Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE

THE FINAL SUMMARY PART 1

Item Description Amount

Part 1

1 Schedule No.1: Preliminaries and General -

2 Schedule No.2: Site Preparation and Earthworks -

3 Schedule No.3: Piling Works -

4 Schedule No.4: External Structure Works -

5 Schedule No.5: Road, Foothpath and Paved Area -

6 Schedule No.6: Hardscaping Works -

7 Schedule No.7: Electrical System -

8 Schedule No.8: Lighting Fixtures -

9 Schedule No.9: Communication and Security System -

10 Schedule No.10: Sanitary and Plumbing System -

11 Schedule No.11: Fire Protection System -

12 Schedule No.12: Air-Conditioning and Ventilation System -

13 Sub-Total Direct Cost -

14 Overhead and Profit (____% of Schedule No.2 to 12) -

15 Total Amount (Exclude VAT) -

SOW_EXAT (PART 1) Page 1 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 2: SITE PREPARATION AND EARTHWORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0601 Site Preparation and Earthworks


1 0601010 Demolition of existing structures Exclude
2 0601020 Site clearance -
3 0601030 General leveling and Filling -

To Final Summary -

1 0601010 Demolition of existing structures

To Collection Exclude

2 0601020 Site clearance

2.01 Clear the site within the boundary for this contract and sum - - - - -
remove all unwanted undergrowth, shurbs, trees, bushes,
verges and hedges including grubbing up all roots and
removing debries of site and filling voids in ground with
approved earth obtained from Contractor's own source
including making good all works disturbed, etc.

2.02 Remove from site any underground obstructions using sum - - - - Included
Contractor's existing plant and equipment readily available
on site. For the benefit of doubt, any unforseen
obstructions that need to be removed by using special
plant and equipment (i.e. plant and equipment not required
for this contract works), shall be subject to further
discussion and consideration.

To Collection -

3 0601030 General leveling and Filling

Earth fill with selected materials as specified to make up


level to receive structure.
3.01 To road way and foothpath area m3 - - - - -

Allow for any other items not described above but deemed
necessary to complete the whole works:

To Collection -

SOW_EXAT (PART 1) Page 2 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 3: PILING WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0101 Piling Works


1 0101020 Equipment Mobilization -
2 0101040 Bored Pile -
3 0101060 Testing -

To Final Summary -

1 0101020 Equipment Mobilization

1.01 Allow for the provision of all necessary piling Sum - - - - -


equipment,plant, tools and ancillaries and for their
subsequenttransportation to site, handling, assembling
and erecting,subsequent dismantling and removal off site
upon completion.

Allow for any other items not described above but deemed
necessary to complete the whole works:

To Collection -

2 0101040 Bored Pile

Reinforced concrete specified cyclinder compressive


strength 32 Mpa at 28 days bored pile including survey
and setting-out, boring, extracting of temporary casing,
steel reinforcement, removing excavated materials off site
to Contractor's own dump, and all other necessary works
as specified in the drawings and specification including
but not limited to ensuring eccentricity of piles, disposal of
water etc.
(See DWG No.S-01-002)

2.01 To 800mm diameter (Cut off level _____) no - - - - -


(Required pile bearing capacity not less than 135 ton w/
SF 2.5)

Breakdown Q'ty and Rate for 1 No as follows:


2.0101 Boring m - - - - Beakdown only
2.0102 Concrete grade 30 m3 - - - - Beakdown only
2.0103 DB25 kg - - - - Beakdown only
2.0104 DB20 kg - - - - Beakdown only
2.0105 DB12 kg - - - - Beakdown only
2.0106 Back fill m3 - - - - Beakdown only
2.0107 Soil removal m3 - - - - Beakdown only

2.02 To 800mm diameter (Cut off level _____) no - - - - -


(Required pile bearing capacity not less than 135 ton w/
SF 2.5)

Breakdown Q'ty and Rate for 1 No as follows:


2.0201 Boring m - - - - Beakdown only
2.0202 Concrete grade 30 m3 - - - - Beakdown only
2.0203 DB25 kg - - - - Beakdown only
2.0204 DB20 kg - - - - Beakdown only
2.0205 DB12 kg - - - - Beakdown only
2.0206 Back fill m3 - - - - Beakdown only
2.0207 Soil removal m3 - - - - Beakdown only

