250613DLDND2242 Exab00 03 PDF
6" CONDENSATE
(FUTURE)
G.L.
1.50
1.50
min.
min.
0+500
V3
TYPICAL EXISTING ABOVEGROUND PIPELINE CROSSING 250600DLDQD0206
G.L.G.L.
1.50
1.50
min.
min.
TYPICAL MAJOR ROAD CROSSING 250600DLDQD0207
4.00 6.75 TYPICAL SECONDARY ROAD CROSSING 250600DLDQD0208
11.00 4.75 7.50 18.75
00
CORRIDOR SECTION A-A TYPICAL EXISTING OVERHEAD POWERLINE CROSSING
0+
42.00 250600DLDQD0211
0+6
V2
40
CORRIDOR SECTION B-B TYPICAL CASING PIPE DETAIL DRAWING 250600DLDQD0210
0
PPG INTERCONNECTING - RIVER WATER PIPELINE
250613DLDLD2234
00
FROM ZUBAIR MISHRIF NEW DGS TO PPG - ROUTE MAP
MATCHLINE
0+7
V4
ZUBAIR MISHRIF NEW DGS TO PPG - CROSSINGS DETAILED DRAWING 250613DLDND2250
PPG INTERCONNECTING - RIVER WATER PIPELINE FROM
250613DLDND2258
RX01 RX02
A ZUBAIR MISHRIF NEW DGS TO PPG - PIPELINE APPROACH DRAWING
PPG INTERCONNECTING - RIVER WATER LINE FROM ZUBAIR MISHRIF NEW DGS TO PPG -
0
80
PIPELINE STRESS ANALYSIS REPORT 250613DLCPD2268
0+300
0+
ZB-12
LEGEND
SYMBOLS AND ABBREVIATIONS
EP
ANCHOR BLOCK STP SINGLE TEST POINT
A
EP
HOT BEND CCTP CROSSING TEST POINT
900
V1
MARKER POST UCTP UNCASED CROSSING TEST POINT
0+
INSULATING JOINT SIJ SHUNTING INSULATING JOINT
6" CONDENSATE
NEW TRAP
DIRECTION CHANGE VALUES EPC EXISTING PIPELINE CROSSING
0+
V5
200
TP
TIE IN POINT ETP EQUIPOTENTIAL TEST POINT
8" REJECT WATER
XX
000
12" RAW GAS NEW TRAP TO PPG Coordinate System: WGS 1984 UTM Zone 38N
Projection: Transverse Mercator
0+1
1+
false easting: 500'000.0000 OVERHEAD POWERLINE ELECTRICAL CABLE U. G.
00
100
1+4
0+
NOTES:
1+
000
00
SP
1+3
200
00
1+
V6 V7 8" RIVER WATER FROM NEW TRAP AREA TO PPG
INTERSECTION POINTS COORDINATES (WGS 84)
700
200
700
650
0 0
750
750
749
NEW TRAP
EP
AREA V2 V3
EP
V9
PROFILE SCALE
HORIZONTAL 1:2000 SP V1
ZB-12
VERTICAL 1:200
V4 SHEET 1of 3
EP
EP
EP
PPG
700
EP
EP
750
V5
336
750
0
ZUBAIR MISHRIF
LENGTH (Kilometers) 0.0 0.2 0.4 0.6 0.8 1.0
336
650
0
OPENSHUTOPENSHUTOPENSHUT
DIRECTION CHANGES
STATION
336
800
0
700
200
200
700
336 336
750
749
749
700
750
748
0 0
GROUND FEATURE
WALL THICKNESS (mm)
PIPE OD (in) STEEL GRADE
CHARACTERISTICS
PIPELINE LENGTH (m)
PIPE COVER (m)
CROSSINGS
DESIGN FACTOR
PIPE PROTECTION
CATHODIC PROTECTION SIJ SGP CCTP CCTP EPC EPC EPC EPC CCTP EPC EPC EPC EPC
TYPICAL FLOWLINES SECTION 250600DLDQD0202
TYPICAL FLOWLINES RIGHT OF WAY 250600DLDQD0203
1+100 TYPICAL FOR FLOWLINES MARKER 250600DLDQD0460
TYPICAL FLOWLINES CABLE CROSSING 250600DLDQD0204
TYPICAL EXISTING UNDERGROUND PIPELINE CROSSING 250600DLDQD0205
TYPICAL EXISTING ABOVEGROUND PIPELINE CROSSING 250600DLDQD0206
TYPICAL MAJOR ROAD CROSSING 250600DLDQD0207
