THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE
Part 1
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
To Collection Exclude
2.01 Clear the site within the boundary for this contract and sum - - - - -
remove all unwanted undergrowth, shurbs, trees, bushes,
verges and hedges including grubbing up all roots and
removing debries of site and filling voids in ground with
approved earth obtained from Contractor's own source
including making good all works disturbed, etc.
2.02 Remove from site any underground obstructions using sum - - - - Included
Contractor's existing plant and equipment readily available
on site. For the benefit of doubt, any unforseen
obstructions that need to be removed by using special
plant and equipment (i.e. plant and equipment not required
for this contract works), shall be subject to further
discussion and consideration.
To Collection -
Allow for any other items not described above but deemed
necessary to complete the whole works:
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
Allow for any other items not described above but deemed
necessary to complete the whole works:
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
To Collection -
3 0101060 Testing
Drilling Monitor
3.04 800 mm diameter bores no - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
Formworks
1.04 To sump wall m2 - - - - -
Formworks
1.08 To lower barrier m2 - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
2.01 Allow for the provision of all necessary diaphragm wall sum - - - - -
equipment, plant, tools and ancillaries and for their
subsequenttransportation to site, handling, assembling
and erecting,subsequent dismantling and removal off site
upon completion.
Guide wall
2.02 To diaphragm wall m - - - - -
Diaphragm wall
To Collection -
Capping beam
Formworks
3.06 To capping beam m2 - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
To Collection Exclude
5 0602021 Column
(See DWG No. S-02-007)
Formwork
5.04 To column in pump sump area m2 - - - - -
To Collection -
Waterproof membrane
6.04 To underside of base slab m2 - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Formworks
7.04 To suspended slab m2 - - - - -
Formworks
7.08 To suspended slab m2 - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
Subgrade
Sand embankment: Min. CBR 12%, Min. compaction 95%,
Max. dry density by modified proctor all as specified on
drawings and specification.
Subbase
Crushed rock 0.15 thick: Min. CBR 80%, Min. compaction
95%, Max. dry density by modified proctor all as specified
on drawings and specification.
Dowel bars
1.04 DB 25 kg - - - - -
Formworks
1.06 To pavement edge m - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
2 0603011 Curb
(See DWG No. H-02-008)
To Collection -
To Collection Exclude
4 0603030 Foothpath
To Collection -
Rumble strip
5.03 To STA.0 + 000.000 - STA 0 + 408.820 Set - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
6 0603050 Signage
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Manhole Structure
Manhole type "A" comprising works describe below:
1.) excavation
2.) compacted sand bedding
3.) lean concrete
4.) reinforcement concrete
5.) manhole cover
6.) steel grating cover
7.) all accessories that necessary to complete
(See DWG No.D-01-005)
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
1.03 To A9 no - - - - -
1.04 To A8 no - - - - -
1.05 To A7 no - - - - -
1.06 To A6 no - - - - -
1.07 To A5 no - - - - -
1.08 To A4 no - - - - -
1.09 To A3 no - - - - -
1.1 To A2 no - - - - -
1.11 To A1 no - - - - -
To Collection -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
DB : SP-02
1.01 Enclosure with busbar, wiring, control and metering parts Sum - - - - -
1.02 for
MCCBSP-02
3P 20AT/100AF Set - - - - -
1.03 CB 1P 20AT/50AF Set - - - - -
1.04 Supply pillar on Concrete foundation complete with all Sum - - - - -
accessories for SP-02
DB : SP-03
1.05 Enclosure with busbar, wiring, control and metering parts Sum - - - - -
1.06 for
MCCBSP-03
3P 100AT/100AF Set - - - - -
1.07 CB 1P 20AT/50AF Set - - - - -
1.08 Supply pillar on Concrete foundation complete with all Sum - - - - -
accessories for SP-03
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
IEC01 Cable
2.01 1C-16 Sq.mm. M - - - - -
2.02 Fitting and Accessories Connecting for Cable Sum - - - - -
(…….%M,L)
NYY Cable
2.03 1C-16 Sq.mm. M - - - - -
2.04 1C-4 Sq.mm. M - - - - -
2.05 1C-2.5 Sq.mm. M - - - - -
2.06 Fitting and Accessories Connecting for Cable Sum - - - - -
(…….%M,L)
LSOH Cable
2.07 1C-4 Sq.mm. M - - - - -
2.08 1C-2.5 Sq.mm. M - - - - -
2.09 Fitting and Accessories Connecting for Cable Sum - - - - -
(…….%M,L)
HDPE Conduit
2.1 Diameter 50 mm. M - - - - -
2.11 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)
IMC Conduit
2.12 Diameter 20 mm. M - - - - -
2.13 Diameter 50 mm. M - - - - -
2.14 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)
Duct bank
2.15 2-75 mm.HDPE. Compact sand ductbank M - - - - -
2.16 Excavation and Backfill Sum - - - - -
To Collection -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
To Collection -
5.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -
To Collection -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
General lighting
@Pump station
1.01 Flood light 1 x 200W. LED IP65 Set - - - - -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
1 0503020 IP CCTV
To collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Check valve
1.11 200 mm Diameter No - - - - -
Flap valve
1.12 200 mm Diameter No - - - - -
RSC Conduit
1.23 Diameter 90 mm. M - - - - -
1.24 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)
1.26 Pump control conduit and wiring complete all accessories Sum - - - - -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
2.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
Drain Pipe :
1.05 25 mm Diameter M - - - - -
Check valve
1.08 100 mm Diameter No. - - - - -
Ball valve
1.09 25 mm Diameter No. - - - - -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
2.01 Fire hose cabinet (FHC) complete with all accessories Set - - - - -
To Collection -
3.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Collection
To Final Summary -
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
Control Cable
2.07 1P AWG 18 teisted pair shilded M - - - - -
2.08 2.5 Sq.mm. IEC01 M - - - - -
2.09 1.5 Sq.mm. IEC01 M - - - - -
2.1 2.5 Sq.mm. FRC M - - - - -
2.11 Fitting and Accessories Connecting for Cable (…….%M,L) Sum - - - - -
EMT Conduit
2.12 Diameter 15 mm. M - - - - -
2.13 Diameter 20 mm. M - - - - -
2.14 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)
IMC Conduit
2.15 Diameter 15 mm. M - - - - -
2.16 Diameter 20 mm. M - - - - -
2.17 Hanger , Support and Accessories for Conduit ( …..% Sum - - - - -
M,L)
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
THE PROPOSED CONSTRUCTION OF ROAD AND UNDERPASS CONNECTING EXPRESSWAY AND ONE BANGKOK PROJECT SITE (PART 1)
RATE
ITEM CBS CODE DESCRIPTION UNIT Q'TY AMOUNT (BAHT)
Mat Lab Total
MI Cu. Cable
3.01 3/C- 2.5 Sq.mm. M - - - - -
IMC Conduit
3.03 20 mm. Diameter M - - - - -
AMCC-01
3.04 Enclosure with busbar, wiring, control and metering parts Set - - - - -
3.05 for LC-CCB
MCCB 3P 200AT/250AF Set - - - - -
3.06 CB 3P 80AT/100AF Set - - - - -
3.07 CB 3P 16AT/100AF Set - - - - -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
4.01 Block out, Opening and Sleeve for floor and wall Sum - - - - -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -
Allow for any other items not described above but deemed
necessary to complete the works :
To Collection -