2.03 To 800mm diameter (Cut off level _____) no - - - - -


(Required pile bearing capacity not less than 135 ton w/
SF 2.5)

Breakdown Q'ty and Rate for 1 No as follows:


2.0301 Boring m - - - - Beakdown only
2.0302 Concrete grade 30 m3 - - - - Beakdown only
2.0303 DB25 kg - - - - Beakdown only
2.0304 DB20 kg - - - - Beakdown only
2.0305 DB12 kg - - - - Beakdown only
2.0306 Back fill m3 - - - - Beakdown only
2.0307 Soil removal m3 - - - - Beakdown only

SOW_EXAT (PART 1) Page 3 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 3: PILING WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2.04 To 800mm diameter (Cut off level _____) no - - - - -


(Required pile bearing capacity not less than 135 ton w/
SF 2.5)

Breakdown Q'ty and Rate for 1 No as follows:


2.0401 Boring m - - - - Beakdown only
2.0402 Concrete grade 30 m3 - - - - Beakdown only
2.0403 DB25 kg - - - - Beakdown only
2.0404 DB20 kg - - - - Beakdown only
2.0405 DB12 kg - - - - Beakdown only
2.0406 Back fill m3 - - - - Beakdown only
2.0407 Soil removal m3 - - - - Beakdown only

2.05 To 800mm diameter (Cut off level _____) no - - - - -


(Required pile bearing capacity not less than 135 ton w/
SF 2.5)

Breakdown Q'ty and Rate for 1 No as follows:


2.0501 Boring m - - - - Beakdown only
2.0502 Concrete grade 30 m3 - - - - Beakdown only
2.0503 DB25 kg - - - - Beakdown only
2.0504 DB20 kg - - - - Beakdown only
2.0505 DB12 kg - - - - Beakdown only
2.0506 Back fill m3 - - - - Beakdown only
2.0507 Soil removal m3 - - - - Beakdown only

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

3 0101060 Testing

Seismic Integrity Test


3.01 To 800mm diameter x 20m bored pile no - - - - -

Static Load Test


3.02 To 800mm diameter x 20m bored pile no - - - - -

Sonic Logging Test


3.03 Sonic Logging Test (5% of total bored piles) no - - - - -

Drilling Monitor
3.04 800 mm diameter bores no - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 4 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 4: EXTERNAL STRUCTURE WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0602 External Structure Works


1 0602010 RC retaining wall -
2 0602011 Diaphragm Wall -
3 0602012 Capping beam -
4 0602020 Structure to hardscaping works Exclude
5 0602021 Column -
6 0602022 Base slab -
7 0602023 Suspended slab -

To Final Summary -

1 0602010 RC retaining wall

RC wall for pump sump area

Reinforced concrete Grade ( ) as specified:


1.01 To sump wall m3 - - - - -

Reinforcement Steel Bar


1.02 DB28 kg - - - - -
1.03 DB25 kg - - - - -

Formworks
1.04 To sump wall m2 - - - - -

Lower barrier to underpass way

Reinforced concrete Grade ( ) as specified:


1.05 To lower barrier m3 - - - - -

Reinforcement steel bar


1.06 DB28 kg - - - - -
1.07 DB25 kg - - - - -

Formworks
1.08 To lower barrier m2 - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 5 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 4: EXTERNAL STRUCTURE WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2 0602011 Diaphragm Wall

2.01 Allow for the provision of all necessary diaphragm wall sum - - - - -
equipment, plant, tools and ancillaries and for their
subsequenttransportation to site, handling, assembling
and erecting,subsequent dismantling and removal off site
upon completion.

Guide wall
2.02 To diaphragm wall m - - - - -

Diaphragm wall

Reinforced concrete min cyclinder compressive strength


300 KSC at 28 days diaphragm wall including survey and
setting-out, boring, extracting of temporary casing, steel
reinforcement, removing excavated materials off site to
Contractor's own dump, and all other necessary works as
specified in the drawings and specification including but
not limited to ensuring eccentricity of wall, disposal of
water etc.
2.03 To 800mm wide x 20m deep diaphragm wall m - - - - -

Breakdown Q'ty and Rate for 0.8m wide x 1m length x


20m depth as follows:
2.0301 Excavation m - - - - Breakdown only
2.0302 Concrete grade 300 KSC m3 - - - - Breakdown only
2.0303 DB32 kg - - - - Breakdown only
2.0304 DB16 kg - - - - Breakdown only
2.0305 Back fill m3 - - - - Breakdown only
2.0306 Soil removed kg - - - - Breakdown only

