You are on page 1of 44

QUALITY ASSURANCE .

VALUE CREATION
PART 1
介绍
Introduction
The Group
中建集团

CSCEC — The largest construction & real estate conglomerate


中国建筑 — 全球最大建筑地产企业集团

NO. 18 of the Global Fortune 500 Enterprises in 2020


世界 500 强排名第 18 名

NO. 1 of the ENR Top 250 Global Contractors 2018/2019


ENR全球最大承包商第 1 名

Got rating "A" with a Stable Outlook by Standard & Poor, Moody and
Fitch Ratings , highest in the Engineering & Construction Business.
获得标普A、穆迪A2、惠誉A 信用评级,为行业内全球最高
主营业务 Group Service

Buildings
Design & Engineering
全品类的房屋建筑
• Highrise / 超高层 工程勘察设计

• Public facility / 公共建筑 • Feasibility Study / 项目可研

• Commercial / 商业地产 • Design / 工程设计

• Office / 办公物业 • Site Survey / 勘察

• Residence / 住宅 • Engineering & Shop Drawing / 深化设计

• Hotel & Resort / 酒店和文旅 •……

•……
Infrastructure
Industrial Facilities 基础设施
• Airport / 机场
工业设施
• Road & Bridge / 公路 和 桥梁
• Plant & Factory / 工业厂房
• Rail & Metro / 铁路和城市轨道交通
• Petrochemical Facility / 石化工业设施
• Ports / 港工
• Power Facility / 能源电力设施
• Water & Utility / 水务和市政管廊
• Military Defence / 国防工业
•……
•……
融投资业务 investment & Financing

• PPP / BT / BOT | 公私合营业务


• Concession | 政府特许经营业务
• Equity Investment | 资本金投资
• Financing Assistant Service | 协助融资
• Credit Enhancement| 项目增信
• Real Estate Development I 房地产开发
服 务 跨 越 五 洲 Build All over The World
Europe
► U.K
► Russia Centre Asia
► Serbian
►Kazakhstan
► Poland
► Austria Eastern Asia
► South Korea
North Africa South Asia
Latin America
► Algeria Middle East Southeast Asia
► Maldives ► Grenada
► Egypt ► Malaysia ► Myanmar
►Trinidad & Tobago
► Libya ► U.A.E ► India ► Indonesia ► Cambodia
► Tunisia ► Bahrain ► Philippine ► Thailand
► Qatar ► Laos ► Vietnam

West Africa Centre / East Africa

► Republic of Congo ► Ethiopia


► Gabon ► Djibouti
Oceania
► Equatorial Guinea
South/ East Africa ► Australia
►Cameron
► New Zealand
► Mozambique
► Papua new guinea
► Zimbabwe ► Vanuatu
► Mauritius
►Madagascar
Human Resources of CSCODS

16.7%
Total Employees 2900
42.7%
现有员工总人数2900
• Senior Level 1,100
Management • Middle Level 1,300
• Junior Level 560
Technical Staff
Other Overseas Employees 2450

海外员工人数 2350
• Chinese Staff 1,500
• International Professional 950

Licensed & Registered Professionals 1530

各类注册专业人员 1530
质 量 重 于 泰 山 Deliver Excellence

65
YEARS OF
EXCELLENCE
SERVICES

1952 - 2017
Domestic International
• State Quality Excellency Award • State Level / President Award in 5 Countries
• 277 Lu B a n P r iz e s / S t a t e T op Q u a lit y • IMPA Excellency Award
Awards for Construction Projects • Singapore BCA Construction Excellence Award
• 65 Chinese National Science and Technology • U.A.E Sheikh Khalifa Excellence Award (SKEA)
Awards • ……
• ……
质 量 重 于 泰 山 Deliver Excellence

境外鲁班奖5项 Luban Prize(Int.) 英国安全协会安全奖12项


• 埃塞非盟会议中心 • 1个杰出奖 ( Distinction)

• 老挝国际会议中心 • 2个卓越奖 ( Merit )

• 毛里求斯SSR机场 • 9个优胜奖 (Pass)

• 刚果(布)布拉柴维尔体育中心 12 Awards by British Safety


• 加蓬让蒂尔港体育场 Council
中建海外境外鲁班奖以及英国安全协会奖的获奖数在中建集团中
排名第一
CSCOD is Leading on Luban Prize(Int.) & British Safety Council
Award within CSCEC group
Indonesia Company

