You are on page 1of 7

Stage 1

Area of Time of
catchment Average concentration Storm mean rainfall
area (A) fall (H) Distance (L) (t) return (i) max runoff (Q) max runoff (Q)
no m2 m/100m m min 1: a b c mm/hr l/sec m3/sec
Catchment A 235640 15 1035 300 10 640 4 0.41 61.4 4018.7 4.0
Catchment B 77450 15 280 73 10 640 4 0.41 108.0 2324.2 2.3
Catchment C 233230 15 795 230 10 640 4 0.41 68.3 4426.6 4.4
Catchment D 39000 15 125 30 10 640 4 0.41 150.3 1627.8 1.6
Catchment B + C + D 349680 15 1075 324 10 640 4 0.41 59.5 5779.7 5.8

Stage 2

Area of Time of
catchment Average concentration Storm mean rainfall
area (A) fall (H) Distance (L) (t) return (i) max runoff (Q) max runoff (Q)
no m2 m/100m m min 1: a b c mm/hr l/sec m3/sec
Catchment A 163000 15 625 175 10 640 4 0.41 76.4 3457.3 3.5
Catchment B 77450 15 280 73 10 640 4 0.41 108.0 2324.2 2.3
Catchment C 233230 15 795 230 10 640 4 0.41 68.3 4426.6 4.4
Catchment D 56300 15 125 31 10 640 4 0.41 148.3 2318.7 2.3
Catchment A + B + C 473680 15 1075 334 10 640 4 0.41 58.8 7733.6 7.7
Stage 1

Trapezoid Drainage Dimension

max.
discharge width of width of
drainage ref. m3/sec gradient bottom (m) depth (m) top (m)
A1 4.02 0.01 0.50 1.00 1.00
A2 4.02 0.01 0.50 1.00 1.00
B1 4.43 0.05 0.50 1.00 1.00
B2 5.78 0.05 0.50 1.00 1.00
C1 4.43 0.07 0.50 1.00 1.00
C2 4.43 0.07 0.50 1.00 1.00

Basin Diemansion

max.
discharge length L wier height
basin ref. m3/sec (m) width B (m) H (m)
A 4.019 12 6 2
B 5.780 12 6 2
C 4.427 12 6 2

Stage 2

Trapezoid Drainage Dimension

max.
discharge width of width of
drainage ref. m3/sec gradient bottom (m) depth (m) top (m)
A1 3.46 0.05 0.50 1.00 1.00
A2 3.46 0.05 0.50 1.00 1.00
B1 4.43 0.07 0.50 1.00 1.00
B2 7.73 0.10 0.50 1.00 1.00
C1 4.43 0.07 0.50 1.00 1.00
C2 4.43 0.07 0.50 1.00 1.00
D1 2.32 0.03 0.50 1.00 1.00

Basin Diemansion

max.
discharge length L wier height
basin ref. m3/sec (m) width B (m) H (m)
A 2.319 12 6 2
B 3.457 10 5 2
C 4.427 12 6 2
Stage 1

Hydraulic
Maximum roughness max Hydraulic width Wetted mean
area Velocity factor Gradient mean depth bottom dpeth width top Area perimeter depth Velocity Discharge
V n S R W D H A P R V Q
m/s m m m m2 m m/s m3/s
Catchment A 7.00 0.01 0.05 0.26 0.50 1.00 1.00 0.75 3.00 0.25 6.79 4.08 4.02 ok
Catchment C 8.00 0.01 0.07 0.26 0.50 1.00 1.00 0.75 3.00 0.25 7.85 4.71 4.43 ok
Catchment D 5.00 0.01 0.03 0.27 0.50 1.00 1.00 0.75 3.00 0.25 4.80 2.88 1.63 ok
Catchment B + C + D 9.00 0.01 0.08 0.26 0.50 1.00 1.00 0.75 3.00 0.25 8.77 5.26 5.78 bigger size

