4.MATERIAL GI
5.TESTING CONDITION
DI water/City Water/ Nitrogen / Others ( )
1) Test with
Compressed Air (Oil Free / Untreated )
2) Working Pressure 0.80 MPa
3) Testing Pressure 1.00 MPa
4) Pressure holding Time 60 minutes
5) Testing points All connection / Partial (see the attached drawings)
6.TESTING RESULT
1) Testing Date & time Start 22/9/2022 7.15PM
End 22/9/2022 8.15PM
2) Conducted by TTE Person name YJ NG
3) Witness IBIDEN/TTE Person name QAMARUL
4) Before Testing 1.10 MPa(S) 1.07 MPa (R)
5) After Testing 1.10 MPa (S) 1.07 MPa (R)
6) Result Accept ・Reject Person name/sign
7.TESTING INSTRUMENT
Instrument Name Measurement Range Model Brand Remark
1) Pressure Gauge 0 ~ 2 MPa Unijin
2) ~
3) ~
8.REMARKS
[Format 7-1]Table
9.Reference documents.
1)Piping schematic shop drawing show testing line
2)Testing record photo.
3)Others
Initial Water Leak Testing Pressure (S) = 1.1MPa Initial Water Leak Testing Pressure(S) = 1.1MPa
Initial Water Leak Testing Pressure (R) = 1.07MPa Initial Water Leak Testing Pressure (R) = 1.07MPa
After Water leak Testing Reading(S) = 1.1MPa After Water leak Testing Reading(R) = 1.1MPa
After Water leak Testing Reading(R) = 1.07MPa After Water leak Testing Reading(R) = 1.07MPa