Saturated case unfac. Ver. Fac. Ver. Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Factor
Code no Descriptions load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.2 0 0 0 0 0 0 0 0
8c Due to Earth preasure in normal Saturate 1.5 0 0 200.08 300.12 412.97 619.455 0 0
case(draw down casae)
9c Due to LL surcharge in normal Saturate 0.2 0 0 69.17 13.834 216.22 43.244 0 0
case(draw down casae)
13c Due to Substructure,Foundation and Soil above 1.35 184.684 249.323 0 0 0 0 0 0
heel in normal saturated case
16c Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 106.08 47.736 326.56 146.952 0 0
seismic(longi.) +sat case
19c Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 0 0 0 0 125.684 188.526
seismic(Trans.) +sat. case
30c Due to Earth preasure in seismic+ saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
31c Due to LL surcharge in seismic+Saturated 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36c Due to seismic transverse componet of LL 1.5 0 0 0 0 0 0 24.61811 36.9272
vertical load 519 t Hor. load 362 t ML 834 t-m MT 225 t-m

HFL Case unfac. Ver. Fac. Ver. Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Factor
Code no Descriptions load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1.35 136.554 184.348 0 0 12.2899 16.5913 0 0
2c Due to SIDL (Wearing coat) 1.75 48.999 85.7483 0 0 4.40991 7.71734 0 0
3c Due to Crash barrier 1.35 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1.35 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.2 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1.5 0 0 189.44 284.16 409.568 614.352 0 0
11c Due to LL surcharge in normal HFL case 0.2 0 0 76.8 15.36 220.544 44.1088 0 0
14c Due to Substructure,Foundation and Soil above 1.35 156.011 210.614 0 0 0 0 0 0
heel in normal HFL case
17c Add. Due to Substr.,Foun. and Soil above heel in 0.45 0 0 103.36 46.512 323.68 145.656 0 0
seismic(longi.) +HFL case
20c Add. Due to Substr.,Foun. and Soil above heel in 1.5 0 0 0 0 0 0 118.564 177.846
seismic(trans.) +HFL case
32c Due to Earth preasure in seismic+ HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
33c Due to LL surcharge in seismic+HFL 0 0 0 0 0 0 0 0 0
case(dynamic increament component)
36c Due to seismic transverse componet of LL 1.5 0 0 0 0 0 0 24.61811 36.9272
vertical load 481 t Hor. load 346 t ML 828 t-m MT 215 t-m

239 239
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
ULS forces summary at base of wall
Basic combination vertical load Hori. Load ML MT
Before construction of super structure.(Considering the Earth preasure is adding to the effects of variable load)
Normal Dry case 249 t 324 t 889 t 0t
Saturated case 249 t 383 t 879 t 0t
HFL case 211 t 376 t 879 t 0t
Before construction of super structure.(Considering the Earth preasure is adding to the effects of variable load)
Normal Dry case 249 t 241 t 672 t 0t
Saturated case 249 t 283 t 672 t 0t
HFL case 211 t 282 t 674 t 0t
Live load as leading load+ wind load as accompanying(considering DL,SIDL,Earth preasure is adding to the effect of variable load)
Dry case 662 t 341 t 1032 t 226 t
Saturated case 662 t 400 t 1022 t 226 t
HFL case 623 t 393 t 1022 t 196 t

Live load as leading load+ wind load as accompanying(considering DL,SIDL is adding to the effect of variable load and EP is relieving the variable load)

Dry case 662 t 258 t 815 t 226 t


Saturated case 662 t 300 t 815 t 226 t
HFL case 623 t 298 t 817 t 226 t
Live load as leading load+ wind load as accompanying(considering DL,SIDL,Earth preasure is relieving the variable load)
Dry case 577 t 258 t 808 t 226 t
Saturated case 577 t 300 t 808 t 226 t
HFL case 539 t 298 t 810 t 226 t

Live load as leading load+ wind load as accompanying(consideringEarth preasure is adding to the effect of variable load and DL,SIDL is relieving the variable load

Dry case 577 t 341 t 1024 t 226 t


Saturated case 577 t 400 t 1014 t 226 t
HFL case 539 t 393 t 1014 t 226 t
Wind load as leading load+ Live load as accompanying(considering DL,SIDL,earth preasure is considerd as adding to effects of variable load)
Dry case 629 t 338 t 1034 t 200 t
Saturated case 629 t 397 t 1024 t 200 t
HFL case 590 t 390 t 1024 t 200 t

Wind load as leading load+ Live load as accompanying(considering DL,SIDL,earth preasure is considerd as relieving the effects of variable load)

Dry case 479 t 255 t 810 t 200 t


Saturated case 479 t 297 t 810 t 200 t
HFL case 451 t 295 t 812 t 200 t
Wind load as leading load+ Live load as accompanying(considering DL,SIDL adding to the effects of varible load and earth preasure is considerd as relieving the
effects of variable load)
Dry case 629 t 255 t 817 t 200 t
Saturated case 629 t 297 t 817 t 200 t
HFL case 590 t 295 t 819 t 200 t
Wind load as leading load+ Live load as accompanying(considering DL,SIDL are relieving the effects of varible load and earth preasure is considerd as adding to the
effects of variable load)
Dry case 479 t 338 t 1026 t 200 t
Saturated case 479 t 397 t 1016 t 200 t
HFL case 451 t 390 t 1016 t 200 t
Wind load as leading load without Live load (considering DL,SIDL,earth preasure is considerd as adding to effects of variable load)
Dry case 519 t 326 t 958 t 40 t
Saturated case 519 t 385 t 948 t 40 t
HFL case 481 t 378 t 948 t 40 t
Wind load as leading load without Live load (considering DL,SIDL,earth preasure is considerd as relieving the effects of variable load)
Dry case 370 t 243 t 733 t 40 t
Saturated case 370 t 285 t 733 t 40 t
HFL case 342 t 283 t 735 t 40 t
Wind load as leading load with out Live load (considering DL,SIDL adding to the effects of varible load and earth preasure is considerd as relieving the effects of
variable load)
Dry case 519 t 243 t 741 t 40 t
Saturated case 519 t 285 t 741 t 40 t
HFL case 481 t 283 t 743 t 40 t
Wind load as leading load without Live load (considering DL,SIDL are relieving the effects of varible load and earth preasure is considerd as adding to the effects of
variable load)
Dry case 370 t 326 t 950 t 40 t
Saturated case 370 t 385 t 940 t 40 t
HFL case 342 t 378 t 940 t 40 t

240 240
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
ULS forces summary at base of wall
Seismic combination vertical load ML MT
Longitudinal seismic case : cefore construction of super structure.(considering Earth preasure is adding to the effect of variacle load)

Normal Dry case 249 t 333 t 914 t 28 t


Saturated case 249 t 394 t 908 t 28 t
HFL case 211 t 377 t 901 t 27 t
Tranverse seismic case : Before construction of super structure.(considering Earth preasure is adding to the effect of variacle load)
Normal Dry case 249 t 258 t 692 t 94 t
Saturated case 249 t 308 t 674 t 94 t
HFL case 211 t 294 t 670 t 89 t
Longitudinal seismic case : Live load as accompaning load(considering DL,SIDl,Earth preasure is adding to the effect of variacle load)
Dry case 519 t 406 t 1163 t 57 t
Saturated case 519 t 473 t 1177 t 57 t
HFL Case 481 t 455 t 1168 t 53 t
Transverse seismic case : Live load as accompaning load(considering DL,SIDl,Earth preasure is adding to the effect of variacle load)
Dry case 519 t 304 t 849 t 225 t
Saturated case 519 t 362 t 834 t 225 t
HFL Case 481 t 346 t 828 t 215 t

241 241
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination
Check for Ultimate moment-considering the wall as beam action
Section of wall at base 16000

Non Eatrh face effective cover = 85

20 @ 180 mm C/C
900 mm 25 @ 180 mm C/C

Earth face effective cover = 87.5


Heel
Effective depth d in mm 815 mm
b1 in mm 16000 mm
Ast min 0.26 fctm/fyk b1 d 16952 Sq.mm
0.0013 b1 d 16952 Sq.mm
Ast min 16952 Sq.mm
Area of steel provided in Earth Face ok 43633 Sq.mm
Max Ast 0.025 Ac ok 360000 Sq.mm
Asc minimum= 0.01 Act.ext= 0.01x 75.00x 16000.00= 12000.000 Sq.mm or 0.0012%
Area of steel provided in Non earth face ok 27925 Sq.mm
Total steel provided 71558 Sq.mm
maximum total steel =0.04 Ac ok 576000 Sq.mm

Depth of NA x from top of girder in m 96.757 mm


Strain at the level of bottom layer steel (Earth face) 0.025981
Strain at the level of top layer steel ( non earth face) 0.00043
Stress at the level of bottom layer steel (earth face) 434.78 Mpa
Stress at the level of top layer steel ( Non earth face) 85.06 Mpa
Force in concrete 16596 kn
Force in bottom Steel ( earth face) -18971 kn
Force in top layersteel ( Non earth face) 2375 kn
Net force at NA 0 kn
Ultimate mome. carring capacity about NA 14570 kn-m
maximun BM ok 11768 kn-m
Check for Ultimate SF
Maximum shear capacty of the section
Shear capacity of concrete with out reinforcement
0.33
Minimum of VRD.C =[0.12K*(80r1*fck) +0.15scp]bwd
and [nmin + 0.15scp]bd
Where
nmin = 3/2 1/2
0.031K *(fck) bd
scp 0 (No axial or prestressing force)
K 1+sqrt*(200/d)1.50
r1 0.003
VRD.C = 4653.48 kN
VRD.C min = 4048.80 kN
Design VRD.C = 4653.48 kN
Actual Shear force 4730.74 kN
Check Provide SR SR - Shear reinforcement

242 242
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of ULS force for design of Walln as per Table 3.2 of IRC 6-2016:Basic combination

Design of vertical shear links


VRDs = Asw*z*fywd*cotq
s

VRDmax = acw*b*z*n1fcd
cotq + tanq

Asw Area of shear links


s spacing of reinforcement
z lever arm - 0.9 times effective depth
acw =1 - for sections with out prestress
fywd =0.8fyd
n1 0.6 for fck< = 80Mpa

Asw 10115.15 sqmm


Dia of bar 8
number of legs 88.9
spacing, s 360
Cotq (Assuming 45deg) 1
Web
VRDs = 8243.85 kN
VRDmax = 47213.93 kN
shear resistance of stirrups 8243.85 kN ok

243 243
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Rare comcination
Before construction of super structure.
Normal Dry case
Factored
unfactore Factored ML
Unfac. Fac. Hor. Unfactore Unfactored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML MT MT
load load

6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0.8 0 0 63.52 50.816 198.82 159.056 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
vertical load 185 t Hor. load 216 t ML 593 t-m MT 0 t-m

Saturated case
unfactore Factored Factored
Unfac. Fac. Hor. Unfactore Factored Factored
Code no Descriptions Factor d vertical vertical ML
Hor. Load Load d ML MT MT
load load
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0.8 0 0 69.17 55.336 216.22 172.976 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
vertical load 185 t Hor. load 255 t ML 586 t-m MT 0 t-m

HFL case
unfactore Factored Factored
Code no Unfac. Fac. Hor. Unfactore Factored Factored
Descriptions Factor d vertical vertical ML
Hor. Load Load d ML MT MT
load load
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
Due to LL surcharge in normal HFL case
11c 0.8 0 0 76.8 61.44 220.544 176.435 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
vertical load 156 t Hor. load 251 t ML 586 t-m MT 0 t-m

244 244
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Rare comcination
Live load as leading load+ thermal load as accompanying
Dry case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0.8 0 0 63.52 50.816 198.82 159.056 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1 94.9245 94.9245 0 0 8.54321 8.54321 130.6589 130.659
22c Due to temparature 0.6 0 0 2.2125 1.3275 10.4054 6.24323 0 0
23c Due to breaking 1 0 0 10.325 10.325 48.5585 48.5585 0 0
vertical load 475 t Hor. load 228 t ML 674 t-m MT 131 t-m

Saturated case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0.8 0 0 69.17 55.336 216.22 172.976 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1 94.9245 94.9245 0 0 8.54321 8.54321 130.6589 130.659
22c Due to temparature 0.6 0 0 2.2125 1.3275 10.4054 6.24323 0 0
23c Due to breaking 1 0 0 10.325 10.325 48.5585 48.5585 0 0
vertical load 475 t Hor. load 267 t ML 667 t-m MT 131 t-m

HFL Case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 0.8 0 0 76.8 61.44 220.544 176.435 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1 94.9245 94.9245 0 0 8.54321 8.54321 130.6589 130.659
22c Due to temparature 0.6 0 0 2.2125 1.3275 10.4054 6.24323 0 0
23c Due to breaking 1 0 0 10.325 10.325 48.5585 48.5585 0 0
vertical load 446 t Hor. load 263 t ML 667 t-m MT 131 t-m

245 245
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Rare comcination
Thermal load as leading load+ Live load as accompanying.
Dry case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Descriptions Factor vertical vertical
load load
Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.75 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0.8 0 0 63.52 50.816 198.82 159.056 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 0.75 94.9245 71.1934 0 0 8.54321 6.40741 130.6589 97.9942
22c Due to temparature 1 0 0 2.2125 2.2125 10.4054 10.4054 0 0
23c Due to breaking 0.75 0 0 10.325 7.74375 48.5585 36.4189 0 0
vertical load 451 t Hor. load 226 t ML 663 t-m MT 98 t-m

Saturated case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.75 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0.8 0 0 69.17 55.336 216.22 172.976 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 0.75 94.9245 71.1934 0 0 8.54321 6.40741 130.6589 97.9942
22c Due to temparature 1 0 0 2.2125 2.2125 10.4054 10.4054 0 0
23c Due to breaking 0.75 0 0 10.325 7.74375 48.5585 36.4189 0 0
vertical load 451 t Hor. load 265 t ML 657 t-m MT 98 t-m

HFL case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.75 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 0.8 0 0 76.8 61.44 220.544 176.435 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 0.75 94.9245 71.1934 0 0 8.54321 6.40741 130.6589 97.9942
22c Due to temparature 1 0 0 2.2125 2.2125 10.4054 10.4054 0 0
23c Due to breaking 0.75 0 0 10.325 7.74375 48.5585 36.4189 0 0
vertical load 423 t Hor. load 261 t ML 657 t-m MT 98 t-m

246 246
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Rare comcination
Live load as leading load+ wind load as accompanying
Dry case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0.8 0 0 63.52 50.816 198.82 159.056 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.6 0 0 1.232 0.7392 36.705 22.023 0 0
35c wind Transverse 0.6 0 0 0 0 0 0 33.255 19.953
vertical load 522 t Hor. load 232 t ML 718 t-m MT 216 t-m

Saturated case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0.8 0 0 69.17 55.336 216.22 172.976 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.6 0 0 1.232 0.7392 36.705 22.023 0 0
35c wind Transverse 0.6 0 0 0 0 0 0 33.255 19.953
vertical load 522 t Hor. load 272 t ML 711 t-m MT 216 t-m

HFL case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 0.8 0 0 76.8 61.44 220.544 176.435 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1.5 94.9245 142.387 0 0 8.54321 12.8148 130.6589 195.988
23c Due to breaking 1.5 0 0 10.325 15.4875 48.5585 72.8377 0 0
34c wind longitudinal 0.6 0 0 1.232 0.7392 36.705 22.023 0 0
35c wind Transverse 0.6 0 0 0 0 0 0 33.255 19.953
vertical load 494 t Hor. load 267 t ML 711 t-m MT 216 t-m

247 247
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Rare comcination
Wind load as leading load+ Live load as accompanying
Dry case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT
1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0
2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.75 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0.8 0 0 63.52 50.816 198.82 159.056 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 0.75 94.9245 71.1934 0 0 8.54321 6.40741 130.6589 97.9942
23c Due to breaking 0.75 0 0 10.325 7.74375 48.5585 36.4189 0 0
34c wind longitudinal 1 0 0 1.232 1.232 36.705 36.705 0 0
35c wind Transverse 1 0 0 0 0 0 0 33.255 33.255
vertical load 451 t Hor. load 225 t ML 690 t-m MT 131 t-m

Saturated case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.75 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0.8 0 0 69.17 55.336 216.22 172.976 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 0.75 94.9245 71.1934 0 0 8.54321 6.40741 130.6589 97.9942
23c Due to breaking 0.75 0 0 10.325 7.74375 48.5585 36.4189 0 0
34c wind longitudinal 1 0 0 1.232 1.232 36.705 36.705 0 0
35c wind Transverse 1 0 0 0 0 0 0 33.255 33.255
vertical load 451 t Hor. load 264 t ML 683 t-m MT 131 t-m

HFL case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0.75 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 0.8 0 0 76.8 61.44 220.544 176.435 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 0.75 94.9245 71.1934 0 0 8.54321 6.40741 130.6589 97.9942
23c Due to breaking 0.75 0 0 10.325 7.74375 48.5585 36.4189 0 0
34c wind longitudinal 1 0 0 1.232 1.232 36.705 36.705 0 0
35c wind Transverse 1 0 0 0 0 0 0 33.255 33.255
vertical load 423 t Hor. load 260 t ML 683 t-m MT 131 t-m

248 248
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Rare comcination
Wind load as leading load (with out LL)
Dry case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0.8 0 0 63.52 50.816 198.82 159.056 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
26c wind longitudinal 1 0 0 1.067 1.067 29.5643 29.5643 0 0
27c Wind transverse 1 0 0 0 0 0 0 26.577 26.577
vertical load 380 t Hor. load 217 t ML 640 t-m MT 27 t-m

Saturated case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0.8 0 0 69.17 55.336 216.22 172.976 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
26c wind longitudinal 1 0 0 1.067 1.067 29.5643 29.5643 0 0
27c Wind transverse 1 0 0 0 0 0 0 26.577 26.577
vertical load 380 t Hor. load 256 t ML 633 t-m MT 27 t-m

HFL case
Code no unfactored Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions Factor vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 0 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 0.8 0 0 76.8 61.44 220.544 176.435 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
26c wind longitudinal 1 0 0 1.067 1.067 29.5643 29.5643 0 0
27c Wind transverse 1 0 0 0 0 0 0 26.577 26.577
vertical load 351 t Hor. load 252 t ML 633 t-m MT 27 t-m

249 249
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Quasi permanent comcination
Before construction of super structure.
Normal Dry case

unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load

6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0 0 0 63.52 0 198.82 0 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
vertical load 185 t Hor. Load 165 t ML 434 t-m MT 0 t-m

Saturated case
unfactore Factored
Unfac. Fac. Hor. Unfactore Factored Factored Factored
Code no Descriptions Factor d vertical vertical
Hor. Load Load d ML ML MT MT
load load
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0 0 0 69.17 0 216.22 0 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
vertical load 185 t Hor. load 200 t ML 413 t-m MT 0 t-m

HFL case
unfactore Factored
Code no Factor for Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions d vertical vertical
ver. load Hor. Load Load d ML ML MT MT
load load
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
Due to LL surcharge in normal HFL case
11c 0 0 0 76.8 0 220.544 0 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
vertical load 156 t Hor. load 189 t ML 410 t-m MT 0 t-m

250 250
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Calculations of SLS force for design of foundation as per Tacle 3.3 of IRC 6-2016:Quasi permanent comcination
After super structure constrction
Dry case
Code no unfactored Factored
Factor for Unfac. Fac. Hor. Unfactore Factored Unfactored Factored
Descriptions ver. load
vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
6c Due to Earth preasure in normal Dry case 1 0 0 165.12 165.12 433.61 433.61 0 0
7c Due to LL surcharge in normal Dry case 0 0 0 63.52 0 198.82 0 0 0
Due to Substructure,Foundation and Soil above
12c 1 184.684 184.684 0 0 0 0 0 0
heel in normal Dry case
21c Due to Live load 1 94.9245 94.9245 0 0 8.54321 8.54321 130.6589 130.659
22c Due to temparature 0.5 0 0 2.2125 1.10625 10.4054 5.20269 0 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
vertical load 475 t Hor. load 166 t ML 465 t-m MT 131 t-m

Saturated case
Code no unfactored Factored
Factor for Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions ver. load
vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
Due to Earth preasure in normal Saturate
8c 1 0 0 200.08 200.08 412.97 412.97 0 0
case(draw down casae)
Due to LL surcharge in normal Saturate
9c 0 0 0 69.17 0 216.22 0 0 0
case(draw down casae)
Due to Substructure,Foundation and Soil above
13c 1 184.684 184.684 0 0 0 0 0 0
heel in normal saturated case
21c Due to Live load 1 94.9245 94.9245 0 0 8.54321 8.54321 130.6589 130.659
22c Due to temparature 0.5 0 0 2.2125 1.10625 10.4054 5.20269 0 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
vertical load 475 t Hor. load 201 t ML 444 t-m MT 131 t-m