06 2020

05 2019 拓展外岛工业项目
04 2018 第一个工业项目 在加里曼丹成功签约
南钢年产300万吨半焦煤项目
第一个基础设施
03 November 2017 开拓印尼市场 印尼西加100万吨冶金级氧化铝项目
成功签约
以雅加达为中心,先后
02 March 2016 设立印尼公司 伊利印尼新建乳业工厂 Exploit Market
在唐格朗、勿加泗
巴厘岛KKB基础设施项目 Outer Java
August 2015 正式设立
01 第一个超高层项目 承揽项目
上海中建印尼公司 Awarded
The Lana高层公寓项目 First Industrial
成功签约
设立印尼代表处 获得所有资质许可 Satoria 办公楼项目 Factory Project Kinteng New Energy
印尼一号双塔项目
PT PMA Exploit Indonesia First Infrastructure Project
中国建筑第八工程局有 总建筑面积30万平米
Establishment Java Market Project at East Kalimantan
限公司印尼代表处 印尼最高双塔 BEGINJAN Aluminum
Established PT PMA Operated business in Java Awarded the YILI new
BUT Establishment First Project Smelter Project
Complete full licenses Island, such as Bekasi, Dairy Factory Project at
Awarded the First Project at West Kalimantan
Established Indonesia Bekasi
NIB TDP SBU SIUJK Tangerang, Surabarya
Representative Office Indonesia 1 Twin Tower
B2 Grade The Lana Apartment KKB Infrastructure
The highest twin tower in
Satoria Office Tower Development at Bali
Indonesia
Indonesia Company

Business License of PT. CSCODS National Construction Association


Construction license of PT CSCODS
印尼公司施工资质 SBU of CSCODS

n BG002
n BG003 n SI003
n BG004 n SI004
n BG006
SIUJK of CSCODS
NPWP and NIB of CSCODS

Certificate

NPWP NIB
Our team in Indonesia

Our Team in Indonesia

At present, we have 63 Chinese employees in Indonesia and more than 200 Indonesian localized employees.
目前,公司在印尼地区现有中方员工63人,印尼属地员工超过200人。

u Indonesia Company and Indonesia Representative Office


设有印度尼西亚公司及印度尼西亚代表处
u Five project teams have been set up
已设立5个项目部:
Ø Indonesia 1 Project at Jakarta
雅加达印尼一号双塔项目部
Ø The LANA Apartment Project at Tangerang
唐格朗Lana公寓项目部
Ø Yili new Factory Project at Bekasi
伊利印尼新建乳业项目
Ø Kura Kura Bali Infrastructure Project Phase 1 at Bali
巴厘岛酷乐酷乐基础设施项目一期工程
Ø Borine Factory Project at Kendal
博菱印尼新建工厂项目
Our team in Indonesia

Organization Chart of Indonesian company


2
埃及新首都中央商务区建设项目

PART The Central Business District of the


New Administrative Capital, Egypt
埃及新首都中央商务区建设项目

The Central Business District of the New Administrative


Capital, Egypt
Phase I GFA: 1,700,000㎡
Phase II GFA: 1,800,000㎡
Project Meaning

目前,埃及新首都中央商务区项目是埃及政府目前正在实施的“头号工程”,并作为“一带一路”重点工程备受中埃两国政府高度关注,
是迄今为止中资企业在埃及市场上承接的最大项目,也是中埃产能合作重点优先项目之一。该项目的成功实施,不仅可以极大缓解开罗的人
口和交通压力,还可撬动埃及苏伊士运河经济带和红海经济带的开发,从而助推埃及政府“国家复兴计划”的实现,并在埃及打造一张亮丽
的“中国楼”名片。
At present, the Central Business District of the New Administrative Capital, Egypt is the "number one project" currently
implemented by the Egyptian government, and as a key project of the "One Belt And One Road" has attracted great
市政服务
attention from the Chinese and Egyptian governments. The largest project is also one of the key priority projects of
China-Egypt production capacity cooperation. The successful implementation of this project will not only greatly ease the
population and traffic pressure in Cairo, but also leverage the development of the Egyptian Suez Canal Economic Belt and
the Red Sea Economic Belt, thereby promoting the realization of the Egyptian government's "National Revival Plan" and in
Egypt. Create a beautiful "China House" business card.
埃及标志塔
ICONIC TOWER
in CBD, New Capital
Cairo, Egypt

