You are on page 1of 4

HARGA SATUAN

MATERIAL
NO. JENIS PEKERJAAN VOLUME SATUAN

I Pekerjaan Persiapan
a. Pekerjaan Persiapan
- Mobilisasi 1.00 ls
- Pagar & Proteksi 90.00 m'
- Pembersihan 518.06 m2
- Material Support 15.00 set
b. Pekerjaan Angkut furniture 10.00 unit
c. Manajemen Proyek 1.00 ls
d. K3 (APD Lengkap; Helm; Wearpack; Safety Shoes; P3K) 1.00 ls
SUB TOTAL
II Pekerjaan Bongkaran & Urugan
a. Pekerjaan Bongkaran Elektrikal
- Pembongkaran Instalasi Listrik 35.00 titik
- Pembongkaran Lampu 30.00 titik
- Pembongkaran Gate Barrier 1.00 ls
b. Pembongkaran Arsitektural
- Pembongkaran Plafond 518.06 m2
- Pembongkaran Keramik Lantai 518.06 m2
- Pembongkaran Partisi Kaca (Kusen Alumunium Perimeter) 301.00 m2
- Pembongkaran Keramik Dinding 124.25 m2
c. Urugan Tanah 80.00 m3
SUB TOTAL P
III Pekerjaan Arsitektural
a. Lantai Marmer Selasar History 212.52 m2
b. Lantai Homogenous Tile Interior 218.46 m2
c. Lantai Homogenous Tile (Luar Ruangan , Tangga) 87.08 m2
d. Plafond Interior - Gypsum 9mm+Hollow 60 x 60 Galvanized+Paint
- Gypsum 9mm+Hollow 60 x 60 Galvanized 518.06 m2
- Pengecatan 518.06 m2
e. Dekorasi Plafond Interior (Multiplex Fin. HPL) 280.00 m2
f. Partisi Kaca Perimeter 301.00 m2
(Kusen Alumunium ex. Alexindo, Kaca eksisting)
g. Alumunium Composite Panel : Kolom 1200 x 1200 172.80 m2
h. Alumunium Composite Panel : Kolom 2700 x 2700 208.80 m2
i. Pelapis Kolom Artificiial Plant : Kolom 1200 x 1200 57.60 m2
j. Portal Gawangan Pintu Entrance & Pintu Exit 80.77 m2
Stainless Steel 600x160x3500
k. Back Wall sisi Kaca (Multiplex Fin. HPL) 125.30 m2

Mechanical Electrical
a. Lampu Plafond include Installation 34.00 unit
b. Hidden light (strip light under ceiling include installation) 1.00 ls

HARGA SATUAN
MATERIAL
NO. JENIS PEKERJAAN VOLUME SATUAN

III.A. MAIN ENTERANCE LOBBY

a. Back Wall Section 1


Multiplex 20mm Fin HPL Ex TACO Include Accessories 35.32 m2
Dekorasi Tanaman Hias dinding
Hidden light (Strip Light under curved wall include installation)
b. Back Wall Section 1A (Information Board) 14.70 m2
Multiplex 20mm Fin HPL Ex TACO Include Accessories
c. Huruf Timbul Logo PERTAMINA : Acrilyc + LED 1.00 unit

Mechanical Electrical
a. Automatic Glass Door W6000xH3000 Tempered Glass 12mm Thk 1.00 unit
b. Pintu Walkthrough Metal Detector 1.00 unit
c. Luggage Metal Detector 1.00 unit
d. Installation Power Cable NYM 3x2,5 In Conduit 20mm, Supreme 50.00 m'
e. Power Outlet Single type + Installation 4.00 titik
f. Switch for light + Grouping 4.00 titik

III.B SELASAR HISTORY
a. Back Wall Section 1
Curved Multiplex 20mm Fin HPL Ex TACO Include Accessories 61.88 m2
Spot light (light under curved wall include installation)
Hidden light (strip light under curved wall include installation)
b. Huruf timbul Logo PERTAMINA : Acrilyc + LED 1.00 unit

Furniture
a. Meja Repsesionis W2200xD4000xH1050 1.00 unit
b. Arm Chair with table 2.00 unit
c. Sofa W6000 1.00 unit
d. Tanaman Hias Pot 2.00 unit

Mechanical Electrical
a. Installation power cable NYM 3x2.5 In Conduit 20mm, supreme 25.00 m'
b. Power outlet single type + installation 4.00 unit
c. TV 85" SMART TV 1.00 unit

III.C SELASAR LIFT
a. Backwall Section 3 (Dinding area pintu lift) 38.63 m2
ConWood 80x160mm (kayu bengkirai finish good)
b. Back wall Section 4 (Dinding Dekorasi Tanaman) 14.30 m2

Furniture
a. Round Chair 3.00 unit
b. Long Table W2000xD900xH770 2.00 unit
c. Sofa W6000 1.00 unit

HARGA SATUAN
MATERIAL
NO. JENIS PEKERJAAN VOLUME SATUAN

Mechanical Electrical
Flab Barrier 4 lines 4.00 lines
Installation power cable NYM 3x2.5 In Conduit 20mm, supreme 25.00 m'
Power outlet single type + installation 4.00 unit

SUB TOT
HARGA SATUAN KEUNTUNGAN DAN
JASA RESIKO (8%)
HARGA SATUAN TOTAL BIAYA

SUB TOTAL PEKERJAAN PERSIAPAN -

SUB TOTAL PEKERJAAN BONGKARAN -

HARGA SATUAN KEUNTUNGAN DAN


JASA RESIKO (8%)
HARGA SATUAN TOTAL BIAYA
HARGA SATUAN KEUNTUNGAN DAN
JASA RESIKO (8%)
HARGA SATUAN TOTAL BIAYA

SUB TOTAL PEKERJAAN ARSITEK -


TOTAL PEKERJAAN -