DOC. NO.

PLQ02
Gabriel India Limted Sanand Front Fork Specification Test Plan - 2021-2022 REV. 01
DATE. 30.07.2021
Test Frequency APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Sr. Test
Part Name Test parameter Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL
No Specification Supplier Gabriel
P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A

1 Assembly tensile strength -- Once / Month P P P P P P P P P P P P

2 Assembly compressive strength -- Once / Month P P P P P P P P P P P P

Once / Development or if 4M
3 Fork Pipe bending strength -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
4 Outer tube bending strength test (Longitudinal ) -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
5 Outer tube bending strength test (Lateral ) -- Already done test during development and submitted to HMSI
condition change in MP
As per Spec STD. 5140Z- Once / Development or if 4M
6 Brake boss strength -- Already done test during development and submitted to HMSI
GHA-6700 condition change in MP
Once / Development or if 4M
7 Brake durability -- Already done test during development and submitted to HMSI
condition change in MP
Axle holder static breaking strength (Through- Once / Development or if 4M
8 -- Already done test during development and submitted to HMSI
hole type) condition change in MP
Once / Development or if 4M
9 Fork Assly. L / R Stroking durability (Reaction force system) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
10 Stroking endurance (Damping system ) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
11 Drum durability -- Already done test during development and submitted to HMSI
Change in MP

12 Damping Force Tension -- 05 Pieces /Lot Refer IPIR Report

13 Damping Force Compression -- 05 Pieces /Lot Refer IPIR Report

14 Oil Lock Force -- Once / 06 Months P P


As per Spec STD. 5140Z-
K0PA-D010-M1
15 Assy Reaction force -- Once / 06 Months P P

16 Friction characterstics -- Once / 06 Months P P

17 Contamination test -- Once / Month P P P P P P P P P P P P

18 Hardness Raw AS PER RIS - 05 AS PER RIS - 05 Receiving Inspection Report

Chemical Test AS PER RIS - 05 Once / 06 Months P P

19 Tensile Strength AS PER RIS - 05 Once / 06 Months P P

20 Yield Point AS PER RIS - 05 Once / 06 Months P P

21 Elongation % AS PER RIS - 05 Once / 06 Months P P

As per Spec STD. 5141Z-


22 Fork Pipe (inner Tube) Tensile strength of sub assy -- Once /Month P P P P P P P P P P P P
GHA-6810-M1 & HES D 2011

23 Plating thickness -- Once /Lot Refer IPIR Report

24 CASS TEST -- Once /Month P P P P P P P P P P P P

25 Plating Hardness -- Once /Month P P P P P P P P P P P P

26 Adhesion test -- Once /Month P P P P P P P P P P P P

27 Microcrack -- Once /Month P P P P P P P P P P P P

28 Material AC2B-F AS PER RIS - 02 Once / 06 Months P P

29 Tensile strength (MPa) Once / 03 Months Once / 06 Months P P P P P P

30 0.2% Yield Strength (MPa) Once / 03 Months Once / 06 Months P P P P P P

As per Spec STD 0093Z-


30 Elongation (%) Once / 03 Months Once / 06 Months P P P P P P
GHA-C410-M1

31 Impact property (J/cm²) Once / 03 Months Once / 06 Months P P P P P P

32 Hardness (HRB) AS PER RIS - 02 AS PER RIS - 02 Receiving Inspection Report

33 Quality of Cast AS PER RIS - 02 N=02 / Month P P P P P P P P P P P P

33 A X-ray Test -- 04 Piece / Month P P P P P P P P P P P P

34 Salt spray Test Each Lot Once / Month P P P P P P P P P P P P

Once / Development or if 4M
35 Filiform test -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
36 Weather resistance -- Already done test during development and submitted to HMSI
condition change in MP

37 water resistance -- Once / 06 Months P P

Once / Development or if 4M
38 Humidity resistance -- Already done test during development and submitted to HMSI
Case Bottom L/ R condition change in MP
(Outer Tube) Once / Development or if 4M
39 Volatile solution resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
40 Xylene resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
41 Spot resistance -water/acid/alkali/gasolene -- Already done test during development and submitted to HMSI
condition change in MP
As per Sec. STD HES D 2016
42 Hardness -- Once /Lot Refer IPIR Report
- 07

