JSA (Job Safety Analysis) Sheet

Activity Name:- Mobile Tower Crane Erection Ref-

Location:- Date :

Sr.N Sub-Activity
Type Of Hazard Risk(s) Involved Risk Control measures
o. Name
Untrained Only inducted worker shall be deputed at the work place.
Manpower
1 worker,lack of skill Personal injury
Mobilization Given Tool Box Talk to all workers.
awareness
For proper shifting of material proper communication equipment should be provide for
proper communication.
Operator having valid driving licence.
Improper shifting of Horn & Light of the crane should be in working condition.
Personal injury,
2 Shifting of Crane material, Improper Signal man should be guide properly
Property damage
communication
Work area should be clean & clear.
Proper housekeeping should be maintained at wok area.
Work done under continuous supervision.

Hand tools should be inspected for any damage before they use & kept in proper toolkit.
Faulty hand tools
Operator having valid driving licences.
Personal injury, Banks man should be provide for giving signal.
Erection of Property damage
3 No work and worker should be deployed under suspended load.
Crane
Swing of Crane Work area should be barricaded to avoid unauthorised entry.
Work shall be carried out under supervision.
Uninspected FBSH Personal injury Only inspected FBSH having double lanyard, shock absorber should be use.
Only authorised person shall work.
Use standard tools & equipment for electrical work.
Electrical
Electrical Work All electrical accessories & cables shall be of adequate capacities.
shortciruit,shock, Electrical burn,
(if the power is All electrical connections shall be made by qualified electrician
4 fire due to short Personal Injury,
given from other Panel boards shall have ELCB,MCB.
circuit or electrical Property Damage.
out-source)
fault Oil spillage to be controlled.
Growth of grass shall be controlled near electrical installations.
All cable joints to be properly jointed and insulated.
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of Ensure proper illumination during dark hours.
Work during Personal injury,
5 person, fall of
dark hours damage to property Electrical cable should lead min 2 m height. No exposed electrical wire.Earthing.
machinery
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :____ Name & Signature of Site In-charge :___________