Project : Contract RA/265 -Construction, Completion and Maintenance of Al Ghouse Road From 7th Ring Road to Fahaheel-Ahmadi Road (R
Client : Ministry of Public Works ( MPW-PART )
Consultants : EGIS International In Association With Dar SSH International Engineering Consultants (SSH) KUWAIT
Contractor: : Kuwait Arab Contractors ( K.A.C )
From : Kuwait Arab Contractors ( K.A.C ) RFI No.: RA-265/RFI/-04
To : EGIS International /Dar SSH International Engineering Consultants Rev. No.: 03
Date: 04/10/2021
Inspection Section :
BOQ /
Describtion
DRAWING No
Protection of the Existing Utilities (Trial Pits ) as per attached sketch
JN-26/TP-1
01 51 02
حماية الخدمات القائمة ( حفر استكشافي) كما هو مبين فى المخطط المرفق
JN-26/TP-1
Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted
BOQ / DRAWING
Describtion
No
Check Existing Utilities under detour area J-26 to start formation layer from St 0+580 to to St 0+670
01 53 01
التدقيق على الخدمات القائمة اسفل التحويلة تقاطعJ-26 لبدء أعمال الطبقة التثبيتية
St 0+580 to to St 0+670
Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted
BOQ / DRAWING
Describtion
No
Check Existing Utilities under detour area J-26 to start formation layer from St 1+200 to to St 1+260
01 53 01
التدقيق على الخدمات القائمة اسفل التحويلة تقاطعJ-26 لبدء أعمال الطبقة التثبيتية
1+200 St 1+260 TO
Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted
BOQ /
Describtion
DRAWING No
Check Surface preparation of wall of the New Proposed Water Box Culvert BC#13 3.00m X3.30 m As Sketch Shows at J16 from 3 to 5
3314 01 .1.4
22.6 m
13# تدقيق أعمال تجهيز سطح حوائط مجرور المياه المقترحJ16 3.00m X 3.30m 5 الى3 حسب المخطط المرفق من
Inspection Report:
Foreman
Road Eng.
Structural Eng.
Utilities Eng.
Surveyor
Material Eng.
Lab. Technician
Consultant Action & Remarks : A Approved
B Approved as Noted
C Not Approved
D Information Noted
E Resubmit As Noted