The document is a technical checklist for supplying local helpers for a power plant project. It outlines requirements including supplying 14 local helpers for 16 days according to DSSP's specifications and safety regulations. The contractor is responsible for the risks of their employees, including injury, sickness, or death. They must also follow COVID-19 protocols established by DSSP at the Kendari site. The scope of work for the local helpers includes following DSSP's instructions.
The document is a technical checklist for supplying local helpers for a power plant project. It outlines requirements including supplying 14 local helpers for 16 days according to DSSP's specifications and safety regulations. The contractor is responsible for the risks of their employees, including injury, sickness, or death. They must also follow COVID-19 protocols established by DSSP at the Kendari site. The scope of work for the local helpers includes following DSSP's instructions.
The document is a technical checklist for supplying local helpers for a power plant project. It outlines requirements including supplying 14 local helpers for 16 days according to DSSP's specifications and safety regulations. The contractor is responsible for the risks of their employees, including injury, sickness, or death. They must also follow COVID-19 protocols established by DSSP at the Kendari site. The scope of work for the local helpers includes following DSSP's instructions.
1 Specific: SUPPLY LOCAL HELPER 1 lot √ According to the technical checklist and DSSP Kendari requirement, Contractor shall supply man 2 √ power, and material required for service the project as is the scope of work. B General requirement and Safety Concerns for work environment 1 lot 1 Job Scope basis is Lumpsump basis √ 2 Accomodation provide by contractor (Transportation, Mess, Meal) √ All the risk of contractor 's employee, include labour supply of injury, sickness, die, etc. will be 3 √ 100% on contractor's responsibility Contractor must follow HSE regulation at DSSP Kendari. 4 √ (Covid 19 Protocol : Rapid test swab antigen) C Time frame: 1 Planned duration 16 days. √ In Order has Force Major Condition -and the project should be discontinue and or should be Hold by 2 √ DSSP , Vendor cannot Complain / take Penalty to DSSP until the next confirmation. D Manpower 1 Contractor will guarantees the services will be made in a professionals and skilled by experienced manpower. Local Helper (14 persons) √ E Technical Job Scope 1 lot 1 Follow DSSP Instruction √ Schedule PIC Jan Feb No. MAINTENANCE ITEM Today REMARK Contractor 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 1 Supply Manpower Welder & Fitter √