You are on page 1of 58

Kabupaten : Aceh Utara Jenis Prasarana : MCK

Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek


Desa : Alue Sijuek Volume : 7.5 x 3 M

1. Galian Tanah Pondasi 29 M Volume


Dimensi = PxLxT
Dimensi = 1x 1x 26
Volume = 1 m2 x 26

0.45 Dimensi
=
=
26 M3
0.5 x 0.6 x 17
31.1 M3

Volume = 0.3 m2 x 17
0.60 = 5.1 M3

2. Pondasi Batu Kali


29 Dimensi = a+b x t

0.20
2
= 0.35 x 0.45
= 0.1575 m2
Volume = 0.1575 m2 x 29

0.45 = 4.5675 M3 M3

0.50
3. Batu Kosong
13 Unit

0.15
Dimensi = PxL
= 0.6 x 0.15 x 13

0.60 Volume
=
=
1.17 M2
1.17 M2
0.702 M3
x 0.6
M3

4. Urugan Pasir 13 Unit Dimensi = Luas + Luas II


= 18 + 9
0.05
= 27 M2
0.6 29 Volume = 31.1 M3 x 0.25
= 7.775 M3
13 Unit
Dimensi = PxL
0.05 0.6 = 0.6 x 0.6
= 0.36 M2
0.6 Volume = 0.018 M3 x 13
= 0.234 M3 7.775 M3

5. Urugan Tanah Kembali


= Galian tanah pondasi - (pondasi+batu kosong+urugan pasir)
= 30.866 m3 30.866 M3

6. Tanah Timbun
Luas I Dimensi = PxL
= 10 x 30.4
= 304 M2
V = 66.88 M3

Luas II Dimensi = PxL


= 2x 3
= 6 M2
V = M3

Luas III Dimensi = PxL


= 2.5 x 4
= 10 M2
V = M3

Luas IV Dimensi = PxL


= 1x 5
= 5 M2
V = M3 66.88 M3
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

Pekerjaan Beton Bertulang

1. Sloof'
29 M

0.2

0.15
Dimensi = PxL
= 0.2 x 0.4
= 0.08 M2
Luas total = 0.08 M2 x 155 m
Volume = 12.4 M3 12.4 M3

2. Kolom 26 Unit

Dimensi = PxL
= 0.15 x 0.3 X
= 0.045 M2
17 Unit Luas total = 1.17 M2 x 7.5 m
Volume = 8.775 M3 X 0

Dimensi = PxL
= 0.15 x 0.15
= 0.0225 M2
Luas total = 0.3825 M2 7.5
Volume = 2.86875 M3 11.64 M3

3. Ring Balok 155 m


Dimensi = PxL
= 0.15 x 0.25
= 0.0375 M2
Luas total = 0.0375 M2
Volume = 5.8125 M3 5.8125 M3

1. beton cor lantai


Dimensi = Luas I + Luas II
= 240 + 12
= 252 M2
Volume = 252 x 0.05
= 12.6 M3 12.6 M3

Pejerjaan Dinding
1. dindig 1 12 m
Dimensi = PxL
= 210 x 3.7
= 777 M2
Luas total = 621.6 M2

dindig 2 7m
Dimensi = PxL
= 7x 1.63
= 11.41 M2
Luas total = M2

dindig 3 9m
Dimensi = PxL
= 9x 1
= 9 M2
Luas total = M2
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

2. Bak Air 2 Unit


Dimensi = PxL
= 1x 1
= 1 M2
Luas total = 2 M2

3. Dinding kuda-kuda 2 Unit


Dimensi = 1/2 a x t
= 0.5 1 x 0.93
= 0.465 M2
V = 0.93 M2 624.53 M2

4. Keramik
Bak Air Dimensi = PxL
4 sisi = 1x 1.5
= 1.5 M2
= 6 M2
4 sisi Dimensi = PxL
= 1x 1
= 1 M2
= 4
dinding Dimensi = PxL
4 sisi = 1x 1.5
= 1.5 M2
= 6 M2
3 2 sisi Dimensi = PxL
= 1x 2
= 2 M2
= 12 M2
4 sisi = 1.63 x 2
= 3.26 M2
= 13.04 M2
4 sisi Dimensi = PxL
= 1.63 x 3
= 4.89 M2
= 19.56
4 sisi = 1x 2.5
= 2.5 M2
= 10 M2
4 sisi Dimensi = PxL
= 1x 3
= 3 M2
= 12 82.6 M2

Pekerjaan Atap
1. Luas Atap
Luas I Dimensi = PxL
= 7.18 x 2.39
= 17.1602 M2
Lus II Dimensi = PxL
= 7.18 x 2.97
= 21.3246 M2
V = 132 M2 132 M2

Luas seng
Dimensi = PxL
= 1.8 x 1.02
= 1.836 M2
kebutuhan = 71.8954248366 + 10%
= 79.08496732026 lembar
2. Kuda-kuda
Kayu 6/12 3 btg
5.36 m 16.08 m = 4.02 btg

Kayu 5/10
balok tarik 3
2.6 m 7.8 m = 1.95 btg

Kayu 5/10
Makelar 3
1.3 m 3.9 m = 0.975 btg

Kayu 5/10
Gording 7
7.2 m 50.4 m = 12.6 btg

Papan listplank 2 unit


7.2 m 14.4 m = 3.6 Btg

Gording 6 unit
5m 30 m = 7.5 Btg
Gording 7 unit
2m 14 m = 3.5 Btg
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

Tripleks 3 mm
Luas Plafond 257.4 m2
Luas tripleks
Dimensi = PxL
= 1.6 x 2.4
= 3.84 M2
Kebutuhan = 67.03125 Lembar

pekerjaanseptictank
galian tanah Dimensi = a+b x t
2
1.36 = 1.13 x 1.32
= 1.4916 M2
Volume = 1.4916 x 1.1
= 1.64076 M3

1.32 Dimensi = PxL


= 1.15 x 2.47
= 2.8405 M2
Volume = 2.8405 x 1.1
0.96 = 3.12455 M3

Dimensi = a+b x t
2
= 1.935 x 0.62
= 1.1997 M2
Volume = 1.1997 x 1.1
= 1.31967 M3

Beton 5.04 m
Dimensi = PxL
= 5.04 x 1.1
= 5.544 M2
Volume = 5.544 x 0.13
= 0.72072 M3 0.72072 M3

ijuk 4.96 m Dimensi = PxL


= 4.96 x 0.13
= 0.6448 M2
Volume = 0.6448 x 0
= 0 M3

Pelat lantai
Dimensi = PxL
= 2.47 x 0.1
= 0.247 M2
Volume = 0.247 x 1.1
= 0.2717 M3 0.2717 M3
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

Bekisting

Kolom 13 Unit 0.45


Papan = 146.64 m
= 16.497 lmbar

sloof 2 unit
Papan = 58 m
= 14.5 lmbar

sloof 2 unit
Papan = 20 m
= 5 lmbar 35.997 Lembar

Total panjang 224.64


449.28 bh

41.82
83.64
Kayu 2/2 20.91
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

3. Balok
Vertikal
b
a
30 ɸ 12
a
a b c
0.05 5 0.05 = 5.4 m
= 162 m : 10
ɸ 12 = 16.2 btg

5 Ø 12
a
f
Ø 8 - 100 e

0,3
d b

0,2
a b c d e f
0.24 0.14 0.24 0.14 0.05 0.05 = 0.86 m
bh 228 = 196.08 m : 10
ɸ8 = 19.608 btg

Horizontal

b
a
40 ɸ 12
a
a b c
0.05 4.5 0.05 = 4.9 m
= 196 m : 10
ɸ 12 = 19.6 btg

5 Ø 12
a
f
Ø 8 - 100 e
0,3

d b

0,2
a b c d e f
0.24 0.14 0.24 0.14 0.05 0.05 = 0.86 m
bh 288 = 247.68 m : 10
ɸ8 = 24.768 btg

4. Pelat lantai
Tipe 1 4 unit

ɸ8 80
81
37.8
36.75

ɸ 10 115
4,5

108

5
Horizontal
ɸ8 235.55 m = 942.2 m : 10 = 94.22 btg

1,21 2,292 1,21


ɸ 10 223 m = 892 m : 10 = 89.2 btg
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

tipe 2 2 unit

ɸ8 48
54
23.8
22.05

3
ɸ 10 99
42

4,5

1,21 2,292 1,21


Horizontal
ɸ8 147.85 m = 295.7 m : 10 = 29.57 btg

ɸ 10 141 m = 282 m : 10 = 28.2 btg

tipe 3 2 unit

ɸ8 24
27

1,5
11.25
9

ɸ 10 36
33

4,325

1,21 2,292 1,21


Horizontal
ɸ8 71.25 m = 142.5 m : 10 = 14.25 btg

ɸ 10 69 m = 138 m : 10 = 13.8 btg

5. Tangga
Balok

b
a a
15 ɸ 12

a b c
0.05 1.6 0.05 = 1.7 m
= 25.5 m : 10
ɸ 12 = 2.55 btg

a Ø 8 - 100 mm
f 5 Ø 12 mm
de b
0,2

c
0,15
a b c d e f
0.09 0.14 0.09 0.14 0.05 0.05 = 0.56 m
bh 32 = 17.92 m : 10
ɸ8 = 1.792 btg
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

Sloof tangga

b
a a
5 ɸ 12

a b c
0.05 1.6 0.05 = 1.7 m
= 8.5 m : 10
ɸ 12 = 0.85 btg
5 Ø 12
a
f
Ø 8 - 100 e

0,3
d b

0,2
a b c d e f
0.24 0.14 0.24 0.14 0.05 0.05 = 0.86 m
bh 10.67 = 9.1762 m : 10
ɸ8 = 0.91762 btg

