BOQ BTB WTP 26 July 2021 Modify
BOQ BTB WTP 26 July 2021 Modify
Bill 2 - CW (IP) - Civil and Building Works for Intake Pumping Station BF2
Bill 5 - CW (WT) - Civil and Building Works for Water Treatment Plant BF5
Bill 5 Civil and Building Works forWater Treatment Plant BF5 10,327,821.50
(C) Total of Work Items plus Daywork plus Provisional Sums 12,407,691.28
(E) Bid Price (C+D) (Carried forward to Form of Bid) - Lot 1 13,648,460.41
Bidder's signature:
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. BILL 1 - GENERAL ITEMS
Contractual Requirements
BF1. 01 All bonds and guarantees in accordance with the Conditions of Contract ls 1 37,830.00 37,830.00 - -
BF1. 02 All insurance policies in accordance with the Conditions of Contract ls 1 238,649.10 238,649.10 - -
- - -
Specified Requirements: Engineer's and Employer's Facilities - - -
The Contractor shall provide, establish, maintain and remove at
completion of works as described in Specification - - -
- - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Services for the Engineer's Staff - - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. 08 Supply, Maintenance of vehicles supplied to Engineer's staff including mths 48 850.00 - - 40,800.00
fuel and maintenances
Local Area Network with DSL internet connection (minimum 10 mbps
BF1. 09 and router) mths 24 54.55 - - 1,309.20
Set of Initial and Progress Photographs (to cover all major activities ) as
BF1. 10 in specification. mths 24 2,515.91 - - 60,381.84
BF1. 11 Printing, Distribution and Preparation of Record Drawings including mths 24 818.18 - - 19,636.32
shop drawings for the Engineer's approval
BF1. 12 Attendance Upon the Engineer's Staff days 1,056 25.00 - - 26,400.00
- - -
All specified testing relating to civil and building works for concrete,
BF1. 14 roads, paving, water retaining structures and any other testing required ls 1 45,000.00 - - 45,000.00
as specified and not listed above.
Pressure testing pipelines in access road, yard piping and process piping
BF1. 15 ls 1 40,666.34 - - 40,666.34
as specified.
BF1. 16 Disinfection and flushing of pipelines after pressure testing ls 1 5,000.00 - - 5,000.00
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
- - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Testing of the Works; Plant Installation Testing and Trial Operation - - -
BF1. 19 Rotating equipment checklist and description of test procedures ls 1 2,910.00 - - 2,910.00
BF1. 20 Rotating equipment test report: vibration and alignment check. ls 1 2,910.00 - - 2,910.00
Dry run tests for treatment plant M&E equipment as specified prior to
BF1. 21 start up including services of equipment manufacturers representative ls 1 18,072.32 - - 18,072.32
and test reports.
Dry run tests for Intake Pump Station M&E equipment as specified prior
BF1. 22 to start up including services of equipment manufacturers ls 1 18,072.32 - - 18,072.32
representative and test reports.
Wet run tests on Water Treatment Plant M&E equipment prior to start
BF1. 23 up including services of equipment manufacturers representative and ls 1 35,081.56 - - 35,081.56
test reports.
Wet run tests on Intake Pumping Station M&E equipment prior to start
BF1. 24 up including services of equipment manufacturers representative and ls 1 35,081.56 - - 35,081.56
test reports.
BF1. 26 Allow for any other testing required as specified and not listed above ls 1 3,880.00 - - 3,880.00
- - -
Training for BTBWSA staff - - -
Contractor's outline of the training program within 90 days after notice
BF1. 27 to start work. ls 1 1,455.00 - - 1,455.00
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. 28 Course materials, student notes and instruction manuals 30 days prior ls 1 1,940.00 - - 1,940.00
to training
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. 29 Training for instrumentation and control systems operation and days 20 582.00 - - 11,640.00
maintenance
BF1. 31 Training for operation of all treatment plant processes during trial days 60 582.00 - - 34,920.00
operation.
BF1. 32 Allow for any other training required as specified and not listed above ls 1 20,370.00 - - 20,370.00
- - -
Temporary Works - - -
BF1. 33 Project Sign Board Establish, Maintenance and Removal ls 1 3,600.00 - - 3,600.00
BF1. 34 Traffic Regulation (management), safety and control as specified days 730 47.00 - - 34,310.00
BF1. 36 Mobilization and Setup of Piling Equipment for Concrete Pile ls 1 7,500.00 - - 7,500.00
- - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. 39 Preparation of QC/QA and QMS and Compliance with the Quality ls 1 14,400.00 - - 14,400.00
Assurance Standards as specified
Allow for any other submittals and services required as specified and
BF1. 42 not listed above ls 1 3,600.00 - - 3,600.00
- - -
Specified Requirements: Personnel - - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. 50 Electrical engineer mths 4 13,580.00 - - 54,320.00
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF1. 51 Health and safety officer mths 24 15,520.00 - - 372,480.00
- - -
Subtotal for Bill 1, CARRIED TO GRAND SUMMARY 276,479 - 3,094,287.58
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) PRELIMINARIES & GENERAL BILL- 1
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
BF1. BILL 1 - GENERAL ITEMS
All necessary materials required to perform the work to be provided by
the contractor to the respective sites.
Preliminary studies
Civil and structural engineering and other necessary studies to adapt the
project with functional modifications. This price includes especially
BF1. 01 calculations and shop drawings. ls 1 -
Calculation per Lump Sum.
BF1. 14 Supply and Maintenance of vehicles supplied to Engineer's staff including veh- 48 -
fuel mon
BF1. 15 Local Area Network with DSL internet connection (minimum 2mbps and mon 24 -
router)
Set of Initial and Progress Photographs (to cover all major activities and
BF1. 16 including monthly drone photos ) as in specification. mon 24 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) PRELIMINARIES & GENERAL BILL- 1
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Dry run tests for treatment plant M&E equipment as specified prior to
BF1. 30 start up including services of equipment manufacturers representative ls 1 -
and test reports.
Dry run tests for Intake Pump Station M&E equipment as specified prior
BF1. 31 to start up including services of equipment manufacturers representative ls 1 -
and test reports.
Wet run tests on Water Treatment Plant M&E equipment prior to start
BF1. 32 up including services of equipment manufacturers representative and ls 1 -
test reports.
Wet run tests on Intake Pumping Station M&E equipment prior to start
BF1. 33 up including services of equipment manufacturers representative and ls 1 -
test reports.
