CONSTRUCTION
MANAGEMENT
Maintenance
Completion
Documentation
1/4/2023 2
Maintenance
1. All things deteriorate
2. Preservation
3. Maintenance in Construction
6. Warranty
1/4/2023 3
Maintenance
• The equipment, tools and machinery that are used by a construction
company are new only until they are “unwrapped” and with the first
use become “used” equipment. The useful life of the equipment then
becomes a factor of how well the equipment is managed and
maintained.
• Maintenance programs are predicated on chronological time as well
as time of operation. Most engine driven equipment includes hour
meters to determine exactly how much time the equipment has been
in operation. That information coupled with information regarding the
conditions of use will determine the frequency of service that may be
required for the equipment.
1/4/2023 4
O&M Manuals
• Equipment and materials delivered and installed on a project site
O&M Manuals
• O&M Manuals become a part of the permanent reference library for a
3. Bid Date
4. Award
6. Substantial Completion
7. Contract Time
1/4/2023 7
Delays
Weather
1/4/2023 8
Also
Force Majeure
Such as????
1/4/2023 9
Completion?
1. Punch List
2. Closeout Documents
3. Certifications
Completion?
Closeout Documents
Typical closeout documentation may be but not limited to:
1. Record (As Built) Drawings of the Improvements as they
were constructed
2. Copies of all submittal documents
3. Copies of all test results
4. Samples
5. Keys and key schedule
6. Regulatory inspection reports
7. Warranty Documentation
8. Final Payment Request
1/4/2023 11
Completion?
1. Closeout Documents
2. Certifications
Final Payment
1/4/2023 13
LAW
ON
CONSTRUCTION
1/4/2023 15
Questions?????