Pelat tangga
Pelat 1
3.616

b
a a
12

a b c
0.05 3.616 0.05 = 3.716 m
= 44.592 m : 10
ɸ 10 = 4.4592 btg

Anak tangga ɸ8 = 0.23 x 13 = 3.090 m


0.18 x 13 = 2.440 m
0.90 x 24 = 21.700 m
0.90 x 46 = 41.500 m
total = 824.76 m : 10
= 82.476 btg

Pelat 2
3.5

b
a a
12

a b c
0.05 3.5 0.05 = 3.6 m
= 43.2 m : 10
ɸ 10 = 4.32 btg

Anak tangga ɸ8 = 0.23 x 12 = 2.860 m


0.18 x 12 = 2.260 m
0.90 x 24 = 21.700 m
0.90 x 46 = 41.500 m
total = 819.84 m : 10
= 81.984 btg
Pelat borders

b
11
a a
a b c
0.05 1.2 0.05 = 1.3 m
= 14.3 m : 10
ɸ 10 = 1.43 btg

b
a a
b
24
a a
a b c
0.05 1.6 0.05 = 1.7 m
ɸ8 = 40.8 m : 10
4.08 btg

6. Pondasi 0,3

0,8

0,15

0,15
0,8 0,74
ɸ 12 326.4 m : 10 174.144 m : 10
ɸ 12 32.64 btg 17.4144 btg
Kabupaten : Aceh Utara Jenis Prasarana : MCK
Kecamatan : Tanah Luas Take Of Sheet Lokasi : Alue Sijuek
Desa : Alue Sijuek Volume : 7.5 x 3 M

m 534.5 = Ø 12 = 53.4544 tangga


m 102.1 = Ø 10 = 10.2092 tangga
m 1672 = Ø 8= 171.2496 tangga

Total Pembesian pada Gelagar memanjang = Ø 16 = 0 Batang


Ø 12 = 69.6544 Batang tangga
Ø 10 = 141.4092 Batang tangga
Ø 8 = 354 Batang tangga

Total Panjang Ø 16 = 0 M
Ø 12 = 696.544 M
Ø 10 = 1414.092 M
Ø 8 = 3495.856 M

Berat/M Jlh panjang Total berat dibulatkan


berat besi Ø 16 mm 1.579 0 0.000 0.00 Kg
berat besi Ø 12 mm 0.888 696.544 618.531 619.00 Kg
berat besi Ø 10 mm 0.617 1414.092 872.023 872.00 Kg
berat besi Ø 8 mm 0.395 3495.8562 1379.698 1380.00 Kg
2871.00 Kg 2871.00 kg
RENCANA ANGARAN BIAYA

Pekerjaan : Pembangunan Rumah 2 Lantai


Lokasi :
Th : 2022

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME TOTAL HARGA Rp.
SATUAN (Rp.) HARGA (Rp.)

I PEKERJAAN PERSIAPAN
1 Pengukuran m2 144.00 17,034.90 2,453,025.60
2 Air Kerja ls 1.00 500,000.00 500,000.00
3 Listrik ls 1.00 500,000.00 500,000.00
4 Pembersihan lokasi m2 144.00 5,000.00 720,000.00
4,173,025.60

II PEKERJAAN TANAH DAN URUGAN


1 Galian tanah pondasi m3 33.00 44,800.00 1,478,400.00
2 Urugan tanah kembali m3 11.00 21,480.00 236,280.00
3 Urugan pasir bawah pondasi m3 1.65 340,080.00 561,132.00
4 Tanah Timbun T= 20 cm m3 72.80 156,000.00 11,356,800.00
13,632,612.00
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Bata Merah 1:4 m2 525.08 148,449.00 77,948,194.72
2 Plesteran 1 : 4 m2 1,050.17 53,813.94 56,513,677.74
3 Acian Plesteran m2 525.08 18,475.00 9,700,926.90
144,162,799.36
IV PEKERJAAN BETON BERTULANG
1 Sloof 20/40 camp. 1pc:2ps:3split m3 12.00 4,737,718.00 56,861,712.42
2 Kolom utama 15/40 camp. 1pc:2ps:3split K1 m3 12.29 4,737,718.00 58,217,078.78
3 Balok 15/25 camp. 1pc:2ps:3split m3 3.38 4,737,718.00 15,992,356.62
4 Foot plat 100x100 cm tbl 20 cm camp. 1pc:2ps:3split m3 5.20 4,737,718.00 24,636,133.60
5 Foot plat 50x50 cm tbl 20 cm camp. 1pc:2ps:3split m3 0.85 4,737,718.00 4,027,060.30
6 Plat Lantai T= 10 cm camp. 1pc:2ps:3split m3 22.46 4,737,718.00 106,428,097.15
7 Tangga camp. 1pc:2ps:3split m3 9.80 4,737,718.00 46,429,636.40
312,592,075.27
V PEKERJAAN PINTU DAN JENDELA
1 Kusen dan pintu Aluminium set 20.00 900,000.00 18,000,000.00
2 Jendela dan Daun Aluminium set 24.00 450,000.00 10,800,000.00
3 Pintu Garasi set 4.00 4,500,000.00 18,000,000.00
4 Pintu Piber set 4.00 500,000.00 2,000,000.00
48,800,000.00
VI PEKERJAAN SANITAIR
1 Saluran air kotor Ø 4" m 80.00 80,000.00 6,400,000.00
2 Kran air Ø1/2" bh 8.00 75,000.00 600,000.00
3 Saluran air bersih m 60.00 25,000.00 1,500,000.00
4 Klosen duduk bh 8.00 3,500,000.00 28,000,000.00
5 Floor drain bh 8.00 55,000.00 440,000.00
6 Bak cuci piring stainless steel bh 4.00 900,000.00 3,600,000.00
7 Water Tank bh 4.00 1,200,000.00 4,800,000.00
8 Septick tank ls 4.00 3,250,000.00 13,000,000.00
58,340,000.00
VII PEKERJAAN PENGECATAN
1 Cat tembok m2 1,050.17 39,549.00 41,533,094.23
41,533,094.23
VIII INSTALASI LISTRIK
1 Titik lampu (siap nyala lampu SL) ttk 35.00 350,000.00 12,250,000.00
2 Stop kontak ttk 14.00 80,000.00 1,120,000.00
3 Kotak MCB bh 1.00 650,000.00 650,000.00
4 Pasang Baru PLN ttk 1.00 4,500,000.00 4,500,000.00
18,520,000.00
IX PEKERJAAN ATAP
1 Kuda-kuda Rangka baja m3 142.21 250,000.00 35,553,600.00
2 Atap genteng Metal m3 142.21 200,000.00 28,442,880.00
3 Lisplank m' 136.00 85,000.00 11,560,000.00
4 Bubungan m' 42.00 70,000.00 2,940,000.00
78,496,480.00
X PEKERJAAN PLAFON
1 Pekerjaan Plafon m2 158.40 230,000.00 36,432,000.00
36,432,000.00
XI PEKERJAAN LANTAI
1 Pasang Rabat Beton Lantai 1 T= 5 cm m3 7.20 1,419,630.00 10,221,336.00
2 Pasang keramik 50/50 cm m2 288.00 220,000.00 63,360,000.00
3 Pasang keramik KM/WC 20/20 cm m2 30.00 140,000.00 4,200,000.00
4 Pasang keramik Dinding KM/WC 20/40 cm m2 98.00 150,000.00 14,700,000.00
92,481,336.00
XIII PEKERJAAN LAIN LAIN
1 Biaya Lain Lain LS 1.00 5,000,000.00 5,000,000.00
5,000,000.00
TOTAL 854,163,422.46
REKAPITULASI ANGGARAN BIAYA

Pekerjaan : Pembangunan Rumah 2 Lantai


Lokasi :
Th : 2022

JUMLAH HARGA
NO JENIS PEKERJAAN
(RP.)

I PEKERJAAN PERSIAPAN 4,173,025.60


II PEKERJAAN TANAH DAN URUGAN 13,632,612.00
III PEKERJAAN PASANGAN DAN PLESTERAN 144,162,799.36
IV PEKERJAAN BETON BERTULANG 312,592,075.27
V PEKERJAAN PINTU DAN JENDELA 48,800,000.00
VI PEKERJAAN SANITAIR 58,340,000.00
VII PEKERJAAN PENGECATAN 41,533,094.23
VIII INSTALASI LISTRIK 18,520,000.00
IX PEKERJAAN ATAP 78,496,480.00
X PEKERJAAN PLAFON 36,432,000.00
XI PEKERJAAN LANTAI 92,481,336.00
XIII PEKERJAAN LAIN LAIN 5,000,000.00

JUMLAH BIAYA 854,163,422.46


ONGKOS TUKANG 213,540,855.62
JUMLAH 1,067,704,278.08
DIBULATKAN 1,067,704,000.00
TERBILANG ; SATU MILYAR ENAM PULUH TUJUH JUTA TUJUH RATUS EMPAT RIBU RUPIAH
DAFTAR ANALISA PEKERJAAN
TAHUN 2009

ANALISA SATUAN PEKERJAAN


No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)

PEKERJAAN PERSIAPAN
SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu glugu 5/7 @ Rp. 10,400.00 124.80
03-2835-2002 0.0200 kg Paku reng @ Rp. 28,600.00 572.00
0.0070 m3 Papan begesting @ Rp. 3,575,000.00 25,025.00
0.1000 org Tukang kayu @ Rp. 140,000.00 14,000.00
0.0100 org Kepala tukang kayu @ Rp. 130,000.00 1,300.00
0.1000 org Pekerja @ Rp. 100,000.00 10,000.00
0.0050 org Mandor @ Rp. 120,000.00 600.00
JUMLAH ( BELUM PPN ) 25,900.00 25,721.80
PPN BAHAN 10%
JUMLAH
DIBULATKAN