非洲第一高楼(在建)
The Highest Tower
in Africa (Ongoing)
Height: 385 m
GFA: 241,550 Sq.m
Residence In Project
地上44层,地下1层,建筑高度174米,
地上29层,地下3层,建筑高度150
米,总建筑面积77,207平米,大楼均 Residential 总建筑面积97,190平米,可提供套321公寓。
office
包括混合使用的办公和零售设施。 building It has 44 floors above ground and 1
building 29 floors above ground, 3 basement floor with a building height
办公楼 basements, building height of 住宅楼 of 174 meters and a total construction
150 meters, total building area of area of 97,190 square meters. It can
11 77,207 square meters, all 埃及新首都中央商务区项目分三批 02 provide 321 apartments.
buildings include mixed-use
项目推进融资,第一批项目包括2栋高
office and retail facilities
层商务楼和5栋高层公寓楼。第一批项
地上44层,地下2层,建筑高度174米,
目总建筑面积607,657m2,结构形式
总建筑面积96,560平米,可提供321套公
为核心筒+预应力板柱结构,项目总 Residential 寓。
office 地上29层,地下2层,建筑高度150
投资暂定为920,595,132美元,每栋
米,总建筑面积71,527平米,大楼均 building It has 44 floors above ground and 2
building 包括混合使用的办公和零售设施。 楼的建设工期为39.5个月。 basement floors, with a building
It has 29 floors above ground, 2 height of 174 meters and a total
The new capital's central business district
办公楼 basement floors, a building 住宅楼 construction area of 96,560 square
project in Egypt has been financed in three meters. It can provide 321
height of 150 meters, and a total
12 building area of 71,527 square
batches. The first batch of projects includes 03 apartments.
meters. The building includes two high-rise commercial buildings and five
地上38层,地下2层,建筑高度156米,总
mixed office and retail facilities. high-rise apartment buildings. The first batch
建筑面积82,208平米,可提供266套公寓。
of projects has a total construction area of Residential 38 floors above ground, 2 basement
607,657m2, and the structural form is a core building floors, building height of 156 meters,
地上47层,地下2层,建筑高度
tube + prestressed plate-column structure. total building area of 82,208 square
192米,总建筑面积105,849平米, 住宅楼
Residential 可提供367套公寓。 The total investment of the project is meters, providing 266 apartments
building It has 47 floors above ground, tentatively set at USD 920,595,132. The 04 地上37层,地下2层,建筑高度148.8米,
2 basement floors, a building construction period of each building is 39.5
住宅楼 height of 192 meters, and a months.
总建筑面积77,116平米,可提供233套公寓。
Residential It has 37 floors above ground and 2
total building area of 105,849
01 basement floors, with a building
square meters. It can provide building height of 148.8 meters and a total
367 apartments.
住宅楼 construction area of 77,116 square
meters. It can provide 233 apartments.
05
PART 3 建 设 印 尼
BUILD IN INDONESIA
The Highest Twin Tower in Indonesia
印尼最高双塔楼

Indonesia 1 印尼一号双塔项目
Building Height: 303m 建筑高度:303米
Twin Tower,North-59 Floors,South-58 Floors,7 Floors Basement
双塔楼,北塔59层,南塔58层,7层地下室
Land Area: 18,952 ㎡ 占地面积:18,952平米
GFA: 300,000 ㎡ 建筑面积:30万平米
Contract Value: 300 Million USD 合同额:3亿美元

Latest progress: Ongoing; Contract Period:50 Months 最新进展:施工中;合同工期:50个月


山东东辰控股集团有限公司20万吨年芳烃联合装置
Indonesia 1, Jalan Thamrin, Jakarta, Indonesia 印尼一号双塔项目·印尼雅加达
The Highest Twin Tower in Indonesia
Indonesia 1 Twin Tower
North Tower :59 F
South Tower: 58 F 印尼 1 号双塔项目 . 雅加达
Basement : 7 F
Height : 303 m GFA: 300,000 sqm
Client:PT. BREWIN MESA SUTERA
Building height: 142 m
GFA: 94,000㎡
No.of Floors: 38F + 2F Basement
Contract Value: IDR 770 Billion
Latest Progress:Under Construction

业主:PT. BREWIN MESA SUTERA


建筑高度: 142 米
总建筑面积: 9.4万平米
楼层数: 地下2层,地上37层,2栋
合同额: 7700亿印尼盾
最新进展:在建
伊利印尼新建乳业项目 印度尼西亚 勿加泗 Yili New Dairy Project, Bekasi , Indonesia
Client:PT. YILI DAIRY GFA: 46,700㎡ Land Area:96,500 ㎡ Latest Progress:Under construction
Construction Period: 11 Months
巴厘岛酷乐酷乐综合开发项目 Kura Kura Bali, Bali , Indonesia 业主 Client:PT. Bali Turtle Island Development
Land Area: 500 Ha Latest Progress:Under construction of 1st Phase Construction Period: 16 Months
占地面积:500 公顷 最新进展:项目一期在建 工期:16个月
雅加达标志塔 . 印度尼西亚
Signature Tower, SCBD, Jakarta , Indonesia
Height : 638 m 建筑高度: 638米
GFA : 836,000 sqm 总建筑面积:83.6万平米
No. of Floors: 111F + 7F Basement 楼层数:地下7层,地上111层
Contract Value: 1.716 Billion USD 总合同额:17.16亿美元
Latest Progress:In financial process; 最新进展:融资关闭阶段,
Signed the commercial contract. 已签署商务合同,施工准备中