HFL Case
Code no unfactored Factored
Factor for Unfac. Fac. Hor. Unfactore Factored Factored Factored
Descriptions ver. load
vertical vertical
load load Hor. Load Load d ML ML MT MT

1c Due to Dead load of super structure 1 136.554 136.554 0 0 12.2899 12.2899 0 0


2c Due to SIDL (Wearing coat) 1.2 48.999 58.7988 0 0 4.40991 5.29189 0 0
3c Due to Crash barrier 1 0 0 0 0 0 0 0 0
4c Due to Foot path dead load 1 0 0 0 0 0 0 0 0
5c Due to Footpath Live load 1 0 0 0 0 0 0 0 0
10c Due to Earth preasure in normal HFL case 1 0 0 189.44 189.44 409.568 409.568 0 0
11c Due to LL surcharge in normal HFL case 0 0 0 76.8 0 220.544 0 0 0
Due to Substructure,Foundation and Soil above
14c 1 156.011 156.011 0 0 0 0 0 0
heel in normal HFL case
21c Due to Live load 1 94.9245 94.9245 0 0 8.54321 8.54321 130.6589 130.659
22c Due to temparature 0.5 0 0 2.2125 1.10625 10.4054 5.20269 0 0
23c Due to breaking 0 0 0 10.325 0 48.5585 0 0 0
vertical load 446 t Hor. load 191 t ML 441 t-m MT 131 t-m

251 251
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Design Calculations of Wall for SLS forces


Rare Combination
Before construction of super structure. vertical load Horizo. Load ML MT
Normal Dry case 185 t 216 t 593 t 0t
Saturated case 185 t 255 t 586 t 0t
HFL case 156 t 251 t 586 t 0t
Live load as leading load+ thermal load as accompanying
Normal Dry case 475 t 228 t 674 t 131 t
Saturated case 475 t 267 t 667 t 131 t
HFL Case 446 t 263 t 667 t 131 t
Thermal load as leading load+ Live load as accompanying.
Dry case 451 t 226 t 663 t 98 t
Saturated case 451 t 265 t 657 t 98 t
HFL case 423 t 261 t 657 t 98 t
Live load as leading load+ wind load as accompanying
Dry case 522 t 232 t 718 t 216 t
Saturated case 522 t 272 t 711 t 216 t
HFL case 494 t 267 t 711 t 216 t
Wind load as leading load+ Live load as accompanying
Dry case 451 t 225 t 690 t 131 t
Saturated case 451 t 264 t 683 t 131 t
HFL case 423 t 260 t 683 t 131 t
Wind load as leading load (with out LL)
Dry case 380 t 217 t 640 t 27 t
Saturated case 380 t 256 t 633 t 27 t
HFL case 351 t 252 t 633 t 27 t
Quasi permanent comcination
Before construction of super structure.
Normal Dry case 185 t 165 t 434 t 0t
Saturated case 185 t 200 t 413 t 0t
HFL case 156 t 189 t 410 t 0t
After super structure constrction
Dry case 475 t 166 t 465 t 131 t
Saturated case 475 t 201 t 444 t 131 t
HFL Case 446 t 191 t 441 t 131 t

252 252
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Abutment for bridge at Design
Chainage 70+010 Design by Suresh Date
Check by Pavan 09-08-2019

Ref Design Calculations of Wall for SLS forces


Check for SLS-considering the wall as beam action
Calculation of Stress (rare combination)
IRC 112Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2.1 Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio m or ae 12.90
Ast 43633 Sq.mm
Asc 27925 Sq.mm
D 900 mm
d 815 mm
dc 85 mm
b 16000 mm
x 196 mm
Maximum BM in rare combination: 7179 Kn-m
BM=0.5 scbc x /3 +Asc (x-dc) m scbc /x +Ast (d-x) m scbc /x
2 2 2

fcc 5.868 N/sqmm Safe


fst =scbc m (d-x) /x 238.66 N/sqmm Safe
fsc =scbc m (x-dc) /x 42.93 N/sqmm Safe
Calculation of Stress (Quasi permanent Combination)
Maximum BM in Quasi permanent combination: 4649.38 Kn-m
ssc 154.56 N/sqmm
Crack width = W r = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff

C clear cover 75 mm
k1 0.8 deformed bars, 0.8
1.6 plain bars
k2 0.5 bending 0.5
1 pure tension
f bar dia of tension steel 1.5
rpeff = Ast/Acef
Acef 3400000 sq.mm
Ast 43633 sq.mm
rpeff = 0.01283
Sr,max = 274.87
Kt 0.5
fcteff 2.5 N/sqmm
(esm-ecm=) 0.00046
W r = Sr,max(esm-ecm) = 0.12745 mm
safe

253 253
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of abutmnt cap
Design by Suresh Date
Check by Pavan 09-08-2019
Design of Abutment cap

Minimum thickness of the cap required as per cl. 710.8.2 of IRC : 78- 2000 is 200 mm.

Thickness of cap provided = 300 mm


Width of the cap = 1400 mm

Reaction from Superstructure


Verification of
Structural Strength Servicebility limit state
LL as leading load Rare Combination Frequent combination
Load
Description (kN) Factor F load Factor F load Factor F load
DL 273.108 1.35 368.70 1.00 273.108 1.00 273.108
SIDL 97.998 1.75 171.50 1.00 97.998 1.00 98.00
LL 189.8491 1.5 284.77 1.00 189.8 0.00 0

Maximum Reaction from Super structure = 824.97 kN


Pedestal = 650 x 600
2
Maximum Bearing Stress = 2.115 N/mm

C = Co A1
A2
Co = 13.40 N/mm2

18.950 N/mm2 ok

Provide Min Reinforcement = 0.15 % of cross sectional area


2
= 630 mm

Provide 6 numbers of 12 mm dia bars at top and bottom


Minimum Shear reinforcement

rw.min (0.072 fck)


= fyk
= 0.027

rw = Asw
sbwsina
= 1256 =
0.028 Okay
45000
Provide 2 legged stirrups 12mm diameter @ 180 mm c/c

254 254
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Dirt wall
Design by Suresh Date
Check by Pavan 09-08-2019
Design of Dirt Wall

Dirt wall will be designed as a vertical cantilever.

Earth pressure
2
0.328 x 20 x 1.20 = 7.872 kN/m

F1

F2 1.55 m

2 2
10.161 kN/m 7.872 kN/m

Earth Pressure Diagram

2
Intensity for = 0.328 x 20 x 1.2 = 7.872 kN/m
rectangular portion

F1 = 7.872 x 1.549 x 16 = 195.100 kN Live load surcharge

2
Intensity for = 0.328 x 20 x 1.549 = 10.161 kN/m
triangular portion

F2 = 0.5 x 10.162 x 1.549 x 16 = 125.921 kN Earth pressure

Total F = 195.100 + 125.921 = 321.020 kN

Moment @ RL 1.55 m (at dirt wall base)

M1 = 195.100 x 0.774 = 151.10 kN.m

M2 = 125.921 x 0.651 = 81.92 kN.m


(Centre of pressure considered at an elevation
of 0.42m of the height of the abutment shaft
as per cl. 217.1 of IRC:6
Total M (at abutment shaft base) = 233.026 kN.m
HL = 321.020 kN ML = 233.026 kN.m
Total moment at the base of = 233.026 kN.m
The axial load is considered as 20 tonne
Braking force is 0.20 times the axial load = 18.850 kN

dirt wall
= 284.845 = 17.803 kN.m/m
16.00

Thickness of dirt wall = 0.3 m

255 255
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of Dirt wall
Design by Suresh Date
Check by Pavan 09-08-2019

Adopt clear cover on either face = 40 mm


Moment Force
Sl.No Description per m per m
1 LL Surcharge = 9.44 12.19
2 Earthpressure = 5.12 7.87
3 Live load = 3.24 1.18

Summary of Forces and Moments ULS


Verification of structural Strength Verification of structural Strength
EP as leading LL as leading EP as leading LL as leading
Factor Moment Factor Moment Factor Force Factor Force

1.2 11.33 1.20 11.33 1.2 14.63 1.20 14.63


1.5 7.68 1.00 5.12 1.5 11.81 1.00 7.87
1.15 3.72 1.50 4.86 1.15 1.35 1.50 1.77
22.74 21.31 27.79 24.27

Summary of Forces and Moments -SLS


Quasi Permenant
Rare Combination Combination
LL as leading
Factor Moment Factor Moment
0.8 7.56 0.8 7.56
1 5.12 1 5.12
1 3.24 0.00 0.00
15.91 12.68

256 256
Part of structure: Job No. Rev.
Project:Kusumba-Malegaon Dsign of Dirt Wall Design by Suresh Date.
Check by Pavan 09-08-2019
Detailed Design of Dirtwall
Structural Strength - Ultimate
Fck 30
Fst 500

Section Thickness Cover Bar dia


Dirtwall 300 75 16

Section Max moment


K
Dirtwall 22.7 0.016 OK

Steel provided
Section Moment b d K z Asreq s x MR Bar dia spacing Bar dia spacing As
Dirtwall 22.7 1000 217 0.02 213.02 315.95 10.25 12.81 29.12 16 636.37 16 180 1117.01

0.26*fctm/fyk*b*d
Minimum steel
Dirt wall 315.952

Design for shear force


IRC 112 Shear capacity of concrete with out reinforcement
10.3.2 Minimum of VRD.C = (0.12K*(80r1*fck)1/3+scp)bwd
V
and RD.C = (nmin + 0.15scp)bd
nmin = 1.5
0.031K *(fck) bd
.5*

scp 0 (No axial or prestressing force)


Dirtwall Toe
K 1+sqt*(200/d) 1.96 #REF!
r1 0.005 #REF!
VRD.C = kN 117.99 #REF!
VRD.C min = kN 101.11 #REF!
Design VRD.C
kN= 117.99 #REF!
Actual Shear force 28 93

Check No SR #REF!
SR - Shear reinforcement

257 257
Part of structure: Job No. Rev.
Project:Kusumba-Malegaon Dsign of Dirt Wall Design by Suresh Date.
Check by Pavan 09-08-2019
Serviceability Limit state
Stress (rare combination)
IRC 112 Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2 Maxium allowable concrete tensile stress fctm 2.8 N/sqmm
Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio ac 6.25
As 1117
d 217
b 1000
x 48.50
M 16
M = 0.5*b*x*fcc*(d-x/3)
fcc 3.27
Check Okay
fst fst*As=0.5*b*x*fcc 70.94
Check Okay

21.3.2 Cracking (Quasi permanent combination)


IRC 112 Dirtwall
12.3 M 13
W r = Sr,max(esm-ecm) Sr,max = 3.4c+0.425k1*k2*f/rpeff
c 75
k1 0.8 deformed bars,
1.6 plain bars
k2 0.5 bending
1 pure tension
f bar dia 16
rpeff = As/Acef 0.007 2.5*(h-d) 207500
Sr,max 620.26 (h-x/3) 295730
fctm - value from table 6.5 page 38 2.8 h/2 150000
ssc 56.5 Min of above 150000
kt 0.5
ae = Es/Ecm 6.25
esm-ecm -0.0007
0.6*ssc/Es 0.0002
esm-ecm 0.0002
W r = Sr,max(esm-ecm) 0.105 Okay

258 258
Part of structure: Job No. Rev.
Design of Return wall
Project:Kusumba-Malegaon
Design by Suresh Date
Check by Pavan 09-08-2019

Design of Returnwall

0.500 m ( a )
A 4.600 B

6.25 m
( bB )

0.625

0.750 Y direction
A' B'
Width of Solid Return ( a ) = 4.60 m Avg. Heigth of Solid Return ( b ) = 6.25 m
Thickness of Solid Return at farther end = = 0.63 m Thickness of Cantilever return = 0.00 m
Thickness of Solid Return at Root = 0.63 m Unit weight of soil = 20.00 kN/m^3
Thickness of Solid Return at bottom = 0.75 m
Thickness of Solid Return at top = 0.50 m
Coe.of Active Earth Pressure 'Ka' = 0.33
Grade of Conc. = M30
For design of return wall Load case 11.a & 11.d and their formulae given by Roark have been used.
Case (1) For uniformally distributed load over entireFrom
plateTable 11.a
Here, a/b = 0.736 For a/b = 0.5 b1 = 0.631 b2 = 0.632
For a/b = 0.75 b1 = 1.246 b2 = 1.186

For, a/b = 0.736 b1 = 1.211


b2 = 1.154
Live load surcharge :
q = 0.328 x 20 x 1.2
= 7.87 kN/m^2

Max. .s b = b1 x q b^2
x
(t1)^2

.s a = b2 x q b^2
x
(t2)^2

.s b = 1.2 x 7.87 x 39.088


0.5625
= 662 kN/m^2
= 0.66 MPa
For 1000 mm of width , Z = 1000 x 562500
6
= 9.4E+07 mm^3
Hence Moment /m width along Y direction -

My /m width = 0.662 x 9.4E+07

= 6.2E+07 Nmm/m

= 62.10249 kN.m/m
.s a = 1.2 x 7.872 x 39.088
0.390625
= 909.3681
= 0.909368 MPa
For 1000 mm of height , Z = 1000 x 390625
6
= 6.5E+07 mm^3
Hence, Moment /m height along X direction -

Mx /m height = 0.9 x 6.5E+07

= 5.9E+07 Nmm/m

= 59.2 kN.m/m

259 259
Part of structure: Job No. Rev.
Design of Return wall
Project:Kusumba-Malegaon
Design by Suresh Date
Check by Pavan 09-08-2019

Case (2) For triangular loading due to Earth Pressure 'Refer Load case No. 11 d
From Table 11.a
a/b = 0.736 For a/b = 0.5 b1 = 0.328 b2 = 0.2
For a/b = 0.75 b1 = 0.537 b2 = 0.276

For, a/b = 0.736 b1 = 0.525


b2 = 0.272

q = 0.328 x 20 x 6.252

= 41.013 kN/m^2

Max. .s b = b1 x q b^2
x
(t1)^2

.s a = b2 x q b^2
x
(t2)^2

.s b = 0.525 x 41.013 x 39.088


0.5625
= 1496.51 kN/m^2

= 1.49651 MPa
For 1000 mm of width , Z = 1000 x 562500
6
= 9.4E+07 mm^3
Hence Moment /m width along Y direction -
My /m width = 1.5 x 9.4E+07

= 1.4E+08 Nmm/m
= 140 kN.m/m
.s a = 0.272 x 41.013 x 39.09
0.390625

= 1114.927

= 1.1 MPa

For 1000 mm of height , Z = 1000 x 390625 Shear Force Calculation


6 Uniform load
= 6.5E+07 mm^3 0.5 0.75
g1 0.874 1.129
Hence Moment /m height along X direction - g2 0.557 0.829
a/b 0.736
Mx /m height = 1.11 x 6.5E+07 g1 = 1.114
g2 = 0.814
= 7.3E+07 Nmm/m Triangular load
0.5 0.75
= 72.58637 kN.m/m g1 0.483 0.551
g2 0.195 0.23
Total Moment in Solid Return/ m height = 131.79 kN.m/m a/b 0.736
g1 = 0.547
Total Moment in Solid Return/ m width = 202.40 kN.m/m g2 = 0.228

Summary of Design forces Design of Face BB' (Vertical)


Quasi permenant
Verification of structural Strength Verification of structural Strength (Shear force) Rare Combination Combination
EP as leading EP as accompying EP as leading EP as accompying EP & LL surcharge EP & LL surcharge
load load load load load load
Description Factor Moment Factor Moment Factor Force Factor Force Factor Moment Factor Moment
LL Surch 1.2 71.044 1.20 71.04 1.2 48.05 1.20 48.05 1 59.2 1 59.204
EP 1.5 108.880 1.00 72.59 1.5 87.70 1.00 58.46 0.8 58.069093 0 0
Summary 179.92 143.63 135.74 106.51 117.27 59.20

Summary of Design forces Design Face A'B' (Horizontal)


Verification of structural Strength Verification of structural Strength Rare Combination Quasi permenant
EP as leading EP as accompying EP as leading EP as accompying EP & LL surcharge EP & LL surcharge
load load load load load load
Description Factor Moment Factor Moment Factor Force Factor Force Factor Moment Factor Moment
LL Surch 1.2 74.52 1.20 74.52 1.2 48.43 1.20 48.43 1.00 62.10 1.00 62.10
EP 1.5 210.45 1.00 140.30 1.5 154.83 1.00 103.22 0.80 112.24 0.00 0.00
Summary 284.97 214.82 203.26 151.65 174.34 62.10

260 260
Part of structure: Job No. Rev.
Project:Kusumba-Malegaon Dsign of Return wall Design by Suresh Date.
Check by Pavan 09-08-2019

Structural Strength - Ultimate


Fck 30
Fst 500

Section Thickness Cover Bar dia


Return wall 750 75 16

Section Max moment


K
Horizontal 285.0 0.021 OK
Vertical 179.9 0.013 OK
Steel provided
Section Moment b d K z Asreq s x MR Bar dia spacing Bar dia No's As
Horizontal 285.0 1000 667 0.02 650.67 1006.81 32.66 40.82 284.97 16 199.70 16 180 1117.01
Vertical 179.9 1000 667 0.01 656.79 971.15 31.50 39.38 275.12 16 207.03 16 180 1117.01

0.26*fctm/fyk*b*d
Minimum steel
971.152

Design for shear force acw =1 - for sections with out prestress
IRC 112 Shear capacity of concrete with out reinforcement fywd =0.8fyd
10.3.2 Minimum of VRD.C = (0.12K*(80r1*fck)1/3+scp)bwd n1 0.6 for fck< = 80Mpa
and VRD.C = (nmin + 0.15scp)bd
nmin = 1.5
0.031K *(fck) bd
.5*
Asw 1551.40 sqmm
scp 0 (No axial or prestressing force) Dia of bar 8
HorizontalVertical number of legs 5.55556
K 1+sqt*(200/d) 1.55 1.55 spacing, s 180
r1 0.002 0.002 Cotq (Assuming 45deg) 1
VRD.C = kN 196.94 196.94 Web
VRD.C min = kN 218.04 218.04 VRDs = 2069.57 kN
Design VRD.C
kN= 218.04 218.04 VRDmax = 2415.01 kN
Actual Shear force 203 136 shear resistance of stirrups 2069.57 kN ok

Check No SR No SR
SR - Shear reinforcement

261 261
Part of structure: Job No. Rev.
Project:Kusumba-Malegaon Dsign of Return wall Design by Suresh Date.
Check by Pavan 09-08-2019
Serviceability Limit state - Stress Check (rare combination)
IRC 112 Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2 Maxium allowable concrete tensile stress fctm 2.8 N/sqmm
Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio ac 6.25
HorizontalVertical
As 1117 1117
d 667 667
b 1000 1000
x 89.78 89.78
M 174 117
M = 0.5*b*x*fcc*(d-x/3)
fcc 6.10 4.10
Check Okay Okay
fst fst*As=0.5*b*x*fcc 244.99 164.80
Check Okay Okay

21.3.2 Cracking (Quasi permanent combination)


IRC 112 Dirtwall
12.3 M 62 59
W r = Sr,max(esm-ecm) Sr,max = 3.4c+0.425k1*k2*f/rpeff
c 75 75
k1 0.8 deformed bars,
1.6 plain bars
k2 0.5 bending and 1 pure tension
f bar dia 16 16
rpeff = As/Acef 0.005 0.005 2.5*(h-d) 207500
Sr,max 760.28 760.28 (h-x/3) 736392
fctm - value from table 6.5 page 38 2.8 h/2 375000
ssc 87.3 83.2 Min of above 207500
kt 0.5
ae = Es/Ecm 6.25
esm-ecm -0.0009 -0.0009
0.6*ssc/Es 0.0003 0.0002
esm-ecm 0.0003 0.0002
W r = Sr,max(esm-ecm) 0.199 0.190
OK OK

262 262
Project:Kusumba-Malegaon Part of structure: Job No.
Design of cantilever return wall Rev.
Design by Suresh Date
Check by Pavan 09-08-2019

Design of Cantilever Return Wall

(A) - Design of Cantilever Return wall

4 X

0.6
A
y B

4.600
1 dy

Ref: IRC 78 Cl: 715


Earth pressure due to = 0.328 x 20 x 1.2
live load surcharge
2
= 7.872 kN/m
Earthpressure = 0.334 x 20 x 4.600
2
= 30.728 kN/m

max s = b qb 2
t2

a/b = 0.87

a/b 1 1.5 2 2.5


b 0.5 0.67 0.73 0.74
a 0.05 0.071 0.101 0.122
for a/b 0.87
b 0.5943478
a 0.0331739

max s = 1100.02
1.100
max s = 4293.9
4.2938624
For 1000 mm of width , Z 1000 x 90000
6
15000000 mm^3
Hence Moment /m width
= 16500237 Nmm/m
= 16.50 kN.m/m

= 64407937 Nmm/m

= 64.41 kN.m/m

263 263
Project:Kusumba-Malegaon Part of structure: Job No.
Design of cantilever return wall Rev.
Design by Suresh Date
Check by Pavan 09-08-2019

Summary of Forces and Moments Horizantal plane


Verification of
structural strength Rare Combination Quasi Combination
Description EP as leading load EP Leading
Factor FM Factor FM Factor FM
LL Surcharge 1.20 19.80 1 16.500 1 16.50
Earthpressure 1.50 96.61 0.8 51.526 0 0

Summary of Forces and Moments Vertical plane


This return wall will also bend in a vertical plane due to its self wt.