A4 1.0000 bh Membuat Papan Nama Proyek 80x120 cm


0.0350 m3 Kayu meranti @ Rp. 9,035,000.00 316,225.00
1.4000 m1 Seng plat lebar 90 cm @ Rp. 78,000.00 109,200.00
0.6000 kg Paku @ Rp. 28,600.00 17,160.00
1.5000 kg Cat kayu @ Rp. 58,800.00 88,200.00
16.8000 kg PC @ Rp. 1,560.00 26,208.00
0.0270 m3 Pasir beton @ Rp. 325,000.00 8,775.00
0.0405 m 3
Kerikil beton @ Rp. 325,000.00 13,162.50
0.0175 org Tukang batu @ Rp. 140,000.00 2,450.00
1.0000 org Tukang kayu @ Rp. 140,000.00 140,000.00
1.0000 org Tukang cat @ Rp. 140,000.00 140,000.00
2.1000 org Pekerja @ Rp. 100,000.00 210,000.00
1.0050 org Mandor @ Rp. 120,000.00 120,600.00
JUMLAH ( BELUM PPN ) 613,050.00 578,930.50
PPN BAHAN 10%
JUMLAH
DIBULATKAN

Page 17
PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 100,000.00 40,000.00
0.0400 org Mandor @ Rp. 120,000.00 4,800.00
JUMLAH ( BELUM PPN ) 44,800.00 -
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Galian tanah biasa sedalam 1 - 2 meter


6.2 0.5260 org Pekerja @ Rp. 100,000.00 52,600.00
0.0526 org Mandor @ Rp. 120,000.00 6,312.00
JUMLAH ( BELUM PPN ) 58,912.00 -
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Urug kembali bekas galian


6.9 0.1920 org Pekerja @ Rp. 100,000.00 19,200.00
0.0190 org Mandor @ Rp. 120,000.00 2,280.00
JUMLAH ( BELUM PPN ) 21,480.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

A18 1.0000 m3 Urug pasir


1.2000 m3 Pasir urug @ Rp. 234,000.00 280,800.00
0.3000 org Pekerja @ Rp. 100,000.00 30,000.00
0.0100 org Mandor @ Rp. 120,000.00 1,200.00
JUMLAH ( BELUM PPN ) 31,200.00 280,800.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Urugan batu putih


6.15 1.2000 m3 Batu putih @ Rp. 117,000.00 140,400.00
0.2500 org Pekerja @ Rp. 100,000.00 25,000.00
0.0250 org Mandor @ Rp. 120,000.00 3,000.00
JUMLAH ( BELUM PPN ) 28,000.00 140,400.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

PEKERJAAN PASANGAN
SNI 1.0000 m3 Pasangan pondasi batu kosong
6.14 1.2000 m3 Batu belah @ Rp. 117,000.00 140,400.00
03-2836-2002 0.3000 m 3
Pasir urug @ Rp. 234,000.00 70,200.00
0.3900 org Tukang batu @ Rp. 140,000.00 54,600.00
0.0390 org Kepala tukang batu @ Rp. 130,000.00 5,070.00
0.7800 org Pekerja @ Rp. 100,000.00 78,000.00
0.0390 org Mandor @ Rp. 120,000.00 4,680.00
JUMLAH ( BELUM PPN ) 142,350.00 210,600.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps


Page 18
6.12 1.1000 m3 Batu belah putih @ Rp. 117,000.00 128,700.00
03-2835-2002 61.0000 kg PC @ Rp. 1,560.00 95,160.00
0.1470 m3 Kapur pasang @ Rp. 227,500.00 33,442.50
0.4920 m3 Pasir pasang @ Rp. 325,000.00 159,900.00
0.6000 org Tukang batu @ Rp. 140,000.00 84,000.00
0.0600 org Kepala tukang batu @ Rp. 130,000.00 7,800.00
1.5000 org Pekerja @ Rp. 100,000.00 150,000.00
0.0750 org Mandor @ Rp. 120,000.00 9,000.00
JUMLAH ( BELUM PPN ) 250,800.00 417,202.50
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


6.15 110.0000 bh Bata merah @ Rp. 578.50 63,635.00
03-2837-2002 4.5000 kg PC @ Rp. 1,560.00 7,020.00
0.0150 m3 Kapur pasang @ Rp. 227,500.00 3,412.50
0.0500 m 3
Pasir pasang @ Rp. 325,000.00 16,250.00
0.1000 org Tukang batu @ Rp. 140,000.00 14,000.00
0.0100 org Kepala tukang batu @ Rp. 130,000.00 1,300.00
0.3200 org Pekerja @ Rp. 100,000.00 32,000.00
0.0150 org Mandor @ Rp. 120,000.00 1,800.00
JUMLAH ( BELUM PPN ) 49,100.00 90,317.50
PPN BAHAN 10%
JUMLAH
DIBULATKAN

Page 19
SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
6.10 110.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 578.50 63,635.00
03-2837-2002 14.3700 kg PC @ Rp. 1,560.00 22,417.20
0.0400 m3 Pasir pasang @ Rp. 325,000.00 13,000.00
0.1000 org Tukang batu @ Rp. 140,000.00 14,000.00
0.0100 org Kepala tukang batu @ Rp. 130,000.00 1,300.00
0.3200 org Pekerja @ Rp. 100,000.00 32,000.00
0.0150 org Mandor @ Rp. 120,000.00 1,800.00
JUMLAH ( BELUM PPN ) 49,100.00 99,052.20
PPN BAHAN 10%
JUMLAH
DIBULATKAN

PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 1,560.00 524,160.00
0.5400 m 3
Pasir beton @ Rp. 325,000.00 175,500.00
0.8100 m3 Kerikil beton @ Rp. 325,000.00 263,250.00
0.3500 org Tukang batu @ Rp. 140,000.00 49,000.00
0.0350 org Kepala tukang batu @ Rp. 130,000.00 4,550.00
2.0000 org Pekerja @ Rp. 100,000.00 200,000.00
0.1000 org Mandor @ Rp. 120,000.00 12,000.00
JUMLAH ( BELUM PPN ) 265,550.00 962,910.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

Page 20
SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
6.1 218.0000 kg PC @ Rp. 1,560.00 340,080.00
0.5200 m 3
Pasir beton @ Rp. 325,000.00 169,000.00
0.8700 m3 Kerikil beton @ Rp. 325,000.00 282,750.00
0.2500 org Tukang batu @ Rp. 140,000.00 35,000.00
0.0250 org Kepala tukang batu @ Rp. 130,000.00 3,250.00
1.6500 org Pekerja @ Rp. 100,000.00 165,000.00
0.0800 org Mandor @ Rp. 120,000.00 9,600.00
JUMLAH ( BELUM PPN ) 212,850.00 791,830.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

AK 1.0000 m3 Beton cyclope 1pc:3ps:5kr


0.7000 m3 Batu kali (hitam) @ Rp. 195,000.00 136,500.00
61.2500 kg PC @ Rp. 1,560.00 95,550.00
0.4000 m3 Pasir pasang @ Rp. 325,000.00 130,000.00
0.6500 m3 Kerikil beton @ Rp. 325,000.00 211,250.00
1.0000 org Tukang batu @ Rp. 140,000.00 140,000.00
0.1000 org Kep. Tk. Batu @ Rp. 130,000.00 13,000.00
6.0000 org Pekerja @ Rp. 100,000.00 600,000.00
0.3000 org Mandor @ Rp. 120,000.00 36,000.00
JUMLAH ( BELUM PPN ) 789,000.00 573,300.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 kg Pembesian dengan besi polos


6.25 1.0500 kg Besi beton polos @ Rp. 32,500.00 34,125.00
0.0150 kg Kawat beton @ Rp. 26,000.00 390.00
0.0070 org Tukang besi @ Rp. 140,000.00 980.00
0.0007 org Kepala tukang besi @ Rp. 130,000.00 91.00
0.0070 org Pekerja @ Rp. 100,000.00 700.00
0.0003 org Mandor @ Rp. 120,000.00 36.00
JUMLAH ( BELUM PPN ) 1,807.00 34,515.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

F.8 1.0000 m2 Cetakan beton / begisting memakai papan


0.0170 m3 Usuk glugu @ Rp. 10,400.00 176.80
0.0240 m3 Papan cetakan @ Rp. 3,575,000.00 85,800.00
0.4000 kg Paku @ Rp. 28,600.00 11,440.00
0.5000 org Tukang kayu @ Rp. 140,000.00 70,000.00
0.0500 org Kep. Tk. Kayu @ Rp. 130,000.00 6,500.00
0.2000 org Pekerja @ Rp. 100,000.00 20,000.00
0.0100 org Mandor @ Rp. 120,000.00 1,200.00
JUMLAH ( BELUM PPN ) 97,700.00 97,416.80
PPN BAHAN 10%
JUMLAH
DIBULATKAN

F.V 1.0000 m3 Membongkar cetakan


4.0000 org Pekerja @ Rp. 100,000.00 400,000.00
JUMLAH ( BELUM PPN ) 400,000.00 -
PPN BAHAN 10%
JUMLAH
Page 21
DIBULATKAN

Page 22
REKAPITULASI (CONTOH UNTUK 100 KG BESI)
Pekerjaan beton bertulang 1:2:3 tanpa dolken, 100 kg besi
A. Beton cor 1pc:2ps:3kr 1,324,751.00 1,324,751.00
B. Tulangan 100 kg 39,773.50 1,988,675.00
C. Cetakan memakai papan ( 10 m2 ) 204,858.48 1,024,292.40
D. Membongkar cetakan 400,000.00
JUMLAH
DIBULATKAN

Page 23
REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pekerjaan beton bertulang 1:2:3 tanpa dolken, 150 kg besi


A. Beton cor 1pc:2ps:3kr 1,324,751.00 1,324,751.00
B. Tulangan 150 kg 39,773.50 5,966,025.00
C. Cetakan memakai papan ( 10 m2 ) 204,858.48 2,048,584.80
E. Membongkar cetakan 400,000.00
JUMLAH 1,969,382.98 9,339,360.80
DIBULATKAN

