HYDRAULIC CALCULATION REPORT

Name of work :-
CONDUCTING GEOTECHNICAL INVESTIGATION (INCLUDING STATION
BUILDINGS), PREPARATION OF ESP OF STATIONS, DETAILED
STRUCTURAL DRAWINGS FOR STATION BUILDINGS, QUARTERS, GAD &
DETAILED DESIGN DRAWINGS OF MAJOR BRIDGES, MINOR BRIDGES,
ROBS & RUBS INCLUDING ITS APPROACHES, ETC. INCLUDING MARKING
OF CENTRE LINE OF PROPOSED ALIGNMENT, FIXING OF BOUNDARY
STONES ON BOTH SIDES OF ALIGNMENT AND AT JUNCTIONS OF ROW,
COUNTING OF TREE AND GIRTH MEASUREMENT, ETC. FROM CHAINAGE
KM 157 (EXCLUDING DIGRAS STATION) TO KM. 285.5 (EXCLUDING
NANDED STATION) IN CONNECTION WITH YAVATMAL-NANDED NEW
B.G. LINE PROJECT IN STATE OF MAHARASHTRA, INDIA

Chainage : 157.240

Client :-

RAIL VIKAS NIGAM LIMITED


(A GOVERNMENT OF INDIA ENTERPRISE)

Prepared By:

C. E. Testing Company Pvt. Limited


An ISO 9001, 14001 & OHSAS 18001 Cerified Company
NABL Accredited Laboratory
124A, N.S.C. Bose Road: Kolkata - 700 092
Hydraulic Calculation
at
Chainage : 157.240
Hydrological calculaton
Bridge details:
A) Bridge No.: =
B) Chainage: = 157.240 km
C) Lowest Bed Level: = 374.846 m (From survey)
D) Formation Level: = 364.290 m (From project sheet)
E) Coordinates: = 779868.678,2221393.525
F) Prposed Openings: = 9.15 m
G) Hydrometerological Subzones: = 3(f) Lower Godavari
Improved Rational Formula
(Flood estimation method as per RDSO Report No. RBF-16):
A) Area of Catchment (A): = 0.1494 sq. Km
B) Distance from the critical point to the Outlet (L): = 0.558 km
C) RL of Farthest Point: = 387.62 m
D) Fall in level from the farthest point to the Outlet (H): = 19.2 m
E) Slope of stream, S: = 0.03446
F) Nature of soil: = Medium to deep clayey, black cotton soils

Flood Estimation:
50 years design flood discharge (m3/s) = Q50 = 0.278 C I A
Where,
C= Runoff coefficient
50 year rainfall intensity (mm/h) lasting for tc hour duration
I=
where tc is the time of concentration
A= Catchment area in Km2

STEP-1:- Calculation of Runoff Coefficient (C) :

0.2
Now, C= X (R F)

Value of "X" depends upon the soil type and location as given in Chart No 1

Chart No 1
Sl. No. Description of catchment Value of X
1 Sandy Soil/sandy loam/arid areas 0.249
2 Alluvium / silty loam / coastal areas 0.332

Red Soil / clayey loam / grey or brown alluvium /


3 0.415
cultivated plains / tall crops /wooded areas

Black cotton/ clayey soil / lightly covered / lightly


4 0.456
wooded / plain and barren / submontane and plateau

5 Hilly soils / plateau and barren 0.498

STEP-2:- Calculation of time of concentration (tc) :

3 0.345
tc= [ L / H ]
= [ 0.558^3 / 19.23 ]^ 0.345
= 0.197 h
= 12 min
STEP-3:- Calculation of areal reduction factor depending upon catchment
area and duration of rainfall (F) :

Value of F is calculated from the table given in RDSO Report RBF 16

Value of F
Catchment area Duration of rainfall
2
km < 30 mins 30 to 60 mins 60 to 100 mins
A < 2.5 0.72 0.81 0.88
2.5≤A≤5 0.71 0.8 0.87
5<A≤13 0.7 0.79 0.86
13<A<25 0.68 0.78 0.85
Note: Rainfall duration shall be equal to the calculated t c for the catchment

F= 0.72

STEP-4:- Calculation of 50 year 24 hour point rainfall (R) :


R= 220x1.15 mm as read from3f (lower Godawari) subzone (fig-3.6)
253 mm

And, For Black cotton/ clayey soil / lightly covered / lightly wooded / plain and barren /
submontane and plateau
X = 0.456

Therefore, C C = 0.456 x (25.3 x 0.72)^ 0.2


= 0.815

STEP-5:- Calculation of I :

From Fig. 2
The location of this bridge lies in sub-zone 3f of Hydrometerological Subzones of India

From Fig. 4
Thus, for curve corresponding to Zone 3
And,
For T = tc hrs = 0.197 h,
Ratio of 50 yrs tc hrs rainfall / 50 yrs 24 hrs rainfall = 0.15

For T = 1 h,
Ratio of 50 yrs 1 hr rainfall / 50 yrs 24 hrs rainfall = 0.38

Therefore, Ratio of 50 yrs tc hrs rainfall / 50 yrs 1 hr rainfall (K)= [ 0.15/0.38 ] = 0.395

