You are on page 1of 4

Request For Inspection

Project : Contract RA/265 -Construction, Completion and Maintenance of Al Ghouse Road From 7th Ring Road to Fahaheel-Ahmadi Road (R
Client : Ministry of Public Works ( MPW-PART )
Consultants : EGIS International In Association With Dar SSH International Engineering Consultants (SSH) KUWAIT
Contractor: : Kuwait Arab Contractors ( K.A.C )
From : Kuwait Arab Contractors ( K.A.C ) RFI No.: RA-265/RFI/-04
To : EGIS International /Dar SSH International Engineering Consultants Rev. No.: 03
Date: 04/10/2021
Inspection Section :

01 General 08 Lighting & Elec. Works 15 Ground Water Control


02 Road Works 09 Irregation Works & landscape 16 Excavation Support & Protection
03 Stormwater Drainage 10 Traffic Cont. System 17 Compliance with EPA Requirement
04 Traffic Marking/ Signs 11 Utility Structure 18 Treated Sewage Water
05 Water Construction 12 Maint. & Protect Of Traffic 19 Others
06 Site Laboratoris 13 Telephone Works
07 Structure 14 Sanitary Sewer Works
Inspection of:
ST Structure RD Roads UT Utilities SR Survey
EM Electro mechanical OT Others
We are submitting: For Your:
01 Herewith 02 Under Separate Cover 01 Action 02 Information

BOQ /
Describtion
DRAWING No
Protection of the Existing Utilities (Trial Pits ) as per attached sketch
JN-26/TP-1
01 51 02
‫حماية الخدمات القائمة ( حفر استكشافي) كما هو مبين فى المخطط المرفق‬
JN-26/TP-1

Date of Inspection: Submitted By Signature

10/3/2021 Abdelfattah Mohammed Elshandidy

Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted

(MPW-PART) : Consultant Received By Contractor


Date : Date : Date :
Signature : Signature : Signature :
Request For Inspection
Project : Contract RA/265 -Construction, Completion and Maintenance of Al Ghouse Road From 7th Ring Road to Fahaheel-Ahmadi Road (R
Client : Ministry of Public Works ( MPW-PART )
Consultants : EGIS International In Association With Dar SSH International Engineering Consultants (SSH) KUWAIT
Contractor: : Kuwait Arab Contractors ( K.A.C )
From : Kuwait Arab Contractors ( K.A.C ) RFI No.: RA-265/RFI/-46
To : EGIS International /Dar SSH International Engineering Consultants Rev. No.: 00
Date: 04/10/2021
Inspection Section :

01 General 08 Lighting & Elec. Works 15 Ground Water Control


02 Road Works 09 Irregation Works & landscape 16 Excavation Support & Protection
03 Stormwater Drainage 10 Traffic Cont. System 17 Compliance with EPA Requirement
04 Traffic Marking/ Signs 11 Utility Structure 18 Treated Sewage Water
05 Water Construction 12 Maint. & Protect Of Traffic 19 Others
06 Site Laboratoris 13 Telephone Works
07 Structure 14 Sanitary Sewer Works
Inspection of:
ST Structure RD Roads UT Utilities SR Survey
EM Electro mechanical OT Others
We are submitting: For Your:
01 Herewith 02 Under Separate Cover 01 Action 02 Information

BOQ / DRAWING
Describtion
No
Check Existing Utilities under detour area J-26 to start formation layer from St 0+580 to to St 0+670

01 53 01
‫ التدقيق على الخدمات القائمة اسفل التحويلة تقاطع‬J-26 ‫لبدء أعمال الطبقة التثبيتية‬
St 0+580 to to St 0+670