2.04 Water stop m - - - - -

2.05 Inclinometer system including installation of tube, no - - - - -


monitoring and report

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

3 0602012 Capping beam

Demolition of reinforced concrete guide wall (for


diaphragm wall) including removing debris off site to
Contractor's own dump.
3.01 To Guide wall m - - - - -

Cutting or breaking away heads of diaphragm wall to the


required cut-off level including any trimming, stripping,
exposing straightening and bending reinforcement in
position for connections and remove all debris off the site
to Contractor's own dump.
3.02 To 800mm thick diaphragm wall m - - - - -

Capping beam

Reinforced concrete 300 ksc as specified:


3.03 To capping beam m3 - - - - -

Reinforcement steel bar


3.04 DB16 kg - - - - -
3.05 DB26 kg - - - - -

Formworks
3.06 To capping beam m2 - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 6 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 4: EXTERNAL STRUCTURE WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

4 0602020 Structure to hard scaping works

To Collection Exclude

5 0602021 Column
(See DWG No. S-02-007)

Reinforced concrete Grade ( ) as specified:


5.01 To column in pump sump area m3 - - - - -

Reinforcement steel bar


5.02 DB-28 kg - - - - -
5.03 DB-12 kg - - - - -

Formwork
5.04 To column in pump sump area m2 - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

6 0602022 Ground slabs

Base slab for underpass


Note: Base slab including pumpsump area but except
suspended slab

Cutting or breaking away heads of piles not exceeding 3m


high to required level, clearing and bending projected steel
reinforcement into position and removing from site

6.01 To 800mm diameter bored piles no - - - - -

100mm thick sand bed


6.02 To underside of base slab m2 - - - - -

50mm thick lean concrete


6.03 To underside of of base slab m2 - - - - -

Waterproof membrane
6.04 To underside of base slab m2 - - - - -

Reinforced concrete Grade ( ) as specified:


6.05 To base slab m3 - - - - -

Reinforcement steel bar


6.06 DB28 kg - - - - -
6.07 DB25 kg - - - - -

Full strength screwed coupler


6.08 To base slab: DB28 no - - - - -

6.09 Formwork for forming U-ditch size 0.5m width x 0.6m m - - - - -


depth

6.1 Steel grating size 0.5m width m - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 7 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 4: EXTERNAL STRUCTURE WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

7 0602023 Suspended floor slabs

Suspended floor slabs for underpass

Reinforced concrete Grade ( ) as specified:


7.01 To ground slab m3 - - - - -

Reinforcement steel bar


7.02 DB28 kg - - - - -
7.03 DB25 kg - - - - -

Formworks
7.04 To suspended slab m2 - - - - -

Suspended floor slabs for sump area


(See DWG No.S-02-007)

Reinforced concrete Grade ( ) as specified:


7.05 To ground slab m3 - - - - -

Reinforcement steel bar


7.06 DB28 kg - - - - -
7.07 DB25 kg - - - - -

Formworks
7.08 To suspended slab m2 - - - - -

Full strength screwed coupler


7.09 To suspended slab: DB28 no - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 8 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 5: ROAD, FOOTHPATH AND PAVED AREA

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0603 Road, Footpath and paved area


1 0603010 Road works -
2 0603011 Curb -
3 0603020 Open carpark Exclude
4 0603030 Foothpath -
5 0603040 Pavement marking and stripping -
6 0603050 Signage -
7 0603060 Drainage, Manhole and RCP -

To Final Summary -

1 0603010 Road works

Subgrade
Sand embankment: Min. CBR 12%, Min. compaction 95%,
Max. dry density by modified proctor all as specified on
drawings and specification.

1.01 To underside of pavement m2 - - - - -

Subbase
Crushed rock 0.15 thick: Min. CBR 80%, Min. compaction
95%, Max. dry density by modified proctor all as specified
on drawings and specification.