PEKERJAAN PELESTERAN

SNI 1.0000 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm


6.9 1.8400 kg PC @ Rp. 1,560.00 2,870.40
03-2837-2002 0.0060 m 3
Kapurr pasang @ Rp. 227,500.00 1,365.00
0.0140 m3 Pasir pasang @ Rp. 325,000.00 4,550.00
0.1500 org Tukang batu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang batu @ Rp. 130,000.00 1,950.00
0.2000 org Pekerja @ Rp. 100,000.00 20,000.00
0.0100 org Mandor @ Rp. 120,000.00 1,200.00
JUMLAH ( BELUM TERMASUK PPN ) 44,150.00 8,785.40
PPN BAHAN 10%
JUMLAH
DIBULATKAN
SNI 1.0000 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm
6.4 5.2000 kg PC @ Rp. 1,560.00 8,112.00
03-2837-2002 0.0200 m3 Pasir pasang @ Rp. 325,000.00 6,500.00
0.1500 org Tukang batu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang batu @ Rp. 130,000.00 1,950.00
0.2000 org Pekerja @ Rp. 100,000.00 20,000.00
0.0100 org Mandor @ Rp. 120,000.00 1,200.00
JUMLAH ( BELUM PPN ) 44,150.00 14,612.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm


6.30 7.0700 kg PC @ Rp. 1,560.00 11,029.20
03-2837-2002 0.0210 m3 Pasir pasang @ Rp. 325,000.00 6,825.00
0.2000 org Tukang batu @ Rp. 140,000.00 28,000.00
0.0200 org Kepala tukang batu @ Rp. 130,000.00 2,600.00
0.2600 org Pekerja @ Rp. 100,000.00 26,000.00
0.0130 org Mandor @ Rp. 120,000.00 1,560.00
JUMLAH ( BELUM PPN ) 58,160.00 17,854.20
PPN BAHAN 10%
JUMLAH
DIBULATKAN
SNI 1.0000 m1 Plesteran sponeng 1 Pc : 2 Ps ( untuk gedung )
6.31 0.5000 kg PC @ Rp. 1,560.00 780.00
03-2837-2002 0.0020 m3 Pasir pasang @ Rp. 325,000.00 650.00
0.0380 org Tukang batu @ Rp. 140,000.00 5,320.00
0.0380 org Kepala tukang batu @ Rp. 130,000.00 4,940.00
0.0570 org Pekerja @ Rp. 100,000.00 5,700.00
0.0020 org Mandor @ Rp. 120,000.00 240.00
JUMLAH ( BELUM PPN ) 16,200.00 1,430.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

Page 24
Analisa ZAZ 1.0000 m2 Acian dinding bata
3.5000 kg PC @ Rp. 1,560.00 5,460.00
0.0330 org Tukang batu @ Rp. 140,000.00 4,620.00
0.0033 org Kep. Tk. Batu @ Rp. 130,000.00 429.00
0.0700 org Pekerja @ Rp. 100,000.00 7,000.00
0.0035 org Mandor @ Rp. 120,000.00 420.00
JUMLAH ( BELUM PPN ) 12,469.00 5,460.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

AK 1.0000 m2 Keramik Lantai KIA KW 1 30/30 cm


1.0000 m2 Tegel keramik 30X30 cm @ Rp. 49,400.00 49,400.00
4.0800 kg PC @ Rp. 1,560.00 6,364.80
0.0090 m3
Pasir pasang @ Rp. 325,000.00 2,925.00
0.6000 kg
Semen putih @ Rp. 3,575.00 2,145.00
0.5000 org
Tukang batu @ Rp. 140,000.00 70,000.00
0.0500 org
Kep. Tk. Batu @ Rp. 130,000.00 6,500.00
0.2500 org
Pekerja @ Rp. 100,000.00 25,000.00
0.0125 org
Mandor @ Rp. 120,000.00 1,500.00
JUMLAH ( BELUM PPN ) 103,000.00 60,834.80
PPN BAHAN 10%
JUMLAH
DIBULATKAN
PEKERJAAN KAYU
SNI 1.0000 m3 Membuat kuda-kuda kayu kruing
6.30 1.1000 m3 Kayu kruing @ Rp. 7,052,500.00 7,757,750.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 24,700.00 370,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 28,600.00 22,880.00
12.0000 org Tukang kayu @ Rp. 140,000.00 1,680,000.00
1.2000 org Kepala tukang kayu @ Rp. 130,000.00 156,000.00
4.0000 org Pekerja @ Rp. 100,000.00 400,000.00
0.2000 org Mandor @ Rp. 120,000.00 24,000.00
JUMLAH ( BELUM PPN ) 2,260,000.00 8,151,130.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Pasang Nok kayu bengkirai


6.30 1.1000 m3 Kayu bengkirai @ Rp. 10,075,000.00 11,082,500.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 24,700.00 370,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 28,600.00 22,880.00
12.0000 org Tukang kayu @ Rp. 140,000.00 1,680,000.00
1.2000 org Kepala tukang kayu @ Rp. 130,000.00 156,000.00
4.0000 org Pekerja @ Rp. 100,000.00 400,000.00
0.2000 org Mandor @ Rp. 120,000.00 24,000.00
JUMLAH ( BELUM PPN ) 2,260,000.00 11,475,880.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN
SNI 1.0000 m3 Pasang mirplat/ gording kayu kruing
6.30 1.1000 m3 Kayu kruing @ Rp. 7,052,500.00 7,757,750.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 24,700.00 370,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 28,600.00 22,880.00
12.0000 org Tukang kayu @ Rp. 140,000.00 1,680,000.00
1.2000 org Kepala tukang kayu @ Rp. 130,000.00 156,000.00
4.0000 org Pekerja @ Rp. 100,000.00 400,000.00
0.2000 org Mandor @ Rp. 120,000.00 24,000.00
JUMLAH ( BELUM PPN ) 2,260,000.00 8,151,130.00
PPN BAHAN 10%
Page 25
JUMLAH
DIBULATKAN

AK 1.0000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kamper
2.2000 m1 Usuk kayu kruing 5/7 @ Rp. 19,500.00 42,900.00
4.0000 m1 Reng kayu kamper 2/3 @ Rp. 3,770.00 15,080.00
0.1500 kg Paku usuk @ Rp. 28,600.00 4,290.00
0.1000 kg Paku reng @ Rp. 28,600.00 2,860.00
0.1000 org Tukang kayu @ Rp. 140,000.00 14,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 130,000.00 1,300.00
0.1000 org Pekerja @ Rp. 100,000.00 10,000.00
0.0025 org Mandor @ Rp. 120,000.00 300.00
JUMLAH ( BELUM PPN ) 25,600.00 65,130.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu BENGKIRAI


1.2000 m3 Kayu bengkirai @ Rp. 10,075,000.00 12,090,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 140,000.00 2,520,000.00
2.0000 org Kepala tukang kayu @ Rp. 130,000.00 260,000.00
6.0000 org Pekerja @ Rp. 100,000.00 600,000.00
0.3000 org Mandor @ Rp. 120,000.00 36,000.00
JUMLAH ( BELUM PPN ) 3,416,000.00 12,090,000.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu bengkirai


0.0350 m3 Papan kayu bengkirai @ Rp. 11,700,000.00 409,500.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 140,000.00 280,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 130,000.00 26,000.00
0.8000 org Pekerja @ Rp. 100,000.00 80,000.00
0.0400 org Mandor @ Rp. 120,000.00 4,800.00
JUMLAH ( BELUM PPN ) 390,800.00 409,500.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu bengkirai


0.0640 m3 Kayu bengkirai papan @ Rp. 11,700,000.00 748,800.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 140,000.00 420,000.00
0.3000 org Kepala tukang kayu @ Rp. 130,000.00 39,000.00
1.0000 org Pekerja @ Rp. 100,000.00 100,000.00
0.0500 org Mandor @ Rp. 120,000.00 6,000.00
JUMLAH ( BELUM PPN ) 565,000.00 748,800.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing


0.0120 m3 Kayu kruing @ Rp. 7,052,500.00 84,630.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 28,600.00 2,860.00
0.2500 org Tukang kayu @ Rp. 140,000.00 35,000.00
0.0250 org Kepala tukang kayu @ Rp. 130,000.00 3,250.00
0.1500 org Pekerja @ Rp. 100,000.00 15,000.00
0.0075 org Mandor @ Rp. 120,000.00 900.00
JUMLAH ( BELUM PPN ) 54,150.00 87,490.00
PPN BAHAN 10%

Page 26
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m tanpa plepet


6.1 1.1000 lbr Pelat asbes @ Rp. 14,300.00 15,730.00
03-2838-2002 0.0100 kg Paku eternit @ Rp. 37,180.00 371.80
0.0700 org Tukang kayu @ Rp. 140,000.00 9,800.00
0.0070 org Kepala tukang kayu @ Rp. 130,000.00 910.00
0.0300 org Pekerja @ Rp. 100,000.00 3,000.00
0.0015 org Mandor @ Rp. 120,000.00 180.00
JUMLAH ( BELUM PPN ) 13,890.00 16,101.80
PPN BAHAN 10%
JUMLAH
DIBULATKAN