BF1. 35 Allow for any other testing required as specified and not listed above ls 1 -
BF1. 36 Contractor's outline of the training program within 90 days after notice ls 1 -
to start work.
Course materials, student notes and instruction manuals 30 days prior to
BF1. 37 training ls 1 -
BF1. 41 Allow for any other training required as specified and not listed above ls 1 -
Temporary Works -
BF1. 42 Project Sign Board Establishment nr 1 -
BF1. 43 Maintenance mon 24 -
BF1. 44 Removal nr 1 -
BF1. 45 Traffic Regulation (management), safety and control as specified days 720 -
BF1. 46 Site Fencing including Relocation as specified mon 24 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) PRELIMINARIES & GENERAL BILL- 1
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
BF1. 50 Preparation of QC/QA and QMS and Compliance with the Quality ls 1 -
Assurance Standards as specified
BF1. 51 As Built Drawings ls 1 -
BF1. 53 Allow for any other submittals and services required as specified and not ls 1 -
listed above
BF1. 54 Project Plaque ls 1 -
BF1. 55 Architectural Model of WTP and Intake PS building ls 1 -
Costs for Key Personnel who meet the requirement in the qualification
criteria plus costs for other personnel, engineers and surveyors with the
exception of the foreman and labourers who are included in the cost of
the works.
Bidder shall specify the person months of each professional (with the
exception of the Project Manager) to be assigned according to the
construction schedule.
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Earthwork
Excavation by dredging Materials other than topsoil, rock or
BF2. 04 artificial hard materials m3 1,000 5.50 5,500.00
Concrete
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Includes supply and provision of concrete, casting work and ancillary
materials, formworks, scaffolding, support and ancillary materials
including joints, water stop, and tie-bars which is specified in the
drawings and/or required for construction to comply with
specifications.
15Mpa
Concrete blinding layer 100mm
BF2. 12 thick m3 40 150.00 6,000.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Concrete for stair 37Mpa
shown on drawings of IPS siteworks
BF2. 20 and retaining walls m3 29 280.00 8,120.00
Concrete Ancillaries
-
Reinforcement Deformed Bar, shown on drawings
of IPS siteworks and retaining walls
BF2. 23 t 150 1,390.00 208,500.00
Piles
Riprap Class A
as specified and shown on drawings
BF2. 28 of intake works m3 100.0 50.00 5,000.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
PVC pipe for weep holes for all pvc φ50mm, supply and installation
masonry and retaining wall
BF2. 35 m 1,620 15.00 24,300.00
BF2. 37 Rubber Fender, 400H x 1000L Supply and Installation Including bolt nr 11 1,396.80 15,364.80
etc. for mounting to the revement
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
BF2. 51 Concrete for beam and column 37MPa m3 55.9 280.00 15,652.00
All internal pipework and fittings for the intake PS and the Sediment
pump well including boxouts, supports and building in pipes to
BF2. 63 complete the works shown on the drawings and as specified not ls 1 -
included elsewhere
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Structural Metalwork
BF2. 76 Step iron with polypropylene W=300mm with fall arrest cage nr 50 21.60 1,080.00
coatings
Circle fall arrest cage for iron
BF2. 77 steps D=800mm m 12 14.40 172.80
BF2. 78 Stainless Steel stair and platforms as outlined in drawings ls 1 2,160.00 2,160.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Stainless steel multi-stage vertical ladder with platforms, railing, safety
BF2. 79 hoops and safety chains in pump forbay, as shown on drawing B-IW- ls 1 5,400.00 5,400.00
PS/PW-C-GA-XS-014, etc.
Handrail
BF2. 92 H=1.1m (level) SS304 m 3 65.00 195.00
Handrail for step
BF2. 93 H=1.1m (inclined) SS304 m 7 65.00 455.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 2 - CIVIL WORKS FOR INTAKE BILL - 2
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 PUMPING STATION
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Roof drain
BF2. 94 φ75mm nr 4 45.00 180.00
Downpipe
BF2. 95 VP75 m 10 15.00 150.00
Construction of Guard House, Fencing and Main/ Side Gates
including general preparation, formwork, re-bar arrangement,
concrete, interior and exterior finishing for all floors, walls, bases and
ceilings, roofing, windows, doors, shutters, shelves, supply and
installation of Main gate and side gate, Nameplate Panel with
BF2. 96 BTBWSA logo, and other miscellaneous equipment specified in the ls 1 22,968.00 22,968.00
Drawings and Specifications
Electrical Work
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 3 - MECHANICAL WORKS FOR
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 INTAKE PUMPING STATION BILL-3
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Spare parts for main intake pumps for each pump ( bearings, seals,
BF3. 02 sensor set , O ring set) nr 3 -
Drain sump pumps @ drain Intake pit 10l/sec x15m, with motors
BF3. 03 >5.5kW, fixed installation nr 2 -
Pump inlet pipe , Raw water, from inlet well to pump, SP, ND450 mm
BF3. 11 nr 3 -
Pump discharge pipe , Raw water, from pump to header pipe, SP,
BF3. 12 ND300 mm nr 3 -
Pump discharge pipe, Raw water, header pipe in the pump room, SP,
BF3. 14 ND700 mm nr 1 -
Drainage pipe, Sand drainage pipe in the pump room, SSP, ND100 mm
BF3. 15 nr 1 -
Drainage pipe, Floor drainage pipe in the pump room, SSP, ND50 mm
BF3. 16 m 30 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 3 - MECHANICAL WORKS FOR
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 INTAKE PUMPING STATION BILL-3
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Pump inlet , ND450 mm, knife valve for water
BF3. 19 nr 3 -
Transmission flow control, ND700 mm, toothed vane disc butterfly valve
BF3. 22 nr 1 -
Air valves for header pipe, ND80 mm high speed air valve
BF3. 23 nr 3 -
Air valves for vertical shaft pipe, ND100 mm high speed air valve
BF3. 24 nr 3 -
Air valves isolation for header pipe, ND80 mm, knife valve
BF3. 25 nr 3 -
Sand drainage pump discharge checks, ND100 mm, swing check valve
BF3. 27 nr 1 -
Supply and Hinged Manhole Cover light duty (for access to the
Installation of wet well stairs)
BF3. 33 Manhole cover nr 1 -
(No.4)
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 4 - ELECTRICAL WORKS FOR
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 INTAKE PUMPING STATION BILL - 4
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Panel boards and motor control centres as per one line diagrams
pole panel
BF4. 01 nr 1 -
Transformer (400 kVA) oil type for outdoor use inclusive of accessories
BF4. 11 as buchold relay/lifting hooks/oil fill plug/oil drain valve. nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 4 - ELECTRICAL WORKS FOR
