DAILY CONSTRUCTION REPORT

PROJECT TITLE : PROPOSED ONE STOREY COMMERCIAL BUILDING

LOCATION : LANGTAD, ARGAO, CEBU


DATE :
DAY

Monday Thursday Sunday


Tuesday Friday
Wednesday Saturday
WEATHER

Clear Windy Cool Low Temperature


Overcast Fog Warm High Temperature
Rain Cold Hot
SITE CONDITION
Clear
Muddy
Dusty
WORKMEN

Engineers Plasterers Heavy Equipment Operators


Field Staffs Tile Setters Service Vehicle Drivers
Foreman Electricians Laborers/Helpers
Rough Carpenters Plumbers
Finish Carpenters Roofers
Masons Painters
Concrete Finishers Landscapers

ACTIVITIES

Earthworks
Structural Works
Architectural Works
Electrical Works
Plumbing and Sanitation Works
Mechanical Works
Electronics & Communication Works

Submitted by:
Engr. EnP. MARY JOHN PAUL F. BETONTA
Registered Civil Engineer
Licensed No. 0138780
BETONTA-MANAYAN ASSOCIATES
Civil/Structural/Materials/UrbanPlanner
Taloot, Argao, Cebu, Philippines
Contact Number : 09632107332/09275802950

DAILY CONSTRUCTION LOGBOOK

PROJECT TITLE : PROPOSED ONE STOREY COMMERCIAL BUILDING

LOCATION : LANGTAD, ARGAO, CEBU

Submitted by:
Engr. EnP. MARY JOHN PAUL F. BETONTA
Registered Civil Engineer
Licensed No. 0138780

Submitted to:
MR. LEOMAR Z. GENABE JR.
Owner
BETONTA-MANAYAN ASSOCIATES
Civil/Structural/Materials/UrbanPlanner
Taloot, Argao, Cebu, Philippines
Contact Number : 09073137221/09275802950

GENERAL CONSTRUCTION INSPECTION REPORT

BUILDING PERMIT NO. : TYPE OF INSPECTION Pre-Construction

NAME OF OWNER : RICKY E. TE Complaint


PROPOSED TWO STOREY
PROJECT TITLE : Meeting
COMMERCIAL BUILDING

LOCATION : LAMACAN Routine

USE OR CHARACTER OF MIXED USED


OCCUPANCY : Follow-up

NUMBER OF STOREYS : TWO

DATE OF INSPECTION : Saturday, April 8, 2023


I. DAY

Monday Thursday Sunday


Tuesday Friday
Wednesday Saturday
II. WEATHER

Clear Windy Cool Low Temperature


Overcast Fog Warm High Temperature
Rain Cold Hot
III. SITE CONDITION
Clear
Muddy
Dusty
IV. MANPOWER ON SITE

Engineers Plasterers Heavy Equipment Operators


Field Staffs Tile Setters Service Vehicle Drivers
Foreman Electricians Laborers/Helpers
Rough Carpenters Plumbers
Finish Carpenters Roofers
Masons Painters
Concrete Finishers Landscapers

V. CONSTRUCTION ACTIVITIES

GENERAL SCOPE OF WORK SPECIFIC ACTIVITIES


Earthworks
Structural Works
Architectural Works
Electrical Works
Plumbing and Sanitation Works
Mechanical Works
Electronics & Communication Works

Submitted by:
Engr. EnP. MARY JOHN PAUL F. BETONTA
Registered Civil Engineer
Inspector of Construction
PRC Licensed No. 0138780
GENERAL CONSTRUCTION INSPECTION REPORT