43 Specular gloss -- Once / 06 Months P P

Once / Development or if 4M
44 Color Retention -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
45 Polishing resistance -- Already done test during development and submitted to HMSI
condition change in MP

46 Coating Adhesion Once /Lot Once /Lot Refer IPIR Report

Once / Development or if 4M
47 Print Resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
48 Recoat performance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
49 Impact resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
50 Bending resistance -- Already done test during development and submitted to HMSI
condition change in MP

51 Film thickness -- Once /Lot Refer IPIR Report


52 MTC Once / 06 Months Once / 06 Months P P P P
As per Spec STD IS 4454 GR
Spring front fork (Spring -1) SAGAR
SH
53 Endurance test Once /Year NA P

54 MTC Once / 06 Months Once / 06 Months P P P P


As per Spec STD IS 4454 GR
Spring front fork (Spring -1) SUMA
SH
55 Endurance test Once /Year NA P

56 MTC Once / 06 Months Once / 06 Months P P P P


As per Spec STD IS 4454 GR
Spring front fork (Spring -1) EMKAY
SH
57 Endurance test Once /Year NA P

58 MTC Once / 06 Months Once / 06 Months P P P P


Pipe Seat (Piston) HARSHAD ENGG As per IS 3074 CEW-1
59 Tensile strength Once/Lot Once /03 Month P P P P

60 MTC Once / 06 Months Once / 06 Months P P P P


Pipe Seat (Piston) NARINDER PRAKASH As per IS 3074 CEW-1
61 Tensile strength Once/Lot Once /03 Month P P P P

62 SST AS PER RIS - 20 AS PER RIS - 20 P P P P P P P P P P P P P P P P


Bolt A front fork (Bolt Cap) SANGKAJ ENGG As per SAE 1010 / SAE 1018
63 MTC Once / 06 Months Once / 06 Months P P P P

64 SST AS PER RIS - 20 AS PER RIS - 20 P P P P P P P P P P P P P P P P


Bolt A front fork (Bolt Cap) NARINDER PRAKASH As per SAE 1010 / SAE 1018
65 MTC Once / 06 Months Once / 06 Months P P P P

66 O ring CAMATA ENTERPRIZE MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)

67 O ring BYMER ELOSTOMERS MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)

68 MTC (R) AS PER RIS - 13 NA

69 Seal Dust HITECH ARAI Recovery Rate of Seal (R) As per Drawing
Once/ Development or if 4M
condition change in MP
NA Already done test during development and submitted to HMSI

70 Ozone Resistance (R) Once / 06 Months NA

71 MTC Once / 06 Months Once / 06 Months P P P P


Ring oil seal stop (Circlip) EMKAY AUTO As per IS 4454
72 SST AS PER RIS - 12 AS PER RIS - 12 P P P P P P P P P P P P P P P P

73 MTC Once / 06 Months Once / 06 Months P P P P


Ring oil seal stop (Circlip) BELLITE SPRING As per IS 4454
74 SST AS PER RIS - 12 AS PER RIS - 12 P P P P P P P P P P P P P P P P

75 MTC (R) AS PER RIS - 11 NA


Seal Oil As per Drawing
76 Recovery Rate of Seal (R) Once/ Development or if 4M
condition change in MP
NA Already done test during development and submitted to HMSI

77 Ring Piston JAIRAJ ANCILLARY MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

78 Ring Piston SUBA INJECTION MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

79 MTC Once / 06 Months Once / 06 Months P P P P


Spring Rebound (Spring - 2) SAGAR As per IS 4454
80 Endurance test Once / Year NA P

81 MTC Once / 06 Months Once / 06 Months P P P P


Spring Rebound (Spring - 2) SUMA As per IS 4454
82 Endurance test Once / Year NA P

Washer Special 8 MM As per GRM 0801


83 MTC Once / 06 Months Once / 06 Months P P P P
(Gasket Copper) CITIZEN PRESS COMPONENTS specification

Washer Special 8 MM As per GRM 0801


84 MTC Once / 06 Months Once / 06 Months P P P P
(Gasket Copper) GOLDY specification

85 MTC Once / 06 Months Once / 06 Months P P P P


Bolt socket M8 Hex. DHAM FASTNERS As per IS 1367 specification
86 SST AS PER RIS - 16 AS PER RIS - 16 P P P P P P P P P P P P P P P P