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 INTAKE PUMPING STATION BILL - 4
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
BF4. 17 Heavy duty galvanized steel cable trays, ducts and raceways as per ls 1 -
Drawings and Specifications
BF4. 19 Power outlets complete all receptacles, boxes, wiring and conduit to ls 1 -
distribution panel as per Drawings and Specifications
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Wire Mesh
BF5. 11 t 36.6 1,590.00 58,194.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Slope Embankment and Sodding for Protection
BF5. 18 m2 300 7.20 2,160.00
Sub-total for Bill 5-1 – Access Road and Piping, CARRIED TO PART SUMMARY 366,214.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 5-2 – Earthwork for Water Treatment Plant, CARRIED TO PART SUMMARY 671,637.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Bill 5-3 – Receiving Well and Coagulation Basin, Flocculation and Sedimentation Basin (in Treatment Facilities)
Construction of Receiving Well, Coagulation Basin, Flocculation and
Sedimentation Basin including supply of materials, general
preparation, formwork, re-bar arrangement, concrete, interior and
exterior finishing for all floors, walls, columns, bases, ladders, handrails,
stepirons as specified and shown in the Drawings
Sub-total for Bill 5-3 – Receiving Well and Coagulation Basin, Flocculation and Sedimentation Basin (in Treatment Facilities), 1,609,265.20
CARRIED TO PART SUMMARY
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Handrails
BF5. 54 m 280 86.00 24,080.00
Manhole
BF5. 55 nr 18 1,310.40 23,587.20
Building Architectural work for Filter Gallery & Blower Room in Water
Treatment Facility -
Building electrical works for Filter Gallery & Blower Room including
distribution panels, cables and termination, conduit and fittings, lighting
BF5. 57 fixtures, switches, and other miscellaneous equipment specified in the ls 1 7,200.00 7,200.00
Drawings.
Sub-total for Bill 5-4 – Filters (in Treatment Facilities), CARRIED TO PART SUMMARY 799,471.20
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sand Backfill
BF5. 59 m³ 24,464 40.00 978,560.00
Concrete for main Structures like as Column, Base Slab, Top Slab, Roof
Slab with Parapet Wall, External Wall, Internal Wall and Partition Wall,
BF5. 61 manhole (Concrete cube compressive strength = 37 MPa) t 4,805 140.00 672,700.00
Formwork
BF5. 62 m2 17,354 31.00 537,974.00
Handrail
BF5. 66 m 80 86.00 6,880.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Manhole Including 6 ventilation towers complete
with protective cowel annd filters and 14
BF5. 67 access manholes with chimney and step nr 20 1,306.80 26,136.00
irons in upper part
Supply and Install Stainless steel Stairs and platforms as outlined on the
BF5. 70 drawings ls 1 10,800.00 10,800.00
Sub-total for Bill 5-5 – Clear water reservoir and Distribution Pump Station, CARRIED TO PART SUMMARY 3,760,340.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Re-bar work
BF5. 75 t 143 1,390.00 198,770.00
Structural Concrete
BF5. 76 m³ 1,065 260.00 276,900.00
Handrail H=1.10m
BF5. 77 m 72 86.00 6,192.00
Supply and Install lifting beam for travelling trolley hoist for a capacity
BF5. 78 of 1500kg including all embedding and securing to structure. nr 1 3,600.00 3,600.00
Sub-total for Bill 5-6 – Drainage Basin, CARRIED TO PART SUMMARY 503,105.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Concrete for main Structures like as Footing, Wall, Approach Slab and U-
BF5. 86 drain (Concrete cube compressive strength = 37 MPa) m³ 296 140.00 41,440.00
BF5. 88 Deformed bar with Yield strength = 390 MPa t 61.8 1,390.00 85,902.00
Sub-total for Bill 5-7 – Sludge Storage Lagoon, CARRIED TO PART SUMMARY 335,412.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
BF5. 94 Pile work Driven pile size 0.3x0.3x12.0m nr. 66 597.60 39,441.60
Construction of Administration Building including supply of materials,
general preparation, formwork, re-bar arrangement, concrete, interior
and exterior finishing for all floors, walls, bases and ceilings, roofing,
BF5. 95 stairs, windows, doors, handrails, shutters, shelves, racks, tables and ls 1 439,200.00 439,200.00
other miscellaneous equipment specified in the Drawings.
Sub-total for Bill 5-8 – Administration building, CARRIED TO PART SUMMARY 512,553.60
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 5-9 – Chemical building, CARRIED TO PART SUMMARY 439,992.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Construct reinforced concrete bund for Genset fuel tank that holds 1.1
BF5. 104 times the tank (9000 litres) capacity. ls 1 1,080.00 1,080.00
Sub-total for Bill 5-10 – Generator House, CARRIED TO PART SUMMARY 145,512.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 5-11 –Gates, Plaque Shelter and Fencing, CARRIED TO PART SUMMARY 22,000.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
H. Backwash Drain Pipe DIP ND400
BF5. 117 ls 1 7,200.00 7,200.00
Water Supply Pipes, HDPE OD32-90 including materials and labour for
straight pipes, fittings, expansion joint, trenching and filling as specified
BF5. 123 in the Drawings ls 1 18,000.00 18,000.00
Water Supply Pipes, HDPE OD32-90 including materials and labour for
straight pipes, fittings, expansion joint, trenching and filling as specified
BF5. 124 in the Drawings ls 1 18,000.00 18,000.00
Sub-total for Bill 5-12 – Yard piping, CARRIED TO PART SUMMARY 315,216.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
BF5. 126 Cutting Existing Ground 100mm thk. and recompact 95% of MDD m3 1,547 10.00 15,470.00
BF5. 127 Back Fill Selected Material and recompact 95% of MDD m3 1,547 16.80 25,989.60
BF5. 128 Sub Base Layer With Compact 95% of MDD m3 726 43.00 31,218.00
BF5. 141 Compacted Stone (4x6) With Sand, 150mm thk m3 259 43.00 11,137.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Supply and Installation of Drainage pipes and chambers specified in the
Drawings
3.1 RC U Drain
BF5. 151 Compcted Stone (4x6) With Sand, 150mm thk m3 118 43.00 5,074.00
BF5. 161 Granula Bedding Back Fill and Compaction m3 89 43.00 3,827.00
BF5. 162 Selected Field Material Back Fill and Compaction m3 286 16.80 4,804.80
BF5. 163 Backfilling With Selected Excavation Material m3 403 16.80 6,770.40
BF5. 165 Compcted Stone (4x6) With Sand, 150mm thk m3 6 43.00 258.00
RC Pipe
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Lean Concrete, 50mm thk
BF5. 173 m3 4 150.00 600.00
Compcted Stone (4x6) With Sand, 150mm thk
BF5. 174 m3 11 43.00 473.00
Concrete Block Pavment
BF5. 175 m2 470 30.00 14,100.00
Concrete Curb for Road
BF5. 176 m 228 20.00 4,560.00
Concrete Curb for Walkway
BF5. 177 m 140 20.00 2,800.00
Tree Planting with each approved type tree of initial size 2 m high & 200
mm girth including 1 m3 of subsoil and 3 wooden stakes for stabilizing
tree. Maintain tree till the end of Defects Liability Period.
