KLIA BHS ARP

DAILY SITE REPORT

Date / Day: 01.04.2023 / Saturday Working Hours: 0800 hrs to 1700 hrs

Location: Level 3, Block A PD, PMC and SLT7 Consortium Accommodation


1.Segregation of loose furniture’s
2.Housekeeping

Others:
1.Tendering process
2.Technical and coordination meetings
KEY ACTIVITIES
A.

Project EHS Surveyor Subcon Subcon


1 1
MANPOWER

Director Personnel personnel Manager Supervisor 1


Manager QAQC Turnkey Subcon Operator
Personnel Consultant Engineer
Engineer Supervisor Project Subcon EHS Skill/non-
Coordinator personnel skill worker 3
B.

Mobile crane Generator Welding set


EQUIPMENT

set
PLANT AND

Backhoe Air Fire


compressor Extinguisher 10
Lorry Electric
cutter
E.
NOTES H.

Prepared By Verified By Approved By

Name: Name: Name:


VERIFICATION

Designation: Designation: Designation:


Date: Date: Date:

Signature: Signature: Signature:


I.

Note: This form shall be used for daily site report

QUALITY RECORD