1.0000 m2 Langit-langit asbes (1,00 x 1,00) m memakai plepet


1.1000 lbr Pelat asbes @ Rp. 14,300.00 15,730.00
2.6000 m1 Plepet kayu @ Rp. 7,150.00 18,590.00
0.0100 kg Paku eternit @ Rp. 37,180.00 371.80
0.0100 kg Paku plepet @ Rp. 37,180.00 371.80
0.0700 org Tukang kayu @ Rp. 140,000.00 9,800.00
0.0070 org Kepala tukang kayu @ Rp. 130,000.00 910.00
0.0300 org Pekerja @ Rp. 100,000.00 3,000.00
0.0015 org Mandor @ Rp. 120,000.00 180.00
JUMLAH ( BELUM PPN ) 13,890.00 35,063.60
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet
0.0120 m3 Kayu kruing balok @ Rp. 7,052,500.00 84,630.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 28,600.00 1,716.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 14,300.00 15,730.00
0.3200 org Tukang kayu @ Rp. 140,000.00 44,800.00
0.0320 org Kepala tukang kayu @ Rp. 130,000.00 4,160.00
0.1800 org Pekerja @ Rp. 100,000.00 18,000.00
0.0090 org Mandor @ Rp. 120,000.00 1,080.00
JUMLAH ( BELUM PPN ) 68,040.00 102,076.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet
0.0120 m3 Kayu kruing balok @ Rp. 7,052,500.00 84,630.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 28,600.00 1,716.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 14,300.00 15,730.00
2.6000 m1 Plepet kayu @ Rp. 7,150.00 18,590.00
0.0100 kg Paku eternit @ Rp. 37,180.00 371.80
0.0100 kg Paku plepet @ Rp. 37,180.00 371.80
0.3200 org Tukang kayu @ Rp. 140,000.00 44,800.00
0.0320 org Kepala tukang kayu @ Rp. 130,000.00 4,160.00
0.1800 org Pekerja @ Rp. 100,000.00 18,000.00
0.0090 org Mandor @ Rp. 120,000.00 1,080.00
JUMLAH ( BELUM PPN ) 68,040.00 121,409.60
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.13 1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing

Page 27
0.0130 m3 Kayu kruing @ Rp. 7,052,500.00 91,682.50
0.3600 lbr Gypsum board 9 mm @ Rp. 76,700.00 27,612.00
0.0500 roll Kasa gypsum @ Rp. 253,500.00 12,675.00
0.4500 kg Tepung gypsum @ Rp. 6,500.00 2,925.00
0.0030 kg Alkasit @ Rp. 22,100.00 66.30
0.0500 kg Paku gypsum @ Rp. 37,180.00 1,859.00
0.1200 kg Paku usuk @ Rp. 28,600.00 3,432.00
0.3700 org Tukang kayu @ Rp. 140,000.00 51,800.00
0.0370 org Kepala tukang kayu @ Rp. 130,000.00 4,810.00
0.2400 org Pekerja @ Rp. 100,000.00 24,000.00
0.0120 org Mandor @ Rp. 120,000.00 1,440.00
JUMLAH ( BELUM PPN ) 82,050.00 140,251.80
PPN BAHAN 10%
JUMLAH
DIBULATKAN
6.13 1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing
0.0130 m3 Kayu kruing @ Rp. 7,052,500.00 91,682.50
0.3600 lbr Kalsiboard 3.5 mm @ Rp. Err:509 Err:509
0.0500 roll Kasa gypsum @ Rp. 253,500.00 12,675.00
0.4500 kg Tepung gypsum @ Rp. 6,500.00 2,925.00
0.0030 kg Alkasit @ Rp. 22,100.00 66.30
0.0500 kg Paku gypsum @ Rp. 37,180.00 1,859.00
0.1200 kg Paku usuk @ Rp. 28,600.00 3,432.00
0.3700 org Tukang kayu @ Rp. 140,000.00 51,800.00
0.0370 org Kepala tukang kayu @ Rp. 130,000.00 4,810.00
0.2400 org Pekerja @ Rp. 100,000.00 24,000.00
0.0120 org Mandor @ Rp. 120,000.00 1,440.00
JUMLAH ( BELUM PPN ) 82,050.00 138,847.80
PPN BAHAN 10%
JUMLAH
DIBULATKAN

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai


0.0048 m3 Kayu bengkirai papan @ Rp. 11,700,000.00 56,160.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 28,600.00 1,716.00
0.1000 org Tukang kayu @ Rp. 140,000.00 14,000.00
0.0100 org Kepala tukang kayu @ Rp. 130,000.00 1,300.00
0.1000 org Pekerja @ Rp. 100,000.00 10,000.00
0.0050 org Mandor @ Rp. 120,000.00 600.00
JUMLAH ( BELUM PPN ) 25,900.00 57,876.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

1.0000 m1 Mengerjakan papan ruiter kayu bengkirai 2/20


0.0040 m3 Kayu bengkirai papan @ Rp. 11,700,000.00 46,800.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 28,600.00 572.00
0.0800 org Tukang kayu @ Rp. 140,000.00 11,200.00
0.0080 org Kepala tukang kayu @ Rp. 130,000.00 1,040.00
0.0280 org Pekerja @ Rp. 100,000.00 2,800.00
0.0014 org Mandor @ Rp. 120,000.00 168.00
JUMLAH 15,208.00 47,372.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

1.0000 m1 Pasang krepyak ukuran (2 x 12) cm, kayu kruing


0.0020 m3 Kayu kruing papan @ Rp. 11,700,000.00 23,400.00
0.0600 kg Lem kayu @ Rp. 11,900.00 714.00
0.1000 org Tukang kayu @ Rp. 140,000.00 14,000.00
0.0100 org Kepala tukang kayu @ Rp. 130,000.00 1,300.00
Page 28
0.1000 org Pekerja @ Rp. 100,000.00 10,000.00
0.0050 org Mandor @ Rp. 120,000.00 600.00
JUMLAH ( BELUM PPN ) 25,900.00 24,114.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

1.0000 m1 Mengerjakan papan ruiter kayu bengkirai 2/20


0.0040 m3 Kayu bengkirai papan @ Rp. 11,700,000.00 46,800.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 28,600.00 572.00
0.0800 org Tukang kayu @ Rp. 140,000.00 11,200.00
0.0080 org Kepala tukang kayu @ Rp. 130,000.00 1,040.00
0.0280 org Pekerja @ Rp. 100,000.00 2,800.00
0.0014 org Mandor @ Rp. 120,000.00 168.00
JUMLAH 15,208.00 47,372.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang miring, seng BJLS, papan kayu kruing
6.18 0.5000 lbr Seng plat BJLS @ Rp. 54,600.00 27,300.00
0.0150 kg Paku biasa @ Rp. 37,180.00 557.70
0.0190 m3 Kayu kruing papan @ Rp. 7,475,000.00 142,025.00
0.3000 kg Flincoat @ Rp. 19,040.00 5,712.00
0.4000 org Tukang kayu @ Rp. 140,000.00 56,000.00
0.0250 org Kepala tukang kayu @ Rp. 130,000.00 3,250.00
0.0400 org Pekerja @ Rp. 100,000.00 4,000.00
0.0013 org Mandor @ Rp. 120,000.00 150.00
JUMLAH ( BELUM PPN ) 63,400.00 175,594.70
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
6.19 0.5000 lbr Seng plat BJLS 20 @ Rp. 54,600.00 27,300.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 37,180.00 557.70
0.0190 m3 Kayu kruing papan @ Rp. 7,475,000.00 142,025.00
0.2500 kg Flincoat @ Rp. 19,040.00 4,760.00
0.4000 org Tukang kayu @ Rp. 140,000.00 56,000.00
0.0250 org Kepala tukang kayu @ Rp. 130,000.00 3,250.00
0.0400 org Pekerja @ Rp. 100,000.00 4,000.00
0.0013 org Mandor @ Rp. 120,000.00 150.00
JUMLAH ( BELUM PPN ) 63,400.00 174,642.70
PPN BAHAN 10%
JUMLAH
DIBULATKAN

PEKERJAAN ATAP
H.2 1.0000 m2 Pasang genteng plentong
25.0000 bh Genteng plentong @ Rp. 1,105.00 27,625.00
0.1000 org Tukang batu @ Rp. 140,000.00 14,000.00
0.0100 org Kep. Tk. Batu @ Rp. 130,000.00 1,300.00
0.2000 org Pekerja @ Rp. 100,000.00 20,000.00
0.0100 org Mandor @ Rp. 120,000.00 1,200.00
JUMLAH ( BELUM PPN ) 36,500.00 27,625.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

H.6 1.0000 m1 Pasang bubungan genteng plentong


Page 29
5.0000 bh Bubungan genteng plentong @ Rp. 3,250.00 16,250.00
0.0152 m 3
Kapur pasang @ Rp. 227,500.00 3,458.00
0.0152 m3 Pasir pasang @ Rp. 325,000.00 4,940.00
1.5240 kg PC @ Rp. 1,560.00 2,377.44
0.2000 org Tukang batu @ Rp. 140,000.00 28,000.00
0.0200 org Kep. Tk. Batu @ Rp. 130,000.00 2,600.00
0.4000 org Pekerja @ Rp. 100,000.00 40,000.00
0.0200 org Mandor @ Rp. 120,000.00 2,400.00
JUMLAH ( BELUM PPN ) 73,000.00 27,025.44
PPN BAHAN 10%
JUMLAH
DIBULATKAN

PEKERJAAN CAT-CATAN

SNI 1.0000 m2 Mendempul dan menggosok kayu


6.6 0.0800 kg Dempul jadi @ Rp. 21,000.00 1,680.00
0.0200 kg Minyak cat @ Rp. 15,400.00 308.00
0.0100 kg Batu apung @ Rp. 16,940.00 169.40
0.0400 org Tukang cat @ Rp. 140,000.00 5,600.00
0.0040 org Kepala tukang cat @ Rp. 130,000.00 520.00
0.0400 org Pekerja @ Rp. 100,000.00 4,000.00
0.0025 org Mandor @ Rp. 120,000.00 300.00
JUMLAH ( BELUM PPN ) 10,420.00 2,157.40
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 21,000.00 4,200.00
0.1500 kg Plamir @ Rp. 22,400.00 3,360.00
0.1700 kg Cat dasar @ Rp. 58,800.00 9,996.00
0.3500 kg Cat penutup @ Rp. 58,800.00 20,580.00
0.1050 org Tukang cat @ Rp. 140,000.00 14,700.00
0.0040 org Kepala tukang cat @ Rp. 130,000.00 520.00
0.0700 org Pekerja @ Rp. 100,000.00 7,000.00
0.0025 org Mandor @ Rp. 120,000.00 300.00
JUMLAH ( BELUM PPN ) 22,520.00 38,136.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 35,000.00 3,500.00
0.1000 kg Cat dasar @ Rp. 60,000.00 6,000.00
0.2600 kg Cat penutup 2 x @ Rp. 60,000.00 15,600.00
0.0630 org Tukang cat @ Rp. 140,000.00 8,820.00
0.0063 org Kepala tukang cat @ Rp. 130,000.00 819.00
0.0200 org Pekerja @ Rp. 100,000.00 2,000.00
0.0025 org Mandor @ Rp. 120,000.00 300.00
JUMLAH ( BELUM PPN ) 11,939.00 25,100.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

