Rev No: 00
CONTINGENCY SITUATION TEST PLAN
Sl No Description Existing status Alternatives-1 Alternatives-2 Testing Method & Tested On Status Action Plan if not Responsibility & Remarks
Frequency working Target
1 UTILITY INTERRUPTIONS
Working condition of
Status recorded in
standby compressor will
Recorded in Daily maintenance checksheet
be checked by Actions planned as per
1.3 Air Pressure Compressor 1 operators checksheet and and compressor monthly Maintenance
maintenance on daily System
monthly PM checksheet PM checksheet & AMC
basis and monthly
covered from third party.
checked
2 LABOUR SHORTAGE
Components sent to
Recorded in third Party Actions planned as per
3.2 Instruments Regular Neighbour company ___ external lab and for its Ok QA
report System
confirmation
Components/Samples
Recorded in third Party Actions planned as per
3.3 Hardness Regular External labs(IRMRA,Sricity) ____ sent to external lab and OK QA
report System
for its confirmation
3.6
4 Field Returns
6 IT Equipment failure
Regular-TATA Tele Alternatuve broad band 1) USB - Dongle ( BSNL, Actions planned as per
6.3 Internet Access Checked monthly OK IT
services connections are available TATA proton) System
7 Fire
UV -Generic- Cont-plan / 03 1 of 1