PRE-CONSTRUCTION CHECKLIST

POLICY & OBJECTIVES REMARKS

1. Communication of HSE
Policy" and " CONSTRUCTION SITE
PHILOSOPHY".
2. Finalization of HSE goals and
objectives for this particular project.

ORGANIZATION REMARKS

3. Communication of "HSE Place notice boards on site to communicate HSE


responsibilities" using job description information and other issues.
of key project personnel.
4. All subcontractors to comply with
ARABIAN CONSTRUTION COMPANY-
ACC
Requirements".

PROCEDURES & CHECKLISTS REMARKS

5. Review PROJECT SHE PLAN”.


and finalize for implementation.

6. Submission of construction vehicles


Specific checklists will be made as work
safety checklists and maintenance & develops.
inspection schedules as per
government/customer/HSE requirements
.
7. Monitoring plan for achieving
subcontractor’s compliance to ACC
HSE requirements"

8. Prepare induction for new employees. - Site induction


Management, HSE Orientation program.

9. Hazard identification & risk


assessment
to avoid unusual processes.

REMARKS
SITE FACILITIES

10. “Temporary Facility Plan" reviewed


and
approved for: -

(a) Emergency Assembly Points.


(b) Fire Exits

(c) Fire Extinguisher Points

(d) Generator/Cable route


(single line diagram)

(e) POL storage

(f) Other highly flammable, toxic


substances/storage (e.g. Acetylene
Cylinders)

(g) Protection of important documents.

11. Facility traffic and parking


plans developed and reviewed.

12. Is there adequate provision in the


"Temporal Facility Plan" for avoiding future
congested work areas?

13. Local authorities contacted to verify


their requirements
HSE BUDGET REMARKS

14. Are orders placed for fire protection,


medical, personal protective equipment,
hazard signs?
15.
(a) "OSHE incentive plan"
finalized and included in budget.

(b) Publicity plans and details worked


out.

(c) Develop personal contacts plan for


appreciation during site tours and
visits.
PROJECT SPECIFIC REMARKS

16. Heavy lifts and critical loading


procedures submitted.
17. Orientation planned for: -

(a) Project key personnel


(b) Craft Workers / Supervisors/
Engineers arriving site
(c) Special orientation by craft
supervisors.
18. Workers HSE meetings planned
on the basis of work hazards

19. "Construction site OSHE audit plans"

20. Standard incident reporting, analysis,


and follow up system finalized
MEDICAL REMARKS

21. "Medical plan" finalized for:

(a) Site Dispensary

(b) First Aid facilities and life


saving medicines

(c) Emergency vehicle

22. "General health plans" developed for:

(a) Temporary facility sanitation and


garbage control

(b) Adequacy of drinking water and


food supplies/storage

(c) Kitchen and Canteen hygienic


Conditions

FIRE PROTECTION REMARKS

23. Fire protection, emergency response


plans and training finalized
24. Fire Extinguishers/Fire posts location
finalized & plotted on site plan

25. Emergency assembly points marked