87 MTC Once / 06 Months Once / 06 Months P P P P


Bolt socket M8 Hex. SANGKAJ ENGG As per IS 1367 specification
88 SST AS PER RIS - 16 AS PER RIS - 16 P P P P P P P P P P P P P P P P

89 MTC Once / 06 Months Once / 06 Months P P P P


Bolt socket M8 Hex. SINGLA FORGING As per IS 1367 specification
90 SST AS PER RIS - 16 AS PER RIS - 16 P P P P P P P P P P P P P P P P

As per GRM 0101


91 Piece Oil Lock (Spindle Taper) SANGKAJ ENGG. MTC Once / 06 Months Once / 06 Months P P P P
specification

As per GRM 0101


92 Piece Oil Lock (Spindle Taper) SIGMA CNC MTC Once / 06 Months Once / 06 Months P P P P
specification

Seat Rebound (Seat Spring Lower) CITIZEN PRESS


93 MTC As per IS 513 specification Once / 06 Months Once / 06 Months P P P P
COMPONENTS

94 Collar Oil Lock (Spacer Oil Lock) SSPL MTC As per Drawing AS PER RIS - 08 Once / 06 Months P P P P

95 Collar Oil Lock (Spacer Oil Lock) NINGHBO CHINA MTC As per Drawing AS PER RIS - 09 Once / 06 Months P P P P

96 Guide Spring JAIRAJ ANCILLARY MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

97 Guide Spring SUBA INJECTION MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

Spring Valve As per GRM 1201


98 MTC Once / 06 Months Once / 06 Months P P P P
(Spring Wave Washer) SHREE RAM ENGG. specification

Spring Valve As per GRM 1201


99 MTC Once / 06 Months Once / 06 Months P P P P
(Spring Wave Washer) GOLDY specification

REMARKS :-

1. (P) - PLASTIC PARTS & (R) RUBBER PARTS P PLAN

2. GIL will not conduct third party & inhouse test for plastic and rubber components DD ACTUAL

3. Delay in Plan Vs. Actual, Marked with (D) D IF ANY DELAY IN PLAN Vs. ACTUAL
Prepared By : SAIL KHHAMBHATI Approved By :- LAXMAN RAO

Sr. No Description Revision Number Revision Date

1 New Released 0 01.12.2019

2 Revised as per AHQC 1 30.07.2021

PLQ02/0119
DOC. NO. PLQ02
Gabriel India Limted Sanand Front Fork Specification Test Plan - 2022-2023 REV. 01
DATE. 30.07.2021
Test Frequency APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Sr. Test
Part Name Test parameter Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL Supplier GIL
No Specification Supplier Gabriel
P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A P A

1 Assembly tensile strength -- Once / Month P P P P P P P P P P P P

2 Assembly compressive strength -- Once / Month P P P P P P P P P P P P

Once / Development or if 4M
3 Fork Pipe bending strength -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
4 Outer tube bending strength test (Longitudinal ) -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
5 Outer tube bending strength test (Lateral ) -- Already done test during development and submitted to HMSI
condition change in MP
As per Spec STD. 5140Z- Once / Development or if 4M
6 Brake boss strength -- Already done test during development and submitted to HMSI
GHA-6700 condition change in MP
Once / Development or if 4M
7 Brake durability -- Already done test during development and submitted to HMSI
condition change in MP
Axle holder static breaking strength (Through- Once / Development or if 4M
8 -- Already done test during development and submitted to HMSI
hole type) condition change in MP
Once / Development or if 4M
9 Fork Assly. L / R Stroking durability (Reaction force system) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
10 Stroking endurance (Damping system ) -- Already done test during development and submitted to HMSI
Change in MP
Once / Development or if 4M
11 Drum durability -- Already done test during development and submitted to HMSI
Change in MP

12 Damping Force Tension -- 05 Pieces /Lot Refer IPIR Report

13 Damping Force Compression -- 05 Pieces /Lot Refer IPIR Report

14 Oil Lock Force -- Once / 06 Months P P


As per Spec STD. 5140Z-
K0PA-D010-M1
15 Assy Reaction force -- Once / 06 Months P P