Now, R50 24 hour rainfall = 253 mm (as in step 4)

So, R50 1 hour rainfall = [ 253 x 0.38 ]


= 96.14 mm

Now, R50 tc hour rainfall= K x R50 1 hour rainfall


= 37.975 mm

So, I = R50 (tc) / tc


= 37.975 / 0.197
= 192.766 mm/h

Hence, total discharge = Q50 = 0.278 C I A


= 0.278 x 0.815 x 192.766 x 0.1494
= 7 cumecs
Fixing of Bridge Length:

1) From Modified Rational Method:


Discharge Calculated: = 7.00 m3/s

Calculation of Regime width for discharge of 7.00 m3/s


Pw=1.811 X C X Q^1/2 (As per cl No. 4.5.3 of IRS Substructure foundation code.)

Where, P= Wetted perimeter in meters which can be taken as the effective width of waterway

Q= Design discharge in m3/s


C= A Coefficient normally equal to 2.67
= 1.811 X 2.67 X 7^0.5 12.793 m
2) Bank to bank distance:
Bank to bank distance: = 8.870 m

From the above data and also considering the suitable abutment location and site condition,the proposed
bridge has been fixed as the details given below:
No. of Span = =1
Span Arrangement =1x9.15M _PSC slab
Total Bridge length (dirt wall inner to inner) = 10.340 m
Let,
Width of abutment shaft = 1.150 m

Width of Clear waterway, B'= 10.3-(1-1)xx2-1.15/2x2 = 9.15 m


Rugosity coefficient, n= = 0.05
Slope, S = 0.0344624
Q50=(B'xd)x(1/n)x((B'xd)/(B'+2d))2/3 x (S)1/2 = 7.00 m3/s
Depth of flow,d = = 0.401 m
LBL = = 374.846 m
Hence, Calculated HFL = = 375.247 m
Survey HFL = = 0m
Take calculated HFL

Velocity = (1/n)x((B'xd)/(B'+2d))2/3 x (S)1/2 = 1.909 m/s


Afflux and Maximum scour level calculations
HFL = 375.247 m ( From Calculated data)
LBL = 374.846 m ( From survey data)
Width of abutment shaft = 1.150 m

Providing m Dia Pile


Span Arrangement =1x9.15M _PSC slab
Total Bridge length (dirt wall inner to inner) = 10.340 m

Clear linear water way Provided = = 9.15 m

( As per cl. No. 4.5.6 of IRS Substructure Foundation Code )


3
Design discharge = 7.000 m /s
Considering Velocity = 1.909 m/s
3
Design Discharge for foundation(Qf) = 7 x 1.33 = 9.310 m /s
Design per linear m = qf = 1.01 cumec/m
Average Ksf for abutment (from soil report) = 2.580

(For Wardha at hivra site of Godavari Basin, GOVERNMENT OF INDIA CENTRAL


WATER COMMISSION)
Here, Width of waterway provided = 10.340 m
Lacey's Regime Width = 12.793 m
Width of waterway provided < Lacey's Regime Width
So, Following, (Ref. Cl: 4.6.4 of IRS Substructure Foundation Code )
Normal Scour depth from HFL for Abutment = 1.338 x (qf^2 / Ksf)^0.33 0.726 m
Scour Level:
For Abutment ( 1 x DSL)= 375.247 - 0.726 = 374.600 m
For Abutment (1.25XDSL)= 375.247 - 0.726x1.25 = 374.400 m
Hence this level is below LBL, So Scour will occur.
Calculation of afflux:
Discharge = 7.0 cumec
Velocity (V) = 1.909 m/s
2
Area (A) = 3.67 m
Total Linear Waterway = 10.34 m
Average Depth = 3.67/10.34 = 0.35 m
Clear Linear Waterway due to obstruction= 9.15 m
2
Area(a) = 3.203 m

As per Cl. No. 4.7.1 of IRS Substructure & Foundation Code

= (0.2+ 0.01524) x[(1.31)-1] = 0.069 m


(Considering HFL is including Afflux)
So, Afflux= 0m
77°40'15"E 77°40'30"E 77°40'45"E

CATCHMENT AREA FOR BRIDGE CH.157.240 KM.

·
CATCHMENT AREA= 149400 Sqm.

20°4'30"N
20°4'30"N

20°4'15"N
20°4'15"N

Centroid
c
ta n e =
s
Di

55

Bridge Ch.- 157.240 KM.


8m

Origin

LEGEND

20°4'0"N
20°4'0"N

Bridge Location

Centroid
Origin
Catchment Area
Longest Stream
River
Proposed Railway

Elevation in metre
370 - 372
372 - 376
376 - 378
378 - 380
380 - 382
382 - 384
384 - 386
20°3'45"N

386 - 387
20°3'45"N

387 - 389
Longest Stream Length- 558 m.
389 - 392

0 37.5 75 150 225 300


M

77°40'15"E 77°40'30"E