TYPICAL SECONDARY ROAD CROSSING 250600DLDQD0208
2+5
TYPICAL EXISTING OVERHEAD POWERLINE CROSSING 250600DLDQD0211
1+200
00
TYPICAL CASING PIPE DETAIL DRAWING 250600DLDQD0210
PPG INTERCONNECTING - RIVER WATER PIPELINE
2+4
PPG INTERCONNECTING - RIVER WATER PIPELINE FROM
ZUBAIR MISHRIF NEW DGS TO PPG - CROSSINGS DETAILED DRAWING 250613DLDND2250
1+ 3
00
PPG INTERCONNECTING - RIVER WATER PIPELINE FROM
6" CONDENSATE 250613DLDND2258
00
ZUBAIR MISHRIF NEW DGS TO PPG - PIPELINE APPROACH DRAWING
V7
2+3
8" REJECT WATER PPG INTERCONNECTING - RIVER WATER LINE FROM ZUBAIR MISHRIF NEW DGS TO PPG -
250613DLCPD2268
1+4
PIPELINE STRESS ANALYSIS REPORT
8" RIVER WATER
00
B
00
2+2
2-12" RAW GAS IPF - PPG ANCHOR BLOCK STP SINGLE TEST POINT
00
HOT BEND CCTP CROSSING TEST POINT
00
MARKER POST UCTP UNCASED CROSSING TEST POINT
1+5
INSULATING JOINT SIJ SHUNTING INSULATING JOINT
DIRECTION CHANGE VALUES EPC EXISTING PIPELINE CROSSING
TP
XX TIE IN POINT ETP EQUIPOTENTIAL TEST POINT
FCB FIELD COLD BENDS UGPL UNDERGROUND PIPELINE
2+1
SCP STEEL CASING PIPE AGPL ABOVE GROUND PIPELINE
00
B
CS CONCRETE SLAB OHL OVERHEAD ELECTRICAL LINE
1+6
00
GEODETIC PARAMETERS
Coordinate System: WGS 1984 UTM Zone 38N
PLANIMETRY SYMBOLS
Projection: Transverse Mercator
Datum: WGS 1984 NEW FLOWLINE ASPHALT ROAD/TRACK ROAD
false easting: 500'000.0000 OVERHEAD POWERLINE ELECTRICAL CABLE U. G.
00
2+0
false northing: 0.0000
MATCHLINE
central meridian: 45.0000 PL/FLOWLINES IN PROJECT (FROM GIS) ABANDONED PIPELINE
1+7
scale factor: 0.9996 EXISTING PIPELINE U. G. ABOVE GROUND FLOWLINE
0
latitude of origin: 0.0000
DEMINING LIMIT
0
Units: Meter
CONTINUE TO DWG. NO. 250613DLDND2242 SHT. 1 OF 3
NOTES:
00
1+9
00
1.50
1.50
min.
min.
MATCHLINE
700
200
700
650
0 0
750
750
749
NEW TRAP
TOP OF PIPE
EP
AREA V2 V3
EP
PROFILE SCALE ORIGNAL GROUND V9
HORIZONTAL 1:2000 SP V1
ZB-12
VERTICAL 1:200
V4
EP
EP
EP
PPG
700
EP
EP
750
V5
SHEET 2 of 3
336
750
0
ZUBAIR MISHRIF
LENGTH (Kilometers) 1.2 1.4 1.6 1.8 2.0 2.2
336
650
V8
0
TOPOGRAPHIC REFERENCES V6 V7 V6
V7
30° 30° 54° V8
OPENSHUTOPENSHUTOPENSHUT
DIRECTION CHANGES
STATION
336
800
0
700
200
200
700
336 336
750
749
749
700
750
748
0 0
GROUND FEATURE
WALL THICKNESS (mm)
PIPE OD (in) STEEL GRADE
CHARACTERISTICS
PIPELINE LENGTH (m)
PIPE COVER (m)
CROSSINGS
DESIGN FACTOR
PIPE PROTECTION
CATHODIC PROTECTION
TYPICAL FLOWLINES SECTION 250600DLDQD0202
(FUTURE)
TYPICAL EXISTING UNDERGROUND PIPELINE CROSSING 250600DLDQD0205
TYPICAL EXISTING ABOVEGROUND PIPELINE CROSSING 250600DLDQD0206
G.L.G.L. G.L. TYPICAL MAJOR ROAD CROSSING 250600DLDQD0207
min.
min.
min.
min.