106. 1 m2 Mengecat 1 x cat-catan lama 10 m2


1.3 kg Cat Emco @ Rp. 58,800.00 76,440.00
2 lb kertas gosok @ Rp. 9,240.00 18,480.00
1 org tukang cat @ Rp. 140,000.00 140,000.00

Page 30
0.1 org Kepala tukang cat @ Rp. 130,000.00 13,000.00
0.67 org Pekerja @ Rp. 100,000.00 67,000.00
0.34 org Mandor @ Rp. 120,000.00 40,800.00
JUMLAH ( BELUM PPN ) 260,800.00 94,920.00
PPN BAHAN 10%
JUMLAH
Jadi 1 m2 Cat lama
SNI 1.0000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15 0.1200 kg Cat dasar @ Rp. 60,000.00 7,200.00
0.1800 kg Cat penutup 2 x @ Rp. 60,000.00 10,800.00
0.0420 org Tukang cat @ Rp. 140,000.00 5,880.00
0.0042 org Kepala tukang cat @ Rp. 130,000.00 546.00
0.0280 org Pekerja @ Rp. 100,000.00 2,800.00
0.0025 org Mandor @ Rp. 120,000.00 300.00
JUMLAH ( BELUM PPN ) 9,526.00 18,000.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

PEKERJAAN KUNCI DAN KACA

6.2 1.0000 bh Pasang kunci tanam biasa


1.0000 bh Kunci tanam biasa @ Rp. 165,451.00 165,451.00
0.5000 org Tukang kayu @ Rp. 140,000.00 70,000.00
0.0100 org Kepala tukang kayu @ Rp. 130,000.00 1,300.00
0.0100 org Pekerja @ Rp. 100,000.00 1,000.00
0.0050 org Mandor @ Rp. 120,000.00 600.00
JUMLAH ( BELUM PPN ) 72,900.00 165,451.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.5 1.0000 bh Pasang engsel pintu


1.0000 bh Engsel pintu @ Rp. 23,400.00 23,400.00
0.1500 org Tukang kayu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang kayu @ Rp. 130,000.00 1,950.00
0.0150 org Pekerja @ Rp. 100,000.00 1,500.00
0.0008 org Mandor @ Rp. 120,000.00 90.00
JUMLAH ( BELUM PPN ) 24,540.00 23,400.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.6 1.0000 bh Pasang engsel jendela kupu-kupu


1.0000 bh Engsel jendela @ Rp. 15,600.00 15,600.00
0.1000 org Tukang kayu @ Rp. 140,000.00 14,000.00
0.0100 org Kepala tukang kayu @ Rp. 130,000.00 1,300.00
0.0100 org Pekerja @ Rp. 100,000.00 1,000.00
0.0050 org Mandor @ Rp. 120,000.00 600.00
JUMLAH ( BELUM PPN ) 16,900.00 15,600.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.7 1.0000 bh Pasang engsel angin


1.0000 bh Engsel angin @ Rp. 12,350.00 12,350.00
0.2000 org Tukang kayu @ Rp. 140,000.00 28,000.00
0.0200 org Kepala tukang kayu @ Rp. 130,000.00 2,600.00
0.0200 org Pekerja @ Rp. 100,000.00 2,000.00
0.0100 org Mandor @ Rp. 120,000.00 1,200.00
Page 31
JUMLAH ( BELUM PPN ) 33,800.00 12,350.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

Page 32
6.8 1.0000 bh Pasang handle jendela
1.0000 bh Handle jendela @ Rp. 5,850.00 5,850.00
0.1500 org Tukang kayu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang kayu @ Rp. 130,000.00 1,950.00
0.0150 org Pekerja @ Rp. 100,000.00 1,500.00
0.0008 org Mandor @ Rp. 120,000.00 90.00
JUMLAH ( BELUM PPN ) 24,540.00 5,850.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.9 1.0000 bh Pasang kait angin


1.0000 bh Kait angin @ Rp. 7,150.00 7,150.00
0.1500 org Tukang kayu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang kayu @ Rp. 130,000.00 1,950.00
0.0150 org Pekerja @ Rp. 100,000.00 1,500.00
0.0008 org Mandor @ Rp. 120,000.00 90.00
JUMLAH ( BELUM PPN ) 24,540.00 7,150.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.11 1.0000 bh Pasang kunci selot


1.0000 bh Kunci selot @ Rp. 127,270.00 127,270.00
0.2000 org Tukang kayu @ Rp. 140,000.00 28,000.00
0.0200 org Kepala tukang kayu @ Rp. 130,000.00 2,600.00
0.0200 org Pekerja @ Rp. 100,000.00 2,000.00
0.0010 org Mandor @ Rp. 120,000.00 120.00
JUMLAH ( BELUM PPN ) 32,720.00 127,270.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.16 1.0000 m2 Pasang kaca, tebal 3 mm


1.1000 m2 Kaca polos @ Rp. 52,000.00 57,200.00
0.1500 org Tukang kayu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang kayu @ Rp. 130,000.00 1,950.00
0.0150 org Pekerja @ Rp. 100,000.00 1,500.00
0.0008 org Mandor @ Rp. 120,000.00 90.00
JUMLAH ( BELUM PPN ) 24,540.00 57,200.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

6.17 1.0000 m2 Pasang kaca, tebal 5 mm


1.1000 m2 Kaca polos @ Rp. 58,500.00 64,350.00
0.1500 org Tukang kayu @ Rp. 140,000.00 21,000.00
0.0150 org Kepala tukang kayu @ Rp. 130,000.00 1,950.00
0.0150 org Pekerja @ Rp. 100,000.00 1,500.00
0.0008 org Mandor @ Rp. 120,000.00 90.00
JUMLAH ( BELUM PPN ) 24,540.00 64,350.00
PPN BAHAN 10%
JUMLAH
DIBULATKAN

Page 33
FTAR ANALISA PEKERJAAN
TAHUN 2009

ANALISA SATUAN PEKERJAAN


Jumlah
(5)

51,621.80
5,162.18
56,783.98
56,783.00

1,191,980.50
57,893.05
1,249,873.55
1,249,873.00

Page 34
44,800.00

44,800.00
44,800.00

58,912.00

58,912.00
58,912.00

21,480.00

21,480.00
21,480.00

312,000.00
28,080.00
340,080.00
340,080.00

168,400.00
14,040.00
182,440.00
182,440.00

352,950.00
21,060.00
374,010.00
374,010.00

Page 35
668,002.50
41,720.25
709,722.75
709,722.00

139,417.50
9,031.75
148,449.25
148,449.00

Page 36
148,152.20
9,905.22
158,057.42
158,057.00

1,228,460.00
96,291.00
1,324,751.00
1,324,751.00

Page 37
1,004,680.00
79,183.00
1,083,863.00
1,083,863.00

1,362,300.00
57,330.00
1,419,630.00
1,419,630.00

36,322.00
3,451.50
39,773.50
39,773.00

195,116.80
9,741.68
204,858.48
204,858.00

400,000.00

400,000.00
Page 38
400,000.00

Page 39
1,324,751.00
1,988,675.00
1,024,292.40
400,000.00
4,737,718.40
4,737,718.00

Page 40
1,324,751.00
5,966,025.00
2,048,584.80
400,000.00
11,308,743.78
11,308,743.00

