ST (10801 / 38100) + P/F

ST (38100 / 13756) + P/F

USE EXISTING DUCT

USE EXISTING DUCT OR


INSTALL HDD EN6

Schematic Diagram

13756
10801

bx+P/F

bx+P/F
USE EXISTING DUCT 1131 1131

1131 1131
5 38100
ABAL GARAREES- 15
A 04-01-2022 REVISED AS PER 11 KV ADVISE. MS

BP # N/2020/0466
MD : 162 kW
NOTES:
S/STN. 38100 - SELF WORK, APPLICANT TO PROVIDE PLINTH FOR PKG S/STN
ABAL GARAREES- 15 & PROVIDE ALL REQUIRED MATERIALS AS PER KAHRAMAA
PKG STANDARD & HIRE KAHRAMAA APPROVED CONTRACTOR TO
GRID : 220830 , 444928 CARRY OUT THE WORK.
INSTALL - ALL COST TO APPLICANT, NO COST TO KAHRAMAA.
- 1 x 500 kVA PACKAGE S/STN - NO BASEMENT BELOW SUBSTATION.
- 1 x PLINTH FOR PACKAGE S/STN - ALL MV CABLES ARE 3C 240 mm² XLPE + PILOT / FIBER.
- 1 x S/STN EARTHING
SUPPLY TO LABOR
IMPORTANT NOTE: ACCOMMODATION FOR BP # M/2020/466
CABLES SHALL BE LAID AS PER RELEVANT LATEST
MME GUIDELINES IN DESIGNATED ELECTRICITY
Abal Gararees
CORRIDOR AS PER RELEVANT RIGHT OF WAY FOR MS 22-04-2021 1 : 500
UTILITY CROSS SECTION. DEPTH TO BOTTOM OF W Ahmed AK
CABLE FROM ROAD LEVEL SHALL BE 800 mm FOR
A Aziz AA
11KV CABLES AND 700 mm FOR LV CABLES. 27-64-2021
Zone - 75