This document is a cost proposal for an event at a property venue. It provides a breakdown of costs for items needed to produce the event, including:
1) Covering the atrium floor area and providing a main stage and backdrop.
2) Decorating the space with flower gardens, exhibition booths, backdrops, and hanging decorations.
3) Loading and unloading equipment.
The total proposed cost before tax is Rp. 147,575,000 with an additional 10% organizer fee and 11% value added tax, bringing the total proposed cost to Rp. 163,808,250. The proposal specifies payment and talent terms and provides contacts for the production company and client.
This document is a cost proposal for an event at a property venue. It provides a breakdown of costs for items needed to produce the event, including:
1) Covering the atrium floor area and providing a main stage and backdrop.
2) Decorating the space with flower gardens, exhibition booths, backdrops, and hanging decorations.
3) Loading and unloading equipment.
The total proposed cost before tax is Rp. 147,575,000 with an additional 10% organizer fee and 11% value added tax, bringing the total proposed cost to Rp. 163,808,250. The proposal specifies payment and talent terms and provides contacts for the production company and client.
This document is a cost proposal for an event at a property venue. It provides a breakdown of costs for items needed to produce the event, including:
1) Covering the atrium floor area and providing a main stage and backdrop.
2) Decorating the space with flower gardens, exhibition booths, backdrops, and hanging decorations.
3) Loading and unloading equipment.
The total proposed cost before tax is Rp. 147,575,000 with an additional 10% organizer fee and 11% value added tax, bringing the total proposed cost to Rp. 163,808,250. The proposal specifies payment and talent terms and provides contacts for the production company and client.
Venue :- RE : Cost Produksi No. : 11077/SP.PROD/MAG/X1I/2022 Detail Quotation
No. ITEM Qty Freq. Unit Price Budget Sub Total
A ATRIUM AREA UK. 24,25 x 18 METER 1. Cover Flooring uk 24,25 x 18 Meter 436 1 75,000 32,700,000 Material : a. Karpet Buana Warna Coklat b. Karpet Buana Warna Abu-abbu 2. Main Stage and Backdrop uk 10 x 5 x 0,6 m 1 1 40,000,000 40,000,000 Main Stage uk 10 x 5 x 0,6 m Material : a. Multipleks Covering Karpet Merah Backdrop uk 10 x 5 x 3,5 m Material : a. Multipleks Wall Paint b. Ornamen Genteng Flexy Digital Print c. Ornamen Stryfoam d. LED Strip e. Dekorasi Lampion 3. Taman Bunga Mehwa uk 3 x 3 m 4 1 5,000,000 20,000,000 Material : a. Pohon Bunga Mehwa b. Dekorasi Pohon dan Karpet Hijau 4. Booth Pameran uk 5 x 5 m 4 1 5,500,000 22,000,000 Material : a. Kain Organdi b. Tiang dan Bergola Multipeks fin Wall Paint c. Level Multipeks fin Vinnyl Motif batu 5. Backdrop Kelinci uk 1,75 x 1,75 m 2 1 3,500,000 7,000,000 Material : a. Multipleks wall Paint b. Stereofoam c. Lampu Bias 6. Photobooth Loby nusantara uk 7 x 3 m 1 1 16,500,000 16,500,000 Material : a. Tulisan Years Of Rabit Pop Up Lampu ias b. Drum : Multipleks Fin Stiker c. Leveling Multipleks Fin Flexy c. Koin Stereoform Fn Cat Gold Diameter 20 cm total 25 25 1 75,000 1,875,000 7. Hangging Loby Utama nusantara uk 2 x 3 m 1 1 2,500,000 2,500,000 Material : a. Polyfoam wall paint merah b. Lampion Nyala 142,575,000 B LOADING / UNLOADING Loading / Unloading 2 1 2,500,000 5,000,000 a. Man Power b. Transportation b. Meals 5,000,000
Sub Total 147,575,000
Organizer fee 10% Total 147,575,000 PPN 11% 16,233,250 TOTAL COST +PPN 163,808,250 NOTES: 1 Term of payment : 100% should be made no later than 1 weeks after the event 2 Talent proposed is subject to change, depends on the availability 3 Pph 2% from Organizer Fee