Activity Detailed Job Steps Potential Hazards / Aspect Associated risks / Impact Controls Monitoring
Type (Risk
rating)
Note: At the start of each days work STA/ToolBox Talks shall be conducted to ensure work related hazards are discussed with the crew, work related training shall be conducted as and when required.
Insulation Fixing Handling & Fixing of Handling of Insulation Material Respiratory diseases ,skin diseases/ Qualified & Trained workers should be used for Daily Monitoring by
inside the Wall Insulation Material skin allergies/ rashes ,infection , Lung the task. the Supervisor.
Panel Cancer. Proper ventilation & illumination to be provided.
Body should be fully cover.
Appropriate PPE's to be worn-Disposable
H 3 4 M coverall, Dust Mask, Rubber Hand Gloves, 1 2 L
Safety Goggles.
Storage of Insulation material Fire hazard Avoid ingnition source in the vicinity. Daily Monitoring by
Store the insulation material in the designated the Supervisor.
area & cover the insulated material storage area
with tarpoline.
Follow No smoking policy.
H 3 4 M Suitable & third party inspected fire extinguisher 1 2 L
to be in place.
Proper housekeeping to be maintained in the
storage area.
Probability
Probability
Base
Residual
Severity
Severity
Risk Risk
Risk
Activity Detailed Job Steps Potential Hazards / Aspect Associated risks / Impact Controls Monitoring
Type (Risk
rating)
DESIGNATION : HSE Officer DESIGNATION : Sr HSE Officer DESIGNATION QHSE Manager DESIGNATION : Production Manager