Gabriel India Limted Sanand Front Fork Specification Test Plan - 2021-2022 REV. 01
DATE. 30.07.2021
Test Frequency APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Sr. Test
Part Name Test parameter Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL
No Specification Supplier Gabriel
P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A
Once / Development or if 4M
3 Fork Pipe bending strength -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
4 Outer tube bending strength test (Longitudinal ) -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
5 Outer tube bending strength test (Lateral ) -- Already done test during development and submitted to HMSI
condition change in MP
As per Spec STD. 5140Z- Once / Development or if 4M
6 Brake boss strength -- Already done test during development and submitted to HMSI
GHA-6700 condition change in MP
Once / Development or if 4M
7 Brake durability -- Already done test during development and submitted to HMSI
condition change in MP
Axle holder static breaking strength (Through- Once / Development or if 4M
8 -- Already done test during development and submitted to HMSI
hole type) condition change in MP
Once / Development or if 4M
9 Fork Assly. L / R Stroking durability (Reaction force system) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
10 Stroking endurance (Damping system ) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
11 Drum durability -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
35 Filiform test -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
36 Weather resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
38 Humidity resistance -- Already done test during development and submitted to HMSI
Case Bottom L/ R condition change in MP
(Outer Tube) Once / Development or if 4M
39 Volatile solution resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
40 Xylene resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
41 Spot resistance -water/acid/alkali/gasolene -- Already done test during development and submitted to HMSI
condition change in MP
As per Sec. STD HES D 2016
42 Hardness -- Once /Lot Refer IPIR Report
- 07
Once / Development or if 4M
44 Color Retention -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
45 Polishing resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
47 Print Resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
48 Recoat performance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
49 Impact resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
50 Bending resistance -- Already done test during development and submitted to HMSI
condition change in MP
66 O ring CAMATA ENTERPRIZE MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)
67 O ring BYMER ELOSTOMERS MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)
69 Seal Dust HITECH ARAI Recovery Rate of Seal (R) As per Drawing
Once/ Development or if 4M
condition change in MP
NA Already done test during development and submitted to HMSI
94 Collar Oil Lock (Spacer Oil Lock) SSPL MTC As per Drawing AS PER RIS - 08 Once / 06 Months P P P P
95 Collar Oil Lock (Spacer Oil Lock) NINGHBO CHINA MTC As per Drawing AS PER RIS - 09 Once / 06 Months P P P P
REMARKS :-
2. GIL will not conduct third party & inhouse test for plastic and rubber components DD ACTUAL
3. Delay in Plan Vs. Actual, Marked with (D) D IF ANY DELAY IN PLAN Vs. ACTUAL
Prepared By : SAIL KHHAMBHATI Approved By :- LAXMAN RAO
PLQ02/0119
DOC. NO. PLQ02
Gabriel India Limted Sanand Front Fork Specification Test Plan - 2022-2023 REV. 01
DATE. 30.07.2021
Test Frequency APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Sr. Test
Part Name Test parameter Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL
No Specification Supplier Gabriel
P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A
Once / Development or if 4M
3 Fork Pipe bending strength -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
4 Outer tube bending strength test (Longitudinal ) -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
5 Outer tube bending strength test (Lateral ) -- Already done test during development and submitted to HMSI
condition change in MP
As per Spec STD. 5140Z- Once / Development or if 4M
6 Brake boss strength -- Already done test during development and submitted to HMSI
GHA-6700 condition change in MP
Once / Development or if 4M
7 Brake durability -- Already done test during development and submitted to HMSI
condition change in MP
Axle holder static breaking strength (Through- Once / Development or if 4M
8 -- Already done test during development and submitted to HMSI
hole type) condition change in MP
Once / Development or if 4M
9 Fork Assly. L / R Stroking durability (Reaction force system) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
10 Stroking endurance (Damping system ) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
11 Drum durability -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
35 Filiform test -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
36 Weather resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
38 Humidity resistance -- Already done test during development and submitted to HMSI
Case Bottom L/ R condition change in MP
(Outer Tube) Once / Development or if 4M
39 Volatile solution resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
40 Xylene resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
41 Spot resistance -water/acid/alkali/gasolene -- Already done test during development and submitted to HMSI
condition change in MP
As per Sec. STD HES D 2016
42 Hardness -- Once /Lot Refer IPIR Report
- 07
Once / Development or if 4M
44 Color Retention -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
45 Polishing resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
47 Print Resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
48 Recoat performance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
49 Impact resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
50 Bending resistance -- Already done test during development and submitted to HMSI
condition change in MP
66 O ring CAMATA ENTERPRIZE MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)
67 O ring BYMER ELOSTOMERS MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)
69 Seal Dust HITECH ARAI Recovery Rate of Seal (R) As per Drawing
Once/ Development or if 4M
condition change in MP
NA Already done test during development and submitted to HMSI
94 Collar Oil Lock (Spacer Oil Lock) SSPL MTC As per Drawing AS PER RIS - 08 Once / 06 Months P P P P
REMARKS :-
2. GIL will not conduct third party & inhouse test for plastic and rubber components DD ACTUAL
3. Delay in Plan Vs. Actual, Marked with (D) D IF ANY DELAY IN PLAN Vs. ACTUAL
Prepared By : TOFEEK ALI Approved By :- LAXMAN RAO
PLQ02/0119