1.02 To underside of pavement m2 - - - - -

Reinforced concrete pavement slab

Reinforced concrete Grade ( ) as specified:


1.03 260mm thick pavement (including broom finish) m3 - - - - -

Dowel bars
1.04 DB 25 kg - - - - -

Reinforcement steel mesh


1.05 RB9 m2 - - - - -

Formworks
1.06 To pavement edge m - - - - -

Pavement Joints all as specified:


1.07 Expansion joint m - - - - -
1.08 Longitudinal joint m - - - - -
1.09 Contraction joint m - - - - -
1.1 Transverse construction joint m - - - - -
1.11 Dummy joint m - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 9 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 5: ROAD, FOOTHPATH AND PAVED AREA

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2 0603011 Curb
(See DWG No. H-02-008)

Type "A": Reinforced concrete curb and gutter


2.01 Overall size 0.5m x 0.45m high. m - - - - -

Type "B": Reinforced concrete mountable curb


2.02 Overall size 0.2m x 0.6m high. m - - - - -

Type "C": Reinforced concrete for backside of sidewalk

2.03 Overall size 0.2m x 0.5m high. m - - - - -

Type "D": Reinforced concrete V-gutter


2.04 Overall size 0.8m x 0.25m high. m - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

3 0603020 Open carpark

To Collection Exclude

4 0603030 Foothpath

50mm thick sand bedding as specified


4.01 To sidewalk m2 - - - - -

60mm thick Interlocking paving block as specified


4.02 To sidewalk m2 - - - - Rate only

RC slab ( ) thick (Contractor to propose)


4.03 To receive sandwash m2 - - - - -

CR1: sand wash as specified:


(See hardscape DWG)
4.04 To walk way area/ foothpath m2 - - - - -
4.05 To top of pump control area m2 - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

5 0603040 Pavement marking and stripping

White reflectorized thermoplastic marking


5.01 To STA.0 + 000.000 - STA 0 + 408.820 m - - - - -

Yellow reflectorized thermoplastic marking


5.02 To STA.0 + 000.000 - STA 0 + 408.820 m - - - - -

Rumble strip
5.03 To STA.0 + 000.000 - STA 0 + 408.820 Set - - - - -

Lane indication arrows


5.04 To STA.0 + 000.000 - STA 0 + 408.820 no - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 10 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 5: ROAD, FOOTHPATH AND PAVED AREA

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

6 0603050 Signage

Traffic signage with mounting


(See DWG No. H-01-002, H-01-006 to 008)

M-4 with S-1


6.01 To before STA.0 + 000 set - - - - -

M-3 with C-4, C-7


6.02 To STA.0 + 015 LT set - - - - -

M-1 with S-17, S-18


6.03 To STA.0 + 040 LT set - - - - -

M-4 with S-13.2


6.04 To STA.0 + 050 LT set - - - - -

M-5 with C-3


6.05 To STA.0 + 130 RT set - - - - -

M-6 with 1.12


6.06 To STA.0 + 200 LT set - - - - -

M-4 with S-20


6.07 To STA.0 + 205 RT set - - - - -

M-1 with C-21


6.08 To STA.0 + 225 LT set - - - - -

M-1 with C-21


6.09 To STA.0 + 264 RT set - - - - -

M-1 with C-21


6.1 To STA.0 + 293 LT (beside road) set - - - - -

M-4 with S-1


6.11 To STA.0 + 293 LT (beside road) set - - - - -

M-6 with 1.12


6.12 To before STA.0 + 300 LT set - - - - -

M-1 with S-XX


6.13 To STA.0 + 300 LT (beside walk way) set - - - - -

M-3 with C-3


6.14 To STA.0 + 355 LT (beside walk way) set - - - - -

M-1 with C-21


6.15 To STA.0 + 359 RT set - - - - -

M-4 with S-13.1


6.16 To STA.0 + 405 RT set - - - - -

M-7 with S-16


6.17 To STA.0 + 406 RT set - - - - -

M-7 with S-18


6.18 To STA.0 + 406 LT set - - - - -

M-3 with C-13, B-7


6.19 To STA.0 + 408 RT set - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 11 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 5: ROAD, FOOTHPATH AND PAVED AREA

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

7 0603060 Drainage Structure

Manhole Structure
Manhole type "A" comprising works describe below:
1.) excavation
2.) compacted sand bedding
3.) lean concrete
4.) reinforcement concrete
5.) manhole cover
6.) steel grating cover
7.) all accessories that necessary to complete
(See DWG No.D-01-005)

For 800mm dia RCP


7.01 Overall size: 1.3m x 1.08m width x (____) high no - - - - -

For 1,000mm dia RCP


7.02 Overall size: 1.3m x 1.33m width x (____) high no - - - - -

Manhole type "B" comprising works describe below:


1.) excavation
2.) compacted sand bedding
3.) lean concrete
4.) reinforcement concrete
5.) manhole cover
6.) steel grating cover
7.) all accessories that necessary to complete
(See DWG No.D-01-006)

For 800mm dia RCP


7.03 Overall size: 1.3m x 1.5m width x (____) height no - - - - -

For 1,000mm dia RCP


7.04 Overall size: 1.3m x 1.7m width x (____) height no - - - - -

Manhole type "C" comprising works described below:


1.) excavation
2.) compacted sand bedding
3.) lean concrete
4.) reinforcement concrete
5.) manhole cover
6.) all accessories that necessary to complete
(See DWG No.D-01-007)

For 1,000mm dia RCP


7.05 Overall size: 1.65m x 1.65m width x (____) height no - - - - -

Manhole type "D" comprising works described below:


1.) excavation
2.) compacted sand bedding
3.) lean concrete
4.) reinforcement concrete
5.) manhole cover
6.) all accessories that necessary to complete
(See DWG No.D-01-008)

For 1,000mm dia RCP


7.06 Overall size: 0.8m x 1m width x (____) height no - - - - -

RCP culvert: comprising works described below:


1.) excavation
2.) compacted sand bedding
3.) lean concrete
4.) RCP culvert
5.) Backfill
6.) all accessories that necessary to complete

7.07 1.0m diameter RCP. Culvert m - - - - -


7.08 0.8m diameter RCP. Culvert m - - - - -
7.09 0.6m diameter RCP. Culvert m - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 12 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 6: HARDSCAPING WORKS

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0606 Hardscaping Works


1 0606030 Decorative Feature Work -
2 0606040 Architectural Work

To Final Summary -

1 0606030 Decorative Feature Work

Steel column (Arch)

SS1: gulvanized steel column overall size 0.3m x 0.15m x


varies length of arch with powder coated including LED
strip light, including all accessories to complete this work.

1.01 To entrance gate B1 no - - - - -

1.02 To entrance gate A10 no - - - - -

1.03 To A9 no - - - - -

1.04 To A8 no - - - - -

1.05 To A7 no - - - - -

1.06 To A6 no - - - - -

1.07 To A5 no - - - - -

1.08 To A4 no - - - - -

1.09 To A3 no - - - - -

1.1 To A2 no - - - - -

1.11 To A1 no - - - - -

To Collection -

2 0606040 Architectural Work

CR12: sand wash as specified:


2.01 To side of wall at pump control area m2 - - - - -

CR3: 0.1m thick pre-cast concrete wall cladding including


structure supporting as specified:
(See DWG No. 2101.01)
2.02 To side of wall at underpass m2 - - - - -

CR4: pre-cast concrete barrier overall size 0.3m x 0.7m


high as specified:
2.03 To driveway barrier m - - - - -

ME1: gulvanized steel with powder coated including


structure and all accessories that necessary to complete
this works as specified:
(See DWG No. 3101.01)
2.04 To cover at pump sump area m2 - - - - -

Allowance for door and hardwares overall size 1.05m x


3m high as specified:-
2.05 To pump sump area no - - - - -

Allow for any other items no described above but deemed


necessary for the completion of whole works:

To Collection -

SOW_EXAT (PART 1) Page 13 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 7: ELECTRICAL SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0501 Electrical System


1 0501070 Distribution Board and Panel Board -
2 0501080 Branch Feeder Cable and Conduit from DB to Panel -
Board and Outlets
3 0501090 Switches and Power Outlets -
4 0501110 Grounding and Lightning Protection System -
5 0501120 Miscellaneous Works -
6 0501130 Testing, Adjusting, Balancing and Commissioning -

To Final Summary -

1 0501070 Distribution Board and Panel Board

Supply, installation and fixing in position complete with all


accessories as per specification

DB : SP-02
1.01 Enclosure with busbar, wiring, control and metering parts Sum - - - - -
1.02 for
MCCBSP-02
3P 20AT/100AF Set - - - - -
1.03 CB 1P 20AT/50AF Set - - - - -
1.04 Supply pillar on Concrete foundation complete with all Sum - - - - -
accessories for SP-02

