Professional Documents
Culture Documents
3.20201027 机场 Company Profile -Airport
3.20201027 机场 Company Profile -Airport
VALUE CREATION
PART 1
介绍
Introduction
The Group
中建集团
Got rating "A" with a Stable Outlook by Standard & Poor, Moody and
Fitch Ratings , highest in the Engineering & Construction Business.
获得标普A、穆迪A2、惠誉A 信用评级,为行业内全球最高
主营业务 Group Service
Buildings
Design & Engineering
全品类的房屋建筑
• Highrise / 超高层 工程勘察设计
•……
Infrastructure
Industrial Facilities 基础设施
• Airport / 机场
工业设施
• Road & Bridge / 公路 和 桥梁
• Plant & Factory / 工业厂房
• Rail & Metro / 铁路和城市轨道交通
• Petrochemical Facility / 石化工业设施
• Ports / 港工
• Power Facility / 能源电力设施
• Water & Utility / 水务和市政管廊
• Military Defence / 国防工业
•……
•……
融投资业务 investment & Financing
16.7%
Total Employees 2900
42.7%
现有员工总人数2900
• Senior Level 1,100
Management • Middle Level 1,300
• Junior Level 560
Technical Staff
Other Overseas Employees 2450
海外员工人数 2350
• Chinese Staff 1,500
• International Professional 950
各类注册专业人员 1530
质 量 重 于 泰 山 Deliver Excellence
65
YEARS OF
EXCELLENCE
SERVICES
1952 - 2017
Domestic International
• State Quality Excellency Award • State Level / President Award in 5 Countries
• 277 Lu B a n P r iz e s / S t a t e T op Q u a lit y • IMPA Excellency Award
Awards for Construction Projects • Singapore BCA Construction Excellence Award
• 65 Chinese National Science and Technology • U.A.E Sheikh Khalifa Excellence Award (SKEA)
Awards • ……
• ……
质 量 重 于 泰 山 Deliver Excellence
06 2020
05 2019 拓展外岛工业项目
04 2018 第一个工业项目 在加里曼丹成功签约
南钢年产300万吨半焦煤项目
第一个基础设施
03 November 2017 开拓印尼市场 印尼西加100万吨冶金级氧化铝项目
成功签约
以雅加达为中心,先后
02 March 2016 设立印尼公司 伊利印尼新建乳业工厂 Exploit Market
在唐格朗、勿加泗
巴厘岛KKB基础设施项目 Outer Java
August 2015 正式设立
01 第一个超高层项目 承揽项目
上海中建印尼公司 Awarded
The Lana高层公寓项目 First Industrial
成功签约
设立印尼代表处 获得所有资质许可 Satoria 办公楼项目 Factory Project Kinteng New Energy
印尼一号双塔项目
PT PMA Exploit Indonesia First Infrastructure Project
中国建筑第八工程局有 总建筑面积30万平米
Establishment Java Market Project at East Kalimantan
限公司印尼代表处 印尼最高双塔 BEGINJAN Aluminum
Established PT PMA Operated business in Java Awarded the YILI new
BUT Establishment First Project Smelter Project
Complete full licenses Island, such as Bekasi, Dairy Factory Project at
Awarded the First Project at West Kalimantan
Established Indonesia Bekasi
NIB TDP SBU SIUJK Tangerang, Surabarya
Representative Office Indonesia 1 Twin Tower
B2 Grade The Lana Apartment KKB Infrastructure
The highest twin tower in
Satoria Office Tower Development at Bali
Indonesia
Indonesia Company
n BG002
n BG003 n SI003
n BG004 n SI004
n BG006
SIUJK of CSCODS
NPWP and NIB of CSCODS
Certificate
NPWP NIB
Our team in Indonesia
At present, we have 63 Chinese employees in Indonesia and more than 200 Indonesian localized employees.
目前,公司在印尼地区现有中方员工63人,印尼属地员工超过200人。
Indonesia 1 印尼一号双塔项目
Building Height: 303m 建筑高度:303米
Twin Tower,North-59 Floors,South-58 Floors,7 Floors Basement
双塔楼,北塔59层,南塔58层,7层地下室
Land Area: 18,952 ㎡ 占地面积:18,952平米
GFA: 300,000 ㎡ 建筑面积:30万平米
Contract Value: 300 Million USD 合同额:3亿美元
The Promising Financing + EPC Landmark High-rise Project Financing Assisted by CSCEC
由中建基于出口买方信贷协助业主融资,施工总承包
BJM印尼年产100万吨氧化铝项目 BJM 1 million tons of alumina project, Indonesia
Land Area: 230 Ha Latest Progress:Project construction preparation Construction Period: 20 Months
占地面积:230 公顷 最新进展:项目施工准备中 工期:20个月
Work Content: alumina plant with an annual output of 1 million tons, supporting wharf, office and living area
工作内容:年产100万吨氧化铝厂房及配套码头、办公生活区
博菱电器印尼新建厂房项目 印度尼西亚 肯德尔 Borine Factory Project, Kendal , Indonesia
Client:PT. Borine Technology Indonesia GFA: 82,600㎡ Latest Progress:Under construction
Construction Period: 10 Months
PART 3 机 场
View of parking space
阿尔及尔布迈丁国际机场(三期) Including:
Asphalt Pavement 230,000 Sq.m
Boumediene International Airport , Algeria ICAO 4F Concrete Pavement 140,000 Sq.m
Phase Ⅲ Other Pavement 40,000 Sq.m
Completion: December 2018
Benazir Bhutto (New Islamabad)
International Airport-Islamabad,
Pakistan
Client: The Pakistan Civil Aviation
Authority (PCAA)
Designer&Supervisor: CPG Airport Group
& Louis Berger Group
Contract Value: USD 236 million
Period: Jun. 2011 - Sep. 2013.
n ICAO: 4F
n GFA: 165,000㎡
曼谷素万那普机场新航站楼•泰国
New Terminal of Bangkok Airport, Thailand
GFA: 216,000㎡ ICAO 4F
主体结构提前65天封顶
The main structure was capped 65 days ahead of schedule.
