CONSTRUCTION MANAGEMENT
Code: CVE4159
CHAPTER 3
CONSTRUCTION MANAGEMENT FUNCTIONS
Assoc. Prof. NGUYEN Trong Tu
Email: nguyentrongtu@tlu.edu.vn
Tel: 0945055455
CHAPTER 3

CONSTRUCTION MANAGEMENT FUNCTIONS


• - Planning phase
• Project delivery methods

1/4/2023 2
Classification of works
According to Construction Law No. 50/2014/QH13
Article 5. Classification and grading of construction works
Construction works are classified as follows:
• Building works;
• Industrial works;
• Transportation works;
• Works for agriculture and rural development;
• Technical infrastructure works.
• National security works
Classification of works
According to Construction Law No. 50/2014/QH13
Article 5. Classification and grading of construction works
1. Supper Class
2. Class I
3. Class II
4. Class III
5. Class IV
Phases of Planning
1. Project Planning Phase
2. Master Planning Phase
3. Scoping Phase
4. Design Phase
5. Bid Phase
6. Award Phase
7. Construction Phase
8. Operation and
Maintenance Phase

1/4/2023 5
Project Planning Phase
Instigation
Dreams
Ideas
Innovation
Why not?
1/4/2023 6
Master Planning Phase
• Master Planning is an extension of conceptual
planning. It looks at the project and its relationship
with overall development for the future.
• It deals with the impact of the proposed plan on the
environment, the economy, the potential for other
development for the purpose of determining the
impact of the improvement.
=> Research – Assessment - Report

1/4/2023 7
Scoping Phase
• During scoping the Owner defines what
kind of project will be constructed, the
budget that will be allowed for the
project, and the timing or schedule for
the prosecution and the completion of
the project.

1/4/2023 8
Project Delivery Methods
1. Design-Bid-Build

2. Design-Build

3. Design-Build-Operate

4. Construction Management At Risk

5. Partnering

1/4/2023 9
COMPETETIVE BID
(DESIGN/BID/BUILD)
COMPETETIVE BID
(DESIGN/BID/BUILD)
COMPETETIVE BID
(DESIGN/BID/BUILD)
COMPETITIVE SEALED
PROPOSALS
COMPETETIVE SEALED
PROPOSALS
COMPETETIVE SEALED
PROPOSALS
CONSTRUCTION MANAGEMENT
AT-RISK
CONSTRUCTION MANAGEMENT
AT-RISK
CONSTRUCTION MANAGEMENT
AT-RISK
CONSTRUCTION MANAGEMENT
AGENCY
CONSTRUCTION MANAGEMENT
AGENCY
CONSTRUCTION MANAGEMENT
AGENCY
DESIGN/BUILD
(POSSIBLE LEASEBACK)
DESIGN/BUILD
(POSSIBLE LEASEBACK)

(GMP – Guaranteed Maximum Price)


DESIGN/BUILD
(POSSIBLE LEASEBACK)
BRIDGING
BRIDGING
BRIDGING