16 Friction characterstics -- Once / 06 Months P P

17 Contamination test -- Once / Month P P P P P P P P P P P P

18 Hardness Raw AS PER RIS - 05 AS PER RIS - 05 Receiving Inspection Report

Chemical Test AS PER RIS - 05 Once / 06 Months P P

19 Tensile Strength AS PER RIS - 05 Once / 06 Months P P

20 Yield Point AS PER RIS - 05 Once / 06 Months P P

21 Elongation % AS PER RIS - 05 Once / 06 Months P P

As per Spec STD. 5141Z-


22 Fork Pipe (inner Tube) Tensile strength of sub assy -- Once /Month P P P P P P P P P P P P
GHA-6810-M1 & HES D 2011

23 Plating thickness -- Once /Lot Refer IPIR Report

24 CASS TEST -- Once /Month P P P P P P P P P P P P

25 Plating Hardness -- Once /Month P P P P P P P P P P P P

26 Adhesion test -- Once /Month P P P P P P P P P P P P

27 Microcrack -- Once /Month P P P P P P P P P P P P

28 Material AC2B-F AS PER RIS - 02 Once / 06 Months P P

29 Tensile strength (MPa) Once / 03 Months Once / 06 Months P P P P P P

30 0.2% Yield Strength (MPa) Once / 03 Months Once / 06 Months P P P P P P

As per Spec STD 0093Z-


30 Elongation (%) Once / 03 Months Once / 06 Months P P P P P P
GHA-C410-M1

31 Impact property (J/cm²) Once / 03 Months Once / 06 Months P P P P P P

32 Hardness (HRB) AS PER RIS - 02 AS PER RIS - 02 Receiving Inspection Report

33 Quality of Cast AS PER RIS - 02 N=02 / Month P P P P P P P P P P P P

33 A X-ray Test -- 04 Piece / Month P P P P P P P P P P P P

34 Salt spray Test Each Lot Once / Month P P P P P P P P P P P P

Once / Development or if 4M
35 Filiform test -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
36 Weather resistance -- Already done test during development and submitted to HMSI
condition change in MP

37 water resistance -- Once / 06 Months P P

Once / Development or if 4M
38 Humidity resistance -- Already done test during development and submitted to HMSI
Case Bottom L/ R condition change in MP
(Outer Tube) Once / Development or if 4M
39 Volatile solution resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
40 Xylene resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
41 Spot resistance -water/acid/alkali/gasolene -- Already done test during development and submitted to HMSI
condition change in MP
As per Sec. STD HES D 2016
42 Hardness -- Once /Lot Refer IPIR Report
- 07

43 Specular gloss -- Once / 06 Months P P

Once / Development or if 4M
44 Color Retention -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
45 Polishing resistance -- Already done test during development and submitted to HMSI
condition change in MP

46 Coating Adhesion Once /Lot Once /Lot Refer IPIR Report

Once / Development or if 4M
47 Print Resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
48 Recoat performance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
49 Impact resistance -- Already done test during development and submitted to HMSI
condition change in MP
Once / Development or if 4M
50 Bending resistance -- Already done test during development and submitted to HMSI
condition change in MP

51 Film thickness -- Once /Lot Refer IPIR Report


52 MTC Once / 06 Months Once / 06 Months P P P P
As per Spec STD IS 4454 GR
Spring front fork (Spring -1) SAGAR
SH
53 Endurance test Once /Year NA P

58 MTC Once / 06 Months Once / 06 Months P P P P


Pipe Seat (Piston) HARSHAD ENGG As per IS 3074 CEW-1
59 Tensile strength Once/Lot Once /03 Month P P P P

60 MTC Once / 06 Months Once / 06 Months P P P P


Pipe Seat (Piston) NARINDER PRAKASH As per IS 3074 CEW-1
61 Tensile strength Once/Lot Once /03 Month P P P P

62 SST AS PER RIS - 20 AS PER RIS - 20 P P P P P P P P P P P P P P P P


Bolt A front fork (Bolt Cap) SANGKAJ ENGG As per SAE 1010 / SAE 1018
63 MTC Once / 06 Months Once / 06 Months P P P P