Sub-total for Bill 5-13 –Yard Development , CARRIED TO PART SUMMARY 826,223.50
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 5-14 – Miscellaneous Facilities, CARRIED TO PART SUMMARY 20,880.00
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 5 - CIVIL WORKS FOR WATER
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 TREATMENT PLANT BILL - 5
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 5-1 – Access Road and Piping, CARRIED TO PART SUMMARY 366,214.00
Sub-total for Bill 5-2 – Earthwork for Water Treatment Plant, CARRIED TO PART SUMMARY 671,637.00
Sub-total for Bill 5-3 – Receiving Well and Coagulation Basin, Flocculation and Sedimentation Basin (in Treatment Facilities), 1,609,265.20
CARRIED TO PART SUMMARY
Sub-total for Bill 5-4 – Filters (in Treatment Facilities), CARRIED TO PART SUMMARY 799,471.20
Sub-total for Bill 5-5 – Clear water reservoir and Distribution Pump Station, CARRIED TO PART SUMMARY 3,760,340.00
Sub-total for Bill 5-6 – Drainage Basin, CARRIED TO PART SUMMARY 503,105.00
Sub-total for Bill 5-7 – Sludge Storage Lagoon, CARRIED TO PART SUMMARY 335,412.00
Sub-total for Bill 5-8 – Administration building, CARRIED TO PART SUMMARY 512,553.60
Sub-total for Bill 5-9 – Chemical building, CARRIED TO PART SUMMARY 439,992.00
Sub-total for Bill 5-10 – Generator House, CARRIED TO PART SUMMARY 145,512.00
Sub-total for Bill 5-11 – Gates, Plaque, Shelter and Fencing, CARRIED TO PART SUMMARY 22,000.00
Sub-total for Bill 5-12 – Yard piping, CARRIED TO PART SUMMARY 315,216.00
Sub-total for Bill 5-13 – Yard Development, CARRIED TO PART SUMMARY 826,223.50
Sub-total for Bill 5-14 – Miscellaneous Facilities, CARRIED TO PART SUMMARY 20,880.00
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY
RATE Amount
(USD) (USD)
Bill 6-1-1-1-5 Filters Outlet and Drain Pipelines - Piping in Carbon Steel
unless differently specified
Pipes, Valves, Fittings and Sensors for all items incorporated in the
Filters Outlet and Drain Pipeline system including all excavation, layng
BF6. 05 and backfill as LS breakdown ls 1 -
Bill 6-1-1-1-6 Filters Air Scour Pipeline - Piping in Carbon Steel unless
differently specified
Pipes, Valves, Nozzles, Fittings and Sensors for all items incorporated in
the Filters Air Scour Pipeline system including all excavation, layng and
BF6. 06 backfill as LS breakdown ls 1 -
P04, P05 & P06 Drain Pump; Type: Free Standing Submersible Drainage
Centrifugal Pump; Duty point: Q=>5 l/s with a total dH total = 10 m;
BF6. 12 Power rated (P2): 1.5 kW nr 3 -
B01 A&B Air Scour Blower; Type: Roots type blower; Duty point: Q=51
m3/min, discharge pressure 400 mbar; Installation: Indoor installation,
tropical climate; Motor output: 55 kW totally enclosed fan cooled type;
Accessories (for each unit): V belt and Pulley, pressure gauge and stand,
BF6. 14 safety valve attached to blower, check valve inlet silencer and nr 2 -
antivibration plate
stainless steel Catwalk for each basin as shown on the Drawings and
BF6. 23 Work in Specification ls 1 -
Spare parts for each Air Scouring Blower as: belts, bearing set, gasket
BF6. 26 set nr 2 -
filter valve gallery Sump Pump cast iron submersible pump installed
BF6. 27 fixed in the sump 6.3L/sec @12 meter nr 2 -
valve chamber Sump Pump cast iron submisible pump installed fixed in
BF6. 28 the sump 6.3L/sec @12 meter nr 2 -
drain valve galery Sump Pump cast iron submisible pump installed fixed
BF6. 29 in the sump 6.3L/sec @12 meter nr 2 -
Spare Pumps for sump pump set ups cast iron submisible pump
BF6. 30 installed fixed in the sump 6.3L/sec @12 meter nr 2 -
Spare parts for each sludge drain pump like: bearing set, mechanical
BF6. 32 seal, O ring set. nr 2
BF6. 39 Throwable Polyethylene Safety Ring Buoy with rope and stand nr 30 -
BF6. 40 Supply Portable sump pump nr 2 -
Supply and Install stainless steel Equipment Handling Jib Crane
BF6. 41 complete with remote cable controls, power supply and accessories, nr 1 -
0.5ton
Sub-total for Part 6-1. Coagulation, Flocculation, Sedimentation and Filtration Block - CFSF block, CARRIED TO PART SUMMARY -
BF6. 55 CWT access manhole cover (frame size: 800 x 800 mm) nr 16 -
CWT equipment access manhole (frame size 1000 x 1200 mm
BF6. 56 nr 2 -
Sub-total for Part 6-2. Drainage Tanks, CARRIED TO PART SUMMARY 3,600.00
None
BF6. 67 Filling lean concrete externally up to half-way level of the perforated m3 148 -
PVC pipes (100mm)
0-100 mm (variable due to floor slope) deep layer of 16-40 mm crushed
BF6. 68 stone/ gravel m3 74 -
BF6. 71 100 mm deep layer of washed sand (effective size 0.3-0.75 mm, m3 148 -
uniformity coefficient <4).
