CHECKLIST FOR BEAMS AND SLABS

Site: __________________________ Building:__________________________


Position & location of Concrete Work : __________________________
A) CHECKS BEFORE CONCRETING: Date : _______________
Sr. Item Satisfactory Signature
No
1 Formwork
No of props and condition
Level checked at locations:-

Maximum level difference :-


Gaps in plates sealed by :-

Gaps in beam bottoms sealed by :-


Shikanja Spacing confirmed
Beam Side supports
2 Steel
Checked as per schedule
Cover blocks spacing & thickness for beams
Cover block density & thickness for slabs
3 Materials Quantity Quantity Quality
stacked in brass Requir
ed
Cement
N.Sand
S. dust
M.sand
10 mm Agg.
20 mm Agg.
Plasticiser
Water
4 Instruments and Machinery reqd.
a) Punjas  b)Dhummas  c) Ghodis  d) Floats  e)Thapi, 
Vibrator (No. ) & Condition
Needles Size & No.
Mixer Operating condition and fuel
Lift Operating condition and fuel
Weigh batcher Error L. Hopper _______R. Hopper ________
Weigh batcher Level
Farmas Available at site Size & No
Slope of chute above lift
Walking platforms provided

Signature Signature