Self Weight = 0.6 x 4 x 0.5


0.5 x 4.0 x 3 x 0.5

4.2 x 25 = 105.0 kN

Crash barrier
Area = 0.36 m2
Length 4m
Load = 36 kN

Load per meter run = 35.25

Moment = 282 kN.m


Force = 141 kN

Load factorMoment Force


Verification of structural strength = 1.35 380.7 kN.m 190.35 kN
Rare combination = 1.00 282 kN.m
Quasi permenant combination = 1.00 282 kN.m

264 264
Part of structure: Job No. Rev.
Project:Kusumba-Malegaon Dsign of Cantilever Return wall Design by Suresh Date.
Check by Pavan 09-08-2019

Structural Strength - Ultimate


Fck 30
Fst 500

Section Thk. Cover Bar dia


Cant Return 4600 75 25

Section Max moment K


Cant Return 380.7 0.001 OK

Steel provided
Section Moment b d K z Asreq s x MR Bar dia spacing Bar dia No's As
Cant Return 380.7 500 4512.5 0.00 4506.20 3285.10 213.13 266.41 6296.16 25 149.42 25 4 1963.5

0.26*fctm/fyk*b*d
Minimum steel
Dirt wall 3285.1

Design for shear force


IRC 112 Shear capacity of concrete with out reinforcement
10.3.2 Minimum of VRD.C = (0.12K*(80r1*fck)1/3+scp)bwd
V
and RD.C = (nmin + 0.15scp)bd
nmin = 1.5
0.031K *(fck) bd
.5*

scp 0 (No axial or prestressing force)


Cant Return Toe
K 1+sqt*(200/d) 1.21
r1 0.001
VRD.C = kN 418.95
VRD.C min = kN 510.24
Design VRD.C
kN= 510.24
Actual Shear force 190

Check No SR
SR - Shear reinforcement

265 265
Part of structure: Job No. Rev.
Project:Kusumba-Malegaon Dsign of Cantilever Return wall Design by Suresh Date.
Check by Pavan 09-08-2019
Serviceability Limit state
Stress (rare combination)
IRC 112 Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2 Maxium allowable concrete tensile stress fctm 2.8 N/sqmm
Maxium allowable tensile stress in steel 0.8fyk 400 N/sqmm
Modular ratio ac 6.25
As 1963
d 4512.5
b 500
x 446.74
M 282
M = 0.5*b*x*fcc*(d-x/3)
fcc 0.58
Check Okay
fst fst*As=0.5*b*x*fcc 32.91
Check Okay

21.3.2 Cracking (Quasi permanent combination)


IRC 112 Dirtwall
12.3 M 282
W r = Sr,max(esm-ecm) Sr,max = 3.4c+0.425k1*k2*f/rpeff
c 75
k1 0.8 deformed bars,
1.6 plain bars
k2 0.5 bending
1 pure tension
f bar dia 25
rpeff = As/Acef 0.009 2.5*(h-d) 218750
Sr,max 728.49 (h-x/3) 4511197
fctm - value from table 6.5 page 38 2.8 h/2 2300000
ssc 32.9 Min of above 218750
kt 0.5
ae = Es/Ecm 6.25
esm-ecm -0.0007
0.6*ssc/Es 0.0001
esm-ecm 0.0001
W r = Sr,max(esm-ecm) 0.072 Okay

266 266
DESIGN OF PIER
R3

267 267
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
INTRODUCTION :
This report presents design of piert, with open foundation. the super-structure span arrangement is 1x15m c/c of bearing

LOADING CONSIDERED :
1) Selfweight of superstructure 5) Breaking load
2) Superimposed dead load (crash barrier, wearing coat etc.) 6) Buoyancy
3) Self weight of sub structure and Foundation 7) Seismic load
4) Live load: 8) Wind Load
a) Three Lane of class A 9) Temparature load.
b) One lane of class 70 R wheel+Class A
c) One lane of class 70 R Track+Class A
CODE OF PRACTICE FOLLOWED :
IRC 6 : 2016 Standard specification and code of practice for road bridges (Load and stresses). IS 1893-1984 Criteria for Earthquake Resistance Design of structures
IRC 112-2011 Code of Pratice for Concret road bridges. IS 1893- 2000 Criteria for Earthquake Resistance Design of structures
IRC 78-2014 Standard Specifications and Code of Practice for Road Bridges, Section VII – Foundations and Substructure IS SP 22- 1982 Explanatory Hand Book On Codes for Earthquake Engineering
DESIGN PHILOSPHY :
The pier shaft is designed as column member with biaxial bending ,foundation is designed as cantilever slab.
SAILENT FEATURES OF SUPER-STRUCTURE Additional pin Additional pin Additional pin Additional pin
Radius of curve = 1E+33 m bearing Not provided 2 bearing Not provided
2 2
bearing Not provided 2
bearing Not provided
left side span c/c of Exp joint = 15 m
Right side span c/c of Exp joint = 15 m pier under consideration
left side span c/c of bearing = 13.96 m Bearing long. Elastomeric 3 Bearing long. Elastomeric 3 Bearing long. Elastomeric 3 Bearing long. Elastomeric 3
Right side span c/c of bearing = 13.96 m Bearing Trans. Elastomeric 3 Bearing Trans. Elastomeric 3 Bearing Trans. Elastomeric 3 Bearing Trans. Elastomeric 3
Expansion gap at pier = 40 mm Arreated Provided
Wearing coat thickness = 75 mm Free Not provided
Depth of slab+ girder at c/L of left side span = 1420 mm Elastomeric
Depth of slab+ girder at c/L of Right side span = 1420 mm Elastomeric
Bearing type = Elastomeric 1 Pot Bearing
Height of Brg+ pedestal for leaf side sapn = 396.5 mm Tar paper bering
Height of Brg+ pedestal for Right side sapn = 396.5 mm
Total width of structure = 16 m ( square )
Friction coeff. b/w foundation and strata below foundation = 0.5
Height of Crash barrier = 1.1 m

268 268
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
PIER DETAIL :
Formation Level at C/L = RL 473.897
PIER cap top level = RL 472.348
Minimum GL at Footing Corner = RL 468.557 Seismic Zone III 2
Scour Level = RL 466.057 Response reduction factor = 3
Embedement of foundation below scour level = 0.6 m Importance factor considerd in seismic factor calculations = 1.2
Founding level = RL 465.457 Type of soil considerd in calculating Sa/g is = Rocky
Highest flood level = RL 469.757 pier shape 2 rectangular
Scour depth below HFL = 3.7 m
Max. velocity of flow = 3.09 m/sec
Skew Angle of supe structure with respective pier cap/pier = 0.00 Deg Shape of Ease water and cut water
Skew Angle between footing axis(pier) and pier cap/pier = 0.00 deg Semi circular ends 2 0.66
Basic wind speed = 39 m/sec
Terrain to be considerd in wind load calculations = Plain terrain 1 Plain terrain K for pier cap to cal. water presure = 1.5
Type of deck supporting System = Two or more beams or3multiple box girders Terrain with Obstructions
K for pier to cal. water presure = 0.66
Bearing Details Soild slab
Number of bearings on pier from left span = 5 No's Single beam of box girder
Number of bearings on pier from Right span = 5 No's Two or more beams or multiple box girders
Net safe bearing capacity at founding level considered = 25.000 t/m2 Non-seismic case
= 31.250 t/m2 Seismic case, increase by 25%
Shear rating in case of elastomeric bearing Vr = 2.50 Kn/mm
Maximum temperature Tmax = 50 °C Temp. varation Tvar = K 10 °C
Minimum temperature Tmin = 13 °C
Coefficent of thermal expansion = 0.000012 / °C As per IRC 6-2016 clause 215.4
Shrinkage Coefficient = 0.0002 As per IRC 6-2016clause 217.3
Material Data
Density of Concrete = 2.500 t/m3 Angle of internal friction of backfill soil behind abutment in degress= 30.00
Density of Soil in Dry condition = 1.800 t/m3 Surcharge angle of backfill soil behind abutment in degress = 0.00
Density of soil in saturated conditoin = 2.000 t/m3 Modulus of elasticity of untensioned steel = 200.00Gpa
Density of water = 1.000 t/m3 Modulus of elasticity of concrete = 31.00Gpa
Grade of concrete = M 30 fctm = 2.50Mpa
Grade of steel fyk = Fe 500 fcd = 13.40Mpa

269 269
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
The general Dimensional details of the bridge structure at the pier are as below. (not to scale)

0.50 m 15.00 m 0.50 m


0.52 m 0.52 m
6.00 m RL 473.897 0.90 m ht of railing
0.24 m max slab thk

3.00 m 3.00 m 1.18 m Girder height


RL 472.127 SQ SQ 0.35 m ped. and brg ht
RL 471.227 0.90 m pier cap end ht
HFL
0.00 m pier cap tap. ht
RL 469.757 13.4 m(Sq)
13.4 m(Sk)
2.00 m(sk)
2.00 m(sq) 4.84 m RL 471.497 Reinforcement
6.34 m Pier height curtailment level
8.0 m(sk) 5.09 m
left Span = Right Span = 15.00 m 8.00 m(sq)
15.00 m RL 468.557 GL 5.14 m
1.00 m(sk) RL 466.1 Scour LVL
1.00 m(sq)
RL 466.357 Top of Foundation

RL 465.457 Bottom of Foundation

ELEVATION OF PIER SECTIONAL VIEW OF PIER

270 270
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations

1000 mm

Clear Cover = 75 mm
2841 mm 809 809 2841 mm dia of bar Considered = 32 mm

900 mm 900 mm
300 mm 300 mm
3650 mm 3650 mm
footing in longitudinal direction

8000 mm

Clear Cover = 107 mm


615 mm 785 785 615 mm dia of bar Considered = 16 mm

900 mm 900 mm
300 mm 300 mm
1400 mm 1400 mm
footing in Transverse direction
Dead Loads of Pier Cap
Self weight of piercap = 2.5 x ( 13.4 x 2 x 0.9 + (13.4 + 8.3 )/2 x 0.00000001 x 2 ) = 60.310 t
Self weight of bearing Pedestals = 10 x 0.65 x 0.6 x 0.35 x 2.5 = 3.420 t
self wt of foundation and PCC filing over foundation = 201.69 t
Dead Loads of Pier
Self weight of pier = 2.5 x 8 x 1 x 5.09 At curtailment height, Wt = -2.921 t
Self weight of pier and foundation = 303.510 t

271 271
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
one spans dislodge case
Loads in t Total Loads at Base Total Loads at curtailment point
Vertical
1 load Hzl. - X Hzl. - Z ML MT Vertical load Hzl. - X Hzl. - Z ML MT
Due to Girder+slab+pier+pier cap = 503.794 0.000 0.000 -71.008 0.000 144.257 0.000 0.000 -71.008 0.000
Due to Wearing coat = 26.175 0.000 0.000 -13.611 0.000 26.175 0.000 0.000 -13.611 0.000
Due to SIDL = 18.846 0.000 0.000 -9.800 -34.869 18.846 0.000 0.000 -9.800 -34.869
Both spans in place
Due to Girder+slab+pier+pier cap = 640.348 0.000 0.000 0.000 0.000 227.705 0.000 0.000 0.000 0.000
Due to Wearing coat = 52.350 0.000 0.000 0.000 0.000 238.596 0.000 0.000 0.000 0.000
Due to SIDL = 45.648 0.000 0.000 0.000 0.000 70.854 0.000 0.000 0.000 0.000
2 lanes-class A (max load) = 221.190 0.000 0.000 113.948 807.300 67.404 0.000 0.000 113.948 807.300
2 lanes-class A (max ML) = 75.723 0.000 0.000 -38.726 163.014 61.423 0.000 0.000 -38.726 163.014
2 lanes-class A (max MT) = 32.273 0.000 0.000 16.782 -198.930 67.338 0.000 0.000 16.782 -198.930
3 lanes-class A (max load) = 221.190 0.000 0.000 113.948 807.300 101.106 0.000 0.000 113.948 807.300
3 lanes-class A (max ML) = -14.055 0.000 0.000 -26.499 44.418 92.134 0.000 0.000 -26.499 44.418
3 lanes-class A (max MT) = 18.213 0.000 0.000 -9.471 -79.041 68.828 0.000 0.000 -9.471 -79.041
70 R Wheel (max load) = 72.057 0.000 0.000 24.351 -31.434 75.819 0.000 0.000 24.351 -31.434
70 R Wheel (max ML) = 25.700 0.000 0.000 -14.423 -7.515 57.144 0.000 0.000 -14.423 -7.515
70 R wheel (max MT) = 65.818 0.000 0.000 17.426 -201.261 56.185 0.000 0.000 17.426 -201.261
70 R Track (max load) = 68.360 0.000 0.000 35.547 -30.549 75.866 0.000 0.000 35.547 -30.549
70 R Track (max ML) = 43.673 0.000 0.000 -22.675 126.966 58.839 0.000 0.000 -22.675 126.966
70 R track (max MT) = 19.051 0.000 0.000 -9.907 -79.743 58.752 0.000 0.000 -9.907 -79.743
70 R Wheel + class A (max load) = 126.646 0.000 0.000 52.737 267.351 109.521 0.000 0.000 52.737 267.351
70 R Wheel+class A (max ML) = 63.802 0.000 0.000 -33.236 -9.675 72.639 0.000 0.000 -33.236 -9.675
70 R wheel+class A (max MT) = 105.371 0.000 0.000 -3.201 -318.681 86.856 0.000 0.000 -3.201 -318.681
70 R Track+class A (max load) = 134.113 0.000 0.000 34.384 230.952 109.568 0.000 0.000 34.384 230.952
70 R Track+classA (max ML) = 80.893 0.000 0.000 -42.124 0.930 89.551 0.000 0.000 -42.124 0.930
70 R track+class A (max MT) = 84.499 0.000 0.000 -34.722 570.216 90.210 0.000 0.000 -34.722 570.216
Governing max load case = 221.190 0.000 0.000 113.948 807.300 109.568 0.000 0.000 34.384 230.952
Governing max ML case = 221.190 0.000 0.000 113.948 807.300 67.404 0.000 0.000 113.948 807.300
Governing max MT case = 221.190 0.000 0.000 113.948 807.300 67.404 0.000 0.000 113.948 807.300

272 272
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
WIND LOAD CALCULATION Due to Deck
Due to crash Due to pier
Transverse Wing force calculation Slab and Due to LL Due to pier
Barrier cap
girder
Avg Height from top of foundation = 7.99 m 6.83 m 5.32 m 3.65 m
Avg Height from bottom of foundation = 8.89 m 7.73 m 6.22 m 4.55 m
Avg Height from Curtailment point = 2.85 m 1.69 m 0.18 m 0.00 m
Avg Height from GL = 5.79 m 4.63 m As wind speed 3.12 m 1.45 m
Basic Wind Speed = 39 m/s 39 m/s is more than 36m/s 39 m/s 39 m/s
Horizontal wind preasure for 33m/sec basic wind speed for
463.7N/m2 463.7N/m2 Wind load on LL 463.7N/m2 463.7N/m2
corresponding height
Horizontal wind preasure corresponding to basic wind speed and
647.6N/m2 647.6N/m2 is not considerd 647.6N/m2 647.6N/m2
height Pz
Exposed Length per pier = 15.00 m 15.00 m "as per the 2.00 m 1.00 m
Exposed height per pier(to cal forces up to GL) = 0.90 m 1.42 m clause 209.3.7 0.90 m 2.89 m
Exposed height per pier(to cal forces up to curtailment ht) = 0.90 m 1.42 m of IRC 6-2016" 0.90 m 2.94 m
Effective area per pier (to cal forces up to GL) = 13.50 m2 21.30 m2 1.80 m2 2.89 m2
Effective area per pier (to cal forces up to curtailment ht) = 13.50 m2 21.30 m2 1.80 m2 2.94 m2
G guest factor = 2 2 2 2
Cd Drag coefficent = 1.950 1.950 1.1 0.8
Force up to GL Pz A1GCd = 3.410 t 5.381 t 0.257 t 0.300 t
Force up to curtailment height Pz A1GCd = 3.410 t 5.381 t 0.257 t 0.305 t
Moment about top of foundation = 27.25 t-m 36.75 t-m 1.37 t-m 1.09 t-m
Moment about bottom of foundation = 30.31 t-m 41.60 t-m 1.60 t-m 1.36 t-m
Moment at curtailment depth = 9.72 t-m 9.09 t-m 0.05 t-m 0.00 t-m
Longitudinal Wind force calculation ( 25% of transverse forces and moments)
Force up to GL Pz A1GCd = 0.853 t 1.345 t 0.064 t 0.075 t
Force up to curtailment height Pz A1GCd = 0.853 t 1.345 t 0.064 t 0.076 t
Moment about top of foundation = 6.81 t-m 9.19 t-m 0.34 t-m 0.27 t-m
Moment about bottom of foundation = 7.58 t-m 10.40 t-m 0.40 t-m 0.34 t-m
Moment at curtailment depth = 2.43 t-m 2.27 t-m 0.01 t-m 0.00 t-m

273 273
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
WIND LOAD CALCULATION (FOR WIND SPEED 36M/S) Due to Deck
Due to crash Due to pier
Transverse Wing force calculation Slab and Due to LL Due to pier
Barrier cap
girder
Avg Height from top of foundation = 7.99 m 6.83 m 8.59 m 5.32 m 3.65 m
Avg Height from bottom of foundation = 8.89 m 7.73 m 9.49 m 6.22 m 4.55 m
Avg Height from Curtailment point = 2.85 m 1.69 m 3.45 m 0.18 m 0.00 m
Avg Height from GL = 5.79 m 4.63 m 6.39 m 3.12 m 1.45 m
Basic Wind Speed = 36.00 m/s 36.00 m/s 36.00 m/s 36.00 m/s 36.00 m/s
Horizontal wind preasure for 33m/sec basic wind speed for
463.7N/m2 463.7N/m2 463.70 N/m2 463.7N/m2 463.7N/m2
corresponding height
Horizontal wind preasure corresponding to basic wind speed and
551.8N/m2 551.8N/m2 551.85 N/m2 551.8N/m2 551.8N/m2
height Pz
Exposed Length per pier = 15.00 m 15.00 m 15.00 m 2.00 m 1.00 m
Exposed height per pier(to cal forces up to GL) = 0.90 m 1.42 m 2.10 m 0.90 m 2.89 m
Exposed height per pier(to cal forces up to curtailment ht) = 0.90 m 1.42 m 2.10 m 0.90 m 2.94 m
Effective area per pier (to cal forces up to GL) = 13.50 m2 21.30 m2 31.50 m2 1.80 m2 2.89 m2
Effective area per pier (to cal forces up to curtailment ht) = 13.50 m2 21.30 m2 31.50 m2 1.80 m2 2.94 m2
G guest factor = 2 2 2.00 2 2
Cd Drag coefficent = 1.950 1.950 1.20 1.1 0.8
Force up to GL Pz A1GCd = 2.906 t 4.585 t 4.17 t 0.219 t 0.256 t
Force up to curtailment height Pz A1GCd = 2.906 t 4.585 t 4.17 t 0.219 t 0.260 t
Moment about top of foundation = 23.22 t-m 31.32 t-m 35.84 t-m 1.17 t-m 0.93 t-m
Moment about bottom of foundation = 25.83 t-m 35.44 t-m 39.60 t-m 1.36 t-m 1.16 t-m
Moment at curtailment depth = 8.28 t-m 7.75 t-m 14.40 t-m 0.04 t-m 0.00 t-m
Longitudinal Wind force calculation ( 25% of transverse forces and moments)
Force up to GL Pz A1GCd = 0.727 t 1.146 t 1.04 t 0.055 t 0.064 t
Force up to curtailment height Pz A1GCd = 0.727 t 1.146 t 1.04 t 0.055 t 0.065 t
Moment about top of foundation = 5.80 t-m 7.83 t-m 8.96 t-m 0.29 t-m 0.23 t-m
Moment about bottom of foundation = 6.46 t-m 8.86 t-m 9.90 t-m 0.34 t-m 0.29 t-m
Moment at curtailment depth = 2.07 t-m 1.94 t-m 3.60 t-m 0.01 t-m 0.00 t-m