Front loader/
BF6. 72 excavator 4-5T with approximately 2m wide loader bucket nr 1 -
Bill 6-5-1 – Tanks, hoppers & bunds (supply, installation and testing)
V6, Calcium hypochlorite spill and drain collection tank made of High-
Density Cross-linked Polyethylene: H=2.4 m D=1.2 m, Working volume
BF6. 83 2.0 m3. Inclusive of nozzles as specified. All specified control nr 1 -
instrumentation unless already included in other Bills.
Agitators for lime slurry preparation units (V4 A & B) - AISI 316 or
BF6. 91 equivalent nr 2 -
Platforms
Supply and installation of stainless steel (AISI304) platforms as shown in
the Contract Drawings
B-WTP-CHB-C-GA-DT-012: Coagulant and lime platform (Surface
BF6. 97 including access stairs: 38.0 m2) nr 1 -
B-WTP-CHB-C-GA-DT-012: Calcium hypochlorite platform (Surface
BF6. 98 including access stairs: 22.3 m2) nr 1 -
Supply and Install stainless steel Pump Handling Jib Crane complete with
BF6. 99 remote cable controls, power supply and accessories, 0.5tonne nr 1 -
Supply and install of overhead roller door as shown in the Contract
Drawings. The doors shall be made for heavy duty
BF6. 100 commercial/industrial applications and provide a free passage of 2.5 m nr 2 -
width and 3.0 m height. The doors shall be electrical actuated
Supply and install stainless steel (Grade 304) pallet lift (inclusive of
safety guards) to elevate standard pallet (1200 x 1000 x 1800 mm high)
BF6. 101 of chemical bags/drum. Safe working load of 1000 Kg.
Lift 1: coagulant and lime service. From building ground floor (15.00 m
asl) to first stop at the work platform level (16.60 m asl), second stop at
BF6. 102 first floor (19.80 m asl). nr 1 -
HVAC work for Chemical Building including supply and installation of air
conditioning unit and accessories, plumbing and other miscellaneous
BF6. 113 equipment specified in the Drawings. ls 1 -
Supply and install a pallet lift with a capacity of 2500Kg lifting pallets
from the ground to first floor of the building installed with accessories
BF6. 116 so a level surface is achieved to transport pallets on and off the lift. nr 1 -
(1) Pumps
BF6. 120 Spare parts per Distribution Pump as (bearing set, gaskets, seals) nr 5 -
Backwash Pump, closed coupled centrifugal end suction pump,
1000m3/hours @ 25 meter, equipped with a 1485 rpm E3 electric
BF6. 121 motor suitable for VFD use nr. 2 -
Spare parts for Backwash each pump including: bearing set, mechanical
BF6. 122 seal, O ring set. nr 2 -
Pump Station Sump Pumps, cast iron submersible pump installed fixed
BF6. 123 in the sump 6.3L/sec @12 meter nr 3 -
BF6. 127 Valves and sensors for all systems incorporated in the pump station as
listed in the particular specifications volume 2A section 1.4 ls 1
Clear water reservoir outlet butterfly valve, ND800, with extension stem
BF6. 144 and manual floor stand operator nr 3 -
Sub-total for Part 6-6. Distribution Pump Station, CARRIED TO PART SUMMARY -
Part 6-7. Miscellaneous WTP Piping and Equipment
Supply and install yard piping as shown on the drawings including all
excavation, backfill, valves, fittings and testing up to the limits of Lot 1
BF6. 149 for WTP facilities ls 1 -
Fire fight piping distributing the water to hose reels over the premises,
Steel pipe DN 100 schedule 40 installed underground and protected
BF6. 150 with bituminous lining for corrosion protection m 300 -
Fire hose reel cabinets red painted steel cabinets complete with
pressure gauge pressure reducing valve 30 meters hose of 25 mm
BF6. 151 diameter inclusive with an adjustable nozzle nrs 5 -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Bill 6-1 – Treatment Facilities (Receiving Well and Coagulation Basin, Flocculation and Sedimentation Basin)
Note: The bidder who intends to propose the contractor's alternative
design for this part shall fill in the form "Part 8.1 Contractor's
Alternative design - Treatment Facilities (Receiving Well and
Coagulation Basin, Flocculation and Sedimentation Basin)" and may
leave the rates or bidder’s estimated quantities of this part blank.