DB : SP-03
1.05 Enclosure with busbar, wiring, control and metering parts Sum - - - - -
1.06 for
MCCBSP-03
3P 100AT/100AF Set - - - - -
1.07 CB 1P 20AT/50AF Set - - - - -
1.08 Supply pillar on Concrete foundation complete with all Sum - - - - -
accessories for SP-03

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 14 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 7: ELECTRICAL SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2 0501080 Branch Feeder Cable and Conduit from DB to Panel


Board and Outlets

Supply, installation and fixing in position complete with all


accessories as per specification

IEC01 Cable
2.01 1C-16 Sq.mm. M - - - - -
2.02 Fitting and Accessories Connecting for Cable Sum - - - - -
(…….%M,L)

NYY Cable
2.03 1C-16 Sq.mm. M - - - - -
2.04 1C-4 Sq.mm. M - - - - -
2.05 1C-2.5 Sq.mm. M - - - - -
2.06 Fitting and Accessories Connecting for Cable Sum - - - - -
(…….%M,L)

LSOH Cable
2.07 1C-4 Sq.mm. M - - - - -
2.08 1C-2.5 Sq.mm. M - - - - -
2.09 Fitting and Accessories Connecting for Cable Sum - - - - -
(…….%M,L)

HDPE Conduit
2.1 Diameter 50 mm. M - - - - -
2.11 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)

IMC Conduit
2.12 Diameter 20 mm. M - - - - -
2.13 Diameter 50 mm. M - - - - -
2.14 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)

Duct bank
2.15 2-75 mm.HDPE. Compact sand ductbank M - - - - -
2.16 Excavation and Backfill Sum - - - - -

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

3 0501090 Switches and Power Outlets

Supply, installation and fixing in position complete with all


accessories as per specification

3.01 Photo switch Set - - - - -

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 15 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 7: ELECTRICAL SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

4 0501110 Grounding and Lightning Protection System

Supply, installation and fixing in position complete with all


accessories as per specification

4.01 Exothermic welding Set - - - - -

4.02 Ground rod Dia 5/8" x 2.40 M. Set - - - - -

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

5 0501120 Miscellaneous Works

Supply, Installation and fixing in position complete with all


accessories as per specification.

5.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -

5.02 Painting and Coating work Sum - - - - -

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

6 0501130 Testing, Adjusting, Balancing and Commissioning

Supply, Installation and fixing in position complete with all


accessories as per specification.

6.01 Testing, Balancing and Commissioning for Electrical Sum - - - - -


installation

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 16 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 8: LIGHTING FIXTURES

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0502 Lighting Fixture


1 0502010 General Lighting -
2 0502070 Hardscape and Soft scape Exterior Lighting -

To Final Summary -

1 0502010 General Lighting

Supply, installation and fixing in position complete with all


accessories as per specification

General lighting
@Pump station
1.01 Flood light 1 x 200W. LED IP65 Set - - - - -

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

2 0502070 Hardscape and Soft scape Exterior Lighting

Supply, installation and fixing in position complete with all


accessories as per specification

Street, Tunnel and External Lighting fixture


2.01 Type S01 : Lighting column 9 M. With <=110W.LED Set - - - - -
(>=11,500 LM) Luminaire, Single arm 1.5 M.
2.02 Type S02 : Lighting column 12 M. With <=110W.LED Set - - - - -
(>=11,500 LM) Luminaire, Single arm 2.5 M.
2.03 Type TN01 : LED Tunnel light luminaire <=274W.LED Set - - - - -
(>=24,412 LM) Aluminium housing
2.04 Type TN02 : LED Tunnel light luminaire <=40W.LED Set - - - - -
(>=3,717 LM) Aluminium housing
2.05 Type FL01 : LED Floodlight luminaire <=35W.LED Set - - - - -
(>=3,500 LM)
Die-cast Aluminium housing
2.06 Concrete foundation complete with all accessories for Set - - - - -
2.07 Type S01 foundation complete with all accessories for
Concrete Set - - - - -
Type S02
Traffic lighting
2.08 Traffic lighting : Red straight arrow-Amber-Green straight, Set - - - - -
Red right-Amber-Green right arrow with Galvanized steel
pole complete with all accessories

2.09 Concrete foundation complete with all accessories for Set - - - - -


Traffic lighting

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 17 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 9: COMMUNICATION AND SECURITY SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0503 Communication and Security System


1 0503020 IP CCTV -

To Final Summary -

1 0503020 IP CCTV

To collection -

SOW_EXAT (PART 1) Page 18 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 10: SANITARY AND PLUMBING SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0504 Sanitary and Plumbing System


1 0504090 Drainage and Sewage Submersible Pumps and Pipipng -
System
2 0504140 Miscellaneous Works -
3 0504150 Testing, Adjusting, Balancing and Commissioning -

To Final Summary -

SOW_EXAT (PART 1) Page 19 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 10: SANITARY AND PLUMBING SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

1 0504090 Drainage and Sewage Submersible Pumps and


Pipipng System

Supply, installation and fixing in position complete with


all accessories as per specification.