Stage 2

width Hydraulic
Maximum roughness max Hydraulic bottom = Wetted mean
area Velocity factor Gradient mean depth depth dpeth width top Area perimeter depth Velocity Discharge
V n S R D D H A P R V Q
m/s m m m m2 m m/s m3/s
Catchment A 7.00 0.01 0.05 0.26 0.50 1.00 1.00 0.75 3.00 0.25 6.79 4.08 3.46 ok
Catchment B 5.00 0.01 0.03 0.27 0.50 1.00 1.00 0.75 3.00 0.25 4.80 2.88 2.32 ok
Catchment C 8.00 0.01 0.07 0.26 0.50 1.00 1.00 0.75 3.00 0.25 7.85 4.71 4.43 ok
Catchment D 5.00 0.01 0.03 0.27 0.50 1.00 1.00 0.75 3.00 0.25 4.80 2.88 2.32 ok
Catchment A + B + C 11.00 0.01 0.10 0.31 0.80 1.00 1.00 0.90 3.00 0.30 10.86 7.82 7.73 ok

D
W
Calculation Title: Landfill Area Sediment Tank Design (Q=4.5m3/s)

Length of sand trap L= 10 m > 10m OK


Effective length Le= 9.3696
Width of sand trap B= 6m > up stream channel width (1m) OK
Weir Height H= 1.8 m >0.5m OK
Design Flow Q= 4.5 m3/s
Flow depth above weir Ys= 0.5795 m

Horizontal velocity Vh= 0.3152 m/s <1m/s OK


retention time tr= 31.727 >30s OK
terminal velocity Vt= 0.075 m3/s
H+Ys= 2.3795 m > 2x upstream water height (1m) OK

Flow area above weir = 3.4772 m2


flow area of the pipes = 0.4239 m2
terminal flow rate = 1.2296 m3/s

outlet water width B2= 1m


outlet water depth H2= 1m
outlet velocity Vo= 1.2296 m/s
Calculation Title: Landfill Area Sediment Tank Design (Q=8m3/s)

Length of sand trap L= 16 m > 10m OK


Effective length Le= 15.2598
Width of sand trap B= 8m > up stream channel width (1m) OK
Weir Height H= 2m >0.5m OK
Design Flow Q= 8 m3/s
Flow depth above weir Ys= 0.70205 m

Horizontal velocity Vh= 0.37009 m/s <1m/s OK


retention time tr= 43.2328 >30s OK
terminal velocity Vt= 0.0625 m3/s
H+Ys= 2.70205 m > 2x upstream water height (1m) OK

Flow area above weir = 5.61639 m2


flow area of the pipes = 0.5652 m2
terminal flow rate = 2.28774 m3/s

outlet water width B2= 1m


outlet water depth H2= 1m
outlet velocity Vo= 2.28774 m/s
Calculation Title: Landfill Area Sediment Tank Design (Q=3.5m3/s)

Length of sand trap L= 10 m > 10m OK


Effective length Le= 9.4517
Width of sand trap B= 5m > up stream channel width (1m) OK
Weir Height H= 2m >0.5m OK
Design Flow Q= 3.5 m3/s
Flow depth above weir Ys= 0.5535 m

Horizontal velocity Vh= 0.2741 m/s <1m/s OK


retention time tr= 36.478 >30s OK
terminal velocity Vt= 0.07 m3/s
H+Ys= 2.5535 m > 2x upstream water height (1m) OK

Flow area above weir = 2.7674 m2


flow area of the pipes = 0.3533 m2
terminal flow rate = 0.8555 m3/s

outlet water width B2= 1m


outlet water depth H2= 1m
outlet velocity Vo= 0.8555 m/s
Calculation Title: Landfill Area Sediment Tank Design (Q=5.8m3/s)

Length of sand trap L= 12 m > 10m OK


Effective length Le= 11.28031
Width of sand trap B= 6m > up stream channel width (1m) OK
Weir Height H= 2m >0.5m OK
Design Flow Q= 5.8 m3/s
Flow depth above weir Ys= 0.68636 m

Horizontal velocity Vh= 0.359843 m/s <1m/s OK


retention time tr= 33.34792 >30s OK
terminal velocity Vt= 0.080556 m3/s
H+Ys= 2.68636 m > 2x upstream water height (1m) OK

Flow area above weir = 4.118159 m2


flow area of the pipes = 0.4239 m2
terminal flow rate = 1.634426 m3/s

outlet water width B2= 1m


outlet water depth H2= 1m
outlet velocity Vo= 1.634426 m/s