To carry out a pre-commencement audit with the objective of determining compliance with HSE, Quality.
Mobilization and executions plans and thereby establish whether the SUB CONTRACTOR is in a position to
commence work on the contract.
Function
DATE:
Carried Out By:
Pre Execution SUB CONTRACTOR
1 2 3 4 Priority
Designed Undeveloped Developing Developed %
Sub Contracting 0 0 0 0 0.00
Reporting of Defects for Repair / Maintenance 0 0 0 0 0.00
KFD/HSE/SURVEY/VER0/05/24/2023
EAST SHABWA YEMEN
KFD/HSE/SURVEY/VER0/05/24/2023
EAST SHABWA YEMEN
CLIENT:
SITE:
DATE:
Carried Out By:
KFD/HSE/SURVEY/VER005/24/2023
EAST SHABWA YEMEN
KFD/HSE/SURVEY/VER005/24/2023
EAST SHABWA YEMEN
KFD/HSE/SURVEY/VER005/24/2023
EAST SHABWA YEMEN
CLIENT:
SITE:
DATE:
Carried Out By:
1 2 3 4
Designed Undeveloped Developing Developed 0 24 0.00
0 0 0 0
1 Is there a procedure exists for the reporting of defects/faults?
KFD/HSE/SURVEY/VER005/24/2023