274 274
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
WIND LOAD CALCULATION (ONE SPAN DISLOGGED CASE) Due to Deck
Due to crash Due to pier
Transverse Wing force calculation Slab and Due to pier
Barrier cap
girder
Avg Height from top of foundation = 7.99 m 6.83 m 5.32 m 3.65 m
Avg Height from bottom of foundation = 8.89 m 7.73 m 6.22 m 4.55 m
Avg Height from Curtailment point = 2.85 m 1.69 m 0.18 m 0.00 m
Avg Height from GL = 5.79 m 4.63 m 3.12 m 1.45 m
Basic Wind Speed = 39.00 m/s 39.00 m/s 39.00 m/s 39.00 m/s
Horizontal wind preasure for 33m/sec basic wind speed for
463.7N/m2 463.7N/m2 463.7N/m2 463.7N/m2
corresponding height
Horizontal wind preasure corresponding to basic wind speed and
647.6N/m2 647.6N/m2 647.6N/m2 647.6N/m2
height Pz
Exposed Length per pier = 7.50 m 7.50 m 2.00 m 1.00 m
Exposed height per pier(to cal forces up to GL) = 0.90 m 1.42 m 0.90 m 2.89 m
Exposed height per pier(to cal forces up to curtailment ht) = 0.90 m 1.42 m 0.90 m 2.94 m
Effective area per pier (to cal forces up to GL) = 6.75 m2 10.65 m2 1.80 m2 2.89 m2
Effective area per pier (to cal forces up to curtailment ht) = 6.75 m2 10.65 m2 1.80 m2 2.94 m2
G guest factor = 2 2 2 2
Cd Drag coefficent = 1.950 1.950 1.1 0.8
Force up to GL Pz A1GCd = 1.705 t 2.691 t 0.257 t 0.300 t
Force up to curtailment height Pz A1GCd = 1.705 t 2.691 t 0.257 t 0.305 t
Moment about top of foundation = 13.62 t-m 18.38 t-m 1.37 t-m 1.09 t-m
Moment about bottom of foundation = 15.16 t-m 20.80 t-m 1.60 t-m 1.36 t-m
Moment at curtailment depth = 4.86 t-m 4.55 t-m 0.05 t-m 0.00 t-m
Longitudinal Wind force calculation ( 25% of transverse forces and moments)
Force up to GL Pz A1GCd = 0.426 t 0.673 t 0.064 t 0.075 t
Force up to curtailment height Pz A1GCd = 0.426 t 0.673 t 0.064 t 0.076 t
Moment about top of foundation = 3.41 t-m 4.59 t-m 0.34 t-m 0.27 t-m
Moment about bottom of foundation = 3.79 t-m 5.20 t-m 0.40 t-m 0.34 t-m
Moment at curtailment depth = 1.21 t-m 1.14 t-m 0.01 t-m 0.00 t-m

275 275
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
WIND LOAD CALCULATION SUMMARY
For Wind Speed 39m/s Due to Transverse Wind force Due to Longitudinal Wind force
Vertical
load Hzl. - X Hzl. - Z ML MT Vertical load Hzl. - X Hzl. - Z ML MT
At top of foundation = 0.000 9.348 0.000 0.000 66.459 0.000 0.000 2.337 16.615 0.000
At bottom of Foundation = 0.000 9.348 0.000 0.000 74.872 0.000 0.000 2.337 18.718 0.000
At curtailment Depth = 0.000 9.353 0.000 0.000 18.859 0.000 0.000 2.338 4.715 0.000

For Wind Speed 36m/s


Due to Transverse Wind force Due to Longitudinal Wind force
Vertical
load Hzl. - X Hzl. - Z ML MT Vertical load Hzl. - X Hzl. - Z ML MT
At top of foundation = 0.000 7.966 0.000 0.000 56.633 0.000 0.000 1.992 14.158 0.000
At bottom of Foundation = 0.000 7.966 0.000 0.000 63.802 0.000 0.000 1.992 15.951 0.000
At curtailment Depth = 0.000 7.970 0.000 0.000 16.070 0.000 0.000 1.993 4.018 0.000

For one Span Disloged case


Due to Transverse Wind force Due to Longitudinal Wind force
Vertical
load Hzl. - X Hzl. - Z ML MT Vertical load Hzl. - X Hzl. - Z ML MT
At top of foundation = 0.000 4.953 0.000 0.000 34.464 0.000 0.000 1.238 8.616 0.000
At bottom of Foundation = 0.000 4.953 0.000 0.000 38.921 0.000 0.000 1.238 9.730 0.000
At curtailment Depth = 0.000 4.958 0.000 0.000 9.453 0.000 0.000 1.240 2.363 0.000

276 276
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
CALCULATION OF HORIZONTAL FORCE DUE TO BREAKING AND TEMPARATURE
Dead load+ SIDl = Rg1 Rg2 Rg3 Rg4
Live load = Rq1 Rq2 Rq3 Rq4

in case of pot Bearing = in case of elastomeric bearing in case of tar paper bearing
horizontal force = horizontal force = hor load =vertical reactoin x 0.5
Fh/2 + Vr ( ltc left - ltc right)

Fh= 20% of first 2 lane + 5% of loads beyond 2lanes

Dead load (including all loads exculding LL) Live load due to first 2 lane loading Live load due loading beyond 2 lanes
Rg1 Rg2 Rg3 Rg4 Rq1 Rq2 Rq3 Rq4 Rq1 Rq2 Rq3 Rq4
2L-Cl A (max load) 185.6 t 185.6 t 185.6 t 131.0 t 0.7 t 1.0 t 219.8 t 49.1 t 0.0 t 0.0 t 0.0 t 0.0 t
2L-Cl A (max ML) 185.6 t 185.6 t 185.6 t 131.0 t 1.1 t 0.6 t 219.5 t 54.7 t 0.0 t 0.0 t 0.0 t 0.0 t
2L-Cl A (max MT) 185.6 t 185.6 t 185.6 t 131.0 t 0.7 t 1.0 t 201.2 t 48.1 t 0.0 t 0.0 t 0.0 t 0.0 t
3L-Cl A (max load) 185.6 t 185.6 t 185.6 t 131.0 t 0.7 t 1.0 t 219.8 t 49.1 t 0.0 t 0.0 t 0.0 t 0.0 t
3L-Cl A (max ML) 185.6 t 185.6 t 185.6 t 131.0 t 1.1 t 0.6 t 219.5 t 54.7 t 0.0 t 0.3 t 0.4 t 0.0 t
3L-Cl A (max MT) 185.6 t 185.6 t 185.6 t 131.0 t 0.7 t 1.0 t 201.2 t 48.1 t 0.0 t 0.0 t 0.0 t 0.0 t
70 R W (max load) 185.6 t 185.6 t 185.6 t 131.0 t 9.7 t 12.6 t 60.8 t 31.0 t 0.0 t 0.0 t 0.0 t 0.0 t
70 R W (max ML) 185.6 t 185.6 t 185.6 t 131.0 t 9.0 t 9.5 t 60.3 t 22.6 t 0.0 t 0.0 t 0.0 t 0.0 t
70 R W (max MT) 185.6 t 185.6 t 185.6 t 131.0 t 15.1 t 24.2 t 0.0 t 0.0 t 0.0 t 0.0 t 0.0 t 0.0 t
70 R T (max load) 185.6 t 185.6 t 185.6 t 131.0 t 0.0 t 0.0 t 66.9 t 20.4 t 0.0 t 0.0 t 0.0 t 0.0 t
70 R T (max ML) 185.6 t 185.6 t 185.6 t 131.0 t 0.0 t 0.0 t 66.9 t 20.4 t 0.0 t 0.0 t 0.0 t 0.0 t
70 R T (max MT) 185.6 t 185.6 t 185.6 t 131.0 t 19.5 t 43.4 t 0.0 t -8.9 t 0.0 t 0.0 t 0.0 t 0.0 t
70RW+ClA(max load) 185.6 t 185.6 t 185.6 t 131.0 t 9.7 t 12.6 t 60.8 t 31.0 t 0.0 t 0.0 t 54.7 t 25.1 t
70RW+ClA(max ML) 185.6 t 185.6 t 185.6 t 131.0 t 9.0 t 9.5 t 60.3 t 22.6 t 0.0 t 0.0 t 54.7 t 25.1 t
70RW+ClA(max MT) 185.6 t 185.6 t 185.6 t 131.0 t 15.1 t 24.2 t 0.0 t 0.0 t 0.2 t 0.0 t 78.9 t 16.5 t
70RT+ClA(max load) 185.6 t 185.6 t 185.6 t 131.0 t 0.0 t 0.0 t 66.9 t 20.4 t 26.0 t 34.0 t 32.9 t 2.8 t
70RT+ClA(max ML) 185.6 t 185.6 t 185.6 t 131.0 t 0.0 t 0.0 t 66.9 t 20.4 t 0.0 t 0.0 t 54.7 t 25.1 t
70RT+ClA(max MT) 185.6 t 185.6 t 185.6 t 131.0 t 19.5 t 43.4 t 0.0 t -8.9 t 0.0 t 0.0 t 78.9 t 16.5 t

277 277
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
Fh left span- m ( Rg1+Rq1) (where m =0.03) Fh Right span- m ( Rg4+Rq4) (where m =0.03)
in case of Pot bearing
horizontal force = MAX of [ Fh left span/2+ m ( Rg2+Rq2) (where m =0.05) ]
+ Max of [ Fh Right span/2+ m ( Rg3+Rq3) (where m =0.05) ]
Fh-Right in case of elas. Bea.= (Fh left span+Fh right span)/2 + Vr ( ltc left - ltc right) for ( bith spans in place )
Fh-left sapn sapn total horzotal force Vr = 0.25 t/mm
2L-Cl A (max load) 0.3 t 53.8 t 27.1 t Ltc left = Momnet due to temp. of left sapn + moment due to Shri. of left sapn
2L-Cl A (max ML) 0.3 t 54.8 t 27.6 t = (coef. of thermal expansoin*temp variation + shrinkage coef.)* C/C of bering of left sapn
2L-Cl A (max MT) 0.3 t 49.9 t 25.1 t Ltc Right = Momnet due to temp. of right sapn + moment due to Shri. of right sapn
3L-Cl A (max load) 0.3 t 53.8 t 27.1 t = (coef. of thermal expansoin*temp variation + shrinkage coef.)* C/C of bering of right sapn
3L-Cl A (max ML) 0.4 t 54.9 t 27.6 t Movement Calculation
3L-Cl A (max MT) 0.3 t 49.9 t 25.1 t Maximum temperature Tmax = 50 °C
70 R W (max load) 4.5 t 18.4 t 11.4 t Minimum temperature Tmin = 13 °C
70 R W (max ML) 3.7 t 16.6 t 10.1 t Average Temprature Tav= 31.25 °C
70 R W (max MT) 7.9 t 0.0 t 3.9 t Temperature varation Tvar = K 10 °C
70 R T (max load) 0.0 t 17.4 t 8.7 t T = Tmax - (Tav - Tvar) = 28.75 °C
70 R T (max ML) 0.0 t 17.4 t 8.7 t As per IRC 83: ( part ii ) -1987 Clause 916.3.4
70 R T (max MT) 12.6 t -1.8 t 5.4 t Total longitudinal Strain due to temparature,shrinkage, creep = 0.0005
70RW+ClA(max load) 4.5 t 22.4 t 13.4 t total strain = 0.000545 Ltc left = 7.6082 mm
70RW+ClA(max ML) 3.7 t 20.6 t 12.1 t Vr ( ltc left - ltc right) = 0 Kn Ltc Right = 7.6082 m
70RW+ClA(max MT) 7.9 t 4.8 t 6.3 t m Max( Rg2,Rg3) (where m =0.05)
70RT+ClA(max load) 3.0 t 19.2 t 11.1 t incase if one span in case of pot bearing
70RT+ClA(max ML) 0.0 t 21.4 t 10.7 t dislogged case 0.5 x Max( Rg2,Rg3) (where m =0.05) The horizontal force = 1.9 t
70RT+ClA(max MT) 12.6 t 3.0 t 7.8 t The horizontal force = In case of tar paper bearing
Vr x max[ Ltc left, Ltc right ]
in case of elastomeric bearing
To cal. one sapn dislogged case
Forces at To cal. Forces at To cal. Forces at
base curtailment ht To cal. Forces at base curtailment ht
Horizontal force in case of Governing max load case = 27.1 t 11.1 t 1.9 t 1.9 t
Horizontal force in case of Governing max ML case = 27.1 t 27.1 t
Horizontal force in case of Governing max MT case = 27.1 t 27.1 t

278 278
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
SUMMARY OF HORIZONTAL FORCE DUE TO BREAKING AND TEMPARATURE

In case of Governing max load case Vertical


load Hzl. - X Hzl. - Z ML MT
At top of foundation = 4.727 0.000 27.061 236.511 0.000
At bottom of Foundation = 4.727 0.000 27.061 260.865 0.000
At curtailment Depth = 1.941 0.000 11.114 40.011 0.000

In case of Governing max ML case


Vertical
load Hzl. - X Hzl. - Z ML MT
At top of foundation = 4.727 0.000 27.061 236.511 0.000
At bottom of Foundation = 4.727 0.000 27.061 260.865 0.000
At curtailment Depth = 4.727 0.000 27.061 97.419 0.000

In case of Governing max MT case


Vertical
load Hzl. - X Hzl. - Z ML MT
At top of foundation = 4.727 0.000 27.061 236.511 0.000
At bottom of Foundation = 4.727 0.000 27.061 260.865 0.000
At curtailment Depth = 4.727 0.000 27.061 97.419 0.000

In case of One span dislogged case


Vertical
load Hzl. - X Hzl. - Z ML MT
At top of foundation = 0.332 0.000 1.902 16.624 0.000
At bottom of Foundation = 0.332 0.000 1.902 18.336 0.000
At curtailment Depth = 0.332 0.000 1.902 6.847 0.000

279 279
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
Water current forces 2.00 m Velocity Preasure
distribution distribution Pressure due to current
2
13.400 m HFL RL 469.76 4.37 m/s 1.4895036 t/m P = 52 K V2
1.34 m RL 471.23 0.950 t/m2 for pier cap
and V2 varies linearly with
2
0.418 t/m for pier height, zero being at scour depth,
8.000 m 1.0 m and P in Kg/m2
2.36 m Max. velocity of flow = 3.09 m/s
RL 471.497 Reinf. Curtailment level 0.964 t/m2 for pier Design velocity = 4.37 m/s
K for pier = 0.66
RL 466.057 Scour level k for pier cap = 1.5

RL 466.357 Foundation top level


RL 465.457 Foundation bottom level
Force at moment at Force at moment at Force at moment at Force at moment at Force at pier moment at Force at moment at
Due to water preasure reinf. Curt. reinf. Curt. pier bottom pier foun. foundation reinf. Curt. reinf. Curt. bottom Hz pier bottom foun. foundation
on pier cap Point Hx Point MT Hx bottom MT Bottom Hx bottom MT Point Hz Point ML ML Bottom Hz bottom ML
Incase of Nor. currrent 3.271 -7.723 3.271 9.090 3.271 12.034 0 0 0 0 0 0
Incase of skew currrent 19.518 -45.247 19.518 55.074 19.518 72.640 7.104 -16.468 7.104 20.045 7.104 26.439

Force at moment at Force at moment at Force at moment at Force at moment at Force at pier moment at Force at moment at
Due to water preasure reinf. Curt. reinf. Curt. pier bottom pier foun. foundation reinf. Curt. reinf. Curt. bottom Hz pier bottom foun. foundation
on pier Point Hx Point MT Hx bottom MT Bottom Hx bottom MT Point Hz Point ML ML Bottom Hz bottom ML
Incase of Nor. currrent -0.186 0.022 2.160 6.798 2.160 8.742 0 0 0 0 0 0
Incase of skew currrent -1.577 0.185 16.065 50.55 16.065 65.009 -0.574 0.067 5.847 18.399 5.847 23.661
Incase of Normal current Incase of Skew current
Ver. Load
or Buoy. Ver. Load or
force Hzl. - X Hzl. - Z ML MT Buoy. force Hzl. - X Hzl. - Z ML MT
At top of foundation = -67.657 5.431 0.000 0.000 15.887 -67.657 35.583 12.951 38.444 105.625
At bottom of Foundation = -67.657 5.431 0.000 0.000 20.776 -67.657 35.583 12.951 50.100 137.649
At curtailment Depth = -26.537 3.084 0.000 0.000 -7.701 -26.537 17.940 -16.401 -16.401 -45.062

280 280
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
SEISMIC FORCE CALCULATION :
Seismic Zone = 3 Zone Z
2 II 0.10
Zone factor Z = 0.16 Importance factor I = 1.2 3 III 0.16
Response reduction factor R = 3 4 IV 0.24
Type of Soil = Medium Soil 5 V 0.36
Grade of
Time Period T = 2 D Concrete Ec in Gpa
1000 F 15 27
D = Approximate DL of super structure + LL * in kN 20 29
= 1919.1 kn *(20% of maximum LL is considered) 25 30
Horizontal force required to be applied at center of mass of 30 31
F = super-structure for 1 mm deflection at the top of pier / 35 32
abutment along the considered direction of horizontal force. 40 33
L = 5991.000 mm 45 34
F = 3EI for 1 mm deflection at x 50 35
3
L 55 36
2
E = 31000 N/mm 60 37
IL = 6.66667E+11 mm4
IT = 4.26667E+13 mm4
FL = 288332.588 N TL = 0.163165661
= 288.332588 Kn Sa/g ( L) = 2.5
FT = 18453285.7 N TT = 0.020395708
= 18453.2857 kn Sa/g ( T) = 2.5
Rocky or hard strata , with N>30 Sa/g= 2.500 0.0<= T <=0.40 Medium Soil 1,N<=30 Sa/g= 2.500 0.0<= T <=0.55
6 0.40<= T <=4.0 8.335 0.550<= T <=4.0
Soft Soil N < 10 Sa/g= 2.500 0.0<= T <=0.670
81.880 0.670<= T <=4.0
AhL = 0.0800
Horizontal seismic coefficient Ah = Z I Sa AhT = 0.0800
2Rg Av = 0.0533
Vertical seismic coefficient Av = 2 Ah / 3

281 281
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
Earth Quake Forces (Cl. of IS: 1893-1984)
Due to loads from Superstructure Fh = a h Wm
a) seismic In transverse Direction Wm = 20% of Total Live Loads on span + all Dead loads
= 782.58 t for maximum vertical load LL- case 1 at CG of superstructure Hence, Fh = 62.61 t for LL- case 1 at CG of superstructure
= 782.58 t for maximum Longitudinal moment LL- case 2 at CG of superstructure = 62.61 t for LL- case 2 at CG of superstructure
= 782.58 t for maximum Transverse moment LL- case 3 at CG of superstructure = 62.61 t for LL- case 3 at CG of superstructure
Forces from superstructure due to transverse seismic force
Force at foundation bottom Force at foundation top Force at cultailment
Vertical Hzl. - Z MT Vertical Hzl. - Z MT Vertical Hzl. - Z MT
LL-case 1 0.000 62.607 429.545 0.000 62.607 485.891 0.000 62.607 164.092
both Spans
LL-case 2 0.000 62.607 429.545 0.000 62.607 485.891 0.000 62.607 164.092
in place
LL-case 3 0.000 62.607 429.545 0.000 62.607 485.891 0.000 62.607 164.092
One span Dislodged 0.000 43.905 301.234 0.000 43.905 340.748 0.000 43.905 115.076

b) seismic In longitudinal Direction Wm =(No Live Loads, Only Dead Loads) = 738.35 t ah = 0.08 t Hence, Fh = 59.07 t
Force at foundation bottom Force at foundation top Force at cultailment
Vertical Hzl. - X ML Vertical Hzl. - X ML Vertical Hzl. - X ML
LL-case 1 0.000 59.068 405.263 0.000 59.068 458.424 0.000 59.068 154.816
both Spans
LL-case 2 0.000 59.068 405.263 0.000 59.068 458.424 0.000 59.068 154.816
in place
LL-case 3 0.000 59.068 405.263 0.000 59.068 458.424 0.000 59.068 154.816
One span Dislodged 0.000 43.905 301.234 0.000 43.905 340.748 0.000 43.905 115.076

c) seismic In vertical Direction


Force at foundation bottom Force at foundation top Force at cultailment
Vertical Hzl. - Z MT Vertical Hzl. - Z MT Vertical Hzl. - Z MT
LL-case 1 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
both Spans
LL-case 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
in place
LL-case 3 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
One span Dislodged 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