64 SST AS PER RIS - 20 AS PER RIS - 20 P P P P P P P P P P P P P P P P


Bolt A front fork (Bolt Cap) NARINDER PRAKASH As per SAE 1010 / SAE 1018
65 MTC Once / 06 Months Once / 06 Months P P P P

66 O ring CAMATA ENTERPRIZE MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)

67 O ring BYMER ELOSTOMERS MTC (R) As per HES C201 AS PER RIS - 21 NA For Rubber Parts GIL Will Not Conduct Test (Supplier MTC OK)

68 MTC (R) AS PER RIS - 13 NA

69 Seal Dust HITECH ARAI Recovery Rate of Seal (R) As per Drawing
Once/ Development or if 4M
condition change in MP
NA Already done test during development and submitted to HMSI

70 Ozone Resistance (R) Once / 06 Months NA

73 MTC Once / 06 Months Once / 06 Months P P P P


Ring oil seal stop (Circlip) BELLITE SPRING As per IS 4454
74 SST AS PER RIS - 12 AS PER RIS - 12 P P P P P P P P P P P P P P P P

75 MTC (R) AS PER RIS - 11 NA


Seal Oil As per Drawing
76 Recovery Rate of Seal (R) Once/ Development or if 4M
condition change in MP
NA Already done test during development and submitted to HMSI

77 Ring Piston JAIRAJ ANCILLARY MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

78 Ring Piston SUBA INJECTION MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

79 MTC Once / 06 Months Once / 06 Months P P P P


Spring Rebound (Spring - 2) SAGAR As per IS 4454
80 Endurance test Once / Year NA P

Washer Special 8 MM As per GRM 0801


83 MTC Once / 06 Months Once / 06 Months P P P P
(Gasket Copper) CITIZEN PRESS COMPONENTS specification

Washer Special 8 MM As per GRM 0801


84 MTC Once / 06 Months Once / 06 Months P P P P
(Gasket Copper) GOLDY specification

85 MTC Once / 06 Months Once / 06 Months P P P P


Bolt socket M8 Hex. DHAM FASTNERS As per IS 1367 specification
86 SST AS PER RIS - 16 AS PER RIS - 16 P P P P P P P P P P P P P P P P

87 MTC Once / 06 Months Once / 06 Months P P P P


Bolt socket M8 Hex. SANGKAJ ENGG As per IS 1367 specification
88 SST AS PER RIS - 16 AS PER RIS - 16 P P P P P P P P P P P P P P P P

As per GRM 0101


91 Piece Oil Lock (Spindle Taper) SANGKAJ ENGG. MTC Once / 06 Months Once / 06 Months P P P P
specification

As per GRM 0101


92 Piece Oil Lock (Spindle Taper) SIGMA CNC MTC Once / 06 Months Once / 06 Months P P P P
specification

Seat Rebound (Seat Spring Lower) CITIZEN PRESS


93 MTC As per IS 513 specification Once / 06 Months Once / 06 Months P P P P
COMPONENTS

94 Collar Oil Lock (Spacer Oil Lock) SSPL MTC As per Drawing AS PER RIS - 08 Once / 06 Months P P P P

96 Guide Spring JAIRAJ ANCILLARY MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

97 Guide Spring SUBA INJECTION MTC (P) As per GRM 1402


specification
Once / 06 Months NA For Plastic Parts GIL Will Not Conduct Test (Supplier MTC OK)

Spring Valve As per GRM 1201


99 MTC Once / 06 Months Once / 06 Months P P P P
(Spring Wave Washer) GOLDY specification

REMARKS :-

1. (P) - PLASTIC PARTS & (R) RUBBER PARTS P PLAN

2. GIL will not conduct third party & inhouse test for plastic and rubber components DD ACTUAL

3. Delay in Plan Vs. Actual, Marked with (D) D IF ANY DELAY IN PLAN Vs. ACTUAL
Prepared By : TOFEEK ALI Approved By :- LAXMAN RAO

Sr. No Description Revision Number Revision Date

1 New Released 0 01.12.2019

2 Revised as per AHQC 1 30.07.2021