Under ground, Outdoor Pipe : HDPE PN10


1.01 400 mm Diameter M - - - - -
1.02 600 mm Diameter M - - - - -

1.03 Pipe fittings and connectors (…..%M,L) Sum - - - - -


1.04 Pipe hangers, support and sleeves (…..%M,L) Sum - - - - -
1.05 Excavation and Backfill Sum - - - - -

Discharge Pipe : Galvanized steel pipe


1.06 400 mm Diameter M - - - - -
1.07 600 mm Diameter M - - - - -

1.08 Pipe fittings and connectors (…..%M,L) Sum - - - - -


1.09 Pipe hangers, support and sleeves (…..%M,L) Sum - - - - -
1.1 Excavation and Backfill Sum - - - - -

Check valve
1.11 200 mm Diameter No - - - - -

Flap valve
1.12 200 mm Diameter No - - - - -

1.13 SS304 Ladder 4.40 m.Long Set - - - - -

Drainage submersible pump


1.14 DP-1, 2, 3 : Flowrate 66 LPS, Head 23 m. (by each pump) Set - - - - -

Pump control panel


1.15 Enclosure with busbar, wiring, control and metering parts Set - - - - -
for Pump control panel
1.16 MCCB 3P 400AT/400AF Set - - - - -
1.17 CB 3P 125AT/160AF Set - - - - -
1.18 CB 3P 80AT/100AF Set - - - - -

1.19 Load center 24 CKT Set - - - - -

FRC (LSOH) Cable


1.2 70 Sq.mm. M - - - - -
1.21 16 Sq.mm. M - - - - -
1.22 Fitting and Accessories Connecting for Cable (…….%M,L) Sum - - - - -

RSC Conduit
1.23 Diameter 90 mm. M - - - - -
1.24 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)

1.25 Float level switch Set - - - - -

1.26 Pump control conduit and wiring complete all accessories Sum - - - - -

1.27 Concrete foundation complete with all accessories for Set - - - - -


Pump control panel

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 20 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 10: SANITARY AND PLUMBING SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2 0504140 Miscellaneous Works

Supply, Installation and fixing in position complete with all


accessories as per specification.

2.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -

2.02 Painting and Coating work Sum - - - - -

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

3 0504150 Testing, Adjusting, Balancing and Commissioning

Supply, Installation and fixing in position complete with all


accessories as per specification.

3.01 Testing, Balancing and Commissioning for Electrical Sum - - - - -


installation

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 21 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 11: FIRE PROTECTION SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0506 Fire Protection System


1 0506010 Sprinkler and Associated Piping System -
2 0506050 Fire department connection and Fire Hose Cabinet Works -

3 0506070 Miscellaneous Works -


4 0506080 Testing, Adjusting, Balancing and Commissioning -

To Final Summary -

1 0506010 Sprinkler and Associated Piping System

Supply, installation and fixing in position complete with


all accessories as per specification.

Fire protection piping :


1.01 65 mm Diameter M - - - - -
1.02 100 mm Diameter M - - - - -

1.03 Pipe fittings and connectors (…..%M,L) Sum - - - - -


1.04 Pipe hangers, support and sleeves (…..%M,L) Sum - - - - -

Drain Pipe :
1.05 25 mm Diameter M - - - - -

1.06 Pipe fittings and connectors (…..%M,L) Sum - - - - -


1.07 Pipe hangers, support and sleeves (…..%M,L) Sum - - - - -

Check valve
1.08 100 mm Diameter No. - - - - -

Ball valve
1.09 25 mm Diameter No. - - - - -

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 22 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 11: FIRE PROTECTION SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2 0506050 Fire department connection and Fire Hose Cabinet


Works

Supply, installation and fixing in position complete with


all accessories as per specification.