北京•大兴国际机场
Beijing Daxing International Airport, Beijing, China
GFA: 1,030,000㎡ ICAO 4F
Designer: ADP Ingénierie (ADPI)
Contract Value: 11.4 billion USD Period: Feb., 2016-June., 2019
Hong Kong New Airport-Hong Kong, China 香港国际机场
Client: The Airport Authority Hong Kong GFA: 550,000㎡ Period: Sep. 2008- Jul., 2011
n One of the "Ten Engineering Wonders in Hong Kong" by the Hong Kong Institution of Engineers in 2000
n One of the Top 10 Construction Achievements of the 20th Century
n The Second Tien-Yow Jeme Civil Engineering Prize in 2002
广州•白云国际机场航站楼
Baiyun International Airport , Guangzhou, China
For Southeast China State Gateway Hub & Major Aviation Hub
GFA: 320,000㎡ ICAO 4F Period: Aug. 2001- Jul. 2002
北京•首都国际机场 T3 航站楼
International Airport Terminal 3, Beijing, China
FA: 400,000㎡ Architect : Foster & Partners, UK ICAO 4F
Contract Value: 301 Million USD Period: Aug. 2004 – Jan. 2007
n ICAO: 2F + 3F Basement
n GFA: 400,000㎡
深圳•宝安机场 T3 航站楼
Bao’an International Airport T3, Shenzhen, China
Major Aviation Hub For Southwest China
GFA: 450,000㎡ Steel Structure 50,000 Ton ICAO 4F
Designer & Supervisor: Fuksas, Italy Contract Value: 94 Million USD Period: Feb. 2010 – Aug. 2012
昆明•长水国际机场
Kunming Changshui International Airport -Yunnan, China
Designer & Supervisor: ARUP Contract Value: 201 million USD
Contract Value: 201 million USD Period: Sep. 2008- Jul., 2011
n ICAO: 3F + 3F Basement Awarded the prestigious
n GFA: 730,000㎡ Tien-yow Jeme Civil Engineering Prize
in 2014
天津•滨海机场
Tianjin Binhai International Airport T2, Tanjin, China
GFA: 248,000㎡ ICAO 4F
Designer: China Air Construction Group Corporation& Beijin Huacheng
construction Group
Contract Value: 175 million USD Period: Oct., 2011-Dec., 2013
沈阳•桃仙机场 ICAO 4E
Shenyang Taoxian International Airport
Major Aviation Hub For Northeast China
GFA: 316,000㎡ Contract value: 74 Million USD
Period: Aug. 2004 – Jan. 2007
n ICAO: 3F + 1F Basement
n GFA: 316,000㎡
成都•双流国际机场 T2 航站楼
Chengdu Shuangliu International Airport T2, Chengdu
GFA: 350,000㎡ ICAO 4F
State Gateway Hub & Major Aviation Hub For Southwest China
重庆•江北国际机场 T3 航站楼
Chongqing Jiangbei International Airport - Chong Qing, China
Designer:
Contract Value: 845 million USD n ICAO: 4F + 2F Basement
Period: Mar. 2013- Apr. 2015 n GFA: 530,000㎡
青岛•胶东国际机场
Jiaodong International Airport . Qingdao . China
GFA : 280,000㎡ ICAO 4F
西安•咸阳机场 ICAO 4F
Xi’an Xianyang International Airport, Xi’an,
China
GFA: 450,000㎡ Major Aviation Hub For Northwest China
南京•禄口国际机场
Nanjing Lukou International Airport . Nanjing . China
GFA: Phase Ⅰ 91,000 ㎡ + Phase Ⅱ 234,000㎡ ICAO 4E
Designer” JICADI & ECADI, China Contract Value: 108 Million USD
石家庄•正定国际机场
Shijiazhuang Zhengding International Airport
– Hebei, China
Designer: Beijing Xida, China GFA : 280,000㎡
Contract Value: 492 million USD ICAO 4F
Period: Jan. 2011- July. 2012
济南•遥墙国际机场
Jinan Yaoqiang International Airport
– Shandong, China
Major Aviation Hub For Northeest China
Designer: Viktor, UK
Contract Value: 120 million USD
Period: Apr. 2003- Mar. 2005
n ICAO: 3F + 2F Basement
n GFA: 84,000㎡
郑州•新郑机场 ICAO 4F
Zhengzhou Xinzheng
International Airport
Designer: CNA, China
GFA: 470,000㎡
Xi'an Xianyang International Airport
– ShanXi, China
Designer: Beijing Xida, China
Contract Value: 22 million USD
Period: Feb. 2001- Jul. 2003
n ICAO: 2F + 1F Basement
n GFA: 79,000㎡
Changsha Huanghua International
Airport – Hu nan, China 长沙•黄花国际机场
And Much
More ……
PART 4 国 际 合 作
INTERNATIONAL COOPERATION
Financial Cooperation
International Supply Chain
APL Tower 33rd Floor/T8 Jl. Letjend S. Parman Kav. 28 28th Floor, No. 1568, Century Ave., Pudong District
West Jakarta 11470, Indonesia. Shanghai, China P.O. 200125
感谢观看 Thanks