52,935.40
878.54
53,813.94
53,813.00

58,762.00
1,461.20
60,223.20
60,223.00

76,014.20
1,785.42
77,799.62
77,799.00

17,630.00
143.00
17,773.00
17,773.00

Page 41
17,929.00
546.00
18,475.00
18,475.00

163,834.80
6,083.48
169,918.28
169,918.00

10,411,130.00
815,113.00
11,226,243.00
11,226,243.00

13,735,880.00
1,147,588.00
14,883,468.00
14,883,468.00

10,411,130.00
815,113.00
Page 42
11,226,243.00
11,226,243.00

90,730.00
6,513.00
97,243.00
97,243.00

15,506,000.00
1,209,000.00
16,715,000.00
16,715,000.00

800,300.00
40,950.00
841,250.00
841,250.00

1,313,800.00
74,880.00
1,388,680.00
1,388,680.00

141,640.00
8,749.00

Page 43
150,389.00
150,389.00

29,991.80
1,610.18
31,601.98
31,601.00

48,953.60
3,506.36
52,459.96
52,459.00

170,116.00
10,207.60
180,323.60
180,323.00

189,449.60
12,140.96
201,590.56
201,590.00

Page 44
222,301.80
14,025.18
236,326.98
236,326.00

220,897.80
13,884.78
234,782.58
234,782.00

83,776.00
5,787.60
89,563.60
89,563.00

62,580.00
4,737.20
67,317.20
67,317.00

Page 45
50,014.00
2,411.40
52,425.40
52,425.00

62,580.00
4,737.20
67,317.20
67,317.00

238,994.70
17,559.47
256,554.17
256,554.00

238,042.70
17,464.27
255,506.97
255,506.00

64,125.00
2,762.50
66,887.50
66,887.00

Page 46
100,025.44
2,702.54
102,727.98
102,727.00

12,577.40
215.74
12,793.14
12,793.00

60,656.00
3,813.60
64,469.60
64,469.00

37,039.00
2,510.00
39,549.00
39,549.00

Page 47
355,720.00
9,492.00
365,212.00
36,521.20

27,526.00
1,800.00
29,326.00
29,326.00

238,351.00
16,545.10
254,896.10
254,896.00

47,940.00
2,340.00
50,280.00
50,280.00

32,500.00
1,560.00
34,060.00
34,060.00

Page 48
46,150.00
1,235.00
47,385.00
47,385.00

Page 49
30,390.00
585.00
30,975.00
30,975.00

31,690.00
715.00
32,405.00
32,405.00

159,990.00
12,727.00
172,717.00
172,717.00

81,740.00
5,720.00
87,460.00
87,460.00

88,890.00
6,435.00
95,325.00
95,325.00

Page 50
DAFTAR HARGA BAHAN DAN UPAH

A. UPAH
NO TENAGA KERJA SATUAN HARGA

1 Tukang batu org/hr Rp 140,000.00


2 Tukang kayu org/hr Rp 140,000.00
3 Tukang besi org/hr Rp 140,000.00
4 Tukang Cat org/hr Rp 140,000.00
5 Tukang Las org/hr Rp 140,000.00
6 Kepala tukang batu org/hr Rp 130,000.00
7 Kepala tukang kayu org/hr Rp 130,000.00
8 Kepala tukang besi org/hr Rp 130,000.00
9 Kepala tukang cat org/hr Rp 130,000.00
10 Kepala tukang las org/hr Rp 130,000.00
11 Pekerja org/hr Rp 100,000.00
12 Mandor org/hr Rp 120,000.00

B. BAHAN / MATERIAL
NO BAHAN/MATERIAL SATUAN HARGA

I BAHAN PEREKAT
1 PC (40 kg) zak Rp 75,000.00
2 PC kg Rp 1,560.00
3 PC putih kg Rp 3,575.00
4 Kapur pasang m3 Rp 227,500.00
Rp -
II BAHAN BATU ALAM Rp -
5 Pasir pasang (progo) m3 Rp 325,000.00
6 Pasir urug m3 Rp 234,000.00
7 Tanah urug m3 Rp 156,000.00
8 Batu pecah (split)2/3cm m3 Rp 325,000.00
9 Batu belah putih 15/20cm m3 Rp 117,000.00
10 Batu belah kali (hitam) m3 Rp 195,000.00
11 Kroco m3 Rp 208,000.00
12 Semen merah m3 Rp 169,000.00
13 Batu tempel hitam m2 Rp 143,000.00

III BAHAN BESI DAN ALUMUNIUM


14 Besi tulangan beton polos kg Rp 32,500.00
15 Besi tulangan beton ulir kg Rp 45,500.00
16 Besi bendrat kg Rp 26,000.00
17 Paku kg Rp 28,600.00
18 Paku biasa 1/2" - 1" kg Rp 37,180.00
NO BAHAN/MATERIAL SATUAN HARGA

19 Paku sekrup kg Rp 39,000.00


20 Paku sekrup bh Rp 1,170.00
21 Paku sumbat (paku seng) bh Rp 1,950.00
22 Paku pancing 60 x 230 kg Rp 27,300.00
23 Kawat penggantung m' Rp 1,300.00
24 Beugel, baut, angkur (baja strip) kg Rp 24,700.00
25 Rangka hollow 4x4 cm m' Rp 26,000.00
26 Profil alumunium "T" m 1 Rp 19,110.00
27 Kawat seng polos kg Rp 23,400.00
28 Ramset / dina bolt bh Rp 19,500.00
29 Akustic Armstrong 60 x 120 cm lbr Rp 33,800.00
30 List profil cornees gypsum m' Rp 27,300.00
31 Follding gate m2 Rp 474,500.00
32 Seng BJLS 20 lb. 70 cm m' Rp 41,600.00
33 Seng plat 3' x 6' BJLS 28 m' Rp 54,600.00
34 Seng plat 3' x 6' BJLS 24 m' Rp 39,000.00
35 Seng BJLS 0,30 ( 60 cm ) m' Rp 52,000.00
36 Seng BJLS 0,30 ( 90 cm ) m' Rp 78,000.00
37 Seng gelombang m' Rp 29,510.00
38 Jendela Nako bh Rp 32,500.00
39 Kawat duri kg Rp 19,500.00
40 Kawat galvanis kg Rp 22,100.00
41 Sewa Scafolding unit Rp 26,000.00
42 Sewa Grobag hr Rp 13,000.00
43 Baja profil IWF (rangka atap baja) kg Rp 22,100.00
44 Pintu besi baja m2 Rp 520,000.00
45 Jendela besi m2 Rp 292,500.00
46 Jendela besi tahan api m2 Rp 390,000.00
47 Pintu lipat m2 Rp 455,000.00
48 Sunscreen alumunium m2 Rp 227,500.00
49 Roll door m2 Rp 487,500.00
50 Pintu alumunium m2 Rp 455,000.00
51 Baja strip 2 x 3 (Teralis besi) m' Rp 39,000.00
52 Kawat harmonika m2 Rp 28,600.00
53 Kawat nyamuk m2 Rp 19,500.00
54 Kawat kassa m2 Rp 25,350.00
55 Kawat burung m2 Rp 37,180.00
56 Kusen alumunium m' Rp 156,000.00

IV BAHAN KAYU
56 Papan begesteng m3 Rp 3,575,000.00
57 Kayu tahun steger m3 Rp 2,925,000.00
NO BAHAN/MATERIAL SATUAN HARGA

58 Dolken btg Rp 17,550.00


59 Kayu meranti papan m3 Rp 9,035,000.00
60 Kayu meranti balok m3 Rp 8,606,000.00
61 Kayu jati balok cepu m3 Rp 20,800,000.00
62 Kayu jati papan cepu m3 Rp 26,000,000.00
63 Kayu jati lokal balok m3 Rp 10,400,000.00
64 Kayu jati lokal papan m3 Rp 13,000,000.00
65 Kayu bengkirai balok m3 Rp 10,075,000.00
66 Kayu bengkirai papan m3 Rp 11,700,000.00
67 Kayu kamper balok m3 Rp 9,490,000.00
68 Kayu kamper papan m3 Rp 9,750,000.00
69 Kayu kruing balok m3 Rp 7,052,500.00
70 Kayu kruing papan m3 Rp 7,475,000.00
71 Kayu glugu balok m3 Rp 5,265,000.00
72 Usuk jati cepu 5/7cm m' Rp 81,900.00
73 Usuk jati lokal 5/7cm m' Rp 58,500.00
74 Usuk bengkirai 5/7cm m' Rp 35,100.00
75 Usuk kamper 5/7cm m' Rp 31,200.00
76 Usuk kruing 5/7cm m' Rp 19,500.00
77 Usuk glugu 5/7cm m' Rp 10,400.00
78 Usuk meranti 5/7cm m' Rp 16,250.00
79 Reng jati cepu 2/3cm m' Rp 14,950.00
80 Reng jati lokal 2/3cm m' Rp 4,550.00
81 Reng jati cepu 3/4cm m' Rp 22,750.00
82 Reng jati lokal 3/4cm m' Rp 3,900.00
83 Reng bengkirai 3/4cm m' Rp 10,660.00
84 Reng kamper 3/4cm m' Rp 6,370.00
85 Reng kruing 3/4cm m' Rp 4,940.00
86 Reng bengkirai 2/3cm m' Rp 4,810.00
87 Reng kamper 2/3cm m' Rp 3,770.00
88 Reng kruing 2/3cm m' Rp 2,080.00
89 Plepet eternit m' Rp 7,150.00
90 List kayu profil m' Rp 7,150.00
91 Plat asbes (1,00 x 1,00) lbr Rp 14,300.00
92 Asbes plat m2 Rp 14,300.00
93 Gypsum board 9 mm (1,2 x 2,40) lbr Rp 76,700.00
94 Kalsiboard 3.5 mm lbr Rp 72,800.00
95 Kasa gypsum roll Rp 253,500.00
96 Tepung gypsum kg Rp 6,500.00
97 Alkasit kg Rp 22,100.00
98 Multriplek 122x244x9 lbr Rp 296,010.00
99 Plywood 4' x 8' x 4 mm lbr Rp 136,500.00
NO BAHAN/MATERIAL SATUAN HARGA

100 Teakwood 4' x 8' x 4 mm lbr Rp 126,750.00


101 Triplek m2 Rp 60,060.00
102 Bambu btg Rp 10,400.00
103 Bilik bambu m 2 Rp 32,500.00
104 Ijuk kg Rp 14,300.00

V BAHAN KERAMIK, CAMPURAN SEMAN


105 Buis beton dia. 80 cm bh Rp 65,000.00
106 Bata merah kecil bj Rp 578.50
107 Bata merah besar bj Rp 715.00
108 Genteng paris bh Rp 1,105.00
109 Genteng beton natural bh Rp 5,850.00
110 Genteng beton warna bh Rp 7,150.00
111 Genteng keramik KIA natural bh Rp 6,500.00
112 Genteng metal m 2 Rp 149,500.00
113 Paku anti karat kg Rp 28,600.00
114 Atap metal gelombang t 3,5 mm m2 Rp 175,500.00
115 Paku/skrup atap anti karat bh Rp 1,950.00
116 Nok metal bh Rp 54,600.00
117 Atap alumunium gelombang tebal 0,55 m 2 Rp 208,000.00
118 Paku hak panjang 15 cm kg Rp 28,600.00
119 Nok standar 40 cm 18 SWG 22 m 1 Rp 171,600.00
120 Sisalation / alumunium foil m 2 Rp 208,000.00
121 Plykarbhonat m 2 Rp 143,000.00
122 Besi rangka kg Rp 16,250.00
123 Bubungan genteng paris bh Rp 3,250.00
124 Bubungan genteng beton natural bh Rp 7,475.00
125 Bubungan genteng beton warna bh Rp 8,450.00
126 Bubungan gent.krmk KIA natural bh Rp 7,800.00
127 Asbes gelombang (3,00 x 1,08) lbr Rp 110,500.00
128 Asbes gelombang (2,70 x 1,08) lbr Rp 97,500.00
129 Asbes gelombang (2,40 x 1,08) lbr Rp 87,750.00
130 Asbes gelombang (2,10 x 1,08) lbr Rp 78,000.00
131 Asbes gelombang (1,80 x 1,08) lbr Rp 65,000.00
132 Asbes gelombang (3,00 x 1,05) lbr Rp 105,300.00
133 Asbes gelombang (2,70 x 1,05) lbr Rp 91,000.00
134 Asbes gelombang (2,40 x 1,05) lbr Rp 84,500.00
135 Asbes gelombang (2,10 x 1,05) lbr Rp 71,500.00
136 Asbes gelombang (1,50 x 1,05) lbr Rp 58,500.00
137 Asbes gelombang (2,5 x 0,92) lbr Rp 91,000.00
138 Asbes gelombang (2,25 x 0,92) lbr Rp 78,000.00
139 Asbes gelombang (2,00 x 0,92) lbr Rp 65,000.00
NO BAHAN/MATERIAL SATUAN HARGA