BF6. 06 Sludge Extraction Pipe (A) DIP ND150 and ND200 ls 1 29,079.15 - - 29,079.15 - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
BF6. 08 GV-SXI-A1 to A16 Isolation Valve ND 150 with Operation Stage nr 16 366.29 - 23.32 5,860.64 - 373.12
BF6. 09 Sludge Extraction Pipe (B) PVC, DIP and SP, ND200 and ND150 ls 1 4,390.32 - 55,401.82 4,390.32 - 55,401.82
BF6. 10 MOPLV-SE-B1 to Sludge Extraction Valve ND150 nr 16 - 9,538 23.32 - 152,603 373.12
B16
BF6. 11 GV-SXI-B1 to B16 Isolation Valve ND 150 nr 16 366.29 - 23.32 5,860.64 - 373.12
BF6. 12 MOPLV-SE-M1 Sludge Extraction Valve ND200 nr 1 - 9,538 31.09 - 9,538 31.09
BF6. 14 Sludge Extraction Pipe Flushing Pipe, DIP ND 100 to 200 ls 1 459.75 447 - 459.75 447 -
BF6. 15 CV-SEFLS-1 Sludge Extraction Pipe Flushing Check Valve ND200 nr 1 350.69 - 31.09 350.69 - 31.09
BF6. 16 BV-SEFLS-1 Sludge Extraction Pipe Flushing Flow Control Valve nr 1 - 2,670 31.09 - 2,670 31.09
ND200
BF6. 17 MOBV-SEFLS-1 Sludge Extraction Pipe Flushing Isolation Valve ND200 nr 1 4,884.92 - 31.09 4,884.92 - 31.09
BF6. 18 MOBV-SEFLS-BY-1 Sludge Extraction Pipe Flushing By-pass Valve ND150 nr 1 - 9,230 23.32 - 9,230 23.32
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
EF-SED Sedimentation Pipe Gallery Exhaust Fan
BF6. 22 nr 2 - - 129.55 - - 259.10
Steel works
- - - - - -
Miscellaneous piping works including all valves and fittings, finishing and
painting, welding, installation work as shown in the drawings and the
BF6. 26 specifications. ls 1 - - 1,959.67 - - 1,959.67
Sub-total for Bill 6-1 – Treatment Facilities (Receiving Well and Coagulation Basin, Flocculation and Sedimentation Basin), CARRIED TO PART 94,669.19 323,905 85,804.13
SUMMARY
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
- - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Piping Works including supply of materials, finishing and painting,
welding, jointing, installation work as shown in the drawings and the
specifications, inspections and testings and miscellaneous materials for
connecting and installation. - - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
EF-BWSP Backwash Pump Room Ventilation Fan
BF6. 47 nr 2 - - -
Miscellaneous piping works including all valves and fittings, finishing and
painting, welding, installation work as shown in the drawings and the
BF6. 49 specifications. ls 1 - - -
Sub-total for Bill 6-2 – Treatment Facilities (Filtration Basin), CARRIED TO PART SUMMARY - - -
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Pipes, Fittings, Flexible Joint, Valves and other miscellaneous work
specified in the Drawings and the Specifications and not included in Bill
BF6. 64 6-3-1 ls 1 50,699.09 - 26,347.86 50,699.09 - 26,347.86
Sub-total for Bill 6-3 – Chemical Feed System, CARRIED TO PART SUMMARY 438,328.89 120,139 73,088.38
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
CLB-CH-1 to 4 Chlorinator
BF6. 75 Unit 4 18,839.42 - 1,295.41 75,357.68 - 5,181.64
Sub-total for Bill 6-4– Chlorine Feed System, CARRIED TO PART SUMMARY 631,521.76 2,433 142,585.96
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Part 6-5. Distribution Pump Station
(1) Pumps
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
C-DP-HCH2-1 & 2 Hand-operated chain hoist with plane trolley, 0.5 ton
BF6. 92 set 2 1,222.99 - 369.00 2,445.98 - 738.00
FW-NFPS-1 and 2 Night flow pipe, Finished water, pump suction pipe
DIP and SP, ND150 and ND300 with miscellaneous
BF6. 96 valves including GV-NFP-MFTI, MOGV-NFP-MFT ls 1 254.59 - 3,062.13 254.59 - 3,062.13
DP-DR-1 and 2 Drain pipe, Station drain water, SGP ND80 mm, Soft
BF6. 100 PVC flexible pipe ND80mm ls 1 - - 2,284.27 - - 2,284.27
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
GV-DP-S Pump Suction Valves for Distribution Pump, ND700
BF6. 101 nr 5 11,661.04 - 192.50 58,305.20 - 962.50
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
CV-DP Pump Discharge Check Valves for Distribution Pump,
BF6. 102 ND450 nr 5 3,537.39 - 77.37 17,686.95 - 386.85
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Thrust Block in the Distribution Pump Station as specified in MDS-M-002
BF6. 116 to 007 ls 1 Included in D.3 - - -
Plant Water System Pipes ND80 and 150 specified in the Drawing M-DP-
BF6. 117 M014 ls 1 - - 1,212.64 - - 1,212.64
Sub-total for Part 6-5. Distribution Pump Station, CARRIED TO PART SUMMARY 270,820.55 347,808 247,328.79
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Part 6-6. Drainage Basin and Sludge Lagoon
(1) Pumps
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
GV-TDBSL-1 &2 Pump Discharge Isolation Valve for Sludge Drain
BF6. 137 Pump, ND100 nr 2 343.08 - 12.95 686.16 - 25.90
Sub-total for Part 6-6. Drainage Basin and Sludge Lagoon, CARRIED TO PART SUMMARY 76,894.96 9,372 23,654.56
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Part 6-7. Equipment
Sub-total for Part 6-7. Equipment, CARRIED TO PART SUMMARY 112,477.07 24,009 32,163.95
FC LC FC LC
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE RATE RATE Amount Amount Amount
(USD) (OTHER) (USD) (USD) (OTHER) (USD)
Sub-total for Bill 6-1 – Treatment Facilities (Receiving Well and Coagulation Basin, Flocculation and Sedimentation Basin), CARRIED TO PART 94,669.19 323,905.00 85,804.13
SUMMARY
Sub-total for Bill 6-2 – Treatment Facilities (Filtration Basin), CARRIED TO PART SUMMARY - - -
Sub-total for Bill 6-3 – Chemical Feed System, CARRIED TO PART SUMMARY 438,328.89 120,139.43 73,088.38
Sub-total for Bill 6-4– Chlorine Feed System, CARRIED TO PART SUMMARY 631,521.76 2,433.06 142,585.96
Sub-total for Part4-5. Distribution Pump Station, CARRIED TO PART SUMMARY 270,820.55 347,807.55 247,328.79
Sub-total for Part4-6. Drainage Basin and Sludge Lagoon, CARRIED TO PART SUMMARY 76,894.96 9,372.28 23,654.56
