Quality Management for

Design and Construction

1/4/2023
1
Source Material
W. Edwards Deming, Out of

1/4/2023
Crisis, (MIT Press, 2000)
Mary Walton, The Deming
Management Method,
(Perigee, 1988)
2
A different way of thinking and

management styles for the design

1/4/2023
and construction industry

14 POINTS FOR TOTAL QUALITY 3

MANAGEMENT
Number One

Create constancy of purpose

1/4/2023
toward the improvement of

C. Larry Weir, P.E.


product and services in order
to stay in business and to
provide jobs 4
Number Two

Adopt the new philosophy in

1/4/2023
order to eliminate mistakes,

C. Larry Weir, P.E.


defects, and to eliminate
inferior products
5
Number Three

Cease the dependency on

1/4/2023
C. Larry Weir, P.E.
inspection to achieve quality

6
Number Four

End the practice of awarding

1/4/2023
C. Larry Weir, P.E.
business on the basis of the

lowest price
7
Number Five

Improve constantly and

1/4/2023
C. Larry Weir, P.E.
forever the system of

production and services


8
Number Six

Institute on the job training

1/4/2023
C. Larry Weir, P.E.
9
Number Seven
Institute leadership

1/4/2023
C. Larry Weir, P.E.
10
Number Eight

Drive out fear within the

1/4/2023
C. Larry Weir, P.E.
company

11
Number Nine

Break down barriers that may

1/4/2023
C. Larry Weir, P.E.
exist within the company

12
Number Ten

Eliminate slogans,

1/4/2023
exhortations, and targets for

C. Larry Weir, P.E.


company or individual
achievement
13
Number Eleven

1/4/2023
Eliminate quotas

C. Larry Weir, P.E.


14
Number Twelve

Remove barriers to pride of

1/4/2023
C. Larry Weir, P.E.
workmanship

15
Number Thirteen

Institute a vigorous program

1/4/2023
C. Larry Weir, P.E.
of education and self-

improvement
16
Number Fourteen

Put everyone to work to

1/4/2023
accomplish the transformation

C. Larry Weir, P.E.


of the company for TQM

17
Why Are We in Business?

1/4/2023
18
The Birth of Total Quality

1/4/2023
Management

19
Management in Japan

C. Larry Weir, P.E. 1/4/2023


20
Examples
European Style Figures Cute Kid – Lousy craftsmanship

1/4/2023
C. Larry Weir, P.E.
21
Made in Occupied Japan

C. Larry Weir, P.E. 1/4/2023


22
Made in Japan has more
Quality Represented meaning

1/4/2023
C. Larry Weir, P.E.
23
A Philosophy of Business

C. Larry Weir, P.E. 1/4/2023


24
Start With the Customer
The basis and purpose of

1/4/2023
TQM

C. Larry Weir, P.E.


25
Business in the United States

1/4/2023
C. Larry Weir, P.E.
26
Competition

C. Larry Weir, P.E. 1/4/2023


27
Everyone wants a piece of the
pie

1/4/2023
28
Bigger slices of the same pie?
Or…..

1/4/2023
29
Make more pies!

C. Larry Weir, P.E. 1/4/2023


30
14 POINTS OF TOTAL QUALITY

1/4/2023
MANAGEMENT

C. Larry Weir, P.E.


31
14 Points of Quality
Management

1/4/2023
• What do they mean to our business?

C. Larry Weir, P.E.


• What do they mean to me?

32
Deadly
Diseases
The Seven

C. Larry Weir, P.E. 1/4/2023


33
Are…
1. Lack of constancy or purpose.
2. Emphasis on Short-term profits

1/4/2023
3. Evaluation by performance, merit rating, or annual review

C. Larry Weir, P.E.


of performance.
4. Mobility of management.
5. Running a company on visible figures alone.
6. Excessive medical costs
7. Excessive costs of warranty, fueled by lawyers that work on
34
a contingency fee.
ISO (International Organization for
Standardization) Principles
1. Customer Focus

1/4/2023
2. Leadership
3. Involvement of People

C. Larry Weir, P.E.


4. A Process Approach
5. A Systems Approach
6. Continual Improvement
7. Factual Approach to Decision Making
35
8. Mutually beneficial supplier relationships
Let us be honest…what do

1/4/2023
you really want to happen in
our profession and what are
you willing to pay to get it?

36
Quotations from Deming
1. “Quality is everyone’s responsibility”
2. “It is not enough to do your best, you must know what to do, and
then do your best”

1/4/2023
3. “Profit in business comes from repeat customers, customers that
boast about your product or service, and then brings friends with
them”
4. “If you cannot describe what you are doing as a process, you
don’t know what you are doing”
5. “You cannot inspect quality into a product, it is already there”
6. “Does experience help? Not if we are doing the wrong things”
7. “We are here to make another world”
8. “I think it is necessary to think and not to assume that you do not
know” 37
INSPECTION
RESPONSIBILITIES
• In accepting your assignment as a Construction Inspector for the
Construction Services, you take on certain duties, obligations, and

1/4/2023
responsibilities.

C. Larry Weir, P.E.


• Your DUTY is to inspect and to clearly and concisely record all the
work undertaken while the project is under construction, and to
ensure the construction is completed as per the intent of the design
drawings. At times you may also be required to assist with the initial
pre-engineering surveys and other project related duties as
requested by the construction supervisor.
38
INSPECTION
RESPONSIBILITIES
• Your OBLIGATION is to ensure the project is

1/4/2023
constructed with quality, in accordance with
contract documentation. In relation to the terms

C. Larry Weir, P.E.


QA / QC (Quality Assurance / Quality Control),
you are providing the QA.

39
INSPECTION
RESPONSIBILITIES
• Your RESPONSIBILITY is to properly represent yourself, and
your employer to all persons on the construction site and

1/4/2023
provide an important link between the contractor, the

C. Larry Weir, P.E.


government and the residents. You must be aware of
continuing events on the construction site, and as such,
forecast progress, and anticipate problem areas and present
solutions to avoid same.

40