282 282
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
Due to loads from Substructure
Self weight of pier cap and pedestals = 63.730 t
Self weight of pier upto scour level = 2.5 x 8 x 1 x 5.39 depth of pier up to scour level = 5.39 m
= 107.820 t
Self weight of pier upto curtailment level = 2.5 x 8 x 1 x 0.25 depth of pier up to curtailment depth = 0.25 m
5.020 t
a) seismic In transverse Direction
Forces from superstructure due to transverse seismic force
Force at foundation bottom Force at foundation top Force at cultailment
Vertical Hzl. - Z MT Vertical Hzl. - Z MT Vertical Hzl. - Z MT
LL-case 1 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833
both Spans
LL-case 2 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833
in place
LL-case 3 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833
One span Dislodged 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833

b) seismic In longitudinal Direction


Force at foundation bottom Force at foundation top Force at cultailment
Vertical Hzl. - X ML Vertical Hzl. - X ML Vertical Hzl. - X ML
LL-case 1 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833
both Spans
LL-case 2 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833
in place
LL-case 3 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833
One span Dislodged 0.000 13.724 61.558 0.000 13.724 49.206 0.000 5.500 0.833

c) seismic In vertical Direction


Force at foundation bottom Force at foundation top Force at cultailment
Vertical Hzl. - Z MT Vertical Hzl. - Z MT Vertical Hzl. - Z MT
LL-case 1 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
both Spans
LL-case 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
in place
LL-case 3 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
One span Dislodged 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

283 283
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
Summary of forces at foundation bottom
Total Loads at Base both spans in plce Total Loads at Base one span dislogged case
Description Ver.load In tHzl. - X in t Hzl. - Z in t ML in t-m MT in t-m Ver.load In t Hzl. - X in t Hzl. - Z in t ML in t-m MT in t-m
1 Due to Girder+slab+pier+pier cap 640.348 0.000 0.000 0.000 0.000 503.794 0.000 0.000 -71.008 0.000
2 Due to Wearing coat 52.350 0.000 0.000 0.000 0.000 26.175 0.000 0.000 -13.611 0.000
3 Due to SIDL 45.648 0.000 0.000 0.000 0.000 18.846 0.000 0.000 -9.800 -34.869
4 Governing max axial LL case 221.190 0.000 0.000 113.948 807.300 0.000 0.000 0.000 0.000 0.000
5 Governing max LL ML case 221.190 0.000 0.000 113.948 807.300 0.000 0.000 0.000 0.000 0.000
6 Governing max LL MT case 221.190 0.000 0.000 113.948 807.300 0.000 0.000 0.000 0.000 0.000
For Wind Speed 39m/s ( Due to Transverse wind
7 force 0.000 9.348 0.000 0.000 74.872 0.000 4.953 0.000 0.000 38.921
For Wind Speed 39m/s ( Due to Longitudianl
8 wind force 0.000 0.000 2.337 18.718 0.000 0.000 0.000 1.238 9.730 0.000
For Wind Speed 36m/s ( Due to Transverse wind
9 force 0.000 7.966 0.000 0.000 63.802 0.000 0.000 0.000 0.000 0.000
For Wind Speed 36m/s ( Due to Longitudianl
10 wind force 0.000 0.000 1.992 15.951 0.000 0.000 0.000 0.000 0.000 0.000
BREAKING AND TEMPARATURE for Governing
11 max live load axial forcecase 4.727 0.000 27.061 260.865 0.000 0.332 0.000 1.902 18.336 0.000
BREAKING AND TEMPARATURE for Governing
12 max live load ML case 4.727 0.000 27.061 260.865 0.000 0.000 0.000 0.000 0.000 0.000
BREAKING AND TEMPARATURE for Governing
13 max live load MT case 4.727 0.000 27.061 260.865 0.000 0.000 0.000 0.000 0.000 0.000
14 In case of normal water current -67.657 5.431 0.000 0.000 20.776 -67.657 5.431 0.000 0.000 20.776
15 In case of Skew water current -67.657 35.583 12.951 50.100 137.649 -67.657 35.583 12.951 50.100 137.649
16 Seismic longitudional 0.000 72.792 0 466.821 0.000 0.000 57.629 0.000 362.791 0.000
Seismic transverse in maximum axial LL
17 condition 0.000 0.000 76.331 0.000 491.103 0.000 0.000 57.629 0.000 362.791

18 Seismic vertical in maximum axial LL condition 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

19 Seismic transverse in maximum ML LL condition 0.000 0.000 76.331 0.000 491.103 0.000 0.000 0.000 0.000 0.000

20 Seismic vertical in maximum ML LL condition 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

21 Seismic transverse in maximum MT LL condition 0.000 0.000 76.331 0.000 491.103 0.000 0.000 0.000 0.000 0.000

22 Seismic vertical in maximum MT LL condition 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

284 284
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
Calculations
Summary of forces at foundation top
Total Loads at Base both spans in plce Total Loads at Base one span dislogged case
Description Ver.load In tHzl. - X in t Hzl. - Z in t ML in t-m MT in t-m Ver.load In t Hzl. - X in t Hzl. - Z in t ML in t-m MT in t-m
1a Due to Girder+slab+pier+pier cap 640.348 0.000 0.000 0.000 0.000 503.794 0.000 0.000 -71.008 0.000
2a Due to Wearing coat 52.350 0.000 0.000 0.000 0.000 26.175 0.000 0.000 -13.611 0.000
3a Due to SIDL 45.648 0.000 0.000 0.000 0.000 18.846 0.000 0.000 -9.800 -34.869
4a Governing max load case 221.190 0.000 0.000 113.948 807.300 0.000 0.000 0.000 0.000 0.000
5a Governing max ML case 221.190 0.000 0.000 113.948 807.300 0.000 0.000 0.000 0.000 0.000
6a Governing max MT case 221.190 0.000 0.000 113.948 807.300 0.000 0.000 0.000 0.000 0.000
For Wind Speed 39m/s ( Due to Transverse wind
7a force 0.000 9.348 0.000 0.000 66.459 0.000 4.953 0.000 0.000 34.464
For Wind Speed 39m/s ( Due to Longitudianl
8a wind force 0.000 0.000 2.337 16.615 0.000 0.000 0.000 1.238 8.616 0.000
For Wind Speed 36m/s ( Due to Transverse wind
9a force 0.000 7.966 0.000 0.000 56.633 0.000 4.953 0.000 0.000 34.464
For Wind Speed 36m/s ( Due to Longitudianl
10a wind force 0.000 0.000 1.992 14.158 0.000 0.000 0.000 1.238 8.616 0.000
BREAKING AND TEMPARATURE for Governing
11a max live load axial forcecase 4.727 0.000 27.061 236.511 0.000 0.332 0.000 1.902 16.624 0.000
BREAKING AND TEMPARATURE for Governing
12a max live load ML case 4.727 0.000 27.061 236.511 0.000 0.332 0.000 1.902 16.624 0.000
BREAKING AND TEMPARATURE for Governing
13a max live load MT case 4.727 0.000 27.061 236.511 0.000 0.332 0.000 1.902 16.624 0.000
14a In case of normal water current -67.657 5.431 0.000 0.000 15.887 -67.657 5.431 0.000 0.000 15.887
15a In case of Skew water current -67.657 35.583 12.951 38.444 105.625 -67.657 35.583 12.951 38.444 105.625
16a Seismic longitudional 0.000 72.792 0.000 507.631 0.000 0.000 57.629 0.000 389.955 0.000
Seismic transverse in maximum axial LL
17a condition 0.000 0.000 76.331 0.000 535.097 0.000 0.000 0.000 0.000 0.000

18a Seismic vertical in maximum axial LL condition 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

19a Seismic transverse in maximum ML LL condition 0.000 0.000 76.331 0.000 535.097 0.000 0.000 0.000 0.000 0.000

20a Seismic vertical in maximum ML LL condition 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

21a Seismic transverse in maximum MT LL condition 0.000 0.000 76.331 0.000 535.097 0.000 0.000 0.000 0.000 0.000

22a Seismic vertical in maximum MT LL condition 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

285 285
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.3 0 0 7.966 2.3898 0 0 0 0 63.80235 19.1407
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 1 0 0 0 0 1.9915 1.9915 15.95059 15.95059 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 876 t Hor X in t 18.49575 Hor Z in t 32.93749 ML 406 t-m MT 889 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.02 t/m2 18.56 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1 t/m2 7.55 t/m2 = Base Preasure at point B

286 286
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 1 0 0 7.966 7.966 0 0 0 0 63.80235 63.80235
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.3 0 0 0 0 1.9915 0.59745 15.95059 4.785176 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 876 t Hor X in t 24.07195 Hor Z in t 31.54344 ML 395 t-m MT 933 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.38 t/m2 18.75 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.81 t/m2 7.18 t/m2 = Base Preasure at point B

287 287
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.3 0 0 7.966 2.3898 0 0 0 0 63.80235 19.1407
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 1 0 0 0 0 1.9915 1.9915 15.95059 15.95059 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 876 t Hor X in t 39.60166 Hor Z in t 42.00317 ML 441 t-m MT 970 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.24 t/m2 19.35 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.21 t/m2 7.32 t/m2 = Base Preasure at point B

288 288
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 1 0 0 7.966 7.966 0 0 0 0 63.80235 63.80235
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.3 0 0 0 0 1.9915 0.59745 15.95059 4.785176 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 876 t Hor X in t 45.17786 Hor Z in t 40.60912 ML 430 t-m MT 1015 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.61 t/m2 19.54 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.03 t/m2 6.96 t/m2 = Base Preasure at point B

289 289
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.3 0 0 7.966 2.3898 0 0 0 0 63.80235 19.1407
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 1 0 0 0 0 1.9915 1.9915 15.95059 15.95059 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 876 t Hor X in t 18.49575 Hor Z in t 32.93749 ML 406 t-m MT 889 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.02 t/m2 18.56 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1 t/m2 7.55 t/m2 = Base Preasure at point B

290 290
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 1 0 0 7.966 7.966 0 0 0 0 63.80235 63.80235
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.3 0 0 0 0 1.9915 0.59745 15.95059 4.785176 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 876 t Hor X in t 24.07195 Hor Z in t 31.54344 ML 395 t-m MT 933 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.38 t/m2 18.75 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.81 t/m2 7.18 t/m2 = Base Preasure at point B

291 291
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.3 0 0 7.966 2.3898 0 0 0 0 63.80235 19.1407
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 1 0 0 0 0 1.9915 1.9915 15.95059 15.95059 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 876 t Hor X in t 39.60166 Hor Z in t 42.00317 ML 441 t-m MT 970 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.24 t/m2 19.35 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.21 t/m2 7.32 t/m2 = Base Preasure at point B

292 292
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 1 0 0 7.966 7.966 0 0 0 0 63.80235 63.80235
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.3 0 0 0 0 1.9915 0.59745 15.95059 4.785176 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 876 t Hor X in t 45.17786 Hor Z in t 40.60912 ML 430 t-m MT 1015 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.61 t/m2 19.54 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.03 t/m2 6.96 t/m2 = Base Preasure at point B

293 293
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.3 0 0 7.966 2.3898 0 0 0 0 63.80235 19.1407
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 1 0 0 0 0 1.9915 1.9915 15.95059 15.95059 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 876 t Hor X in t 18.49575 Hor Z in t 32.93749 ML 406 t-m MT 889 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.02 t/m2 18.56 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1 t/m2 7.55 t/m2 = Base Preasure at point B

294 294
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 1 0 0 7.966 7.966 0 0 0 0 63.80235 63.80235
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.3 0 0 0 0 1.9915 0.59745 15.95059 4.785176 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 876 t Hor X in t 24.07195 Hor Z in t 31.54344 ML 395 t-m MT 933 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.38 t/m2 18.75 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.81 t/m2 7.18 t/m2 = Base Preasure at point B

295 295
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.3 0 0 7.966 2.3898 0 0 0 0 63.80235 19.1407
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 1 0 0 0 0 1.9915 1.9915 15.95059 15.95059 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 876 t Hor X in t 39.60166 Hor Z in t 42.00317 ML 441 t-m MT 970 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.24 t/m2 19.35 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.21 t/m2 7.32 t/m2 = Base Preasure at point B

296 296
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC non seismic combinations

Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 1 0 0 7.966 7.966 0 0 0 0 63.80235 63.80235
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.3 0 0 0 0 1.9915 0.59745 15.95059 4.785176 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 876 t Hor X in t 45.17786 Hor Z in t 40.60912 ML 430 t-m MT 1015 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.61 t/m2 19.54 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.03 t/m2 6.96 t/m2 = Base Preasure at point B

297 297
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC Seismic combinations

Seismic longitudinal , Live load as accompanying: maximum axial LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16 Seismic longitudional 1 0 0 72.79168 72.79168 0 0 466.8212 466.8212 0 0
17 Seismic transverse in maximum axial LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
18 Seismic vertical in maximum axial LL condition 0.3 0 0 0 0 0 0 0 0 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase0 4.726602 0 0 0 27.0607 0 260.8651 0 0 0

D A vertical load 738 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 467 t-m MT 147 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 5.39 t/m2 12.92 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 3.56 t/m2 11.09 t/m2 = Base Preasure at point B

298 298
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC Seismic combinations

Seismic Tranverse , Live load as accompanying: maximum axial LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16 Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 466.8212 140.0464 0 0
17 Seismic transverse in maximum axial LL condition 1 0 0 0 0 76.33072 76.33072 0 0 491.1026 491.1026
18 Seismic vertical in maximum axial LL condition 0.3 0 0 0 0 0 0 0 0 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase
0.2 4.726602 0.94532 0 0 27.0607 5.41214 260.8651 52.17303 0 0

D A vertical load 784 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 215 t-m MT 653 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 11.06 t/m2 14.52 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 2.97 t/m2 6.44 t/m2 = Base Preasure at point B

299 299
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC Seismic combinations

Seismic longitudinal , Live load as accompanying: maximum ML due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16 Seismic longitudional 1 0 0 72.79168 72.79168 0 0 466.8212 466.8212 0 0
19 Seismic transverse in maximum ML LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
20 Seismic vertical in maximum ML LL condition 0.3 0 0 0 0 0 0 0 0 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 0 4.726602 0 0 0 27.0607 0 260.8651 0 0 0

D A vertical load 738 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 467 t-m MT 147 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 5.39 t/m2 12.92 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 3.56 t/m2 11.09 t/m2 = Base Preasure at point B

300 300
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC Seismic combinations

Seismic transverse , Live load as accompanying: maximum ML due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16 Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 466.8212 140.0464 0 0
19 Seismic transverse in maximum ML LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
20 Seismic vertical in maximum ML LL condition 0.3 0 0 0 0 0 0 0 0 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 0.2 4.726602 0.94532 0 0 27.0607 5.41214 260.8651 52.17303 0 0

D A vertical load 784 t Hor X in t 21.8375 Hor Z in t 28.31136 ML 215 t-m MT 309 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 8.93 t/m2 12.39 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 5.1 t/m2 8.57 t/m2 = Base Preasure at point B

301 301
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC Seismic combinations

Seismic longitudinal , Live load as accompanying: maximum MT due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16 Seismic longitudional 1 0 0 72.79168 72.79168 0 0 466.8212 466.8212 0 0
21 Seismic transverse in maximum MT LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
22 Seismic vertical in maximum MT LL condition 0.3 0 0 0 0 0 0 0 0 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 0 4.726602 0 0 0 27.0607 0 260.8651 0 0 0

D A vertical load 738 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 467 t-m MT 147 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 5.39 t/m2 12.92 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 3.56 t/m2 11.09 t/m2 = Base Preasure at point B

302 302
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of SBC Seismic combinations

Seismic Tranverse , Live load as accompanying: maximum MT due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1 52.35 52.35 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16 Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 466.8212 140.0464 0 0
21 Seismic transverse in maximum MT LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
22 Seismic vertical in maximum MT LL condition 0.3 0 0 0 0 0 0 0 0 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 0.2 4.726602 0.94532 0 0 27.0607 5.41214 260.8651 52.17303 0 0

D A vertical load 784 t Hor X in t 21.8375 Hor Z in t 28.31136 ML 215 t-m MT 309 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 8.93 t/m2 12.39 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 5.1 t/m2 8.57 t/m2 = Base Preasure at point B

303 303
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of SBC


Prasure at M M
Vertical H
H long longitudin transver
load transverse
al se
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 876.308 18.49575 32.93749 405.7934 888.511
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 876.308 24.07195 31.54344 394.628 933.1726
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 876.308 39.60166 42.00317 440.8635 970.3225
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 876.308 45.17786 40.60912 429.6981 1014.984
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 876.308 18.49575 32.93749 405.7934 888.511
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 876.308 24.07195 31.54344 394.628 933.1726
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 876.308 39.60166 42.00317 440.8635 970.3225
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 876.308 45.17786 40.60912 429.6981 1014.984
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 876.308 18.49575 32.93749 405.7934 888.511
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 876.308 24.07195 31.54344 394.628 933.1726
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 876.308 39.60166 42.00317 440.8635 970.3225
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 876.308 45.17786 40.60912 429.6981 1014.984
Seismic longitudinal , Live load as accompanying: maximum axial LL 738.346 72.79168 22.89922 466.8212 147.3308
Seismic Tranverse , Live load as accompanying: maximum axial LL 783.5293 21.8375 81.74286 215.0089 652.5626
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 738.346 72.79168 22.89922 466.8212 147.3308
Seismic transverse , Live load as accompanying: maximum ML due to LL 783.5293 21.8375 28.31136 215.0089 308.7908
Seismic longitudinal , Live load as accompanying: maximum MT due to LL 738.346 72.79168 22.89922 466.8212 147.3308
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 783.5293 21.8375 28.31136 215.0089 308.7908

304 304
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of SBC

Prasure at t/ sqm A B C D
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 18.56 7.55 1 12.02
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 18.75 7.18 0.81 12.38
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 19.35 7.32 0.21 12.24
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 19.54 6.96 0.03 12.61
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.56 7.55 1 12.02
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 18.75 7.18 0.81 12.38
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.35 7.32 0.21 12.24
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 19.54 6.96 0.03 12.61
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.56 7.55 1 12.02
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 18.75 7.18 0.81 12.38
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.35 7.32 0.21 12.24
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 19.54 6.96 0.03 12.61
Seismic longitudinal , Live load as accompanying: maximum axial LL C A 12.92 11.09 3.56 5.39
Seismic Tranverse , Live load as accompanying: maximum axial LL 14.52 6.44 2.97 11.06
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 12.92 11.09 3.56 5.39
Seismic transverse , Live load as accompanying: maximum ML due to LL 12.39 8.57 5.1 8.93
Seismic longitudinal , Live load as accompanying: maximum MT due to LL D B 12.92 11.09 3.56 5.39
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 12.39 8.57 5.1 8.93

305 305
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 63.80235 17.22663
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 15.95059 14.35553 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 1269 t Hor X in t 18.25677 Hor Z in t 46.26869 ML 592 t-m MT 1290 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.38 t/m2 26.92 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.39 t/m2 10.93 t/m2 = Base Preasure at point B

306 306
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 63.80235 57.42211
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 15.95059 4.306658 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 1269 t Hor X in t 23.27535 Hor Z in t 45.01405 ML 582 t-m MT 1330 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.71 t/m2 27.09 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.22 t/m2 10.6 t/m2 = Base Preasure at point B

307 307
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 63.80235 17.22663
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 15.95059 14.35553 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 1269 t Hor X in t 39.36268 Hor Z in t 55.33437 ML 627 t-m MT 1372 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.61 t/m2 27.71 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.6 t/m2 10.71 t/m2 = Base Preasure at point B

308 308
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 63.80235 57.42211
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 15.95059 4.306658 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 1269 t Hor X in t 44.38126 Hor Z in t 54.07973 ML 617 t-m MT 1412 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.94 t/m2 27.88 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.43 t/m2 10.38 t/m2 = Base Preasure at point B

309 309
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 63.80235 17.22663
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 15.95059 14.35553 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 1269 t Hor X in t 18.25677 Hor Z in t 46.26869 ML 592 t-m MT 1290 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.38 t/m2 26.92 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.39 t/m2 10.93 t/m2 = Base Preasure at point B

310 310
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 63.80235 57.42211
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 15.95059 4.306658 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 1269 t Hor X in t 23.27535 Hor Z in t 45.01405 ML 582 t-m MT 1330 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.71 t/m2 27.09 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.22 t/m2 10.6 t/m2 = Base Preasure at point B

311 311
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 63.80235 17.22663
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 15.95059 14.35553 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 1269 t Hor X in t 39.36268 Hor Z in t 55.33437 ML 627 t-m MT 1372 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.61 t/m2 27.71 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.6 t/m2 10.71 t/m2 = Base Preasure at point B

312 312
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 63.80235 57.42211
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 15.95059 4.306658 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 1269 t Hor X in t 44.38126 Hor Z in t 54.07973 ML 617 t-m MT 1412 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.94 t/m2 27.88 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.43 t/m2 10.38 t/m2 = Base Preasure at point B

313 313
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 63.80235 17.22663
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 15.95059 14.35553 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 1269 t Hor X in t 18.25677 Hor Z in t 46.26869 ML 592 t-m MT 1290 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.38 t/m2 26.92 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.39 t/m2 10.93 t/m2 = Base Preasure at point B