2.01 Fire hose cabinet (FHC) complete with all accessories Set - - - - -

2.02 Fire department connection (FDC) complete with all Set - - - - -


accessories

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

3 0506070 Miscellaneous Works

Supply, Installation and fixing in position complete with all


accessories as per specification.

3.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -

3.02 Painting and Coating work Sum - - - - -

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

4 0506080 Testing, Adjusting, Balancing and Commissioning

Supply, Installation and fixing in position complete with all


accessories as per specification.

4.01 Testing, Balancing and Commissioning for Electrical Sum - - - - -


installation

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 23 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 12: AIR-CONDITIONING AND VENTILATION SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

Collection

0507 Air Conditioning and Ventilation System


1 0507160 Ventilation System -
2 0507190 Automatic Temperature Control -
3 0507200 Electrical Works -
4 0507210 Miscellaneous Works -
5 0507220 Testing, Adjusting, Balancing and Commissioning -

To Final Summary -

1 0507160 Ventilation System

Supply, installation and fixing in position complete with all


accessories as per specification

Jet fan (Underpass)


1.01 JF-(01-04) : Type Jet thrust fan, Capacity 12.0 m3/s, Set - - - - -
Thrust force 400 N

1.02 Supports, Hangers and Vibration Isolator Sum - - - - -

Allow for any other items not described above but


deemed necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 24 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 12: AIR-CONDITIONING AND VENTILATION SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

2 0507190 Automatic Temperature Control

Supply, installation and fixing in position complete with all


accessories as per specification

2.01 Linear heat detector control panel Set - - - - -

2.02 Carbon monoxide GAS detector Set - - - - -

2.03 Sampling module for GAS detectors / Monitors Set - - - - -

2.04 Bell Set - - - - -

2.05 Heat detector Set - - - - -

2.06 CO detector Set - - - - -

Control Cable
2.07 1P AWG 18 teisted pair shilded M - - - - -
2.08 2.5 Sq.mm. IEC01 M - - - - -
2.09 1.5 Sq.mm. IEC01 M - - - - -
2.1 2.5 Sq.mm. FRC M - - - - -
2.11 Fitting and Accessories Connecting for Cable (…….%M,L) Sum - - - - -

EMT Conduit
2.12 Diameter 15 mm. M - - - - -
2.13 Diameter 20 mm. M - - - - -
2.14 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)

IMC Conduit
2.15 Diameter 15 mm. M - - - - -
2.16 Diameter 20 mm. M - - - - -
2.17 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)

2.18 1/4" O.D. Sampling tube M - - - - -


2.19 Hanger, Support, Fitting, Accessories Connecting for Sum - - - - -
Samplong tube (…….%M,L)

2.2 Linear heat M - - - - -


2.21 Hanger, Support, Fitting, Accessories Connecting for Sum - - - - -
Linear heat (…….%M,L)

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 25 of 26


Arcadis (Thailand) Limited

ONE BANGKOK MIXED-USE DEVELOPMENT

THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)

SCHEDULE No. 12: AIR-CONDITIONING AND VENTILATION SYSTEM

RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total

3 0507200 Electrical Works

Supply, installation and fixing in position complete with all


accessories as per specification

Electrical conduit and wiring

MI Cu. Cable
3.01 3/C- 2.5 Sq.mm. M - - - - -

3.02 Fitting and Accessories Connecting for Cable (…….%M,L) Sum - - - - -

IMC Conduit
3.03 20 mm. Diameter M - - - - -

AMCC-01
3.04 Enclosure with busbar, wiring, control and metering parts Set - - - - -
3.05 for LC-CCB
MCCB 3P 200AT/250AF Set - - - - -
3.06 CB 3P 80AT/100AF Set - - - - -
3.07 CB 3P 16AT/100AF Set - - - - -

3.08 Emergency linear heat Power supply 5.0W @ 24VDC Set - - - - -

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

4 0507210 Miscellaneous Works

Supply, Installation and fixing in position complete with all


accessories as per specification.

4.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -

4.02 Painting and Coating work Sum - - - - -

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

5 0507220 Testing, Adjusting, Balancing and Commissioning

Supply, Installation and fixing in position complete with all


accessories as per specification.

5.01 Testing, Balancing and Commissioning for Electrical Sum - - - - -


installation

Allow for any other items not described above but deemed
necessary to complete the works :

To Collection -

SOW_EXAT (PART 1) Page 26 of 26