Date of Inspection: Submitted By Signature

10/3/2021 Abdelfattah Mohammed Elshandidy

Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted

(MPW-PART) : Consultant Received By Contractor


Date : Date : Date :
Signature : Signature : Signature :
Request For Inspection
Project : Contract RA/265 -Construction, Completion and Maintenance of Al Ghouse Road From 7th Ring Road to Fahaheel-Ahmadi Road (R
Client : Ministry of Public Works ( MPW-PART )
Consultants : EGIS International In Association With Dar SSH International Engineering Consultants (SSH) KUWAIT
Contractor: : Kuwait Arab Contractors ( K.A.C )
From : Kuwait Arab Contractors ( K.A.C ) RFI No.: RA-265/RFI/-47
To : EGIS International /Dar SSH International Engineering Consultants Rev. No.: 00
Date: 04/10/2021
Inspection Section :

01 General 08 Lighting & Elec. Works 15 Ground Water Control


02 Road Works 09 Irregation Works & landscape 16 Excavation Support & Protection
03 Stormwater Drainage 10 Traffic Cont. System 17 Compliance with EPA Requirement
04 Traffic Marking/ Signs 11 Utility Structure 18 Treated Sewage Water
05 Water Construction 12 Maint. & Protect Of Traffic 19 Others
06 Site Laboratoris 13 Telephone Works
07 Structure 14 Sanitary Sewer Works
Inspection of:
ST Structure RD Roads UT Utilities SR Survey
EM Electro mechanical OT Others
We are submitting: For Your:
01 Herewith 02 Under Separate Cover 01 Action 02 Information

BOQ / DRAWING
Describtion
No
Check Existing Utilities under detour area J-26 to start formation layer from St 1+200 to to St 1+260

01 53 01
‫ التدقيق على الخدمات القائمة اسفل التحويلة تقاطع‬J-26 ‫لبدء أعمال الطبقة التثبيتية‬
1+200 St 1+260 TO

Date of Inspection: Submitted By Signature

10/3/2021 Abdelfattah Mohammed Elshandidy

Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted

(MPW-PART) : Consultant Received By Contractor


Date : Date : Date :
Signature : Signature : Signature :
Request For Inspection
Project : Contract RA/265 -Construction, Completion and Maintenance of Al Ghouse Road From 7th Ring Road to Fahaheel-Ahmadi Road (Road 212)
Client : Ministry of Public Works ( MPW-PART )
Consultants : EGIS International In Association With Dar SSH International Engineering Consultants (SSH) KUWAIT
Contractor: : Kuwait Arab Contractors ( K.A.C )
From : Kuwait Arab Contractors ( K.A.C ) RFI No.: RA-265/RFI/-4869
To : EGIS International /Dar SSH International Engineering Consultants Rev. No.: 00
Date: 9/27/2022
Inspection Section :

01 General 08 Lighting & Elec. Works 15 Ground Water Control


02 Road Works 09 Irregation Works & landscape 16 Excavation Support & Protection
03 Stormwater Drainage 10 Traffic Cont. System 17 Compliance with EPA Requirement
04 Traffic Marking/ Signs 11 Utility Structure 18 Treated Sewage Water
05 Water Construction 12 Maint. & Protect Of Traffic 19 Others
06 Site Laboratoris 13 Telephone Works
07 Structure 14 Sanitary Sewer Works
Inspection of:
ST Structure RD Roads UT Utilities SR Survey
EM Electro mechanical OT Others
We are submitting: For Your:
01 Herewith 02 Under Separate Cover 01 Action 02 Information

BOQ /
Describtion
DRAWING No
Check Casting Works of RC wall & slab of the New Proposed Water Box Culvert BC#19 3.00m X 3.30m As Sketch Shows From axis 2 To
axis 3
33 14 01.1.4
11.65 m
3.00 ‫تدقيق أعمال صب خرسانة حوائط و سقف مجرور المياة المقترح‬m X 3.30m‫ م‬BC#19 3 ‫ الى محور‬2 ‫حسب المخطط المرفق من محور‬

Date of Inspection: Submitted By Signature

9/27/2022 Eng. Waled Abd-Elaziz

Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted

(MPW-PART) : Consultant Received By Contractor


Date : Date : Date :
Signature : Signature : Signature :