314 314
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 63.80235 57.42211
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 15.95059 4.306658 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 1269 t Hor X in t 23.27535 Hor Z in t 45.01405 ML 582 t-m MT 1330 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.71 t/m2 27.09 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.22 t/m2 10.6 t/m2 = Base Preasure at point B

315 315
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 63.80235 17.22663
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 15.95059 14.35553 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 1269 t Hor X in t 39.36268 Hor Z in t 55.33437 ML 627 t-m MT 1372 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.61 t/m2 27.71 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.6 t/m2 10.71 t/m2 = Base Preasure at point B

316 316
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 63.80235 57.42211
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 15.95059 4.306658 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 260.8651 391.2977 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 1269 t Hor X in t 44.38126 Hor Z in t 54.07973 ML 617 t-m MT 1412 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 17.94 t/m2 27.88 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.43 t/m2 10.38 t/m2 = Base Preasure at point B

317 317
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 Seismic case

Seismic longitudinal , Live load as accompanying: maximum axial LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4 Governing max axial LL case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16 Seismic longitudional 1 0 0 72.79168 72.79168 0 0 466.8212 466.8212 0 0
17 Seismic transverse in maximum axial LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
18 Seismic vertical in maximum axial LL condition 0.3 0 0 0 0 0 0 0 0 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase0 4.726602 0 0 0 27.0607 0 260.8651 0 0 0

D A vertical load 1018 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 467 t-m MT 147 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 8.51 t/m2 16.04 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 6.68 t/m2 14.21 t/m2 = Base Preasure at point B

318 318
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 Seismic case

Seismic Tranverse , Live load as accompanying: maximum axial LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4 Governing max axial LL case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16 Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 466.8212 140.0464 0 0
17 Seismic transverse in maximum axial LL condition 1 0 0 0 0 76.33072 76.33072 0 0 491.1026 491.1026
18 Seismic vertical in maximum axial LL condition 0.3 0 0 0 0 0 0 0 0 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase
0.2 4.726602 0.94532 0 0 27.0607 5.41214 260.8651 52.17303 0 0

D A vertical load 1063 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 215 t-m MT 653 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 14.17 t/m2 17.64 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 6.08 t/m2 9.55 t/m2 = Base Preasure at point B

319 319
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 Seismic case

Seismic longitudinal , Live load as accompanying: maximum ML due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5 Governing max LL ML case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16 Seismic longitudional 1 0 0 72.79168 72.79168 0 0 466.8212 466.8212 0 0
19 Seismic transverse in maximum ML LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
20 Seismic vertical in maximum ML LL condition 0.3 0 0 0 0 0 0 0 0 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 0 4.726602 0 0 0 27.0607 0 260.8651 0 0 0

D A vertical load 1018 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 467 t-m MT 147 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 8.51 t/m2 16.04 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 6.68 t/m2 14.21 t/m2 = Base Preasure at point B

320 320
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 Seismic case

Seismic transverse , Live load as accompanying: maximum ML due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5 Governing max LL ML case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16 Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 466.8212 140.0464 0 0
19 Seismic transverse in maximum ML LL condition 1 0 0 0 0 76.33072 76.33072 0 0 491.1026 491.1026
20 Seismic vertical in maximum ML LL condition 0.3 0 0 0 0 0 0 0 0 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 0.2 4.726602 0.94532 0 0 27.0607 5.41214 260.8651 52.17303 0 0

D A vertical load 1063 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 215 t-m MT 653 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 14.17 t/m2 17.64 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 6.08 t/m2 9.55 t/m2 = Base Preasure at point B

321 321
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 Seismic case

Seismic longitudinal , Live load as accompanying: maximum MT due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6 Governing max LL MT case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16 Seismic longitudional 1 0 0 72.79168 72.79168 0 0 466.8212 466.8212 0 0
21 Seismic transverse in maximum MT LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 491.1026 147.3308
22 Seismic vertical in maximum MT LL condition 0.3 0 0 0 0 0 0 0 0 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 0 4.726602 0 0 0 27.0607 0 260.8651 0 0 0

D A vertical load 1018 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 467 t-m MT 147 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 8.51 t/m2 16.04 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 6.68 t/m2 14.21 t/m2 = Base Preasure at point B

322 322
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.4 Seismic case

Seismic Tranverse , Live load as accompanying: maximum MT due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3 Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6 Governing max LL MT case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16 Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 466.8212 140.0464 0 0
21 Seismic transverse in maximum MT LL condition 1 0 0 0 0 76.33072 76.33072 0 0 491.1026 491.1026
22 Seismic vertical in maximum MT LL condition 0.3 0 0 0 0 0 0 0 0 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 0.2 4.726602 0.94532 0 0 27.0607 5.41214 260.8651 52.17303 0 0

D A vertical load 1063 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 215 t-m MT 653 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 14.17 t/m2 17.64 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 6.08 t/m2 9.55 t/m2 = Base Preasure at point B

323 323
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of ULS Forces for foundation design


Prasure at M M
Vertical H
H long longitudin transver
load transverse
al se
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 1268.627 18.25677 46.26869 591.6047 1290.247
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 1268.627 23.27535 45.01405 581.5558 1330.442
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 1268.627 39.36268 55.33437 626.6748 1372.058
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 1268.627 44.38126 54.07973 616.626 1412.254
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 1268.627 18.25677 46.26869 591.6047 1290.247
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 1268.627 23.27535 45.01405 581.5558 1330.442
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 1268.627 39.36268 55.33437 626.6748 1372.058
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 1268.627 44.38126 54.07973 616.626 1412.254
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 1268.627 18.25677 46.26869 591.6047 1290.247
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 1268.627 23.27535 45.01405 581.5558 1330.442
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 1268.627 39.36268 55.33437 626.6748 1372.058
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 1268.627 44.38126 54.07973 616.626 1412.254
Seismic longitudinal , Live load as accompanying: maximum axial LL 1017.707 72.79168 22.89922 466.8212 147.3308
Seismic Tranverse , Live load as accompanying: maximum axial LL 1062.89 21.8375 81.74286 215.0089 652.5626
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 1017.707 72.79168 22.89922 466.8212 147.3308
Seismic transverse , Live load as accompanying: maximum ML due to LL 1062.89 21.8375 81.74286 215.0089 652.5626
Seismic longitudinal , Live load as accompanying: maximum MT due to LL 1017.707 72.79168 22.89922 466.8212 147.3308
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 1062.89 21.8375 81.74286 215.0089 652.5626

324 324
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of ULS Forces for foundation design

Prasure at t/ sqm A B C D
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 26.92 10.93 1.39 17.38
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 27.09 10.6 1.22 17.71
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 27.71 10.71 0.6 17.61
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 27.88 10.38 0.43 17.94
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 26.92 10.93 1.39 17.38
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 27.09 10.6 1.22 17.71
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 27.71 10.71 0.6 17.61
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 27.88 10.38 0.43 17.94
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 26.92 10.93 1.39 17.38
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 27.09 10.6 1.22 17.71
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 27.71 10.71 0.6 17.61
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 27.88 10.38 0.43 17.94
Seismic longitudinal , Live load as accompanying: maximum axial LL D A 16.04 14.21 6.68 8.51
Seismic Tranverse , Live load as accompanying: maximum axial LL 17.64 9.55 6.08 14.17
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 16.04 14.21 6.68 8.51
Seismic transverse , Live load as accompanying: maximum ML due to LL 17.64 9.55 6.08 14.17
Seismic longitudinal , Live load as accompanying: maximum MT due to LL C B 16.04 14.21 6.68 8.51
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 17.64 9.55 6.08 14.17

325 325
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016

1000 mm

Clear Cover = 75 mm
2841 mm 809 809 2841 mm dia of bar Considered = 32 mm

900 mm 900 mm
300 mm 300 mm
3650 mm 3650 mm

D E F G H A

Base Preasure in longitudinal direction D A

C I J K L B 10.80 m

Base Preasure in longitudinal direction

C B
8000.00
8.30 m
591.0 809.0

300 mm 900 mm 900 mm 300 mm

1400 1400

B M N O P A

Base Preasure in Transverse direction

C Q R S T D

Base Preasure in Transverse direction

Calculation of Bending Moment in longitudinal Direction


326 326
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Max. BM
Load case A D E F G H at face of
support Max. SF
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 26.92 17.38 20.65 21.58 22.72 23.65 170.01 71.84
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 27.09 17.71 20.92 21.83 22.97 23.88 171.29 72.40
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 27.71 17.61 21.07 22.05 23.27 24.25 174.72 73.81
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 27.88 17.94 21.34 22.31 23.51 24.48 176.01 74.37
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 26.92 17.38 20.65 21.58 22.72 23.65 170.01 71.84
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 27.09 17.71 20.92 21.83 22.97 23.88 171.29 72.40
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 27.71 17.61 21.07 22.05 23.27 24.25 174.72 73.81
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 27.88 17.94 21.34 22.31 23.51 24.48 176.01 74.37
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 26.92 17.38 20.65 21.58 22.72 23.65 170.01 71.84
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 27.09 17.71 20.92 21.83 22.97 23.88 171.29 72.40
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 27.71 17.61 21.07 22.05 23.27 24.25 174.72 73.81
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 27.88 17.94 21.34 22.31 23.51 24.48 176.01 74.37
Seismic longitudinal , Live load as accompanying: maximum axial LL 16.04 8.51 11.09 11.82 12.73 13.46 99.49 41.91
Seismic Tranverse , Live load as accompanying: maximum axial LL 17.64 14.17 15.36 15.70 16.11 16.45 114.12 48.43
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 16.04 8.51 11.09 11.82 12.73 13.46 99.49 41.91
Seismic transverse , Live load as accompanying: maximum ML due to LL 17.64 14.17 15.36 15.70 16.11 16.45 114.12 48.43
Seismic longitudinal , Live load as accompanying: maximum MT due to LL 16.04 8.51 11.09 11.82 12.73 13.46 99.49 41.91
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 17.64 14.17 15.36 15.70 16.11 16.45 114.12 48.43

Max. BM
Load case B C I J K L at face of
support Max. SF
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 10.93 1.39 4.66 5.59 6.73 7.66 63.49 26.41
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 10.6 1.22 4.43 5.34 6.48 7.39 61.45 25.55
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 10.71 0.6 4.06 5.05 6.26 7.25 61.47 25.51
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 10.38 0.43 3.84 4.81 6.00 6.97 59.43 24.65
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 10.93 1.39 4.66 5.59 6.73 7.66 63.49 26.41
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 10.6 1.22 4.43 5.34 6.48 7.39 61.45 25.55
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 10.71 0.6 4.06 5.05 6.26 7.25 61.47 25.51
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 10.38 0.43 3.84 4.81 6.00 6.97 59.43 24.65
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 10.93 1.39 4.66 5.59 6.73 7.66 63.49 26.41
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 10.6 1.22 4.43 5.34 6.48 7.39 61.45 25.55
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 10.71 0.6 4.06 5.05 6.26 7.25 61.47 25.51
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 10.38 0.43 3.84 4.81 6.00 6.97 59.43 24.65
Seismic longitudinal , Live load as accompanying: maximum axial LL 14.21 6.68 9.26 9.99 10.90 11.63 87.30 36.71
Seismic Tranverse , Live load as accompanying: maximum axial LL 9.55 6.08 7.27 7.61 8.02 8.36 60.23 25.44
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 14.21 6.68 9.26 9.99 10.90 11.63 87.30 36.71
Seismic transverse , Live load as accompanying: maximum ML due to LL 9.55 6.08 7.27 7.61 8.02 8.36 60.23 25.44
Seismic longitudinal , Live load as accompanying: maximum MT due to LL 14.21 6.68 9.26 9.99 10.90 11.63 87.30 36.71
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 9.55 6.08 7.27 7.61 8.02 8.36 60.23 25.44
Governing BM = 176.01 t-m
Governing SF = 74.37 T
Calculation of Bending Moment in Transverse Direction

327 327
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Max. BM
Load case A B M N O P at face of
support Max. SF
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 26.92 10.93 11.81 13.00 24.85 26.04 25.70 15.65
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 27.09 10.6 11.50 12.74 24.95 26.19 25.85 15.74
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 27.71 10.71 11.64 12.91 25.51 26.78 26.44 16.10
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 27.88 10.38 11.34 12.65 25.61 26.92 26.58 16.19
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 26.92 10.93 11.81 13.00 24.85 26.04 25.70 15.65
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 27.09 10.6 11.50 12.74 24.95 26.19 25.85 15.74
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 27.71 10.71 11.64 12.91 25.51 26.78 26.44 16.10
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 27.88 10.38 11.34 12.65 25.61 26.92 26.58 16.19
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 26.92 10.93 11.81 13.00 24.85 26.04 25.70 15.65
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 27.09 10.6 11.50 12.74 24.95 26.19 25.85 15.74
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 27.71 10.71 11.64 12.91 25.51 26.78 26.44 16.10
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 27.88 10.38 11.34 12.65 25.61 26.92 26.58 16.19
Seismic longitudinal , Live load as accompanying: maximum axial LL 16.04 14.21 14.31 14.45 15.80 15.94 15.64 9.45
Seismic Tranverse , Live load as accompanying: maximum axial LL 17.64 9.55 9.99 10.60 16.59 17.20 16.94 10.29
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 16.04 14.21 14.31 14.45 15.80 15.94 15.64 9.45
Seismic transverse , Live load as accompanying: maximum ML due to LL 17.64 9.55 9.99 10.60 16.59 17.20 16.94 10.29
Seismic longitudinal , Live load as accompanying: maximum MT due to LL 16.04 14.21 14.31 14.45 15.80 15.94 15.64 9.45
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 17.64 9.55 9.99 10.60 16.59 17.20 16.94 10.29

Load case D C Q R S T Max. BM Max. SF


Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 17.38 1.39 2.27 3.46 15.31 16.50 16.36 10.01
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 17.71 1.22 2.12 3.36 15.57 16.81 16.66 10.20
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 17.61 0.6 1.53 2.81 15.41 16.68 16.54 10.13
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 17.94 0.43 1.39 2.70 15.67 16.98 16.84 10.32
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 17.38 1.39 2.27 3.46 15.31 16.50 16.36 10.01
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 17.71 1.22 2.12 3.36 15.57 16.81 16.66 10.20
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 17.61 0.6 1.53 2.81 15.41 16.68 16.54 10.13
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 17.94 0.43 1.39 2.70 15.67 16.98 16.84 10.32
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 17.38 1.39 2.27 3.46 15.31 16.50 16.36 10.01
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 17.71 1.22 2.12 3.36 15.57 16.81 16.66 10.20
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 17.61 0.6 1.53 2.81 15.41 16.68 16.54 10.13
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 17.94 0.43 1.39 2.70 15.67 16.98 16.84 10.32
Seismic longitudinal , Live load as accompanying: maximum axial LL 8.51 6.68 6.78 6.92 8.27 8.41 8.26 5.00
Seismic Tranverse , Live load as accompanying: maximum axial LL 14.17 6.08 6.52 7.13 13.12 13.73 13.54 8.24
Seismic longitudinal , Live load as accompanying: maximum ML due to LL 8.51 6.68 6.78 6.92 8.27 8.41 8.26 5.00
Seismic transverse , Live load as accompanying: maximum ML due to LL 14.17 6.08 6.52 7.13 13.12 13.73 13.54 8.24
Seismic longitudinal , Live load as accompanying: maximum MT due to LL 8.51 6.68 6.78 6.92 8.27 8.41 8.26 5.00
Seismic Tranverse , Live load as accompanying: maximum MT due to LL 14.17 6.08 6.52 7.13 13.12 13.73 13.54 8.24

Governing BM = 26.58 t-m


Governing SF = 16.19 T

Check for Ultimate moment


328 328
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Idealized Stress- strain drawing for untensioned steel Idealized Stress- strain drawing for Concrete
Ecu3 =0.0035
Stress h fcd
Fcs
Asc x lx Fc

fyk/gs NA
= fyk/1.15
= 434.783 Mpa

Ast Fts
min modified yeilding strain = 0.00217
l= 0.8 0.80 for fck <=60 Mpa
0.8-(fck-60)/500 for 60 <fck <110 Mpa
modifed yeild strain = (fyk/gs)/E of steel Strain
= 0.00217 h= 1 1 for fck <=60 Mpa
1- (fck-60)/250 for 60 <fck <110 Mpa
fcd = 13.4 Mpa

Longitudinal BM 1000 Transverse Bm 1000


329 329
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016

Top Face effective cover = 83 Top face effective cover = 115

16 @ 120 mm C/C 16 @ 150 mm C/C


900 mm 32 @ 120 mm C/C 900 mm 16 @ 150 mm C/C

Bottom face effective cover = 91 Bottom face effective cover = 115


Longitunal Reinforcement Transverse Reinforcement
Effective depth d in mm 809 mm Effective depth d in mm 785 mm
b1 in mm 1000 mm b1 in mm 1000 mm
Ast min 0.26 fctm/fyk b1 d 1052 Sq.mm Ast min 0.26 fctm/fyk b1 d 1021 Sq.mm
0.0013 b1 d 1052 Sq.mm 0.0013 b1 d 1021 Sq.mm
Ast min 1052 Sq.mm Ast min 1021 Sq.mm
Area of steel provided in bottom ok 6702 Sq.mm Area of steel provided in bottom ok 1340 Sq.mm
Max Ast 0.025 Ac ok 22500 Sq.mm Max Ast 0.025 Ac ok 22500 Sq.mm
Asc minimum= 0.01 Act.ext= 0.01x 75.00x 1000.00= 750.000 Sq.mm Asc minimum= 0.01 Act.ext= 0.01x 107.00x 1000.00= 1070.000 Sq.mm
Area of steel provided in top ok 1676 Sq.mm Area of steel provided in top ok 1340 Sq.mm
Total steel provided 8378 Sq.mm Total steel provided 2681 Sq.mm
maximum total steel =0.04 Ac ok 36000 Sq.mm maximum total steel =0.04 Ac ok 36000 Sq.mm
+ve BM -ve BM
Depth of NA x from top of foundation 129.900 mm 206.409 mm Depth of NA x from top of girder in m 85.107 mm 75.280 mm
Strain at the level of bottom layer steel 0.001048 0.01022 Strain at the level of bottom layer steel 0.02878 0.001847
Strain at the level of top layer steel 0.01851 0.002093 Strain at the level of top layer steel 0.001229 0.03300
Stress at the level of bottom layer steel 93.76 Mpa -434.78 Mpa Stress at the level of bottom layer steel -434.78 Mpa -113.63 Mpa
Stress at the level of top layer steel -434.78 Mpa 418.52 Mpa Stress at the level of top layer steel -245.87 Mpa -434.78 Mpa
Force in concrete 1393 kn 2213 kn Force in concrete 912 kn 807 kn
Force in bottom Steel 157 kn -2914 kn Force in bottom Steel -583 kn -152 kn
Force in top layersteel -2914 kn 701 kn Force in top layersteel -330 kn -583 kn
Net force at NA -1364 kn 0 kn Net force at NA 0 kn 72 kn
Ultimate mome. carring capacity about NA 2117 kn-m 2116 kn-m Ultimate mome. carring capacity about NA 464 kn-m 444 kn-m
maximun BM ok 0 kn-m 1760 kn-m ok maximun BM ok 266 kn-m 0 kn-m NA
Check for Ultimate SF
330 330
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for ULS as per table 3.4 IRC 6-2016
Maximum shear capacty of the section
Longitudianl Dircetion Transverse direction
Shear capacity of concrete with out reinforcement
Minimum of VRD.C = [0.12K*(80r1*fck)0.33+0.15scp]bwd
and [nmin + 0.15scp]bd
Where depth at d from face of wall = 767 mm
nmin = 3/2
0.031K *(fck) bd
1/2

scp 0 (No axial or prestressing force) depth at d from face of wall = 553 mm
K 1+sqrt*(200/d) 1.50 K 1+sqrt*(200/d) 1.50
r1 0.008 r1 0.002
VRD.C = kN 389.86 VRD.C = kN 159.13
VRD.C min = kN 251.65 VRD.C min = kN 173.41
Design VRD.C
kN= 389.86 Design VRD.C
kN= 173.41
Actual Shear force 743.74 Actual Shear force 161.94
Check Provide SR Check No SR
SR - Shear reinforcement SR - Shear reinforcement
Design of vertical shear links
VRDs = Asw*z*fywd*cotq VRDmax = acw*b*z*n1fcd
s cotq + tanq
Asw Area of shear links s spacing of reinforcement

z lever arm - 0.9 times effective depth acw =1 - for sections with out prestress
fywd =0.8fyd n1 0.6 for fck< = 80Mpa

Asw 523.60 sqmm


Dia of bar 10
number of legs 6.66667
spacing, s 120
Cotq (Assuming 45deg) 1

VRDs = 1270.77 kN
VRDmax = 2929.15 kN
shear resistance of stirrups 1270.77 kN ok

331 331
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 63.80235 11.48442
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 15.95059 9.570352 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 887 t Hor X in t 17.53983 Hor Z in t 32.14089 ML 399 t-m MT 881 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.14 t/m2 18.58 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.22 t/m2 7.66 t/m2 = Base Preasure at point B

