You are on page 1of 5

ENvelope meSh aNd digitAl

framework for building Renovation

Grant Agreement No.: 958445

REVIEWERS DESIGNATED FOR ENSARE DELIVERABLES


Partners identified in the “Review” column are designated to make the review once the partner
in charge of that report, indicated in the column “Beneficiary” asks for that review prior to the
official submission.

More details about the review of Deliverables can be found in section “9.5.1 Reports to the
European Commission” of Deliverable “D9.1. Quality Management Plan (QMP)”.

Relevant aspects to be considered:

- This review must be performed before the due date of the report. Indicatively 10-15
days before, although the specific timeline can be agreed between beneficiary and
reviewers.
- The main activity of reviewing, consists in critically analyzing:
o The description of the work carried out by the involved partners in that specific
Task as part of the WP and the interrelation with the rest of the projects and
WPs.
o Evaluate the progress and advances towards the objectives of the project (as
part of the action), including milestones and other deliverables identified in the
DoA.
o Evaluate the explanations justifying the differences between work expected to
be carried out in accordance with DoA and the one that was really carried out.
o When applicable, and if indicated in the DoA, detail the exploitation and
dissemination of the results.

List of Deliverables and reviewers.

Del nº Title Benefi Nature Diss. Due Status Review


ciary Level Date

D10.1 H - Requirement No. 1 TEC REP CO M3 Submitted TEC


D10.2 POPD – Requirement No. TEC REP CO M3 Submitted TEC
2
D10.1 NEC - Requirement No. 3 TEC REP CO M3 Submitted TEC
D8.1 Communication R2M REP PU M4 Submitted TEC
handbook
D9.1 Quality Management TEC REP CO M4 Submitted TEC
Plan
D1.1 ENSNARE DP4ER TUDE REP PU M7 Submitted ABUD,
specifications TUM, BIO,
TEC

D3.1 ENSNARE EDST CIVI REP PU M7 Submitted TEC


specifications
ENvelope meSh aNd digitAl
framework for building Renovation

Grant Agreement No.: 958445

Del nº Title Benefi Nature Diss. Due Status Review


ciary Level Date

D5.1 Products design RIVE REP PU M7 Submitted TEC,


requirements UNIPD,
ENAR

D8.2 Plan for Communication, R2M REP CO M7 Submitted NBK


Dissemination and
Exploitation of Results
(PCDE) version 1
D9.2 Data Management Plan TEC REP CO M7 Submitted TEC
D1.2 ENSNARE DP4ER TEC REP CO M13 Submitted TUDELFT
architectural software
design – Digital model
definition and workflow
D4.1 Sensors, actuators and TEC REP CO M13 Submitted IES, NBK,
data acquisition CIVI
architecture
D2.1 Initial online data TUM M19 Submitted NBK, TEC
acquisition of the
building and first
definition of the layout
D5.5 Tested prototypes in TEC M19 Submitted RIVE,
laboratory conditions TRESPA,
ENAR
D6.5 Tested prototypes in TEC M19 Submitted ONYX,
laboratory conditions KAMEL
and experimental test
bench
D8.3 Plan for R2M M19 Submitted UNIPD,
Communication, TUDELFT,
Dissemination and ONYX
Exploitation of Results
(PCDE) version 2
D1.3 ENSNARE DP4ER TEC M25 TUDELF,
backbone and NBK, BIO
visualization interface
D2.2 Detailed data TUM M25 IES, R2M,
acquisition of the RIVE
building and automated
detailed definition of
the modules layout
D3.2 ENSNARE EDST TEC M25 ABUD, IES
architectural design -
Data model definition
ENvelope meSh aNd digitAl
framework for building Renovation

Grant Agreement No.: 958445

Del nº Title Benefi Nature Diss. Due Status Review


ciary Level Date

and workflow
D4.2 Data management IES M25 BIO, NBK,
platform and building TEC
level dashboards
D7.1 Architectural ABUD M25 ENAR,
construction projects TUDELFT,
for demo buildings TUM
D2.3 Additional data IES M28 TEC, TUM,
collection aiding the R2M
design process
D2.4 Input for the TUM M28 RIVE,
manufacturing process TRESPA
D5.2 Multifunctional facade RIVE M28 ENAR,
system ABUD,
TUDELT
D5.3 Definition of TRESP M28 RIVE,
components A ENAR,
combinations ABUD
D5.4 Active window system RIVE M28 TUM,
TUDELFT
D6.1 Building integrated ONYX M28 SUN,
photovoltaic systems KAMEL,
detail design UNIPD
D6.2 Solar thermal collectors KAME M28 SUN, ONYX
with roll bond L
technology detail design
D6.3 Solar hybrid KAME M28 SUN,
photovoltaic-thermal L UNIPD,
systems detail design ONYX
D1.4 DP4ER LCA/LCC tool BIO M31 UNIPD,
ABUD, CIVI
D4.3 Operational Digital Twin IES M33 TEC, NBK
D7.2 Demo building 1: Tartu TARTU M34 ABUD,
(Estonia) ENAR, CIVI
D7.3 Demo building 2: Sofia BAL M34 ABUD,
(Bulgaria) ENAR, CIVI
D7.4 Demo building 3: S. COAF M34 ABUD,
Demetrio (Italy) ENAR, CIVI
D2.5 Standardization of the TUM M37 UNIPD,
building data acquisition NBK
process
ENvelope meSh aNd digitAl
framework for building Renovation

Grant Agreement No.: 958445

Del nº Title Benefi Nature Diss. Due Status Review


ciary Level Date

D6.4 Energy storage and SUN M37 ONYX,


production systems KAMEL,
(electrical and thermal)
detail definition
D8.4 Plan for Communication, R2M M37 UNIPD,
Dissemination and CIVI, ABUD
Exploitation of Results
(PCDE) version 3
D3.3 ENSNARE EDST TEC M39 UNIPD, BIO
algorithm definition and
implementation
D7.5 Virtual demos ABUD M40 TUDELFT,
IES, CIVI
D3.4 ENSNARE EDST TEC M43 IES, BIO,
visualization platform CIVI
D3.5 ENSNARE EDST CIVI M43 TUDELFT,
validation TARTU,
BAL, COAF
D5.6 Envelope system TEC M43 RIVE,
prototypes for demo TRESPA,
buildings ENAR
D6.6 Energy module TEC M43 ONYX,
prototypes for demo KAMEL,
buildings SUN
D8.5 IPR protection plan UNIPD M47 R2M, RIVE,
IES, KAMEL,
ONYX
D1.5 Validation of DP4ER in TUDE M49 ABUD, BIO,
the ENSNARE pilots TUM, IES,
TEC,
D4.4 Optimisation service and IES M49 SUN,
active control via the UNIPD, CIVI
Digital Twin
D7.6 Assessment of the pilot ABUD M49 TARTU,
cases BAL, COAF
D8.6 Plan for Communication, UNIPD M49 TEC, R2M,
Dissemination and RIVE,
Exploitation of Results TRESPA,
(PCDE) final version. IES, ONYX,
Detailed exploitation KAMEL,
actions, business SUN, TUM
model(s) and business
plan of the initiative
ENvelope meSh aNd digitAl
framework for building Renovation

Grant Agreement No.: 958445

You might also like