Position & location of Concrete Work : __________________________ A) CHECKS BEFORE CONCRETING: Date : _______________ Sr. Item Satisfactory Signature No 1 Formwork No of props and condition Level checked at locations:-
Maximum level difference :-
Gaps in plates sealed by :-
Gaps in beam bottoms sealed by :-
Shikanja Spacing confirmed Beam Side supports 2 Steel Checked as per schedule Cover blocks spacing & thickness for beams Cover block density & thickness for slabs 3 Materials Quantity Quantity Quality stacked in brass Requir ed Cement N.Sand S. dust M.sand 10 mm Agg. 20 mm Agg. Plasticiser Water 4 Instruments and Machinery reqd. a) Punjas b)Dhummas c) Ghodis d) Floats e)Thapi, Vibrator (No. ) & Condition Needles Size & No. Mixer Operating condition and fuel Lift Operating condition and fuel Weigh batcher Error L. Hopper _______R. Hopper ________ Weigh batcher Level Farmas Available at site Size & No Slope of chute above lift Walking platforms provided