140 Asbes gelombang (1,80 x 0,92) lbr Rp 58,500.00


141 Nok stel gelombang 0,92 m' lbr Rp 35,750.00
142 Nok stel gelombang 1,05 m' lbr Rp 42,250.00
143 Nok stel gelombang 1,08 m' lbr Rp 48,750.00
144 Nok paten 0,92 m' lbr Rp 19,500.00
145 Nok paten 1,05 m' lbr Rp 22,750.00
146 Nok paten 1,08 m' lbr Rp 26,000.00
147 Nok stel rata 0,92 m' lbr Rp 22,100.00
148 Nok stel rata 1,09 m' lbr Rp 29,250.00
149 Tegel traso 30/30 m2 Rp 35,750.00
150 Tegel abu-abu 20/20 m2 Rp 29,250.00
151 Tegel abu-abu 30/30 m2 Rp 31,200.00
152 Tegel warna 30/30 m2 Rp 33,800.00
153 Tegel warna 20/20 m2 Rp 30,550.00
154 Plin ubin 10/30 bh Rp 1,625.00
155 Plin ubin 10/20 bh Rp 1,430.00
156 Plin ubin warna 10/20 bh Rp 1,820.00
157 Plin ubin warna 10/30 bh Rp 1,950.00
158 Tegel porselin m2 Rp 31,200.00
159 Keramik 40/40 m2 Rp 73,450.00
160 Keramik 30/30 m2 Rp 49,400.00
161 Keramik 20/20 m2 Rp 58,500.00
162 Keramik 20/25 m2 Rp 62,400.00
163 Keramik 10/20 m2 Rp 78,000.00
164 List Keramik dinding motif bh Rp 1,820.00
165 Keramik 30/30 berglasir m2 Rp 79,950.00
166 Keramik 20/20 berglasir m2 Rp 82,550.00
167 Stepnosing granito bh Rp 22,100.00
168 Bataco bh Rp 3,250.00
169 Conblock tebal 8 cm (K400) m2 Rp 84,500.00
170 Conblock tebal 8 cm (K300) m2 Rp 80,600.00
171 Conblock tebal 6 cm (K200) m2 Rp 58,500.00
172 Conblock tebal 8 cm (K200) m2 Rp 62,400.00
173 Conblock tebal 8 cm (K300) m2 Rp 80,600.00
174 Conblock warna tebal 8 cm (K400) m2 Rp 88,400.00
175 Conblock warna tebal 8 cm (K300) m2 Rp 84,500.00
176 Conblock warna tebal 6 cm (K200) m2 Rp 62,400.00
177 Conblock warna tebal 8 cm (K200) m2 Rp 66,300.00
178 Grassblock m2 Rp 58,500.00
179 Roster 25/25 cm bh Rp 4,875.00
180 Pipa beton dia. 15 - 20 cm bh Rp 32,500.00
181 Pipa beton dia. 60 cm bh Rp 52,000.00
NO BAHAN/MATERIAL SATUAN HARGA

182 Pipa tanah dia. 15 - 20 cm bh Rp 13,000.00


Rp -
VI PENGANTUNG DAN PENGUNCI, BAHAN KACA Rp -
183 Slot pintu bh Rp 127,270.00
184 Engsel pintu bh Rp 23,400.00
185 Engsel jendela bh Rp 15,600.00
186 Engsel jendela kecil bh Rp 12,350.00
187 Grendel jendela bh Rp 8,450.00
188 Grendel pintu bh Rp 9,100.00
189 Handle jendela bh Rp 5,850.00
190 kait angin jendela bh Rp 7,150.00
191 Kunci tanam antik bh Rp 325,000.00
192 Kunci tanam biasa bh Rp 165,451.00
193 Kunci tanam silinder bh Rp 110,500.00
194 Spring knip bh Rp 9,100.00
195 Door closer bh Rp 16,250.00
196 Door holder bh Rp 14,950.00
197 Door stop bh Rp 12,350.00
198 Rel pintu dorong bh Rp 585,000.00
199 Kunci lemari bh Rp 19,500.00
200 Kaca patri, tebal 5 mm m2 Rp 715,000.00
201 Kaca 3mm m2 Rp 52,000.00
202 Kaca 5mm m2 Rp 58,500.00
203 Kaca cermin m2 Rp 71,500.00
Rp -
VII BAHAN CAT Rp -
204 Cat meni kayu kg Rp 21,000.00
205 Cat meni besi kg Rp 23,800.00
206 Meni besi sinkromat kg Rp 28,000.00
207 Minyak cat ltr Rp 15,400.00
208 Kertas gosok lbr Rp 9,240.00
209 Dempul kg Rp 21,000.00
210 Plmeur kayu kg Rp 22,400.00
211 Plmeur tembok kg Rp 35,000.00
212 Cat kayu (kw. EMCO) kg Rp 58,800.00
213 Cat tembok (kw. CATILAC) kg Rp 60,000.00
214 Cat besi kg Rp 52,500.00
215 Cat duco kg Rp 63,000.00
216 Cat alkali resisting primer kg Rp 91,000.00
217 Cat genteng (ICI Weathershield) kg Rp 91,000.00
218 Prodo Mas 24 karat m2 Rp -
219 Thinner ltr Rp 18,900.00
220 Teak oil ltr Rp 51,100.00
NO BAHAN/MATERIAL SATUAN HARGA

221 Flincoat kg Rp 19,040.00


222 Soda api kg Rp 25,900.00
223 Sabun kg Rp 23,100.00
224 batu kambang kg Rp 16,940.00
225 Lem kayu kg Rp 11,900.00
226 Politur ltr Rp 77,000.00
227 Residu atau ter ltr Rp 11,200.00
228 Vernis ltr Rp 56,000.00
229 Kuas bh Rp 10,500.00
230 Kalkarium kg Rp 70,000.00
231 Alang-alang ikat Rp 14,000.00
232 Kapur sirih kg Rp 245,000.00
233 Wall paper m2 Rp 98,000.00
234 Perekat kg Rp 56,000.00
235 Pipa beton oval dia. 25/37,5 bh Rp 51,800.00
236 Kawat las kg Rp 58,800.00
237 Peralatan las hari Rp 280,000.00
238 Sewa alat sondir tanah hari #VALUE!
239 Sewa alat ukur hari Rp 70,000.00
240 Minyak begesteng ltr Rp 11,200.00
Rp -
VIII TAMAN Rp -
241 Gebalan Rumput m2 Rp 84,000.00
Rp -
IX BAHAN SANITASI Rp -
242 Klosed jangkok porselin bh Rp 315,000.00
243 Klosed jangkok teraso bh Rp 175,000.00
244 Urinoir bh Rp 700,000.00
245 Wastafel bh Rp 420,000.00
246 Floor drain bh Rp 11,900.00
247 Kran air 1/2" bh Rp 32,200.00
248 Pipa galvanis dia. 1/2" m' Rp 6,440.00
249 Pipa galvanis dia. 3/4" m' Rp 13,300.00
250 Pipa galvanis dia. 1" m' Rp 22,400.00
251 Pipa galvanis dia. 1 1/2" m' Rp 49,000.00
252 Pipa galvanis dia. 3" m' Rp 329,000.00
253 Pipa galvanis dia. 4" m' Rp 210,000.00
254 Pipa PVC dia. 1/2" m' Rp 4,200.00
255 Pipa PVC dia. 3/4" m' Rp 7,000.00
256 Pipa PVC dia. 1" m' Rp 9,800.00
257 Pipa PVC dia. 1 1/2" m' Rp 12,600.00
258 Pipa PVC dia. 2" m' Rp 15,400.00
259 Pipa PVC dia. 2 1/2" m' Rp 21,000.00
NO BAHAN/MATERIAL SATUAN HARGA

260 Pipa PVC dia. 3" m' Rp 23,800.00


261 Pipa PVC dia. 4" m' Rp 31,500.00
262 Pintu PVC KMD unit Rp 385,000.00
263 Klosen duduk bh Rp 2,100,000.00
264 Bak mandi porselin 60x60 bh Rp 378,000.00
265 Bak mandi fiberglass volume 0,30 m 3 bh Rp 210,000.00
266 Bak fiberglass volume 1 m air
3 bh Rp 1,750,000.00
267 Badkip bh Rp 3,500,000.00
268 Bak cuci piring stainless steel bh Rp 350,000.00
269 Bak cuci piring traso bh Rp 490,000.00
270 Seat tape bh Rp 6,300.00

Wonosari, 2009

You might also like