The Highest Tower in Asean 东南亚最高楼


Client: PT. Grahamas Adisentosa

The Promising Financing + EPC Landmark High-rise Project Financing Assisted by CSCEC
由中建基于出口买方信贷协助业主融资,施工总承包
BJM印尼年产100万吨氧化铝项目 BJM 1 million tons of alumina project, Indonesia
Land Area: 230 Ha Latest Progress:Project construction preparation Construction Period: 20 Months
占地面积:230 公顷 最新进展:项目施工准备中 工期:20个月
Work Content: alumina plant with an annual output of 1 million tons, supporting wharf, office and living area
工作内容:年产100万吨氧化铝厂房及配套码头、办公生活区
博菱电器印尼新建厂房项目 印度尼西亚 肯德尔 Borine Factory Project, Kendal , Indonesia
Client:PT. Borine Technology Indonesia GFA: 82,600㎡ Latest Progress:Under construction
Construction Period: 10 Months
PART 4 大规模群体建筑
GROUP BUILDINGS

在城市化的伟大进程里,我们是建造者, 让生活和工作的
空间更加美好 ……

We are the builder, for the great course of urbanization


make your surrounding a Better place ……
Jumeirah Beach Villas, Dubai, UAE 迪拜棕榈岛别墅项目
缅甸仰光翡翠湾项目一期
Myanmar Yangon Emerald Bay Project
Location: Thaketa Township, Yangon GFA:
200,000 Sq.M (Phase 1)
Main Contactor … Ongoing project
Dubai Royal Pearls. UAE 迪拜皇家珍珠商住楼
GFA: 348,000sqm
班加西20000套住房
. 利比亚

地中海区域最大的
社会住房工程

Libya Alkhathra New City, Benghazi, Libya GFA: 6,000,000㎡


The largest Social Housing Scheme in Mediterranean
Algiers 2000 Apartments Residence
阿尔及尔 2000套 住宅项目
吉隆坡 湖畔公寓 Mah Sing
Lakeville . Kuala Lumpur . Malaysia
GFA: 280000 ㎡ 2558 Apartments
5 Towers - 35 ~42 F

萨浦街九号公寓

MRCB 9 Mixed Development Scheme . Kuala Lumpur. Malaysia


GFA: 289000 ㎡ 824 Apartments
Tower A - 36F / Tower B – 34F / Tower C - 36F / Tower D - 34F
SOHO Zone - 12F
The Urban Development
of Huinan Town , Shanghai

GFA: 5,950,000㎡
Residence 4,500,000㎡
Social Welfare 420,000㎡

15 Schools \ 16 Kinder gardens\


2 Hospital \ 2 Sports Facilities\
Shopping Mall \Administration Offices\
Infrastructure & Landscape ……

上海惠南镇大型社区开发项目
吉隆坡 湖畔公寓 Mah Sing
Lakeville . Kuala Lumpur . Malaysia
GFA: 280000 ㎡ 2558 Apartments
5 Towers - 35 ~42 F

萨浦街九号公寓

MRCB 9 Mixed Development Scheme . Kuala Lumpur. Malaysia


GFA: 289000 ㎡ 824 Apartments
Tower A - 36F / Tower B – 34F / Tower C - 36F / Tower D - 34F
SOHO Zone - 12F
柬埔寨德瓦度假村项目(一期) Kompong Dewa Resort(Phase I), Cambodia
Location: Village No. 1, Sangkat No.1, Sihanouk Ville Province GFA: 117,172 Sq.M
PART 5 国 际 合 作
INTERNATIONAL COOPERATION
Financial Cooperation
International Supply Chain
APL Tower 33rd Floor/T8 Jl. Letjend S. Parman Kav. 28 28th Floor, No. 1568, Century Ave., Pudong District
West Jakarta 11470, Indonesia. Shanghai, China P.O. 200125

Tel: +62-21-29034511 Tel: +86-21-60576760


Fax: +86-21-60576700

感谢观看 Thanks

You might also like