332 332
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 63.80235 38.28141
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 15.95059 2.871106 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 887 t Hor X in t 20.88555 Hor Z in t 31.30446 ML 393 t-m MT 908 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.36 t/m2 18.69 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.11 t/m2 7.44 t/m2 = Base Preasure at point B

333 333
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 63.80235 11.48442
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 15.95059 9.570352 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 887 t Hor X in t 38.64574 Hor Z in t 41.20657 ML 434 t-m MT 963 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.36 t/m2 19.37 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.43 t/m2 7.44 t/m2 = Base Preasure at point B

334 334
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4 Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 63.80235 38.28141
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 15.95059 2.871106 0 0
11 BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 887 t Hor X in t 41.99146 Hor Z in t 40.37014 ML 428 t-m MT 989 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.58 t/m2 19.48 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.32 t/m2 7.22 t/m2 = Base Preasure at point B

335 335
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 63.80235 11.48442
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 15.95059 9.570352 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 887 t Hor X in t 17.53983 Hor Z in t 32.14089 ML 399 t-m MT 881 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.14 t/m2 18.58 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.22 t/m2 7.66 t/m2 = Base Preasure at point B

336 336
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 63.80235 38.28141
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 15.95059 2.871106 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 887 t Hor X in t 20.88555 Hor Z in t 31.30446 ML 393 t-m MT 908 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.36 t/m2 18.69 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.11 t/m2 7.44 t/m2 = Base Preasure at point B

337 337
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 63.80235 11.48442
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 15.95059 9.570352 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 887 t Hor X in t 38.64574 Hor Z in t 41.20657 ML 434 t-m MT 963 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.36 t/m2 19.37 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.43 t/m2 7.44 t/m2 = Base Preasure at point B

338 338
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5 Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 63.80235 38.28141
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 15.95059 2.871106 0 0
12 BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 887 t Hor X in t 41.99146 Hor Z in t 40.37014 ML 428 t-m MT 989 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.58 t/m2 19.48 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.32 t/m2 7.22 t/m2 = Base Preasure at point B

339 339
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 63.80235 11.48442
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 15.95059 9.570352 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 887 t Hor X in t 17.53983 Hor Z in t 32.14089 ML 399 t-m MT 881 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.14 t/m2 18.58 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.22 t/m2 7.66 t/m2 = Base Preasure at point B

340 340
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 63.80235 38.28141
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 15.95059 2.871106 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 20.77555 20.77555
15 In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 50.1002 15.03006 137.6492 41.29475
D A vertical load 887 t Hor X in t 20.88555 Hor Z in t 31.30446 ML 393 t-m MT 908 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.36 t/m2 18.69 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 1.11 t/m2 7.44 t/m2 = Base Preasure at point B

341 341
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 63.80235 11.48442
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 15.95059 9.570352 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 887 t Hor X in t 38.64574 Hor Z in t 41.20657 ML 434 t-m MT 963 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.36 t/m2 19.37 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.43 t/m2 7.44 t/m2 = Base Preasure at point B

342 342
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6 Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9 For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 63.80235 38.28141
10 For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 15.95059 2.871106 0 0
13 BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 260.8651 260.8651 0 0
14 In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 20.77555 6.232664
15 In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 50.1002 50.1002 137.6492 137.6492
D A vertical load 887 t Hor X in t 41.99146 Hor Z in t 40.37014 ML 428 t-m MT 989 t-m
Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 12.58 t/m2 19.48 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 0.32 t/m2 7.22 t/m2 = Base Preasure at point B

343 343
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of Foundation forces as per IRC 6-2016 table 3.3 SLS Quasi- Permanent combination

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1 Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2 Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3 Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0

D A vertical load 749 t Hor X in t 0 Hor Z in t 0 ML 0 t-m MT 0 t-m


Base area of foundation = 89.64 m2 Base Preasure at point A = P/A + ML/ZL + MT/ZT
ZL = 124.002 m3 Base Preasure at point B = P/A + ML/ZL - MT/ZT
3
10.80m ZT = 161.352 m Base Preasure at point C = P/A - ML/ZL - MT/ZT
Base Preasure at point D = P/A - ML/ZL + MT/ZT
C B Base Preasure at point D = 8.36 t/m2 8.36 t/m2 = Base Preasure at point A
8.30m Base Preasure at point C = 8.36 t/m2 8.36 t/m2 = Base Preasure at point B

344 344
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of SLS Forces for foundation design


Prasure at M M
Vertical H
H long longitudin transver
load transverse
al se
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 886.778 17.53983 32.14089 399.4132 880.8547
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 886.778 20.88555 31.30446 392.7139 907.6517
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 886.778 38.64574 41.20657 434.4833 962.6663
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 886.778 41.99146 40.37014 427.7841 989.4632
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 886.778 17.53983 32.14089 399.4132 880.8547
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 886.778 20.88555 31.30446 392.7139 907.6517
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 886.778 38.64574 41.20657 434.4833 962.6663
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 886.778 41.99146 40.37014 427.7841 989.4632
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 886.778 17.53983 32.14089 399.4132 880.8547
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 886.778 20.88555 31.30446 392.7139 907.6517
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 886.778 38.64574 41.20657 434.4833 962.6663
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 886.778 41.99146 40.37014 427.7841 989.4632
SLS quasi Permanet combination 748.816 0 0 0 0

345 345
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of SLS Forces for foundation design

Prasure at t/ sqm A B C D
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 18.58 7.66 1.22 12.14
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 18.69 7.44 1.11 12.36
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 19.37 7.44 0.43 12.36
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 19.48 7.22 0.32 12.58
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.58 7.66 1.22 12.14
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 18.69 7.44 1.11 12.36
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.37 7.44 0.43 12.36
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 19.48 7.22 0.32 12.58
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.58 7.66 1.22 12.14
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 18.69 7.44 1.11 12.36
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.37 7.44 0.43 12.36
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 19.48 7.22 0.32 12.58
SLS quasi Permanet combination D A 8.36 8.36 8.36 8.36

C B

346 346
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016

1000 mm

Clear Cover = 75 mm
1988 mm 1662.5 1662.5 1988 mm dia of bar Considered = 25 mm

1750 mm 1750 mm
850 mm 850 mm
3650 mm 3650 mm

D E F G H A

Base Preasure in longitudinal direction D A

C I J K L B 10.80 m

Base Preasure in longitudinal direction

C B
8000.00
8.30 m
-262.5 1662.5

850 mm 1750 mm 1750 mm 850 mm

1400 1400

B M N O P A

Base Preasure in Transverse direction

C Q R S T D

Base Preasure in Transverse direction

Calculation of Bending Moment in longitudinal Direction


347 347
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Max. BM
Load case A D E F G H at face of
support
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 18.58 12.14 13.68 14.97 15.75 17.04 117.48
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 18.69 12.36 13.88 15.14 15.91 17.17 118.32
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 19.37 12.36 14.04 15.44 16.29 17.69 122.18
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 19.48 12.58 14.23 15.61 16.45 17.83 123.02
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.58 12.14 13.68 14.97 15.75 17.04 117.48
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 18.69 12.36 13.88 15.14 15.91 17.17 118.32
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.37 12.36 14.04 15.44 16.29 17.69 122.18
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 19.48 12.58 14.23 15.61 16.45 17.83 123.02
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.58 12.14 13.68 14.97 15.75 17.04 117.48
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 18.69 12.36 13.88 15.14 15.91 17.17 118.32
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.37 12.36 14.04 15.44 16.29 17.69 122.18
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 19.48 12.58 14.23 15.61 16.45 17.83 123.02
SLS quasi Permanet combination 8.36 8.36 8.36 8.36 8.36 8.36 55.69

Max. BM
Load case B C I J K L at face of
support
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 7.66 1.22 2.76 4.05 4.83 6.12 44.74
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 7.44 1.11 2.63 3.89 4.66 5.92 43.38
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 7.44 0.43 2.11 3.51 4.36 5.76 42.71
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 7.22 0.32 1.97 3.35 4.19 5.57 41.36
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 7.66 1.22 2.76 4.05 4.83 6.12 44.74
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 7.44 1.11 2.63 3.89 4.66 5.92 43.38
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 7.44 0.43 2.11 3.51 4.36 5.76 42.71
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 7.22 0.32 1.97 3.35 4.19 5.57 41.36
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 7.66 1.22 2.76 4.05 4.83 6.12 44.74
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 7.44 1.11 2.63 3.89 4.66 5.92 43.38
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 7.44 0.43 2.11 3.51 4.36 5.76 42.71
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 7.22 0.32 1.97 3.35 4.19 5.57 41.36
SLS quasi Permanet combination 8.36 8.36 8.36 8.36 8.36 8.36 55.69

Governing BM in rare combination = 123.02 t-m


Governing BM in Quasipermanent combination = 55.69 t-m
Calculation of Bending Moment in Transverse Direction

348 348
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Max. BM
Load case A B M N O P at face of
support
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 18.58 7.66 7.39 9.08 17.16 18.85 17.75
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 18.69 7.44 7.17 8.90 17.23 18.96 17.84
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 19.37 7.44 7.15 8.99 17.82 19.66 18.48
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 19.48 7.22 6.92 8.81 17.89 19.78 18.57
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.58 7.66 7.39 9.08 17.16 18.85 17.75
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 18.69 7.44 7.17 8.90 17.23 18.96 17.84
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.37 7.44 7.15 8.99 17.82 19.66 18.48
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 19.48 7.22 6.92 8.81 17.89 19.78 18.57
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 18.58 7.66 7.39 9.08 17.16 18.85 17.75
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 18.69 7.44 7.17 8.90 17.23 18.96 17.84
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 19.37 7.44 7.15 8.99 17.82 19.66 18.48
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 19.48 7.22 6.92 8.81 17.89 19.78 18.57
SLS quasi Permanet combination 8.36 8.36 8.36 8.36 8.36 8.36 8.19

Load case D C Q R S T Max. BM


Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 12.14 1.22 0.95 2.64 10.72 12.41 11.43
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 12.36 1.11 0.84 2.57 10.90 12.63 11.64
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 12.36 0.43 0.14 1.98 10.81 12.65 11.61
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 12.58 0.32 0.02 1.91 10.99 12.88 11.81
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 12.14 1.22 0.95 2.64 10.72 12.41 11.43
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 12.36 1.11 0.84 2.57 10.90 12.63 11.64
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 12.36 0.43 0.14 1.98 10.81 12.65 11.61
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 12.58 0.32 0.02 1.91 10.99 12.88 11.81
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 12.14 1.22 0.95 2.64 10.72 12.41 11.43
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 12.36 1.11 0.84 2.57 10.90 12.63 11.64
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 12.36 0.43 0.14 1.98 10.81 12.65 11.61
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 12.58 0.32 0.02 1.91 10.99 12.88 11.81
SLS quasi Permanet combination 8.36 8.36 8.36 8.36 8.36 8.36 8.19

Governing BM in rare combination = 18.57 t-m


Governing BM in Quasipermanent combination = 8.19 t-m

Calculation of Stress (rare combination)


349 349
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019
Ref Calculations for design of foundation for SLS as per table 3.3 IRC 6-2016
Longitudinal direction Transverse direction
IRC 112 Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
12.2.1 Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio m or ae 12.90
Ast 6702 Sq.mm Ast 1340 Sq.mm
Asc 1676 Sq.mm Asc 1340 Sq.mm
d 809 mm d 785 mm
dc 83 mm dc 115 mm
b 1000 mm b 1000 mm
x 286 mm x 145 mm
Maximum BM in rare combination: 1230 Kn-m Maximum BM in rare combination: 186 Kn-m
BM=0.5 scbc x2 /3 +Asc (x-dc)2 m scbc /x +Ast (d-x)2 m scbc /x BM=0.5 scbc x2 /3 +Asc (x-dc)2 m scbc /x +Ast (d-x)2 m scbc /x
fcc 12.361 N/sqmm Safe fcc 3.546 N/sqmm Safe
fst =scbc m (d-x) /x 291.89 N/sqmm Safe fst =scbc m (d-x) /x 201.57 N/sqmm Safe
fsc =scbc m (x-dc) /x 113.18 N/sqmm Safe fsc =scbc m (x-dc) /x 9.52 N/sqmm Safe
Calculation of Stress (Quasi permanent Combination)
Maximum BM in Quasi permanent combination: 556.88 Kn-m Maximum BM in Quasi permanent combination: 81.93 Kn-m
ssc 132.13 N/sqmm fst 88.93 N/sqmm
Crack width = W r = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff

C clear cover 75 mm C clear cover 75 mm


k1 0.8 deformed bars, 0.8 k1 0.8 deformed bars, 0.8
1.6 plain bars 1.6 plain bars
k2 0.5 bending 0.5 k2 0.5 bending 0.5
1 pure tension 1 pure tension
f bar dia of tension steel 32 f bar dia of tension steel 16
rpeff = Ast/Acef rpeff = Ast/Acef
Acef 204716.28 sq.mm Acef 251596.46 sq.mm
Ast 6702 sq.mm Ast 1340 sq.mm
rpeff = 0.0327383 rpeff = 0.0053276
Sr,max = 421.1662 Sr,max = 765.54596
Kt 0.5 Kt 0.5
fcteff 2.5 N/sqmm fcteff 2.5 N/sqmm
(esm-ecm) = 0.0003964 (esm-ecm) = 0.0002668
W r = Sr,max(esm-ecm) = 0.1669453 mm W r = Sr,max(esm-ecm) = 0.2042295 mm
safe safe

350 350
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 56.63295 15.2909
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 14.15824 12.74241 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 1269 t Hor X in t 18.25677 Hor Z in t 46.26869 ML 550 t-m MT 1274 t-m

351 351
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 56.63295 50.96965
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 14.15824 3.822724 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 1269 t Hor X in t 23.27535 Hor Z in t 45.01405 ML 541 t-m MT 1309 t-m

352 352
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 56.63295 15.2909
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 14.15824 12.74241 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 1269 t Hor X in t 39.36268 Hor Z in t 55.33437 ML 577 t-m MT 1337 t-m

353 353
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 56.63295 50.96965
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 14.15824 3.822724 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase
1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 1269 t Hor X in t 44.38126 Hor Z in t 54.07973 ML 568 t-m MT 1372 t-m

354 354
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 56.63295 15.2909
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 14.15824 12.74241 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 1269 t Hor X in t 18.25677 Hor Z in t 46.26869 ML 550 t-m MT 1274 t-m

355 355
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 56.63295 50.96965
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 14.15824 3.822724 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 1269 t Hor X in t 23.27535 Hor Z in t 45.01405 ML 541 t-m MT 1309 t-m

356 356
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 56.63295 15.2909
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 14.15824 12.74241 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 1269 t Hor X in t 39.36268 Hor Z in t 55.33437 ML 577 t-m MT 1337 t-m

357 357
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 56.63295 50.96965
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 14.15824 3.822724 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 1269 t Hor X in t 44.38126 Hor Z in t 54.07973 ML 568 t-m MT 1372 t-m

358 358
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 56.63295 15.2909
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 14.15824 12.74241 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 1269 t Hor X in t 18.25677 Hor Z in t 46.26869 ML 550 t-m MT 1274 t-m

359 359
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 56.63295 50.96965
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 14.15824 3.822724 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 1269 t Hor X in t 23.27535 Hor Z in t 45.01405 ML 541 t-m MT 1309 t-m

360 360
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.27 0 0 7.966 2.15082 0 0 0 0 56.63295 15.2909
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.9 0 0 0 0 1.9915 1.79235 14.15824 12.74241 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 1269 t Hor X in t 39.36268 Hor Z in t 55.33437 ML 577 t-m MT 1337 t-m

361 361
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 non seismic case

Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1.5 221.19 331.785 0 0 0 0 113.9476 170.9214 807.3 1210.95
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.9 0 0 7.966 7.1694 0 0 0 0 56.63295 50.96965
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.27 0 0 0 0 1.9915 0.537705 14.15824 3.822724 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1.5 4.726602 7.089903 0 0 27.0607 40.59105 236.5105 354.7658 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 1269 t Hor X in t 44.38126 Hor Z in t 54.07973 ML 568 t-m MT 1372 t-m

362 362
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 seismic case

Seismic longitudinal , Live load as accompanying: maximum axial LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4a Governing max axial LL case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16a Seismic longitudional 1 0 0 72.79168 72.79168 0 0 507.6305 507.6305 0 0
17a Seismic transverse in maximum axial LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 535.097 160.5291
18a Seismic vertical in maximum axial LL condition 0.3 0 0 0 0 0 0 0 0 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase0 4.726602 0 0 0 27.0607 0 236.5105 0 0 0

vertical load 1018 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 508 t-m MT 161 t-m

363 363
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 seismic case

Seismic Tranverse , Live load as accompanying: maximum axial LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
4a Governing max axial LL case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16a Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 507.6305 152.2892 0 0
17a Seismic transverse in maximum axial LL condition 1 0 0 0 0 76.33072 76.33072 0 0 535.097 535.097
18a Seismic vertical in maximum axial LL condition 0.3 0 0 0 0 0 0 0 0 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase
0.2 4.726602 0.94532 0 0 27.0607 5.41214 236.5105 47.3021 0 0

vertical load 1063 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 222 t-m MT 697 t-m

364 364
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 seismic case

Seismic longitudinal , Live load as accompanying: maximum ML due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5a Governing max LL ML case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16a Seismic longitudional 1 0 0 72.79168 72.79168 0 0 507.6305 507.6305 0 0
19a Seismic transverse in maximum ML LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 535.097 160.5291
20a Seismic vertical in maximum ML LL condition 0.3 0 0 0 0 0 0 0 0 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 0 4.726602 0 0 0 27.0607 0 236.5105 0 0 0

vertical load 1018 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 508 t-m MT 161 t-m

365 365
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 seismic case

Seismic transverse , Live load as accompanying: maximum ML due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
5a Governing max LL ML case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16a Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 507.6305 152.2892 0 0
19a Seismic transverse in maximum ML LL condition 1 0 0 0 0 76.33072 76.33072 0 0 535.097 535.097
20a Seismic vertical in maximum ML LL condition 0.3 0 0 0 0 0 0 0 0 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 0.2 4.726602 0.94532 0 0 27.0607 5.41214 236.5105 47.3021 0 0

vertical load 1063 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 222 t-m MT 697 t-m

366 366
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 seismic case

Seismic longitudinal , Live load as accompanying: maximum MT due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6a Governing max LL MT case 0 221.19 0 0 0 0 0 113.9476 0 807.3 0
16a Seismic longitudional 1 0 0 72.79168 72.79168 0 0 507.6305 507.6305 0 0
21a Seismic transverse in maximum MT LL condition 0.3 0 0 0 0 76.33072 22.89922 0 0 535.097 160.5291
22a Seismic vertical in maximum MT LL condition 0.3 0 0 0 0 0 0 0 0 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 0 4.726602 0 0 0 27.0607 0 236.5105 0 0 0

vertical load 1018 t Hor X in t 72.79168 Hor Z in t 22.89922 ML 508 t-m MT 161 t-m

367 367
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.4 seismic case

Seismic Tranverse , Live load as accompanying: maximum MT due to LL

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1.35 640.348 864.4698 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.75 52.35 91.6125 0 0 0 0 0 0 0 0
3a Due to SIDL 1.35 45.648 61.6248 0 0 0 0 0 0 0 0
6a Governing max LL MT case 0.2 221.19 44.238 0 0 0 0 113.9476 22.78952 807.3 161.46
16a Seismic longitudional 0.3 0 0 72.79168 21.8375 0 0 507.6305 152.2892 0 0
21a Seismic transverse in maximum MT LL condition 1 0 0 0 0 76.33072 76.33072 0 0 535.097 535.097
22a Seismic vertical in maximum MT LL condition 0.3 0 0 0 0 0 0 0 0 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 0.2 4.726602 0.94532 0 0 27.0607 5.41214 236.5105 47.3021 0 0

vertical load 1063 t Hor X in t 21.8375 Hor Z in t 81.74286 ML 222 t-m MT 697 t-m

368 368
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of ULS Forces at pier base