Sub-total for Part4-7. Equipment, CARRIED TO PART SUMMARY 112,477.07 24,009.12 32,163.95
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Panel boards and motor control centres as per panel drawings, one line
diagrams and specifications
Main Distribution Panel
BF7. 01 nr 1 -
Instrumentation Panel
BF7. 18 nr 1 -
I/O Panel
BF7. 19 nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
End Part Sludge Extraction Local Control Panel
BF7. 22 nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Battery Panel
BF7. 57 nr 1 -
CVCF Panel
BF7. 59 nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Aux. Relay Panel for Drainage Basin
BF7. 63 nr 1 -
Instrumentation Panel
BF7. 64 nr 1 -
I/O Panel
BF7. 65 nr 1 -
Clear Water Reservoir Water Level sensors including all cabling and
BF7. 74 supports nr 2 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Hoist panel inclusive of all switches/sensors/cables/means of
communication with other system components as indicated in panel
BF7. 84 description and schematics nr 1
Sub-total for Bill 7-2. Distribution Pump Station & Clear Water Reservoir, CARRIED TO PART SUMMARY -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Drainage Basin Water Level sensors including all cabling and supports
BF7. 88 nr 2 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Incoming Panel
BF7. 89 nr 1 -
No.1 Transformer
BF7. 95 nr 1 -
No.2 Transformer
BF7. 96 nr 1 -
Step Up Transformer
BF7. 97 nr 1 -
DS Panel
BF7. 98 nr 1 -
Operator Station
BF7. 99 nr 4
Engineering Station
BF7. 101 nr 1 -
System control computer inclusive of software as required in the system
BF7. 102 specifications nr 2 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Office DB panel inclusive of all switches/sensors/cables/means of
communication with other system components as indicated in panel
BF7. 111 description and schematics nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Instrumentation Panel
BF7. 119 nr 1 -
Instrumentation Panel
BF7. 120 nr 1 -
Lime Preparation Tank Level Switch including all cabling and supports
BF7. 133 nr 3 -
PAC Calibration Tank Level Switch including all cabling and supports
BF7. 134 nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Alum dosing panel inclusive of all switches/sensors/cables/means of
communication with other system components as indicated in panel
BF7. 136 description and schematics nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
No.2 Generator
BF7. 153 nr 1 -
Synchronous Panel
BF7. 159 nr 1 -
MV Feeder Panel
BF7. 160 nr 1 -
Vent Silencer
BF7. 164 nr 2 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
MV switch gear cubicle inclusive of all
switches/sensors/cables/meetering/means of communication with
BF7. 173 other system components as indicated in schematics nr 1 -
BF7. 180 Heavy duty galvanized steel cable trays, ducts and raceways. nr 1 -
Supply and Installation of Fire extinguishers CO2 type 9 KG inclusive
BF7. 181 with wall mounting hooks and signage nr 1 -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Raw Water pH
BF7. 184 Combination Electrode Type nr 1 -
Finished Water pH
BF7. 188 Combination Electrode Type nr 1 -
Sub-total for Bill 7-8. Online Water Quality Monitoring, CARRIED TO PART SUMMARY -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Raw Water ElectroMagnetic Full Bore Flow Meter 700mm dia. including
BF7. 190 all power supply, transmitters and cabling and accessories as specified, nr 1 -
located in flow meter chamber at WTP
Sub-total for Bill 7-9. Raw Water Measuring Chamber, CARRIED TO PART SUMMARY -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 7-10. Wires, Cables and Miscellaneous, CARRIED TO PART SUMMARY -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Bill 7-11. Yard Systems
Yard Lighting system including Street LED Lighting fixtures, distribution
panels, cables and termination, conduit and fittings and other
BF7. 192 miscellaneous works specified in the Drawings. ls 1 -
Sub-total for Bill 7-11. Modification of Existing Systems, CARRIED TO PART SUMMARY -
PROVINCIAL WATER SUPPLY AND SANITATION PROJECT (PWSSP) BILL 7 - ELECTRICAL WORKS FOR BILL - 7
BATTAMBANG WS - ICB No.: PWSSP/MISTI/CW-1 WATER TREATMENT PLANT
Total
ITEM ITEM DESCRIPTION- Lot 1 UNIT QUANTITY RATE Amount
(USD) (USD)
Sub-total for Bill 7-2. Distribution Pump Station & Clear Water Reservoir, CARRIED TO PART SUMMARY -
Sub-total for Bill 7-8. Online Water Quality Monitoring, CARRIED TO PART SUMMARY -
Sub-total for Bill 7-9. Raw Water Measuring Chamber, CARRIED TO PART SUMMARY -
Sub-total for Bill 7-10. Wires, Cables and Miscellaneous, CARRIED TO PART SUMMARY -
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
Note: The Provisional Sums given in the Bill of Quantities are for
defined work and may be used in whole or in part, or not at all
Geo-technical Survey
BFPS. 01 Mobilization/Demobilization nr 1 -
BFPS. 03 All required sampling and laboratory testing to establish soil physical nr 100 -
characteristics and bearing capacity
Defined Work
Provision of standards and other reference documents
BFPS. 04 ls 1 -
Public announcements as directed by the Engineer
BFPS. 05 ls 1 -
Payment to Dispute Board (Employer's portion only)
BFPS. 06 ls 1 -
BFPS. 09 Allow for expenses for stakeholder meeting for the Project ls 1 -
Allow for sediment filter net in Sangke River at intake including all
BFPS. 13 tethering and anchoring ls 1 -
Allow 5% (as per PCC) for Contractor's overheads and profits on items
BFPS. 14 BFPS . 1 to 13 above % 5 -
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
DW.1. BILL DW - DAYWORK SCHEDULE
Schedule 1: Labour
DW.1. 01 Unskilled Labourer days 25 8.00 200.00
DW.1. 02 Banksman/Slinger days 25 8.00 200.00
DW.1. 03 Carpenter days 25 12.00 300.00
DW.1. 04 Mason/ Concrete Finisher days 25 12.00 300.00
DW.1. 05 Driver: Heavy Duty days 25 12.00 300.00
