CONSTRUCTION
MANAGEMENT
Maintenance
Completion
Documentation
1/4/2023 2

Maintenance
1. All things deteriorate

2. Preservation

3. Maintenance in Construction

4. Owner’s Interest In Maintenance

5. Operation and Maintenance Manuals

6. Warranty
1/4/2023 3

Maintenance
• The equipment, tools and machinery that are used by a construction
company are new only until they are “unwrapped” and with the first
use become “used” equipment. The useful life of the equipment then
becomes a factor of how well the equipment is managed and
maintained.
• Maintenance programs are predicated on chronological time as well
as time of operation. Most engine driven equipment includes hour
meters to determine exactly how much time the equipment has been
in operation. That information coupled with information regarding the
conditions of use will determine the frequency of service that may be
required for the equipment.
1/4/2023 4

O&M Manuals
• Equipment and materials delivered and installed on a project site

often require the providing of a detailed Operations and Maintenance


Manual. The O&M Manual’s purpose is to direct and to train the
Owner in the proper care and operation initially and through the
subsequent use of the equipment. O&M Manuals are reviewed by the
contractor and the Owner’s representative for completeness and are
provided as a required submittal normally before the equipment is
delivered.
1/4/2023 5

O&M Manuals
• O&M Manuals become a part of the permanent reference library for a

facility operation. It is good business to have a standard location for


the library of O&M Manuals including prepared maintenance
schedules that may be audited to assure that the warranty conditions
are being satisfied. It is also a good practice to prepare the O&M
Manuals in electronic format for ease of distribution to the
maintenance staff.
1/4/2023 6

Project Completion and Closeout


1. How do we end?

2. How did we start?

3. Bid Date

4. Award

5. Work Order or Notice to Proceed

6. Substantial Completion

7. Contract Time
1/4/2023 7

Delays
Weather
1/4/2023 8

Also

Force Majeure

Changes in project or contract scope

Owner Initiated Delays

Other “things” beyond the contractor’s control?

Such as????
1/4/2023 9

Completion?
1. Punch List

2. Closeout Documents

3. Certifications

4. Final Inspection and Final Acceptance

5. Warranty and Guarantees


1/4/2023 10

Completion?
Closeout Documents
Typical closeout documentation may be but not limited to:
1. Record (As Built) Drawings of the Improvements as they
were constructed
2. Copies of all submittal documents
3. Copies of all test results
4. Samples
5. Keys and key schedule
6. Regulatory inspection reports
7. Warranty Documentation
8. Final Payment Request
1/4/2023 11

Completion?
1. Closeout Documents

2. Certifications

3. Final Inspection and Final Acceptance

4. Warranty and Guarantees


1/4/2023 12

What says that we are done?

Final Payment
1/4/2023 13

Turn out the light, the


party’s over!
Or is it??
1/4/2023 14

LAW
ON
CONSTRUCTION
1/4/2023 15

Questions?????