REPORT AS TO CIVIL/STRUCTURAL WORKS

MINIMUM FINDING/OBSERVATION RECOMMENDATION


BUILDING CONTROL INSPECTION
ACTUAL DESCRIPTION REQUIREMENTS (Verify on NOT
COMPONENTS COMPLYING
Plans) COMPLYING

I Application for Permits

II Safety Requirements for Demolition

III Safety Requirements for Construction

IV Excavation & Foundation

iv.1Foundation Depth 1.5 METER FROM NGL

iv.2 Foundation Width 2.2 X 2.2 METER

V Scaffoldings & Sidewalk

VI Structural Hazards

Placement of Rebars and Pre-Pouring of


VII
Concrete

GROUND LEVEL

vii.1 Foundation Footing

a. Dimension of Footing 2.2 X 2.2 METER

b. Thickness of Footing 0.35 METER THICK

16 - 16MM DIAM RSB


c. Number and Diameter of Rebars
BOTHWAYS

vii.2 Lean Concrete (If necessary)

vii.3 Tie or Grade Beam

a. Base of Tie or Grade Beam 0.25 METER

b. Depth of Tie or Grade Beam 0.3 METER

c. Number and Diameter of Rebars

at Support 3T3B - 16MM DIAM RSB

at Midspan 3T3B - 16MM DIAM RSB


10mm Diam. Bar spaced @ 3-
Lateral Ties or Stirrups 50mm, 5-75mm, 10-100mm
rest at 200 mm OC

vii.4 Columns (Depth of Foundation to


Ground Level)

a. Sectional Dimensions of Column 0.3 METER X 0.3 METER

b. Number and Diameter of Rebars

Main Vertical Bars 8-16mm diam. Vertical Bars

2 sets - 10 mm diam. Lateral


Ties (stirrups) spaced 8-50 mm,
Lateral Ties or Stirrups
10-100 mm and rest at 150 mm
OC

vii.5 Slab on Grade or Fill

a. Thickness of Slab 0.10 METER

b. Number and Diameter of Rebars


10MM DIAM. SPACED 0.6M
Parallel to Short Span
OC
10MM DIAM. SPACED 0.6M
Parallel to Long Span
OC
SECOND LEVEL

vii.6 Columns (Ground Level to Upper


Level)

a. Sectional Dimensions of Column 0.3 METER X 0.3 METER


b. Number and Diameter of Rebars

Main Vertical Bars 8-16mm diam. Vertical Bars

2 sets - 10 mm diam. Lateral


Ties (stirrups) spaced 8-50 mm,
Lateral Ties or Stirrups
10-100 mm and rest at 150 mm
OC

vii.7 Girder and Beams

a. Base of Girder and Beam 0.3 METER

b. Depth of Girder and Beam 0.4 METER

c. Number and Diameter of Rebars

at Support 6T3B - 16MM DIAM RSB


at Midspan 3T4B - 16MM DIAM RSB

10mm Diam. Bar spaced @ 3-


Lateral Ties or Stirrups 50mm, 5-75mm, 10-100mm
rest at 200 mm OC

vii.8 Suspended Slab

a. Type of Slab TWO WAY

b. Thickness of Slab 0.125 METER

c. Number and Diameter of Rebars

12 MM DIAM SPACED 0.2M


Parallel to Short Span
T/B OC

12 MM DIAM SPACED 0.2M


Parallel to Long Span
T/B OC

vii.9 Stairs

a. Dimension of Rise and Run 0.18 M X 0.28 M

b. Width of Stairs 1.20 METER

c. Number and Diameter of Rebars

ROOF LEVEL

vii.10 Roof Beam

a. Base of Roof Beam 0.3 METER

b. Depth of Roof Beam 0.3 METER

c. Number and Diameter of Rebars

at Support 3T3B - 16MM DIAM RSB

at Midspan 3T3B - 16MM DIAM RSB

10mm Diam. Bar spaced @ 3-


Lateral Ties or Stirrups 50mm, 5-75mm, 10-100mm
rest at 200 mm OC

vii.11 Roofing
2-2''X2''X1/4'' ANGULAR
a. Sectional Dimensions of Trusses
BAR
b. Sectional Dimension of Purlins L150X50X20X1.2

c. Type of Roofing Materials Color Roof G24

VIII Others