Prasure at M M
Vertical H
H long longitudin transver
load transverse
al se
1 Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 1268.627 18.25677 46.26869 549.9629 1273.816
2 Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 1268.627 23.27535 45.01405 541.0432 1309.495
3 Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 1268.627 39.36268 55.33437 576.8739 1336.632
4 Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 1268.627 44.38126 54.07973 567.9542 1372.311
5 Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 1268.627 18.25677 46.26869 549.9629 1273.816
6 Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 1268.627 23.27535 45.01405 541.0432 1309.495
7 Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 1268.627 39.36268 55.33437 576.8739 1336.632
8 Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 1268.627 44.38126 54.07973 567.9542 1372.311
9 Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 1268.627 18.25677 46.26869 549.9629 1273.816
10 Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 1268.627 23.27535 45.01405 541.0432 1309.495
11 Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 1268.627 39.36268 55.33437 576.8739 1336.632
12 Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 1268.627 44.38126 54.07973 567.9542 1372.311
13 Seismic longitudinal , Live load as accompanying: maximum axial LL 1017.707 72.79168 22.89922 507.6305 160.5291
14 Seismic Tranverse , Live load as accompanying: maximum axial LL 1062.89 21.8375 81.74286 222.3808 696.557
15 Seismic longitudinal , Live load as accompanying: maximum ML due to LL 1017.707 72.79168 22.89922 507.6305 160.5291
16 Seismic transverse , Live load as accompanying: maximum ML due to LL 1062.89 21.8375 81.74286 222.3808 696.557
17 Seismic longitudinal , Live load as accompanying: maximum MT due to LL 1017.707 72.79168 22.89922 507.6305 160.5291
18 Seismic Tranverse , Live load as accompanying: maximum MT due to LL 1062.89 21.8375 81.74286 222.3808 696.557

369 369
Design of RCC rectangular Coulmn ULS

W As1 /2
effective cover to the reinforcement = 110 mm
2
Compressive cube strength of concrete = 40 N/mm
2
Characteric yeild strength of reinforcement f y = 500 N/mm
2
As2 /2 Modulus of elasticity of Steel = 200000 N/mm
gm for steel = 1.15
Yeilding Strain Considerd for steel = 0.002
Mx Maximum concrete Strain ecu = 0.0035
2
D Characteric yeild strength of reinforcement in tension f y / g m = 434.783 N/mm
2
Characteric yeild strength of reinforcement in compressionfy / (gm + fy /2000) = 357.143 N/mm
As2 /2 Minimum % of Steel = 0.40 %
maximum % of Steel = 6.00 %
D = 8000.00 mm
w = 1000 mm
2
As1 = 4909 mm
2
As2 = 39270 mm
As1 /2 % of Steel provided = 0.55 %
My
Relatoin ship of
N/Nuz to an
N/Nuz an
0 1
0.2 1
0.4 1.33
0.6 1.67
0.8 2
1 2

18
Mux Muy (Mx/Mux
N (Axial Correspo Correspo )an +
load) in Mx in kn- My in kn- nding to nding to (My/Muy
S.no Load case name Kn m m Nuz in Kn N N N/ Nuz an )an Check
1 Case 1 12686.27 12738.16 5499.629 158982.9 81955 7984 0.080 1.000 0.844 Safe
2 Case 2 12686.27 13094.95 5410.432 158982.9 81955 7984 0.080 1.000 0.837 Safe
3 Case 3 12686.27 13366.32 5768.739 158982.9 81955 7984 0.080 1.000 0.886 Safe
4 Case 4 12686.27 13723.11 5679.542 158982.9 81955 7984 0.080 1.000 0.879 Safe
5 Case 5 12686.27 12738.16 5499.629 158982.9 81955 7984 0.080 1.000 0.844 Safe
6 Case 6 12686.27 13094.95 5410.432 158982.9 81955 7984 0.080 1.000 0.837 Safe
7 Case 7 12686.27 13366.32 5768.739 158982.9 81955 7984 0.080 1.000 0.886 Safe
8 Case 8 12686.27 13723.11 5679.542 158982.9 81955 7984 0.080 1.000 0.879 Safe
9 Case 9 12686.27 12738.16 5499.629 158982.9 81955 7984 0.080 1.000 0.844 Safe
10 Case 10 12686.27 13094.95 5410.432 158982.9 81955 7984 0.080 1.000 0.837 Safe
11 Case 11 12686.27 13366.32 5768.739 158982.9 81955 7984 0.080 1.000 0.886 Safe
12 Case 12 12686.27 13723.11 5679.542 158982.9 81955 7984 0.080 1.000 0.879 Safe
13 Case 13 10177.07 1605.291 5076.305 158982.9 81955 7984 0.064 1.000 0.655 Safe
14 Case 14 10628.9 6965.57 2223.808 158982.9 81955 7984 0.067 1.000 0.364 Safe
15 Case 15 10177.07 1605.291 5076.305 158982.9 81955 7984 0.064 1.000 0.655 Safe
16 Case 16 10628.9 6965.57 2223.808 158982.9 81955 7984 0.067 1.000 0.364 Safe
17 Case 17 10177.07 1605.291 5076.305 158982.9 81955 7984 0.064 1.000 0.655 Safe
18 Case 18 10628.9 6965.57 2223.808 158982.9 81955 7984 0.067 1.000 0.364 Safe

370 370
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 56.63295 10.19393
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 14.15824 8.494942 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 887 t Hor X in t 17.53983 Hor Z in t 32.14089 ML 370 t-m MT 865 t-m

371 371
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 56.63295 33.97977
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 14.15824 2.548483 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 887 t Hor X in t 20.88555 Hor Z in t 31.30446 ML 365 t-m MT 889 t-m

372 372
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 56.63295 10.19393
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 14.15824 8.494942 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 887 t Hor X in t 38.64574 Hor Z in t 41.20657 ML 397 t-m MT 928 t-m

373 373
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
4a Governing max axial LL case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 56.63295 33.97977
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 14.15824 2.548483 0 0
11a BREAKING AND TEMPARATURE for Governing max live load axial forcecase1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 887 t Hor X in t 41.99146 Hor Z in t 40.37014 ML 391 t-m MT 952 t-m

374 374
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 56.63295 10.19393
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 14.15824 8.494942 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 887 t Hor X in t 17.53983 Hor Z in t 32.14089 ML 370 t-m MT 865 t-m

375 375
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 56.63295 33.97977
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 14.15824 2.548483 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 887 t Hor X in t 20.88555 Hor Z in t 31.30446 ML 365 t-m MT 889 t-m

376 376
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 56.63295 10.19393
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 14.15824 8.494942 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 887 t Hor X in t 38.64574 Hor Z in t 41.20657 ML 397 t-m MT 928 t-m

377 377
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
5a Governing max LL ML case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 56.63295 33.97977
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 14.15824 2.548483 0 0
12a BREAKING AND TEMPARATURE for Governing max live load ML case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 887 t Hor X in t 41.99146 Hor Z in t 40.37014 ML 391 t-m MT 952 t-m

378 378
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 56.63295 10.19393
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 14.15824 8.494942 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 887 t Hor X in t 17.53983 Hor Z in t 32.14089 ML 370 t-m MT 865 t-m

379 379
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 56.63295 33.97977
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 14.15824 2.548483 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 1 -67.6574 -67.6574 5.431202 5.431202 0 0 0 0 15.88746 15.88746
15a In case of Skew water current 0.3 -67.6574 -20.29722 35.5825 10.67475 12.95097 3.885292 38.44432 11.5333 105.6249 31.68747
vertical load 887 t Hor X in t 20.88555 Hor Z in t 31.30446 ML 365 t-m MT 889 t-m

380 380
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.18 0 0 7.966 1.43388 0 0 0 0 56.63295 10.19393
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.6 0 0 0 0 1.9915 1.1949 14.15824 8.494942 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 887 t Hor X in t 38.64574 Hor Z in t 41.20657 ML 397 t-m MT 928 t-m

381 381
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Rare combination

Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0
6a Governing max LL MT case 1 221.19 221.19 0 0 0 0 113.9476 113.9476 807.3 807.3
9a For Wind Speed 36m/s ( Due to Transverse wind force 0.6 0 0 7.966 4.7796 0 0 0 0 56.63295 33.97977
10a For Wind Speed 36m/s ( Due to Longitudianl wind force 0.18 0 0 0 0 1.9915 0.35847 14.15824 2.548483 0 0
13a BREAKING AND TEMPARATURE for Governing max live load MT case 1 4.726602 4.726602 0 0 27.0607 27.0607 236.5105 236.5105 0 0
14a In case of normal water current 0.3 -67.6574 -20.29722 5.431202 1.629361 0 0 0 0 15.88746 4.766239
15a In case of Skew water current 1 -67.6574 -67.6574 35.5825 35.5825 12.95097 12.95097 38.44432 38.44432 105.6249 105.6249
vertical load 887 t Hor X in t 41.99146 Hor Z in t 40.37014 ML 391 t-m MT 952 t-m

382 382
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Calculations of forces at pier base as per IRC 6-2016 table 3.3 SLS Quasi- Permanent combination

Factor for unfactored Factored unfactored Factored unfactored Factored Unfactored Factored Unfactored Factored
Code no Descriptions
ver. load vertical load vertical load Hor X in t Hor X in t Hor Z in t Hor Z in t ML ML ML ML

1a Due to Girder+slab+pier+pier cap 1 640.348 640.348 0 0 0 0 0 0 0 0


2a Due to Wearing coat 1.2 52.35 62.82 0 0 0 0 0 0 0 0
3a Due to SIDL 1 45.648 45.648 0 0 0 0 0 0 0 0

vertical load 749 t Hor X in t 0 Hor Z in t 0 ML 0 t-m MT 0 t-m

383 383
Project:Kusumba-Malegaon Part of structure: Job No : Rev.
Design of pier for bridge at Design ch:70+010 1516014
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN 09-08-2019

Ref Summary of SLS Forces at pier base


Prasure at M M
Vertical H
H long longitudin transver
load transverse
al se
Live load as leading load: maximum axial LL + Normal water current + longitudianl wind speed 36m/s 886.778 17.53983 32.14089 370.4864 865.0689
Live load as leading load: maximum axial LL + Normal water current + Transverse wind speed 36m/s 886.778 20.88555 31.30446 364.5399 888.8547
Live load as leading load: maximum axial LL + Skew water current + longitudianl wind speed 36m/s 886.778 38.64574 41.20657 397.3974 927.8851
Live load as leading load: maximum axial LL + Skew water current + Transverse wind speed 36m/s 886.778 41.99146 40.37014 391.4509 951.6709
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + longitudianl wind speed 36m/s 886.778 17.53983 32.14089 370.4864 865.0689
Live load as leading load: maximum longitudianl moment due to LL + Normal water current + Transverse wind speed 36m/s 886.778 20.88555 31.30446 364.5399 888.8547
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + longitudianl wind speed 36m/s 886.778 38.64574 41.20657 397.3974 927.8851
Live load as leading load: maximum longitudianl moment due to LL + Skew water current + Transverse wind speed 36m/s 886.778 41.99146 40.37014 391.4509 951.6709
Live load as leading load: maximum Transverse moment due to LL + Normal water current + longitudianl wind speed 36m/s 886.778 17.53983 32.14089 370.4864 865.0689
Live load as leading load: maximum Transverse moment due to LL + Normal water current + Transverse wind speed 36m/s 886.778 20.88555 31.30446 364.5399 888.8547
Live load as leading load: maximum Transverse moment due to LL + Skew water current + longitudianl wind speed 36m/s 886.778 38.64574 41.20657 397.3974 927.8851
Live load as leading load: maximum Transverse moment due to LL + Skew water current + Transverse wind speed 36m/s 886.778 41.99146 40.37014 391.4509 951.6709
SLS quasi Permanet combination 748.816 0 0 0 0

384 384
DESING OF PIER WALL FOR SLS
Dimension Details Reinforcement Details
Eff Cov First Sp
No. Dia (mm) (mm) (mm)
Width (w) = 1000 mm Along w Layer 1 5 25 50 50
Depth (d) = 8000 mm Layer 2 0 16 100 50
Mod Ratio, m= 12.903 Along d Layer 1 40 25 50 50
Layer 2 0 16 100 50

A
N
W
My a

% Reinf 0.55

13 14.0

S.no P (kN) Mx (kNm) My (kNm) a mm b mm Da mm Db mm fc in Mpa fsc in Mpa fst in Mpa


1 8868 8651 3705 707 16057 0 0 5.22 57.56 -52.18
2 8868 8889 3645 719 15728 0 0 5.18 57.18 -50.98
3 8868 9279 3974 678 15640 0 0 5.59 61.38 -60.46
4 8868 9517 3915 690 15332 0 0 5.55 61.01 -59.17
5 8868 8651 3705 707 16057 0 0 5.22 57.56 -52.18
6 8868 8889 3645 719 15728 0 0 5.18 57.18 -50.98
7 8868 9279 3974 678 15640 0 0 5.59 61.38 -60.46
8 8868 9517 3915 690 15332 0 0 5.55 61.01 -59.17
9 8868 8651 3705 707 16057 0 0 5.22 57.56 -52.18
10 8868 8889 3645 719 15728 0 0 5.18 57.18 -50.98
11 8868 9279 3974 678 15640 0 0 5.59 61.38 -60.46
12 8868 9517 3915 690 15332 0 0 5.55 61.01 -59.17
13 7488 0 0

385 385
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
DESIGN OF PIERCAP

2.00 m

13.40 m(Sq) 13.40 m(Sk)

0.650 m

0.90 m
0.900 m
0.500 m 2.200 m
0.90 m

4.000 m
0.18 m
CRITICAL SECTION FOR SHEAR
0.000 m

CRITICAL SECTION FOR BENDING


CL OF PIER

8.000 m
Equivalent Square

386 386
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
DESIGN OF PIERCAP
Length of cantilever protion = 2.700 m
Distance from bearing to face of pier = 0.500 m
Total Width at this section = 2000 mm
Total Depth at this section = 900 mm L/D = 0.5555555
BM at crit. Sec. due to self weight of piercap = 16.40 t-m from
from left span
Seft weight of pier cap up to critical section for shear = 1.46 t right
Live Load on bearing - case 1 0.00 t 211.11 t
Live Load on bearing - case 2 0.00 t 211.11 t
DL on bearing 30.80 t 24.24 t
WC loads on bearing 5.00 t 5.35 t
SDL loads on bearing 18.76 t -2.98 t Torsion
ULS BM at face due to superstr - case 1: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 237 t-m
ULS Torsion at face due to superstr - case 1: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 145.1 t-m
ULS Equ.BM due to Torsion at face due to superstr - case 1: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 123.78 t-m
Total ULS moment in case 1 = 361 t-m
ULS SF at critacl - case 1: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 432.37 t
ULS Equ.SF due to Torsion at face due to superstr - case 1: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 116.10 t
Total ULS SF in case 1 = 548.46 t
ULS BM at face due to superstr - case 2: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 237 t-m
ULS Torsion at face due to superstr - case 2: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 145.1 t-m
ULS Equ.BM due to Torsion at face due to superstr - case 2: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 123.78 t-m
Total ULS moment in case 2 = 361 t-m
ULS SF at critacl - case 2: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 432.37 t
ULS Equ.SF due to Torsion at face due to superstr - case 2: DL*1.35+WC*1.75+SIDL*1.35+LL*1.5 = 116.10 t
Total ULS SF in case 2 = 548.46 t
SLS rarecomb. BM at face due to superstr - case 1: DL*1+WC*1.2+SIDL*1+LL*1 = 164 t-m
SLS rare comb. Torsion at face due to superstr - case 1: DL*1+WC*1.2+SIDL*1+LL*1 = 95.3 t-m
SLS Rare comb. Equ.BM due to Torsion at face due to superstr - case 1: DL*1+WC*1.2+SIDL*1+LL*1 = 81.27 t-m
Total SLS rere combination moment in case 1 = 245 t-m
SLS rarecomb. BM at face due to superstr - case 2: DL*1+WC*1.2+SIDL*1+LL*1 = 164 t-m
SLS rare comb. Torsion at face due to superstr - case 2: DL*1+WC*1.2+SIDL*1+LL*1 = 95.3 t-m
SLS Rare comb. Equ.BM due to Torsion at face due to superstr - case 2: DL*1+WC*1.2+SIDL*1+LL*1 = 81.27 t-m
Total SLS rere combination moment in case 12 = 245 t-m
SLS quasi per. comb. BM at face due to superstr : DL*1+WC*1.2+SIDL*1 = 58 t-m
xulimit/ d = 0.456
Steel provided at top side of pier cap = 25 dia - 14 Nos. in 1st layerDistribution steel = 2160 mm2
25 dia - 14 Nos. in 2nd layer
Steel provided at bottom side of pier cap = 16 dia - 14 Nos. in 1st layer
0 dia - 20 Nos. in 2nd layer
Effective depth d in mm 813 mm
387 387
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
DESIGN OF PIERCAP
b1 in mm 2000 mm
Ast min 0.26 fctm/fyk b1 d 2113 Sq.mm
0.0013 b1 d 2113 Sq.mm
Ast min 2113 Sq.mm
Area of steel provided at top ok 13744 Sq.mm
Max Ast 0.025 Ac ok 45000.0005 Sq.mm
Asc minimum= 0.01 Act.ext= 0.01x 75.00x 2000.00= 1500.000 Sq.mm
Area of steel provided in bottom ok 2815 Sq.mm
Total steel provided 16559 Sq.mm
maximum total steel =0.04 Ac ok 72000 Sq.mm

Moment of resistance due to concrete Mucb = Com. force in concrete X lever arm + com. force in compression steel x lever arm
effective cover for top reinforcement = 87.5 mm
effective cover for bottom reinforcement = 58 mm
deff = 812.50001 mm deff at face of pedestal 813
xulimit = 370.52 mm
Com. Force in concrete = 7944.0 kn and lever arm to tension steel 664.29 mm
Com. Force in compresive steel = 1223.9 kn and lever arm to tension steel 754.50 mm
Mucb = 6200.51 Kn-m

calculation of moment of resistance due to steel


Assumed neutral axis depth 221.642 mm
total compresive force = total tensil force
total compresive force= compressive force in concrete + compresive force in com. Steel
compresive force in concrete = 4752.0 kn and lever arm to NA 132.99 mm
compresive force in com steel = 1223.9 kn and lever arm to NA 163.64 mm
Tensile force in steel = 5975.9 kn and lever arm to NA 503.358 mm
Total compressive force = 5975.9
net force = 0.0
Moment of resistance due to tensile capacity = 3840.21 Kn-m
Capacity of the section = 3840.21 Kn-m
safe

388 388
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
DESIGN OF PIERCAP
Check for Ultimate SF
Maximum shear capacty of the section
Shear capacity of concrete with out reinforcement
Minimum of VRD.C = [0.12K*(80r1*fck)0.33+0.15scp]bwd
and [nmin + 0.15scp]bd
Where
nmin = 0.031K3/2*(fck)1/2bd
scp 0 (No axial or prestressing force)
K 1+sqrt*(200/d) 1.50
r1 0.008
VRD.C = 787.91 kN
VRD.C min = 504.93 kN
Design VRD.C = 787.91 kN
Actual Shear force 5484.65 kN
Check Provide SR SR - Shear reinforcement
Design of vertical shear links
VRDs = Asw*z*fywd*cotq
s
VRDmax = acw*b*z*n1fcd
cotq + tanq
Asw Area of shear links Dia of bar 16
s spacing of reinforcement number of legs 10
z lever arm - spacing, s 100
acw =1 - for sections with out prestress Cotq (Assuming 45deg) 1
fywd =0.8fyd
n1 0.6 for fck< = 80Mpa
Asw 2010.62 sqmm
VRDs = 5881.06 kN
VRDmax = 5879.25 kN
shear resistance of stirrups 5879.25 kN
ok
389 389
Project:Kusumba-Malegaon Part of structure: Job No. Rev.
Design of pier for bridge at Design ch:70+010
applicable for P1 and P2 Design by SURESH Date
Design Consultant: CTLGS Check by PAVAN
DESIGN OF PIERCAP
Calculation of Stress (rare combination)
Maxium allowable concrete compressive stress 0.48fck 14.4 N/sqmm
Maxium allowable tensile stress in steel 0.6fyk 300 N/sqmm
Modular ratio m or ae 12.90
Ast 13744 Sq.mm
Asc 2815 Sq.mm
d 813 mm
dc 58 mm
b 2000 mm
x 290 mm
Maximum BM in rare combination: 245 Kn-m
BM=0.5 scbc x2 /3 +Asc (x-dc)2 m scbc /x +Ast (d-x)2 m scbc /x
fcc 1.215 N/sqmm Safe
fst =scbc m (d-x) /x 28.22 N/sqmm Safe
fsc =scbc m (x-dc) /x 12.54 N/sqmm Safe
Calculation of crack width (Quasi permanent Combination)
Maximum BM in Quasi permanent combination: 58.02 Kn-m
ssc 6.69 N/sqmm
Crack width = W r = Sr,max(esm-ecm)
Sr,max = 3.4c+0.425k1*k2*f/rpeff

C clear cover 50 mm
k1 0.8 deformed bars, 0.8
1.6 plain bars
k2 0.5 bending 0.5
1 pure tension
f bar dia of tension steel 25 mm
rpeff = Ast/Acef
Acef 406550.8849 sq.mm
Ast 13744 sq.mm
rpeff = 0.033807497
Sr,max = 295.7117611
Kt 0.5
fcteff 2.5 N/sqmm
(esm-ecm) = 0.000583736
W r = Sr,max(esm-ecm) = 0.172617568 mm safe