1.50
1.50
1.50
1.50
TYPICAL SECONDARY ROAD CROSSING 250600DLDQD0208
TYPICAL EXISTING OVERHEAD POWERLINE CROSSING 250600DLDQD0211
11.00 4.75 7.50 18.75 14.00
TYPICAL CASING PIPE DETAIL DRAWING 250600DLDQD0210
42.00
PPG INTERCONNECTING - RIVER WATER PIPELINE
FROM ZUBAIR MISHRIF NEW DGS TO PPG - ROUTE MAP 250613DLDLD2234
CORRIDOR SECTION B-B CORRIDOR SECTION A-A
V9
PPG INTERCONNECTING - RIVER WATER PIPELINE FROM
ZUBAIR MISHRIF NEW DGS TO PPG - CROSSINGS DETAILED DRAWING 250613DLDND2250
PPG INTERCONNECTING - RIVER WATER PIPELINE FROM
0
250613DLDND2258
70
ZUBAIR MISHRIF NEW DGS TO PPG - PIPELINE APPROACH DRAWING
2+
PPG INTERCONNECTING - RIVER WATER LINE FROM ZUBAIR MISHRIF NEW DGS TO PPG -
250613DLCPD2268
2+6
PIPELINE STRESS ANALYSIS REPORT
RX04
00
LEGEND
SYMBOLS AND ABBREVIATIONS
ANCHOR BLOCK STP SINGLE TEST POINT
2+5
HOT BEND CCTP CROSSING TEST POINT
MARKER POST UCTP UNCASED CROSSING TEST POINT
800 RX05
INSULATING JOINT SIJ SHUNTING INSULATING JOINT
00
DIRECTION CHANGE VALUES EPC EXISTING PIPELINE CROSSING
2+
TP
XX TIE IN POINT ETP EQUIPOTENTIAL TEST POINT
FCB FIELD COLD BENDS UGPL UNDERGROUND PIPELINE
SCP STEEL CASING PIPE AGPL ABOVE GROUND PIPELINE
CS CONCRETE SLAB OHL OVERHEAD ELECTRICAL LINE
2+4
GEODETIC PARAMETERS
Coordinate System: WGS 1984 UTM Zone 38N
PLANIMETRY SYMBOLS
RX06
00
Projection: Transverse Mercator
Datum: WGS 1984 NEW FLOWLINE ASPHALT ROAD/TRACK ROAD
false easting: 500'000.0000 OVERHEAD POWERLINE ELECTRICAL CABLE U. G.
false northing: 0.0000
central meridian: 45.0000 PL/FLOWLINES IN PROJECT (FROM GIS) ABANDONED PIPELINE
2+3
scale factor: 0.9996 EXISTING PIPELINE U. G. ABOVE GROUND FLOWLINE
latitude of origin: 0.0000
00 Units: Meter
DEMINING LIMIT
2+9
00
NOTES:
MATCHLINE
PPG
2+0
700
200
700
650
0 0
750
750
749
NEW TRAP SHEET 2 of 3
TOP OF PIPE
EP
AREA V2 V3
EP
PROFILE SCALE ORIGNAL GROUND V9
HORIZONTAL 1:2000 SP V1
ZB-12
VERTICAL 1:200
V4
EP
EP
EP
PPG
700
EP
EP
750
V5
336
750
0
ZUBAIR MISHRIF
LENGTH (Kilometers) 2.4 2.6 2.8 2.97
336
650
V9
0
TOPOGRAPHIC REFERENCES V6
V7
90° V8
OPENSHUTOPENSHUTOPENSHUT
DIRECTION CHANGES
STATION
336
800
0
700
200
200
700
336 336
750
749
749
700
750
748
0 0
GROUND FEATURE
WALL THICKNESS (mm)
PIPE OD (in) STEEL GRADE
CHARACTERISTICS
PIPELINE LENGTH (m)
PIPE COVER (m)
CROSSINGS
DESIGN FACTOR
PIPE PROTECTION
FCB FLANGE
FITTINGS AND BENDS 4-22.5° 2-45° 5D I.J.
PIPELINE MARKER POST