DW.1. 06 Driver: Light Duty days 25 10.00 250.00
DW.1. 07 Pipe Fitter days 25 12.00 300.00
DW.1. 08 Plant Operator: Heavy days 25 12.00 300.00
DW.1. 09 Plant Operator: Light days 25 10.00 250.00
DW.1. 10 Steel fixer/ Bar Bender days 25 12.00 300.00
DW.1. 11 Welder days 25 14.00 350.00
DW.1. 12 Jointer days 25 12.00 300.00
DW.1. 13 Painter days 25 12.00 300.00
DW.1. 14 Electrician days 25 14.00 350.00
DW.1. 15 Mechanical Fitter days 25 14.00 350.00
DW.1. 16 Instrumentation Fitter days 25 12.00 300.00
DW.1. 17 Plumber days 25 14.00 350.00
DW.1. 18 Chainman days 25 14.00 350.00
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
DW.2. Schedule 2: Materials
DW.1. 01 Aggregate, base course material m3 20 18.00 360.00
DW.1. 02 Aggregate, course (dry) t 20 18.00 360.00
DW.1. 03 Aggregate, fine (dry) t 20 18.00 360.00
DW.1. 04 Aggregate, sub-base material m3 20 10.00 200.00
DW.1. 05 Asphalt concrete, base course t 10 110.00 1,100.00
DW.1. 06 Bitumen 60/70 t 10 900.00 9,000.00
DW.1. 07 Bitumen40/50 t 10 900.00 9,000.00
DW.1. 08 Bituminous asphaltic concrete, base course t 10 110.00 1,100.00
DW.1. 09 Bituminous asphaltic concrete, wearing course t 10 110.00 1,100.00
DW.1. 10 Borrow material m3 50 8.50 425.00
DW.1. 11 Brick, Standard size nr 4,000 0.06 240.00
DW.1. 12 Cement; Ordinary Portland t 3 100.00 300.00
DW.1. 13 Cement; Sulphate resistant t 3 110.00 330.00
DW.1. 14 Concrete, Grade 15/20 m3 5 92.00 460.00
DW.1. 15 Concrete, Grade 20/20 m3 10 92.00 920.00
DW.1. 16 Concrete, Grade 25/20 m3 10 95.00 950.00
DW.1. 17 Concrete, Grade 30/20 m3 10 98.00 980.00
DW.1. 18 Concrete, Grade 40/20 m3 5 100.00 500.00
DW.1. 19 Formwork, steel m2 60 32.00 1,920.00
DW.1. 20 Formwork, timber (smooth) m2 30 14.00 420.00
DW.1. 21 Fuel, diesel ltr 150 1.10 165.00
DW.1. 22 Fuel, petrol ltr 60 1.10 66.00
DW.1. 23 Fuel, kerosene ltr 60 0.90 54.00
DW.1. 24 Kerbs, cast in-situ concrete m 100 15.00 1,500.00
DW.1. 25 Kerbs, pre-cast concrete m 100 15.00 1,500.00
DW.1. 26 Masonry block, concrete, 400 x 200 x 100 mm nr 1000 3.50 3,500.00
DW.1. 27 Paint, emulsion ltr 12 6.00 72.00
DW.1. 29 Paving stones, interlocking precast concrete, 60mm m2 625 9.00 5,625.00
DW.1. 30 Paving stones, interlocking precast concrete, 80mm m2 400 12.00 4,800.00
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
DW.1. 36 Steel Pipe, ND 300mm, Straight Pipe m 10 120.00 1,200.00
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
DW.1. 45 Welded Flange for Steel Pipe, ND 200mm nr 5 25.00 125.00
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
DW.3. SECTION C - DAYWORK SCHEDULE (Cont'd)
Schedule 3: Plant & Equipment
DW.1. 01 Air compressor 5000-6000 litres with small tools days 30 30.00 900.00
DW.1. 02 Asphalt coring machine, up to 200mm dia. days 30 25.00 750.00
DW.1. 03 Asphalt paver days 30 200.00 6,000.00
DW.1. 04 Asphalt/concrete saw days 30 20.00 600.00
DW.1. 05 Bulldozer up to 100 HP days 30 80.00 2,400.00
DW.1. 06 Bulldozer with ripper (32tons, Class D8) days 30 160.00 4,800.00
DW.1. 07 Bulldozer (21tons, Class D7) days 30 140.00 4,200.00
DW.1. 08 Bulldozer (15tons, Class D6) days 30 100.00 3,000.00
DW.1. 09 Bucket loader up to 3 m3 days 30 80.00 2,400.00
DW.1. 10 Bucket loader over 3 m3 days 30 100.00 3,000.00
DW.1. 11 Concrete mixer, 6 m3 days 30 60.00 1,800.00
DW.1. 12 Concrete mixer, 9m3 days 30 80.00 2,400.00
DW.1. 13 Concrete pump, 50m3/hr days 30 150.00 4,500.00
DW.1. 14 Concrete pump, 70m3/hr days 30 180.00 5,400.00
DW.1. 15 Concrete vibrator (poker/screed) up to 50mm dia days 30 5.00 150.00
DW.1. 16 Dump truck up to 5 tons days 30 50.00 1,500.00
DW.1. 17 Dump truck from 5 to 10 tons days 30 60.00 1,800.00
DW.1. 18 Dump truck over 10 tons days 30 70.00 2,100.00
DW.1. 19 Excavator up to 0.2 m3, wheeled days 30 35.00 1,050.00
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
DW.1. 20 Excavator up to 1 m3, wheeled days 30 120.00 3,600.00
DW.1. 21 Forklift up to 5 tonnes days 30 60.00 1,800.00
DW.1. 22 Generator up to 200 kVA days 30 70.00 2,100.00
DW.1. 23 Grader up to 140 HP days 30 140.00 4,200.00
DW.1. 24 Hiab truck, 6 tonne or greater, with lifting arm days 30 60.00 1,800.00
DW.1. 25 Lorry mounted crane, up to 25 tonnes days 30 120.00 3,600.00
DW.1. 26 Mobile crane, 20 tonne days 30 110.00 3,300.00
DW.1. 27 Mobile crane, 45 tonne days 30 150.00 4,500.00
DW.1. 28 Pick up truck, up to 2 tonnes days 30 35.00 1,050.00
DW.1. 29 Pick up truck, over 3 tonnes days 30 40.00 1,200.00
DW.1. 30 Plate compactor days 30 7.00 210.00
DW.1. 31 Pneumatic breaker days 30 7.00 210.00
DW.1. 32 Pneumatic roller over 10 tons days 30 90.00 2,700.00
DW.1. 33 Portable lighting set with generator days 30 25.00 750.00
DW.1. 34 Vibratory roller, random type up to 3 tons days 30 45.00 1,350.00
DW.1. 35 Vibratory roller, random type up to 8 tons days 30 65.00 1,950.00
DW.1. 36 Water pump, 2 inch days 30 7.00 210.00
DW.1. 37 Water pump, 4 inch days 30 10.00 300.00
DW.1. 38 Welding machine, HDPE electrofusion, 300mm dia. days 30 40.00 1,200.00
DW.1. 39 Welding machine, HDPE butt welding, 300mm dia. days 30 40.00 1,200.00
Total
ITEM ITEM DESCRIPTION- Lot 1 QUANTITY RATE Amount
(USD) (USD)
Schedule DW-1: Labour
Sub-total for labour 5,350.00
Percentage addition for profit and overhead [5%] 267.50
Total for Labour Carried to Summary 5,617.50
Schedule DW-2: Materials
Sub-total for material 132,827.55
Percentage addition for profit and overhead [5%] 6,641.37
Total for Material Carried to Summary 139,468.92
Schedule DW-3: Plant & Equipment
Sub-total for plant & equipment 85,980.00
Percentage addition for profit and overhead [5%] 4,299.00
Total for Plant & Equipment Carried to Summary 90,279.00
Total for Labour 5,617.50
Total for Materials 139,468.92
Total for Plant & Equipment 90,279.00
CARRIED TO GRAND SUMMARY 235,365.42